Toronto Data Centers: Expanding to meet your needs

Technology is driving economy in 60+ CenturyLink data centers worldwide.

Toronto offers two facilities connected via a metro ring to provide clients with a wide range of solutions, from colocation to cloud and managed services. The Markham location is our newest Canadian data center, and has 100,923 sq/ft of premium space that is Uptime Certified Tier III in both design and construction.

 

 

 

 

Announcements

CenturyLink reaches agreement to sell Colocation and Data Center business.

Take a Virtual Tour of our CH3 Data Center

Data Centers

Toronto Data Center Location

Location

TR1: Mississauga, Ontario

Space: 86,758 sf   Power: 6.6 MW

Tech Specs

TR1: Mississauga   Space: 86,758 sf   Power: 6.6 MW

Real Estate Summary

  • Located 25 minutes from Toronto Pearson International Airport
  • One story building
  • Total building interior (sf) = 83,758
  • Raised floor (inches) = 24 and 30

Electrical Summary

  • Enersource provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 6.6 MW
  • Minimum one fuel replenishing company

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard

TR3: Markham, ON

Space: 100,923 sf Power: 5 MW

Tech Specs

TR3: Markham, ON   Space: 100,923 sf   Power: 5 MW

Real Estate Summary

  • Located 25 minutes from Toronto Pearson International Airport
  • One story building
  • Total building interior (sf) = 100,923

Electrical Summary

  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1
  • Minimum two fuel replenishing companies

Fire Detection and Suppression Summary

  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system

Mechanical Summary

  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard

More Locations

Over 60 Data Center Locations Worldwide

Latest from the EpiCenter Blog

Disaster Recovery Planning: Preparing for Winter Weather

Chip Freund | November 30,2016

The arrival of winter means many things: family gatherings, cozy fires and warm sweaters and scarves. It also means cold weather, fewer daylight hours, the flu season and travel hazards including bitter cold and snowy and icy roads. In the … Read more…→ The post Disaster Recovery Planning: Preparing for Winter Weather appeared first on CenturyLink EpiCenter Blog.

Unleash the Power at the Gartner Summit

Drew Leonard | November 28,2016

December is always a busy month, and it’s no different here at CenturyLink. Though we enjoy occasional office holiday festivities and those extra calorie cookies and desserts like many others, we remain committed serving our data center customers and growing … Read more…→ The post Unleash the Power at the Gartner Summit appeared first on CenturyLink EpiCenter Blog.

Partners in Innovation

David Meredith | November 14,2016

Silicon Valley leads the nation as a region conducive to supporting successful start-up and global technology companies. In fact, Silicon Valley tech companies’ total GDP (gross domestic product) exceeds $535 billion and the area supports between 14,000 and 19,000 active … Read more…→ The post Partners in Innovation appeared first on CenturyLink EpiCenter Blog.

CenturyLink
Business
@CenturyLink ENT

Resources

Get Started with Featured Resources and Tools

Get Started
Request Consultation

Request Consultation

Call Us

Call Us

SALES: 800.784.2105
SUPPORT: 888.638.6771

Get Connected. See What's Next for Business.