Skip to main content

UK Data Centers: Connecting London and the South East to global markets

Inside the 60+ CenturyLink data centers around the globe, technology becomes more agile, secure and sustainable.

We augment traditional colocation solutions with a comprehensive hybrid suite of managed services and cloud, so companies can grow without barriers or penalties.

CenturyLink's portfolio of 5 UK Data Centers consists of campuses in London Docklands, Slough, and Reading, interconnected by direct low-latency fibre routes. The two London Data Centers provide proximity to key financial trading and foreign exchange platforms, as well as providing hosting facilities to London's growing legal and professional services sector. The Slough and Reading facilities are ideally situated for the Hi Tech sector located along the M4 corridor and the geographical distribution of our secure UK Data Centers make CenturyLink an intelligent choice for clients seeking fully resilient dual data center solutions and disaster recovery services.

Data Center Locations

Explore Our Rock-Solid Data Centers
What Do Your Peers Look for in a Colocation Provider?

Read the insightful white paper, "Six Important Considerations when Choosing a Colocation Provider" to find out how.

Tech Specs

Space
  • 69,539 sf
Real Estate Summary
  • Located near London Heathrow International Airport; 15 minutes from London
  • Two story building
  • Total building interior (sf) = 69,539
  • Raised floor (mm) = 800
Power
  • 13.5 MW
Electrical Summary
  • Southern Electric provides power feeds
  • Power density minimum (W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 13.5 MW
  • Minimum one fuel replenishing company
Fire Detection and Suppression Summary
  • VESDA provides early warning detection
Mechanical Summary
  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard
DOWNLOAD TECH SPECS
Space
  • 34,850 sf
Real Estate Summary
  • Located near London City and Heathrow Airports; 20 and 50 minute drive from London
  • Two story building
  • Total building interior (sf) = 34,850
  • Raised floor (mm)=600
Power
  • 1.5 MW
Electrical Summary
  • Southern Electric provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 1.5 MW
  • Minimum one fuel replenishing companies
Fire Detection and Suppression Summary
  • VESDA provides early warning detection
  • FM 200 sprinkler system
Mechanical Summary
  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard
DOWNLOAD TECH SPECS
Space
  • 14,488 sf
Real Estate Summary
  • Located near London City and Heathrow Airports; 20 and 50 minutes from London
  • Eight story building
  • Total building interior (sf) = 14,488
  • Raised floor (mm) = 400
Power
  • 7 MW
Electrical Summary
  • UKPN provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 7 MW
  • Minimum one fuel replenishing companies
Fire Detection and Suppression Summary
  • VESDA provides early warning detection
  • FM 200
Mechanical Summary
  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard
DOWNLOAD TECH SPECS
Space
  • 110,864 sf
Real Estate Summary
  • Located near London Heathrow International Airport; 15 minutes from London
  • Two story building
  • Total building interior (sf) = 110,864
  • Raised floor (mm) = 800
Power
  • 13.5 MW
Electrical Summary
  • Southern Electric provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 13.5 MW
  • Minimum one fuel replenishing company
Fire Detection and Suppression Summary
  • VESDA provides early warning detection
  • Pre-Action system utilizes two detection methods; one ionized and one photo electric detector interlocked with the dry pipe sprinkler system
Mechanical Summary
  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard
DOWNLOAD TECH SPECS
Space
  • 308,405 sf
Real Estate Summary
  • Located near London Heathrow International Airport; 15 minutes from London
  • Two story building
  • Total building interior (sf) = 308,405
  • Raised floor (mm) = 600 and 800
Power
  • 6 MW
Electrical Summary
  • Southern Electric provides power feeds
  • Power density minimum(W/sf) = 150
  • Generator configuration = N + 1
  • Total Power Capacity = 6 MW
  • Minimum one fuel replenishing company
Fire Detection and Suppression Summary
  • VESDA provides early warning detection
Mechanical Summary
  • Cooling system configuration = N +1
  • CenturyLink manages temperature and humidity to strict ASHRAE standard
DOWNLOAD TECH SPECS

Latest from the Epicenter Blog

{{feed.title}}

{{feed.contentSnippet | limitTo:200}}...

READ MORE

Get Started

Request Consultation
Get Started
Call Us

SALES: 855-257-1769

SUPPORT: 888-638-6771