Explore Other Data Centers:

Central Washington Data Center

Commitment to Compliance

Cyxtera is dedicated to continuously improving and maintaining compliance and standards that are critical to customers.

Great Disaster Recovery Location: Check Out Low Cost Hydropower in Central Washington

Built to maximize security, resilience utility and spend, the Moses Lake data center in Central Washington provides colocation solutions and access to multiple network providers including diverse fiber access to the CenturyLink network. This remote data center takes advantage of free air cooling and hydropower, in a low risk location that makes it an ideal spot for disaster recovery and non-latency sensitive workloads.

Our Moses Lake facility taps the abundant hydroelectric power available in Central Washington to provide more than 85 percent of the utility power supplied to this facility–making it not only a low carbon footprint hosting solution, but also one of the most cost-effective colocation options in North America. The data center will have an initial 8 megawatts but will ultimately support up to 30 MW of IT load.

Moses Lake provides the full breadth of colocation options. With over 250,000 SF of available space coupled with 40 MW Critical Load on an adjacent 11 acres, this location provides the ability to customize a data center environment by offering a build-to-suit option.

 

 

 

 

Announcements

Take a Virtual Tour of the CW1 Data Center

Data Centers

Moses Lake Data Center Locations

Locations

CW1: Moses Lake, WA

Space: 306,970 sf   Power: 40 MW

Tech Specs

CW1: Moses Lake     Space: 136,000 sf     Power: 40 MW

Real Estate Summary

  • Located in Moses Lake, central Washington
  • Former Command and Control Facility
  • (Built to Withstand a 10 Megaton Bomb at .25 Mile)
  • Geologically Stable – 2B Seismic Rating – Lowest in the Western U.S.

Electrical Summary

  • Building Served by New Utility Substation with Redundant Transformers and Feeds
  • Power density minimum (W/sf) = 175
  • Utility Power Mix to the Facility is 85% Renewable (Hydro)
  • Generator configuration = N + 1
  • Access to over 40 MW Power
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection

Mechanical Summary

  • Cooling system configuration = N + 1
  • Temperature and humidity managed to strict ASHRAE standard

More Locations

Over 60 Data Center Locations Worldwide

Latest from the EpiCenter Blog

CenturyLink
Business
@CenturyLink ENT

Resources

Get Started with Featured Resources and Tools

Get Started

SALES: 800.784.2105
SUPPORT: 888.638.6771

Get Connected. See What's Next for Business.
CenturyLink has sold its data centers and associated colocation business to a consortium led by BC Partners and Medina Capital Advisors. This move led to the creation of a bold, new company, Cyxtera Technologies, comprised of world-class talent and technology. CenturyLink will continue to work closely with Cyxtera and the same strong team that has operated the data centers successfully for years and who will continue to deliver world-class customer service and Operational Excellence for all colocation customers.