Archived System CR 25379 Detail

 
Title: Enhancement to accept and format orders for LSR requests with ACT=T for Unbundled Loop.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25379 Completed
7/18/2002
-   3/10 IMA UBL
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark
Description Of Change
Implements flowthrough for LSR requests with ACT=T (transfer) for Unbundled Loop and Unbundled Loop with number port. This CR is related to the Electronic Flow-through Performance Indicator Definition (PIDs PO2A and B). Colorado Docket 01I-041T. PID definitions can be found at http://www.nrri.ohio-state.edu/oss/master/perform/perform.htm

The benefit to CLECs is that errors are caught earlier in the process and reduces the likelyhood that the CLEC customer will be impacted.

Qwest systems will create correctly formatted service orders for UBL requests with an ACT=T that will be accepted by the Service Order Processing systems. As part of this solution, IMA needs to validate that the CFA and NC codes submitted on the LSR have not changed from the CFA and NC codes currently on the end user CSR.

However, the Co-Provider has the option of populating either the CFA on the LS form or the APOT on the LSR form. When the APOT is filled out, there is nothing of similar format on the CSR to validate against, so the LSR must be dropped to manual handling.

Included in Scope

1. Unbundled Loop requests with Reqtype =AB and ACT=T are in scope.

2. Unbundled Loop NC codes of LX--, LX-N, LXR- are currently in scope.

Status History

Date Action Description
10/18/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Clarification Meeting Held CR was clarified at the monthly CMP meeting. 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting, status changed to development 
10/25/2001 Qwest Response Issued Qwest response included with CLEC prioritization request 
10/31/2001 Release Ranking Ranking for Release 10.0; 25379 is "Above the Line" 
1/17/2002 Status Changed CR # 25379 status updated to 'Packaged' for 10.0 
1/17/2002 Discussed at Monthly CMP Meeting CR # 25379 discussed during 10.0 Packaging Presentation 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development 
3/21/2002 Discussed at Monthly CMP Meeting 25379 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting 25379 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/25/2002 Status Changed Status set to CLEC Test 
7/18/2002 Discussed at Monthly CMP Meeting 25379 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/18/2002 Status Changed Status updated to Completed 

Project Meetings

CenturyLink Response

Qwest is concerned that there is no CR Type that clearly encompasses these CRs. Qwest believes these CRs are most closely aligned with the Regulatory Change CR type. Qwest proposes to address this concern during the next Redesign Working Session.