Skip to main content

Toronto Data Centers: Expanding to meet your needs

Technology is driving economy in 60+ CenturyLink data centers worldwide.

Toronto offers two facilities connected via a metro ring to provide clients with a wide range of solutions, from colocation to cloud and managed services. The Markham location is our newest Canadian data center, and has 100,923 sq/ft of premium space that is Uptime Certified Tier III in both design and construction.

Data Center Locations

Take a Virtual Tour of our CH3 Data Center
What Do Your Peers Look for in a Colocation Provider?

Read the insightful white paper, "Six Important Considerations when Choosing a Colocation Provider" to find out how.

Tech Specs

Space
  • 86,758 sf
Real Estate Summary
  • Located 25 minutes from Toronto Pearson International Airport
  • One story building
  • Total building interior (sf) = 83,758
  • Raised floor (inches) = 24 and 30
Power
  • 6.6 MW
Electrical Summary
  • Enersource provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 6.6 MW
  • Minimum one fuel replenishing company
Fire Detection and Suppression Summary
  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe
Mechanical Summary
  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard Fire Detection and Suppression Summary
DOWNLOAD TECH SPECS
Space
  • 100,923 sf
Real Estate Summary
  • Located 25 minutes from Toronto Pearson International Airport
  • One story building
  • Total building interior (sf) = 100,923
Power
  • 5 MW
Electrical Summary
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Minimum two fuel replenishing companies
Fire Detection and Suppression Summary
  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system
Mechanical Summary
  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard
DOWNLOAD TECH SPECS

Latest from the Epicenter Blog

{{feed.title}}

{{feed.contentSnippet | limitTo:200}}...

READ MORE

Get Started

Request Consultation
Get Started
Call Us

SALES: 855-257-1769

SUPPORT: 888-638-6771