Skip to main content

Toronto Data Centers: Expanding to meet your needs

Technology is driving economy in 60+ CenturyLink data centers worldwide.

Toronto offers two facilities connected via a metro ring to provide clients with a wide range of solutions, from colocation to cloud and managed services. The Markham location is our newest Canadian data center, and has 100,923 sq/ft of premium space that is Uptime Certified Tier III in both design and construction.

Data Center Locations

Not all data centers are created equal.
Come explore ours.
Discover What to Look for in a Provider

Read the insightful white paper, "Six Important Considerations when Choosing a Colocation Provider" to find out how.

Not All Data Centers Are Created Equal

Use this comprehensive data center checklist to ensure that your needs are being met.

READ MORE
Connected Colocation Bundle

Find out how you can obtain the lowest total cost of ownership with the Connected Colocation Bundle.

READ MORE

Tech Specs

Space
  • 86,758 sf
Real Estate Summary
  • Located 25 minutes from Toronto Pearson International Airport
  • One story building
  • Total building interior (sf) = 83,758
  • Raised floor (inches) = 24 and 30
Power
  • 6.6 MW
Electrical Summary
  • Enersource provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 6.6 MW
  • Minimum one fuel replenishing company
Fire Detection and Suppression Summary
  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe
Mechanical Summary
  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard Fire Detection and Suppression Summary
DOWNLOAD TECH SPECS
Space
  • 100,923 sf
Real Estate Summary
  • Located 25 minutes from Toronto Pearson International Airport
  • One story building
  • Total building interior (sf) = 100,923
Power
  • 5 MW
Electrical Summary
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Minimum two fuel replenishing companies
Fire Detection and Suppression Summary
  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system
Mechanical Summary
  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard
DOWNLOAD TECH SPECS

Latest from the Epicenter Blog

CenturyLink is Winner of the DCIM Category

I am pleased to announce that the CenturyLink Asia Pacific Data Center team recently won the Data Center Infrastructure Management (DCIM) category of the 2015 Network World Asia Information Management Awards...

READ MORE

Get Started

Request Consultation
Get Started
Call Us

SALES: 855-257-1769

SUPPORT: 888-638-6771