Loop Qualification and Raw Loop Data - CLEC Job Aid
Course Description
This job aid provides CLECs with guidance on the appropriate use of IMA Loop Qualification Tools, the IMA Raw Loop Data Tool, and the Wire Center Raw Loop Data Tool for Loop Qualifications. This job aid may also be used as a guide for the qualification of DSL. The tools described in this job aid support the pre-order functions for 2/4 wire non-loaded loops, Asymmetrical Digital Subscriber Loop (ADSL) compatible loops, Integrated Switched Digital Network (ISDN) Basic Rate Interface (BRI) capable loops, xDSL-I capable loops, Line Sharing, Line Splitting, Loop Splitting, and Shared Distribution Loops.
Note: This job aid does not contain information for HICAP Service requests or Design Service requests (see the IMA User's Guide).
Course Objectives
While using this job aid you will be able to:
- Describe the terms of Facility Availability, Loop Qualification and Raw Loop Data
- Describe the likes and differences of Loop Qualifications and Raw Loop Data queries
- Navigate the IMA Loop Qualification tools, and Raw Loop Data tools
- Obtain Raw Loop Data from the Wire Center and IMA Raw Loop Data Tools
Prerequisites
- Basic Telephony course and/or equivalent industry experience
- Working knowledge of CenturyLink™ IMA ordering system
- A CLEC end-user must have telecommunication engineering knowledge to interpret the significance of raw loop data
- IMA GUI
- Local CenturyLink 101 "Doing Business with CenturyLink"
Audience
The target audience for this job aid is primarily CLECs and External Customers.Course Registration
It is not necessary to register to obtain and use this job aid. Please click on the link below to download the job aid.