Wholesale: Products & Services

2002 Archived Product/Process CMP's in One File

Open Product/Process CR PC013002-1 Detail

 
Title: Removing Bridge Taps from LADS circuits
CR Number Current Status
Date
Area Impacted Products Impacted

PC013002-1 Denied
3/20/2002
Resale - Private Line
Originator: Worden, Doug
Originator Company Name:
Owner: Houston, Neil
Director:
CR PM:

Description Of Change

Need to have LADS circuits designed with no bridge taps or be able to remove bridge taps.

Modification after Clarification Meeting:

Establish a process to request the removal of bridge-taps.


Status History

01/30/02 - CR Submitted byVanion Inc.

01/30/02 - CR acknowledged by P/P CMP Manager.

02/04/02 - Contacted Doug Worden at Vanion, Inc to schedule meeting time availability for Clarification Meeting.

02/06/02 - Conducted Clarification Meeting with Vanion, Inc.

02/11/02 - Issued Clarification Meeting Minutes to Vanion, Inc.

02/20/02 - CMP Meeting - CLEC Community Clarification held. It was agreed that the CR would move to Evaluation. Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package 03/20/02.

03/13/02 - Issued Qwest's Draft Response dated March 8, 2002 to Vanion.

03/20/02 - CMP Meeting - Qwest presented its Draft Response dated March 8, 2002. The participants agreed that the response was a Deny. Qwest to contact Vanion, who was not in attendance, and inform them of their options.

03/22/02 - Formal response dated March 8, 2002 issued to CLECs. Notification CMPR.03.22.02.F.01240.CR_Responses.

03/28/02 - Telephone conversation with Doug Worden, Vanion - Qwest advised that the response was a deny and there was an escalation process he could pursue if he wanted. He indicated that he would let the response go and they were looking into other avenues.


Project Meetings

CLEC Change Request Clarification Meeting

February 6, 2002 9:00 a.m. (MT) Conference Call 877-564-8688 PC013002-1, Removing Bridge Taps from LADA Circuits

Attendees:

Ric Martin, Qwest Neil Houston, Qwest Jeff Cook, Qwest Cindy Buckmaster, Qwest (Part Time) Steve Kast, Qwest (Follow-up conference call) Doug Worden, Vanion, Inc.

Introduction of Attendees Introductions of the participants on the Conference Call were made and the purpose of the call discussed.

Review Requested (Description of) Change Doug advised that on LADA Circuits, which are for low speed data, but can handle high speed they want the ability to request the removal of bridge taps is requested. Doug clarified that LADA was 2-wire dry pair cable. Qwest indicated that this was data/data non-load service. It was clarified that this was for point to point service passing through the same wire center. Doug indicated that he had no way to order repair and provided an example of where Qwest moved a pedestal and added a bridge-tap, which has disrupted a customer’s service. Doug clarified that for this service Vanion was reselling Private Line services for High-Speed data. He also indicated that Vanion was also a Facility Based CLEC. Cindy Buckmaster joined the call and explained the Line Condition that can be ordered for UBL. However, she indicated that we need to review what was offered for Resale Qwest unable to bring Freddie Pennington, Wholesale Product Manager for Resale, into the call. Qwest indicated that they would coordinate internally and may get Doug back on an additional clarification meeting. Doug indicated that it was OK to have the CR follow the normal process, but wanted Qwest to investigate his trouble ticket CD328473 which was closed and was escalated. Doug advised that Steve Kast, Vanion Service Manager, was involved. Qwest advised that if they caused the problem and were responsible to fix it, they would look into it further. Note: it was clarified further with Doug Worden, Steve Kast and Ric Martin that Qwest was not committing to correcting the problem, but would look into it further to see if there was anything else that could be done.

Confirm Areas & Products Impacted It was confirmed that the product was for Resold Private Line . Confirm Right Personnel Involved Network personnel would be involved, but it was agreed that Process person should be the Owner. Qwest will coordinate.

Identify/Confirm CLEC’s Expectation It was confirmed that Vanion was looking for a process to request the removal of a bridge tap.

Identify any Dependent Systems Change Requests None

Establish Action Plan (Resolution Time Frame) Qwest will look into the Trouble Ticket Qwest will coordinate internal reviews of the CR.


CenturyLink Response

March 8, 2002

Vanion, Inc. Doug Worden Provisioning Manager

SUBJECT: Qwest’s Change Request Response - CR #PC013002-1 Removing Bridged Taps from LADS circuits

This letter is in response to Vanion Inc.’s Change Request PC013002-1 requesting a process for CLECs to request the removal of Bridge Taps from Local Area Data Service (LADS) circuits.

Local Area Data Service (LADS) is ordered in the Colorado Tariffs. Specifically LADS is offered in “Private Line Transport, Services Tariff, COLO. P.U.C. No. 19, Section 5.2”. LADS is described in Section 5.2.4, A.:

Service is offered only for balanced transmission of data signals conforming to the signal power limitations and other parameters specified in the applicable Technical Reference. These circuits are furnished on either a two-wire or four-wire basis, over non-loaded, metallic cable facilities.

Note the facility is non-loaded, but no reference is made to Bridged Tap. Additionally Section 5.2.4, C., 4. states:

No repair will be performed to change the electrical characteristics of the circuit, if they are within the parameters specified in the Technical Publication.

The General Regulations section of COLO. P.U.C. No. 19, Section 2.1.8 states:

It is expressly declared that metallic facilities are in continually decreasing supply and the Company is not obligated to continue to provide such facilities. Due to facility rearrangements, continued use of metallic facilities may be denied to existing customers with no obligation on the Company’s part to pay customer rearrangement costs.

As referenced above, Qwest’s Technical Publication 77314, Local Area Data Service (LADS), Issue C, July 2001 supports the Colorado Tariff on LADS. In addition to qualifying the LADS technical parameters, the General Section 1. states:

The customer should also be aware that Qwest has no obligation to continue to provide this service if suitable facilities are no longer available. Non-availability of suitable facilities may be caused by the continuing need to add new central offices and to transfer areas between serving wire centers, and the increasing use of Digital Loop Carrier technology on lines between the serving wire center and customer locations.

Vanion has stated that their high-speed data has deteriorated with changes in Qwest’s Network, allegedly from the addition of bridged tap to the circuit. LADS is not designed for high-speed data transmission and is not dependent upon the absence of bridged tap. As referenced above, in the Colorado Tariff and Technical Publication 77314, facility rearrangements could impact existing service. Also, as long as the service is within its technical parameters, repair is not required and will not be performed.

Qwest offers a variety of Unbundled Loop products that should meet Vanion’s transmission requirements. These include 2/4/ Wire Non-Loaded Loop, Basic ISDN Capable Loop, DS-1 Capable Loop, and the ADSL Qualified Loop.

Qwest will provide Vanion LADS service as described in its tariffs and technical publications. However, since LADS is not a high speed data service, Qwest declines to initiate a process to remove bridged tap from LADS and respectfully denies Vanion, Inc’s change request.

Sincerely,

Neil G. Houston Staff Advocate-Policy & Law Qwest

Cc: Mary Retka Kathleen Lucero Barry Orrel Jamal Boudhaouia


Open Product/Process CR PC061302-1 Detail

 
Title: Process for ordering Megabit DSL service to connect to Mega Central hubs now installed.
CR Number Current Status
Date
Area Impacted Products Impacted

PC061302-1 Denied
8/21/2002
Pre-Ordering, Ordering, Provisioning Private Line (Megabit DSL Lines)
Originator: Worden, Doug
Originator Company Name:
Owner: Van Dusen, Janean
Director:
CR PM:

Description Of Change

Need to be able to order a new line and megabit service on the same order (LSR) and know that the circuit will be conditioned to provide the DSL service. Without having to do line sharing. Especially when the CO offers MegaBit DSL and the customer has existing lines that already qualify for DSL.


Status History

06/12/02 - CR Submitted by Vanion.

06/13/02 - CR acknowledged by P/P CMP Manager.

06/13/02 - Contacted Vanion to coordinate available times for clarification meeting.

06/18/02 - Conducted Clarification Meeting with Vanion, Inc.

06/25/02 - Issued Clarification Meeting minutes to Vanion. Inc.

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status "Clarification" was not changed.

08/14/02 - Issued Qwest's Draft Response dated August 12, 2002 to Vanion.

08/21/02 - CMP Meeting - Qwest presented its Draft Response dated August 12, 2002. Vanion was not present. Qwest will confirm deny response with Vanion. Minutes on this CR to be posted to the Project Meetings section.

08/22/02 - Confirmed with Doug Worden that Qwest's response was a deny. He expressed concern that he was really looking for line conditioning on a POTS line before ordering. Ric Martin advised that the response referenced a previous CR for that request, which was denied. He understood Qwest's response.


Project Meetings

08/21/02 August CMP Monthly Meeting Minutes

Qwest advised that since Vanion was not on the call, Qwest would get with Vanion independently to go over the response. Qwest reviewed its draft response with the CLEC participants. Eschelon asked how many calls does the retail customer have to make to get DSL. Qwest advised that one call is made and Qwest follows up with the customer after POTS is in service. Eschelon stated that CLECs do not get a follow-up call and the retail customer doesn’t have to call back to get DSL. Qwest confirmed that comment. Eschelon asked if this was a deny and Qwest confirmed that it was.

07/17/02 - July CMP Meeting Minutes: Vanion had to leave the CMP meeting early and asked that their CR be rolled over to the August CMP meeting for presentation. CR status is clarification.

CLEC Change Request Clarification Meeting

June 18, 2002, 11:30 a.m. (MT) Conference Call 877-564-8688 PC061302-1, Process for ordering Megabit DSL service to connect to Mega Central Hubs now installed.

Attendees: Ric Martin, Qwest Cindy Buckmaster, Qwest Jeff Cook, Qwest Steve Kast, Qwest Doug Worden, Vanion, Inc. Becky Watson, Vanion, Inc.

Introduction of Attendees Introductions of the participants on the Conference Call were made and the purpose of the call discussed

Review Requested (Description of) Change Doug reviewed Vanion’s CR. He indicated that they wanted to put in one order (LSR) for Megabit DSL service and POTS. Becky clarified that Vanion was not collocated in Qwest facilities and was not interested in the Line Sharing product. They wanted to order on the customer’s behalf. They would like to order a 1FB with DSL. They want to be able to take the customer out of dealing with Qwest. Becky indicated they currently can’t offer the DSL product because it’s a moving target on whether facilities would be available. Cindy indicated that data would not be available only if the facility can’t support it. Becky confirmed they were only interested carrying data and having Qwest as the voice provider. Cindy clarified that Vanion is looking to be able to provision the POTS circuit on copper cable versus pair gain capable to allow data service.

Confirm Areas & Products impacted It was confirmed that the area impacted was Pre-Ordering, Ordering and Provisioning. The product impacted are Resale POTS and Megabit DSL.

Confirm Right Personnel Involved Qwest indicated that they would need to include their Resale SMEs, Janean Van Dusen and Stacy Hartman.

Identify/Confirm CLEC’s Expectation Vanion’s expectation is to be able to place one LSR and be able to provision DSL on the POTS line ordered.

Identify any Dependent Systems Change Requests There are no related Systems CRs. Qwest advised that there was a similar CR issued by Eschelon, PC122701-2. Qwest requested Vanion to review the Archive Interactive Report for the CR and Qwest’s response.

Establish Action Plan (Resolution Time Frame) The CR will have the collective CLEC clarification and SME input at the July CMP meeting.


CenturyLink Response

August 12, 2002

Doug Worden Provisioning Manager Vanion, Inc.

SUBJECT: Qwest’s Change Request Response - CR #PC061302-1 Process for ordering Megabit DSL service to connect to Mega Central hubs now installed

This letter is in response to Vanion’s Change Request PC061302-1 requesting that they be allowed to place one LSR and be able to provision DSL on the POTS line ordered.

Vanion’s Change Request is similar to two (2) previously submitted Change Requests, PC122701-1, Qwest to offer line conditioning to qualify a loop for Qwest resale DSL service, and PC122701-2, Qwest to allow 1FB POTS and DSL on one LSR.

Qwest’s response to the two previous Change Requests was that basically the service was not offered to Qwest Retail customers and, therefore, was not going to be offered to Resale customers. Qwest’s responses to each CR can be reviewed in Qwest’s Product/Process CR Archive Report located at URL http://www.qwest.com/wholesale/cmp/archive.html. After additional review, Qwest’s position remains the same. It is not technically and economically feasible for Qwest Retail to offer this service at this time. Qwest does not offer pre-qualification of facilities for DSL prior to the end user’s line being in place. Current process for Retail and Resale is that two (2) orders must be issued. One (1) for the POTs and one (1) for the DSL once the POTS line is loop qualified.

At last month's CMP meeting, there was a question on the Retail process for ordering POTS and DSL. The Retail process does require 2 orders, whether it is an N (new) order or a T (transfer) order. If the end user is interested in DSL, then after the N or T order is installed, a Loop qualification is done on the N (telephone number) or the T (telephone number) and the end user is contacted to place the 2nd order, which would be a C (change) order to add the DSL service.

Sincerely,

Janean Van Dusen (801) 239-4305

Cc:


Open Product/Process CR PC062602-2 Detail

 
Title: Rejects on CLEC to CLEC Reuse of Facilities orders for no circuit IDs found
CR Number Current Status
Date
Area Impacted Products Impacted

PC062602-2 Completed
4/15/2009
Ordering, Provisioning LNP, Unbundled Loop, UNE, Loop
Originator: Mendoza, Lori
Originator Company Name: Allegiance
Owner: Urevig, Russell
Director:
CR PM: Thomte, Kit

Description Of Change

While there is a process in place to be able to submit CLEC to CLEC reuse of facilities orders without providing circuit ID information, 90% of the orders submitted by Allegiance since late May 2002 are being rejected for various erroneous and invalid reasons regarding the circuit ID information. While working through these rejected orders with Russ Urveig, it was discovered that the process currently in place for Qwest’s SDCs to find working circuits needs to be redesigned, job aides need to be changed, and the SDCs need more training. While Allegiance received rejects for “no working circuits at end user address”, “unable to validate address to find circuits that are working”, and “these numbers on this LSR are ported to XXX Company” – Russ was able to locate working, reusable UNE DS0 Circuits.

While some of the rejects proved out that there were no reusable UNE DS0 circuits, the reject reasons did not clearly state the true circumstances. For example one reject stated “no working circuits found”. When further researched, it was found that there were indeed working circuits there but the only working circuits for the End User were DS1s.

Allegiance would also like to collaboratively work with Qwest and other CLECs to establish clear, definitive reject reasons for CLEC to CLEC reuse of facilities orders to insure that all resources available to the SDCs have been utilized to find working circuits. When Allegiance submits CLEC to CLEC reuse of facilities orders, we already have obtained a CSR from the CLEC so we know the numbers we are porting are indeed working on some kind of circuit. These reject reasons should be clear enough to insure the CLEC that there are indeed no working UNE DS0 circuits to reuse. As stated above some of the orders rejected did indeed have available working UNE DSO circuits that could be reused. Allegiance currently does not have confidence that the SDC’s reject reasons are valid and their training is adequate to locate reusable UNE DS0 circuits. In many instances we are having to drop new loops in order to take the customer when there are reusable loops available. Installing new loops is more expensive, more time consuming for the cut over, and there is the risk the orders will be held for lack of facilities. The ability to “reuse” facilities is less expensive, the cut over process is less time consuming, and the end user has less down time.

Expected Deliverable:

Clear, definitive reject reasons that the CLECs can rely on that all resources were utilized to “find” working UNE DS0 circuits for CLEC to CLEC reuse of facilities orders.


Status History

06/26/02 - CR Submitted by Allegiance.

06/26/02 - CR acknowledged by P/P CMP Manager

06/28/02 - CR Posted to Web

07/01/02 - Clarification meeting scheduled

07/03/04 - Clarification meeting held

07/10/02 - Meeting minutes distributed to Allegiance

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status remains as "Clarification"

08/06/02 - Held additional session with Allegiance regarding comment and scenarios associated with reject reasons

08/14/02 - Sent Draft Response to Allegiance

08/21/02 - August CMP Meeting - Meeting minutes posted to this CR's Project Meetings section and the CMP Web site. The CR status changed to "CLEC Test"

09/18/02 - September CMP Meeting - Status remains as "CLEC Test" Meeting minutes posted to this CR's Project Meetings section and the CMP Web site.

10/03/02 - Contacted Alex with Allegiance to inform him of action item that Allegiance had from the September Product and Process meeting.

10/16/02 -October CMP Meeting: This CR will remain in "CLEC Test" Meeting minutes posted to this CR's Project Meetings section and the CMP Web site. Approval given to close this off line with concurrence from Lori at Allegiance.

10/18/02 - Contacted Allegiance to follow up on potential closure of this CR.

10/23/02- Received message from Allegiance that this CR could be closed based on information that Lori had received from within Allegiance.


Project Meetings

Qwest requested that Allegiance research to determine if Allegiance personnel is receiving the comments that were agreed to. Attendees agreed that this could be closed off line if Allegince (Mendoza) agreed.

09/18/02 September CMP Meeting The improved comments associated with rejects on CLEC to CLEC Reuse of Facilities were implemented on August 23. The response indicated it was implemented on August 22. Qwest will update the status history to reflect the actual date. Allegiance (Wicks) indicated they were unaware that the process was underway, Terry will check with his people to find out. Eschelon (Johnson) indicated they had encountered a couple of problems with the process, Russ worked through these issues for them. This CR will remain in “CLEC Test” until the October meeting when it is anticipated that the CR will be updated to "Completed."

- 08/21/02 - August CMP Meeting Minutes Qwest (Urevig) reviewed the three scenarios and comments that are associated with the reject reasons. Allegiance (Wicks) inquired about the second scenarios comments. Are they intended to be two separate or one comment? Qwest indicated that they are two distinct comments. This CR was moved to "CLEC Test".

"Wicks, Terry" , Kathleen Thomte/Mass/USWEST/US@USWEST cc: Cheri Hurless/GROUPWARE/USWEST/US@USWEST

Subject: CR

I wanted to get back to you with the different type of comments we are looking at placing on the rejected CLEC to CLEC migrations request, during our last meeting we determined there were 4 different types of rejects which would require different comment.

1. Wrong type of circuit being requested does not match what was requested by CLEC. 2. Multiple circuits at customer location not all circuits being migrated. 3. No circuits found for migration 4. CLEC to CLEC reuse of facility show detail of which CLEC migration is from (This is probably going to be included in the first scenario).

These are the scenarios and the comments that will reject will contain, I combined the 2 and 3

1. When Qwest finds the circuit at the requested address is NOT the same type of circuit to which the migrate has been requested, the comment remark associated with this will read: Circuits at request address do not match the type of circuit indicated on the LSR for migration. The circuits found are (ex. LX-N or AD--, HCE-, etc)

2. Multiple circuits are found at the requested address, if the number of circuits at the address do NOT match the number of migrations indicated on the LSR. It is very important that the CLEC indicate who the OLSP (old local service provider) is when requesting migration because this will aid in determining whether multiple circuits are really an issue. Qwest will provide these comment remarks for the reject: Multiple circuits have been identified at request address, circuits are currently not those of the indicated OLSP or Multiple circuit have been identified for the OSLP but do not match the number of loops requested for migration.

3. Qwest has searched all available records to identify circuits at end user address, but was NOT able to identify circuit for migration. Qwest will review all data on LSR to obtain circuits to be migrated. Additional data that is recommended to aid in the migration request are: the TN that is being ported to the NLSP’s (new local service provider) switch and the name of the OLSP. If Qwest can NOT find the circuits, the following comment remarks will be provided on the reject: Qwest has search for circuits at the requested address, using the end user name, address, OLSP, and TN provided. Qwest can not find circuits please verify data on LSR for accuracy.

If these cover additional comments or consistent comments will help the CLEC determine the reason for the reject I will place these into the Job aid for Migration then cover this with the SDC's, coaches, SME's and SDC to make sure everyone has the same understanding.

If you have any comments or concerns maybe we can talk or discuss this at the next CMP meeting.

August 12, 2002

Terry Wicks Allegiance Russ Urevig Qwest Kit Thomte Qwest

Notes from follow up meeting: PC062602-2 Rejects on CLEC to CLEC Reuse of Facilities order for no Circuit Ids found. Qwest agreed to hold follow up meeting to collaborate with Allegiance regarding comments associated with reject reasons.

The team agreed that Russ would put together proposed comments for Terry to review. The group also agreed to talk through on the call what the 3-4 scenarios are that exist that could drive the comments.

1. Wrong type of circuit being requested does not match what was requested by CLEC. 2. Multiple circuits at customer location not all circuits being migrated. 3. No circuits found for migration 4. CLEC to CLEC reuse of facility show detail of which CLEC migration is from (This is probably going to be included in the first scenario).

The team agreed that Russ would put together scenarios and new comments for Terrys review.

07/17/02 - July CMP Meeting Minutes: Allegiance (Wicks) reviewed the CR and indicated that his representatives were not using the prescribed process. When analyzed he discovered that the reject reasons did not really make sense. Through discussions with Qwest it appeared that our SDC need access to a special database. Qwest and Allegiance will review the reject reasons to help clarify them. Qwest will provide an initial response prior to the August meeting. This CR will carry a “Clarification” status

Date: July 3, 2002 Place: 1005 17th St Room 1770-C Call-In No.: 877 550-8686 PC062602-2 CR No.:PC062602-2 CLEC Change Request Clarification Meeting

Attendees Name/Company: Terry Wicks Allegiance Russ Urevig Qwest Debbie Osborne Qwest Neil Houston Qwest Kit Thomte Qwest

Meeting Agenda: Action 1.0 Introduction of Attendees See list above

2.0 Review Requested (Description of) Change Terry Wicks reviewed the CR with the SME from Qwest. Process to find working circuits needs to be re designed and reviewed with personnel. Update reject reasons to be clearer specify scenarios that relate to the reject so the SDC can provide better information to the CLECs.

2.1 Terry believes that a collaborative process should be used to allow input from Allegiance and other CLECs in the development of the error messages. We agreed that we could discuss at the CMP meeting and determine the level of interest. 2.2 Terry presented an example that the SMEs reviewed to ensure a level of understanding for the problem. 2.3 Qwest inquired about what changed in May 2002 that seemed to impact thee errors. Allegiance clarified that was when they discovered that the process was not being used.

3.0Confirm Areas & Products impacted 3.1CLEC to CLEC migrations Qwest wanted to clarify that this was a specific issue associated with one product (UNE). And not a global issue. Allegiance indicated it was not global. Qwest inquired about what changed in May 2002 that seemed to impact thee errors. Allegiance clarified that was when they discovered that the process was not being used. 4.0Confirm Right Personnel Involved 4.1Russ Urevig will have the lead on this CR. Neil will stay involved as required.

5.0 Identify/Confirm CLEC’s Expectation 5.1Ensure that Qwest personnel understand the process and are trained. Improve the reject remarks to be more specific to scenarios thus providing the CLECs a better idea of the problem.

6.0Identify any Dependent Systems Change Requests 6.1 None apply

7.0 Establish Action Plan 7.1 No systems are impacted the time frame would be dependent on the participation of the CLEC in the meeting and the timing of updating the documentation. 7.2


CenturyLink Response

August 12, 2002

Terry Wicks, LEC Manger Allegiance Telecom, Inc

SUBJECT: Qwest’s Change Request Response - CR # PC062602-2 Rejects on CLEC to CLEC Reuse of Facilities orders for no circuit IDs found

This is in response to the request from Allegiance where as Allegiance would like to collaboratively work with Qwest to establish clear, definitive reject comment reasons for CLEC to CLEC reuse of facilities orders to insure that all resources available to the SDCs have been utilized to find working circuits.

After meeting with Terry Wicks several times to discuss the application of the comment remarks that are associated with the reject for CLEC to CLEC migration, we have clarified the comments and have modified the comments as set forth below to address the following scenarios.

1. When Qwest finds the circuit at the requested address is NOT the same type of circuit to which the migrate has been requested, the comment remark associated with this will read: Circuits at request address do not match the type of circuit indicated on the LSR for migration. The circuits found are (ex. LX-N or AD--, HCE-, etc)

2. Multiple circuits are found at the requested address, if the number of circuits at the address do NOT match the number of migrations indicated on the LSR. It is very important that the CLEC indicate who the OLSP (old local service provider) is when requesting migration because this will aid in determining whether multiple circuits are really an issue. Qwest will provide these comment remarks for the reject: Multiple circuits have been identified at request address, circuits are currently not those of the indicated OLSP or Multiple circuit have been identified for the OSLP but do not match the number of loops requested for migration.

3. Qwest has searched all available records to identify circuits at end user address, but was NOT able to identify circuit for migration. Qwest will review all data on LSR to obtain circuits to be migrated. Additional data that is recommended to aid in the migration request are: the TN that is being ported to the NLSP’s (new local service provider) switch and the name of the OLSP. If Qwest can NOT find the circuits, the following comment remarks will be provided on the reject: Qwest has search for circuits at the requested address, using the end user name, address, OLSP, and TN provided. Qwest can not find circuits please verify data on LSR for accuracy.

A review of the internal documentation for Qwest has been completed and several changes have been made to streamline the search for unbundled loop circuits. The completed changes and notification to the Wholesale Service Delivery centers will be complete by August 22. The change notifications will be distributed with an MCC, the details of the MCC are the TOPIC is Standardized Comments for CLEC to CLEC Migration Rejects, the SUBJECT is Unbundled Loop, the USER GROUPS AFFECTED are Wholesale. A joint review meeting with the Team Leads, Coaches and SMEs (subject matter experts) will also be held to review the changes and clarify the importance of this process. We have accepted the request to modify the comment remarks on the rejected migration, so that the comments are more standard for the problem encountered. If the Qwest deviates from the standard comments it will be only to provide additional information about that reject.

Sincerely,

Russell Urevig Sr Process Analyst Wholesale Service Delivery


Open Product/Process CR PC062602-3 Detail

 
Title: Cross Reference CLEC Trouble Ticket number on Qwest Trouble Ticket numbers
CR Number Current Status
Date
Area Impacted Products Impacted

PC062602-3 Withdrawn
9/18/2002
Billing, Maintenance/Repair
Originator: Mendoza, Lori
Originator Company Name: Allegiance
Owner: Suellentrop, Craig
Director:
CR PM:

Description Of Change

When Allegiance calls the Qwest Repair Center to open a trouble ticket verbally, we want the CLEC’s internal trouble ticket number to be a required item to be provided to the Qwest representative issuing the Qwest trouble ticket. This will allow for both the Qwest trouble ticket number and the CLEC’s internal trouble ticket number to be cross referenced to each other. Allegiance also wants the CLEC’s internal trouble ticket number to appear on the CLEC’s bill from Qwest for repair and maintenance charges along with the Qwest trouble ticket number. This cross reference of both the Qwest trouble ticket number and the CLEC’s internal trouble ticket number on the bills will allow the CLECs the ability to better reconcile the repair and maintenance charges from Qwest.


Status History

06/26/02 - CR Submitted by Allegiance.

06/26/02 - CR acknowledged by P/P CMP Manager.

06/28/02 - Left voice mail message with T Wicks, Allegiance, for coordinating Clarification meeting on 7/2.

07/02/02 - Conducted Clarification Meeting with Allegiance.

07/03/02 - Issued Clarification Meeting Minutes to Allegiance.

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status "Clarification" was not changed.

08/08/02 - Issued Mailout Notification to CLECs advising that the CR will be reviewed with other similar CRs. Notification CMPR.08.08.02.F.01312.Mtg_Proposal.

08/14/02 - Issued Qwest's Draft Response dated August 13, 2002 to Allegiance.

08/19/02 - Issued Mailout Notification to CLECs confirming the Synergy Meeting for Multiple Trouble Ticket and Billing CRs scheduled for 8/27/02, 2:00 pm MT. Notification CMPR.08.19.02.F.01317.CMP_CR_Mtg.

08/21/02 - CMP Meeting - Qwest presented its Draft Response dated August 13, 2002. This CR to be included for discussion in the CLEC conference call scheduled for 8/27. Minutes on this CR to be posted to the Project Meetings section. Status was changed to Evaluation

8/27/02 - CR included in the Synergy Meeting for Multiple Trouble Tickets & Billing CRs. See Meeting Notes in Attach O, Sept Systems CMP Package.

08/30/02 - Conducted additional clarification call with Allegiance to discuss the manual and system aspects of their CR.

09/11/02 - Issued Qwest's revised response dated September 10, 2002 to Allegiance.

09/18/02 - CMP Meeting - Qwest presented its revised response dated September 10, 2002. Minutes on this CR to be posted to the Project Meetings section. Allegiance agreed to withdraw the CR with a Global Action Item being opened to address their request to modify the current spreadsheet they receive with trouble ticket information. Qwest agreed. The CR will be status as Withdrawn


Project Meetings

09/18/02 September CMP Monthly Meeting Minutes

Allegiance advised they would withdraw this CR which will be satisfied with the System CR’s, providing Qwest opens a Global Action Item to research if a column with their Trouble Ticket Number could be added to the current spreadsheet they receive from their Service Manager. Qwest advised that they are looking into this action item. Qwest expressed that development of the spreadsheet is a complicated process. No participating CLEC indicated that they wanted to assume sponsorship of this CR. The CR will be status Withdrawn and a Global Action Item will be opened.

--

08/30/02 Conference Call

Ric Martin and Craig Suellentrop, Qwest, held a conference call with Terry Wicks, Allegiance to discuss the manual and system aspects of their CR. Qwest advised that the system aspect of Allegiance’s CR would be covered under the resultant Systems CR from combining the various System CRs on Trouble Tickets and Repair Charges. Qwest advised that the Systems resolution would look at the “Input” aspect (CEMR and MEDIACC) of getting CLEC Trouble Tickets and the “Output” aspect (Bill) of cross-referencing trouble tickets and Circuit IDs, etc. Allegiance was in agreement with the handling of the systems aspect of their CR. Qwest explained that there might be something that could be done on the manual process aspect, but there wouldn’t be any meaningful output until the systems fix was accomplished. Qwest indicated that they would still pursue the manual aspect if Allegiance were interested in this. Allegiance indicated that they didn’t want Qwest to duplicate efforts on a manual and systems fix. Allegiance asked if Qwest would look into modifying the spreadsheet they get from their Service Manager to include their internal Ticket Number. Qwest advised that they would open a Global Action Item to look at this and asked Allegiance to send an e-mail with a copy of the spreadsheet and details on what they would like included and at the September CMP meeting we would discuss the disposition of their CR.

08/21/02 August CMP Monthly Meeting Minutes

Qwest reviewed its draft response and advised that this CR would be reviewed in conjunction with other CRs related to trouble tickets, repair charges, etc. scheduled for August 27, 2002. The CLEC participants agreed to have this CR reviewed at that meeting. Qwest clarified that a manual process could be developed to request the CLEC trouble ticket, but it would be input into the remarks field that doesn’t have any sorting capability. Allegiance indicated that they currently receive a spreadsheet with the Qwest trouble ticket identified and asked if Qwest couldn’t put Allegiance’s ticket number on the spreadsheet. Qwest confirmed that the spreadsheet is created from a Web site and maintained by Nancy Tangeman.

07/17/02 - July CMP Meeting Minutes: Allegiance introduced their Change Request. Qwest stated the need is to create a process to capture the information Allegiance has requested. CR status is evaluation.

CLEC Change Request Clarification Meeting

July 2, 2002 9:00 a.m. (MT) Conference Call 877-564-8688 PC062602-3, Cross Reference CLEC Trouble Ticket number on Qwest Trouble Ticket Numbers

Attendees: Ric Martin, Qwest Lynn Stecklein, Qwest Craig Suellentrop, Qwest Alice Matthews, Qwest Terry Wicks, Allegiance

Introduction of Attendees Introductions of the participants on the Conference Call were made and the purpose of the call discussed

Review Requested (Description of) Change Terry indicated that this CR was different than the Systems CR that has to do with the CEMR update. Allegiance does not use CEMR and call in their trouble to the AMSC. Allegiance wants to be able to call tickets in, provide their internal number, have it cross referenced with Qwest’s number and to have their internal number show up on the bill. Terry indicated that they would like to see a process change that would require Qwest to get an Internal Ticket number from the CLEC before they open up a trouble ticket. Terry indicated that they intend to e-bond with MEDIACC in the future, which allows them to electronically report trouble without making a phone call. Craig confirmed that the trouble tickets called in are entered into WFA-C and Qwest would need to look into what the flow through systems are. Additionally Qwest will need to look into what is needed to have Allegiance’s ticket number appear on the bill. Terry indicated that no matter how we open up a ticket, the cross-reference to the CLEC Ticket on the bill is what matters. Terry will look into how e bonding to MEDIACC would be communicated and if there is a field currently that would allow this. He will look into whether a systems CR would be required for MEDIACC.

Confirm Areas & Products impacted It was confirmed that the area impacted was Billing and Maintenance & Repair. The product impacted is UBL.

Confirm Right Personnel Involved Qwest confirmed that Craig would remain the SME for now.

Identify/Confirm CLEC’s Expectation Terry confirmed that they were looking for: 1. A process to have the AMSC not open a trouble ticket without first getting a CLEC internal trouble ticket. 2. Determine best method to get CLEC trouble ticket number on the bill.

Identify any Dependent Systems Change Requests Systems CR SCR030702-1 has to do with CEMR update to include a field for CLEC Trouble Ticket. Systems CR SCR042902-01 has to do with getting the CLEC trouble ticket number onto the bill.

Establish Action Plan (Resolution Time Frame) The CR will have the collective CLEC clarification and SME input at the July CMP meeting.


CenturyLink Response

September 10, 2002

Terry Wicks LEC Manager Allegiance Telecom, Inc.

SUBJECT: Qwest’s Revised Change Request Response - CR PC062602-3 “Cross Reference CLEC Trouble Ticket number on Qwest Trouble Ticket numbers.”

This CR requests that “the CLECs internal trouble ticket number to be a required item to be provided to the Qwest Representative issuing the Qwest trouble ticket. This will allow for both the Qwest trouble ticket number and the CLECs internal trouble ticket number to be cross referenced to each other.” Allegiance would also like the CLEC’s trouble ticket number to appear on bills for maintenance and repair charges.

Because of the large number of Charge Requests related to Maintenance and Repair, a meeting was held on August 27, 2002 to discuss possible synergies between the various CRs. As a result of this meeting and further consultation with Allegiance on August 30, 2002, it was determined that the system CRs SCR030702-1 – CLEC Trouble Ticket Cross Reference and SCR042902-01 – Use CLEC Internal Repair Ticket number on CLEC bill to identify maintenance and repair charges would address the concerns raised by this CR relating to cross-referencing trouble ticket numbers and CLEC trouble ticket numbers appearing on the bill. Allegiance agreed that a separate manual process would not be required with the development of the system enhancements covered by these CRs.

Allegiance also raised an issue concerning a spreadsheet they receive from their Qwest Service Manager that contains all of the TOK and NTF tickets. Allegiance would like to see their trouble ticket number on this spreadsheet. Qwest and Allegiance agreed that this issue could be pursued as a Global Action Item and that Qwest will continue to investigate this issue.

Sincerely,

Craig Suellentrop Staff Advocate, Policy & Law Qwest

Cc: Mary Retka, Director-Legal Issues, Qwest Catherine R. Garcia, Senior Process Analyst, Qwest Alice Matthews, Senior Process Analyst, Qwest Dan Busetti, Lead IT Analyst, Qwest

--

August 13, 2002

Terry Wicks LEC Manager Allegiance Telecom, Inc.

SUBJECT: Qwest’s Change Request Response - CR PC062602-3 “Cross Reference CLEC Trouble Ticket number on Qwest Trouble Ticket numbers.”

This CR requests that “the CLECs internal trouble ticket number to be a required item to be provided to the Qwest Representative issuing the Qwest trouble ticket. This will allow for both the Qwest trouble ticket number and the CLECs internal trouble ticket number to be cross referenced to each other.” Allegiance would also like the CLEC’s trouble ticket number to appear on bills for maintenance and repair charges.

The current repair process for Designed Services allows a CLEC to offer the CLEC trouble ticket number to the Qwest representative opening the Qwest trouble ticket. The CLEC trouble ticket number will be entered into a remark field. This field is not “searchable” and does not appear on CLEC bills. This option is not available for Non-Designed Services. Qwest would agree to a process change to ask all CLECs for their internal trouble ticket number, but without systems changes this would not address the majority of Allegiance’s concerns.

Open System CR’s SCR030702-1 – CLEC Trouble Ticket Cross Reference and SCR042902-01 – Use CLEC Internal Repair Ticket number on CLEC bill to identify maintenance and repair charges also would require a very similar process. A meeting will be scheduled for late August to discuss the similarities between these and some other CR’s involving maintenance and repair. Further clarification and direction for this CR will be determined after this meeting.

Sincerely,

Craig Suellentrop Staff Advocate, Policy & Law Qwest

Cc: Mary Retka, Director-Legal Issues, Qwest Catherine R. Garcia, Senior Process Analyst, Qwest Alice Matthews, Senior Process Analyst, Qwest


Open Product/Process CR PC062602-1 Detail

 
Title: Circuit IDs on CLEC to CLEC Reuse of Facilities orders
CR Number Current Status
Date
Area Impacted Products Impacted

PC062602-1 Completed
10/23/2002
Ordering, Provisioning Unbundled Loop, UNE Loop
Originator: Mendoza, Lori
Originator Company Name: Allegiance
Owner: Urevig, Russell
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

Allegiance wants the capability to get CLEC circuit ID information from Qwest on UNE DS0 loops prior to submitting a CLEC to CLEC reuse of facilities order. If Qwest Retail wants to reuse facilities when porting a customer from a CLEC back to Qwest, they have the capability to “look up” circuit ID information. Qwest Retail does not have to get this information directly from the CLEC, thus the ability to access circuit ID information speeds up their process of submitting orders to Wholesale and eliminates rejects for “bad or missing” circuit IDs. Giving the CLECs a process to obtain CLEC circuit ID detail up front for reuse orders, will allow the CLECs the same parity in submitting accurate orders in a timely manner. This capability will also allow more frequent use of the CLEC to CLEC reuse of facilities process. In many instances, some CLECs that are loosing a customer will not provide circuit ID information to the winning CLEC, thus inhibiting the process of reusing the facilities. When facilities are not reused and the CLEC submits new loop orders, the results may be held orders for lack of facilities. Also installing new loops is much more expensive.

While there is a process in place to be able to submit CLEC to CLEC reuse of facilities orders without providing circuit ID information, 90% of the orders submitted by Allegiance since late May 2002 are being rejected for various erroneous or unclear reasons regarding the circuit ID information. (I will be addressing that issue in a separate change request.) Allegiance believes that having this additional capability, will greatly enhance our ability to get reuse orders successfully processed and in a more timely manner.

Expected Deliverable:

A process for CLECs to be able to request Circuit IDs up front for CLEC to CLEC reuse of facilities orders that is in parity with Retail’s capability to get such circuit IDs before placing a reuse order for UNE DS0 loops.


Status History

06/26/02 - CR Submitted by Allegiance.

06/26/02 - CR acknowledged by P/P CMP Manager.

06/28/02 - CR Posted to Web

07/02/02 - Contacted Terry Wicks and set up clarification call for July 8, at 9:00 a.m.

07/08/02 - Clarification call was held

07/10/02 - Clarification meeting minutes sent to Allegiance

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status was changed to Clarification.

08/14/02 - Issued Qwest draft response to Terry Wicks at Allegiance

08/21/02 - CMP Meeting - Qwest presented its draft response dated 8/13/02. Minutes on this CR to be posted to the Project Meetings section.

09/12/02 - Issued revised Qwest draft response dated 9/10/02 to Terry Wicks at Allegiance

09/18/02 - September CMP Meeting - Qwest presented revised response. CR will stay in Development. Meeting minutes will be posted to this CR's Project Meetings section

10/10/02 - Issued revised Qwest draft response dated 10/8/02 to Alex Pantazis at Allegiance

10/16/02 - October CMP Meeting - Minutes on this CR to be posted to the Project Meetings section. CR will move to CLEC Test status.

10/23/02 - Lori Mendoza notified Qwest that CR should be moved Completed status.

10/28/02 - Issued Qwest Revised Response dated 10/8/02 to Lori Mendoza at Allegiance.


Project Meetings

10/16/02 October CMP Meeting Russ Urevig with Qwest reviewed the revised response dated 10/8/02. Lori Mendoza with Allegiance asked what they should do if unable to determine the circuit ID using the RLD Query. Russ said that the RLD Query must have a valid address and suite number. If no response from RLD Query then send in the LSR to Qwest. Qwest does accept LSRs for CLEC to CLEC migration without circuit ID information. This CR will be updated to CLEC test status and will look to close in November.

09/18/02 September CMP Meeting Qwest reviewed its draft response and summarized the September 4th conference call with Allegiance, walking through Raw Loop Data Tool. When the end user location was a single tenant address the circuit ID was produced. When the end user location was a multi-tenant address, the circuit ID was produced when the suite number was included and when the suite number was in PREMIS database. Allegiance appreciated the assistance with RLD, and, said that providing the circuit ID will get migration orders through the first time with fewer rejects. This CR will stay in development status while determining the tool for CLEC’s to obtain circuit IDs is identified. Eschelon asked if Qwest is not able to come to a systems solution, would a single point of contact be implemented for CLEC’s. Qwest responded that such a solution may be entertained but it was more likely that a mechanized process would be identified.

-- 08/21/02 - August CMP Meeting Minutes: Qwest reviewed its draft response. Allegiance would like to walk through on the phone with Qwest and use Raw Loop Data Tool. Eschelon asked how to identify which CLEC owns the circuit. Qwest stated that the RLDT will provide the circuit ids and that retail and CLECs rely on Qwest Wholesale to identify the local provider. Allegiance indicated they would like to move this CR into development.

07/17/02 - July CMP Meeting Minutes: Allegiance presented their Change Request. Qwest stated that current tools will be reviewed for their capability to look at curcuit IDs in conjunction with end user addresses, including specific addresses that have suite numbers. CR status is clarification

Time/Date: 9:00 a.m. (MDT) / Monday, July 8, 2002 Place: Conference Call Conference: TEL: 877.521.8688 Call-In No: CODE: 7901848 CR No: PC062602-1" Circuit IDs on CLEC to CLEC Reuse of Facilities orders"

Attendees: Terry Wicks, Allegiance Russ Urevig, Qwest Neil Houston, Qwest Bob Mohr, Qwest Michael Keegan, Qwest

Introduction of Attendees Attendees introduced. Review Requested (Description of) Change Description: Allegiance wants the capability to get CLEC circuit ID information from Qwest on UNE DS0 loops prior to submitting a CLEC to CLEC reuse of facilities order. If Qwest Retail wants to reuse facilities when porting a customer from a CLEC back to Qwest, they have the capability to "look up" circuit ID information. Qwest Retail does not have to get this information directly from the CLEC, thus the ability to access circuit ID information speeds up their process of submitting orders to Wholesale and eliminates rejects for "bad or missing" circuit IDs. Giving the CLECs a process to obtain CLEC circuit ID detail up front for reuse orders, will allow the CLECs the same parity in submitting accurate orders in a timely manner. This capability will also allow more frequent use of the CLEC to CLEC reuse of facilities process. In many instances, some CLECs that are loosing a customer will not provide circuit ID information to the winning CLEC, thus inhibiting the process of reusing the facilities. When facilities are not reused and the CLEC submits new loop orders, the results may be held orders for lack of facilities. Also installing new loops is much more expensive.

While there is a process in place to be able to submit CLEC to CLEC reuse of facilities orders without providing circuit ID information, 90% of the orders submitted by Allegiance since late May 2002 are being rejected for various erroneous or unclear reasons regarding the circuit ID information. (I will be addressing that issue in a separate change request.) Allegiance believes that having this additional capability, will greatly enhance our ability to get reuse orders successfully processed and in a more timely manner.

Discussion: Allegiance stated they cannot force a CLEC to provide circuit ID information. Allegiance is dependent on Qwest to provide this information. Reuse of facilities benefits both the CLEC and Qwest. Qwest stated that the current tools will be reviewed for their capability to look at circuit IDs in conjunction with end user addresses. Confirm Areas & Products Impacted Areas Impacted: Ordering, Provisioning Products Impacted: Unbundled Loop, UNE Loop Confirm Right Personnel Qwest confirmed the correct personnel were on the call.

Identify/Confirm CLEC’s Expectation A process for CLECs to be able to request Circuit IDs up front for CLEC to CLEC reuse of facilities orders that is in parity with Retail’s capability to get such circuit IDs before placing a reuse order for UNE DS0 loops. Identify any Dependent Systems Change Requests None Establish Action Plan (Resolution Time Frame) Allegiance can present this Change Request to the CLEC community at the July Product/Process CMP meeting scheduled for July 17 Qwest will issue draft response to this Change Request by Aug 14 (one week prior to the Aug 21 CMP meeting). Qwest will discuss the draft response at the Aug 21 CMP meeting.


CenturyLink Response

October 8, 2002

Lori Mendoza LEC Account Manager Allegiance Telecom

SUBJECT:Qwest’s Change Request Revised Response - CR # PC062602-1 Circuit IDs on CLEC to CLEC Reuse of Facilities orders

At the September CMP meeting, Qwest agreed to continue to research the issues, to determine the most suitable path forward in determining circuit ID information to allow the CLECs the ability to get circuit ID information on DSO type loops for CLEC to CLEC migrations.

Qwest has reviewed the current process of obtaining loop circuit ID’s using the Raw Loop Data (RLD) Query for CLEC to CLEC migrations. We find the tool meets the needs of the change request to provide CLECs a process to obtain Loop Circuit ID details for reuse orders. To clarify, the RLD Query can be used as follows: - Enter a valid address, this must be suite or unit specific if address is multi-tenant. - If address is valid, RLD will provide information on all working TN’s or circuits. - If no matches are found for a specific address, RLD will return a message indicating no information found.

When no circuit information is found, proceed with submitting the LSR and Qwest will determine the circuit and migrate the end user as requested.

The current process provides parity with migrations between Wholesale CLEC to CLEC migrations and migrating end users back to Qwest Retail. The work performed, the results and the responses are handled in the same manner between Retail and the CLECs

LSRs for CLEC to CLEC migration do not require that the Circuit ID field be populated. - Qwest will accept the requests for migration without circuit information. - Qwest will research and determine the circuit or circuits at that address. - If the Loop Circuit ID cannot be determined, Qwest will provide a standard remark associated with the reject of a migration request as follows:

1. When Qwest finds the circuit at the requested address is NOT the same type of circuit to which the migrate has been requested, the comment remark associated with this will read: Circuits at requested address do not match the type of circuit indicated on the LSR for migration. The circuits found are (ex. LX-N or AD--, HCE-, etc).

2. Multiple circuits are found at the requested address: If the quantity of circuits at the address do not match the quantity of lines migrating, as indicated on the LSR, Qwest will use the OLSP information provided by the CLEC to try to determine which services will be migrated. It is very important that the CLEC indicate who the OLSP (old local service provider) is when requesting migration because this will aid in determining whether multiple circuits are really an issue. Qwest will provide these comment remarks for the reject: Multiple circuits have been identified at request address, circuits are currently not those of the indicated OLSP or Multiple circuits have been identified for the OSLP but do not match the number of loops requested for migration.

3. Qwest has searched all available records to identify circuits at the end user address, but was not able to identify circuit for migration: Qwest will review all data on the LSR to obtain circuits to be migrated. Additional data that is recommended to aid in the migration request are: the TN that is being ported to the NLSP’s (new local service provider) switch and the name of the OLSP. If Qwest can not find the circuits, the following comment remarks will be provided on the reject: Qwest has searched for circuits at the requested address, using the end user name, address, OLSP, and TN provided. Qwest can not find circuits, please verify data on LSR for accuracy.

- The CLEC should review the reject remarks, validate any issues in question, and re-submit the LSR once the information is found and the LSR is corrected. - Qwest provides a method to escalate questions on rejects or clarification on remarks for rejects.

Sincerely,

Russ Urevig Senior Process Analyst Wholesale Service Delivery


Open Product/Process CR PC071502-1 Detail

 
Title: Include CFA Information on PTA Email Notifications of NDT
CR Number Current Status
Date
Area Impacted Products Impacted

PC071502-1 Completed
12/18/2002
Coordinated Hot Cuts and Regular Cuts LNP, Unbundled Loop, UNE Loop
Originator: Mendoza, Lori
Originator Company Name: Allegiance
Owner: Hendricks, Linda
Director:
CR PM: Thomte, Kit

Description Of Change

Allegiance is requesting that the CFA information be added to the current PTA notifications of NDT. During the testing of the PTA tool notification of NDT, there have been several instances of receiving a notification of NDT that were Qwest errors. When Allegiance has researched these, everything checks out fine. Our translations are correct, and when dispatching our Tech to our Collocation to check the pairs, the pairs are working fine. The issue has been that Qwest has them on the wrong pair and in some instances the service order has been incorrectly issued.

This is resulting in Allegiance spending extra time, effort and money to isolate the NDT issue to the Qwest side. What would resolve this is if the Pair Information was also on the PTA notification next to the telephone number. With this information showing what pairs Qwest is testing to, we can identify the error quicker.

Expected Deliverable:

Receiving the PTA email notifications of NDT with the CFA information provided in addition to PON, TNs and DD


Status History

07/15/02 - CR Submitted by Allegiance

07/15/02 - CR acknowledged by P/P CMP Manager.

07/17/02 - Spoke with Allegiance regarding potential times for meeting

07/22/02 - Held clarification meeting with Allegiance

08/21/02 - This CR is in "Evaluation" status and is alligned with another CR

09/10/02 - Sent Draft Response to Allegiance

09/18/02 - September CMP Meeting: CR status changed to "Development" Meeting minutes will be posted to this CR's Project Meeting section and the CMP Web site.

10/14/02 - Level one notification sent to CLEC community PROS.10.14.02.F.00598.CFA_Email_Notice

10/16/02 -October CMP Meeting: This CR will change "CLEC Test" Meeting minutes posted to this CR's Project Meetings section and the CMP Web site.

11/20/02 - November CMP Meeting: This CR will reamin in "CLEC Test" October CMP Meeting: Meeting minutes posted to this CR's Project Meetings section and the CMP Web site.

12/18/02 - December CMP Meeting: This CR changed to Closed Status in the CMP Meeting. Meeting minutes posted to this CR's Project Meeting section and the CMP Web site.


Project Meetings

12/18/02 December CMP Meeting Qwest (Hendricks) reported that the QCCC is working to ensure they follow the process and Allegiance (Mendoza) reported the process is working as agreed to and it is O.K. to close the CR. This CR will change to Closed status.

11/20/02 November CMP Meeting Qwest (Thomte) indicated that she thought some problems had been identified recently through a comment from Lori Mendoza. Linda Hendricks confirmed that was true. Allegiance (Mendoza) indicated that they were getting CFA on the PTA about 50 percent of the time. Other CLECs indicated they were seeing problems as well. This CR will remain in CLEC Test.

10/16/02 October CMP Meeting Qwest initiated a Level 1 notification (PROS.10.14.02.F.00598.CFAEmailNotice) on October 14 advising the CLEC community that CFA information would be provided on PTA E-mail notifications. This CR moved to “CLEC Test”

09/18/02 September CMP Meeting This CR should be discussed in conjunction with PC050302-1. Qwest provided an updated response indicating this Change Request has been accepted, although it is dependent on the implementation of PC050302-1. Participants agreed that PC071502-1 CR can implement with a Level 1 notice after comments cycle is completed for PC050302-1. This CR will change to "Development"status with agreement to update to "CLEC Test" once Level 1 notice is sent.

08/21/02 - August CMP Meeting Minutes

This CR is dependent on CR PC050302-1. This CR status changed to "Evaluation"

Date: July 22, 200 Place: 1005 17th St Room 1770-C Call-In No.: 877 550-8686 CR No.: CLEC Change Request PC071502-1 Clarification Meeting

Attendees Name/Company: Terry Wicks Allegiance Russ Urevig Qwest Linda Hedricks Qwet Steve Hilleary Qwest Phyllis Sunnins Qwest Kit Thomte Qwest

Meeting Agenda: Action 1.0 Introduction of Attendees See list above 2.0 Review Requested (Description of) Change Terry Wicks reviewed the CR with the SMEs from Qwest. 2.1During the trial that was held in May and June Allegiance investigated situations that resulted in NDT. *One scenario was due to the Service Order being written with information that was different than what appeared on the LSR. *Another scenario was due to the Central Office being wired incorrectly. 2.2Terry indicated that if Allegiance knows up front what CFA Qwest is testing to it allows them to resolve the issue faster. Allegiance can review based on what they passed on the LSR and what Qwest FOCd back. 2.3

3.0 Confirm Areas & Products impacted 3.1 UNE, Unbudled Loop 4.0 Confirm Right Personnel Involved 4. The team agreed that Linda Hendricks would be the respondent Steve will participate, and Phyllis and Russ would have no further action.

5.0 Identify/Confirm CLEC’s Expectation 5.1 Receive notification regarding CFA used in no dial tone situations

6.0 Identify any Dependent Systems Change Requests 6.1

7.0 Establish Action Plan (Resolution Time Frame) 7.1 No systems are impacted the time frame would be dependent on the participation of the CLEC in the meeting and the timing of updating the documentation.


CenturyLink Response

September 5, 2002

Terry Wicks Allegiance

SUBJECT: Qwest’s Change Request Response - CR #PC071502-1 Include CFA Information on PTA Email Notifications of NDT.

This is a preliminary response regarding Allegiance CR PC071502-1 (Include CFA Information on PTA E-Mail Notifications of NDT). As discussed in the August Product & Process Monthly CMP Meeting, this CR is dependent on the outcome of PC050302-1 (Email Notification of No Dial Tone at 48 Hours).

The implementation of Change Request PC050302-1 is being pursued as a CMP Level 3 change as agreed to in the July Product & Process Monthly CMP Meeting. Based upon the issuance of notice PROD.09.05.02.F.00818.AnalogLoop24Wire, Change Request PC050302-1 is currently in a comment cycle.

Upon the implementation of Change Request PC050302-1 Qwest anticipates being able to make changes as described in PC071502-1. Specifically, Qwest expects to be able to include CFA information in addition to PON, TNs and DD in PTA e-mail notifications.

Assuming the successful implementation of e-mail notifications of No Dial Tone (NDT) per Change Request PC050302-1, Qwest would propose to notify the CLEC community of the changes specified in PC071502-1 as a Level 1 change (i.e. “additional information that does not change the product or process”). Qwest will seek concurrence with this approach at the September Product & Process Monthly CMP Meeting.

Sincerely,

Linda Hendricks Lead Project Analyst Qwest


Open Product/Process CR PC072902-1 Detail

 
Title: Request for estimate of cost for extending or moving a DMARC beyond the MPOE prior to doing the work
CR Number Current Status
Date
Area Impacted Products Impacted

PC072902-1 Withdrawn
8/21/2002
Coordinated Hot Cuts and Regular Cuts Unbundled Loop, UNE Loop
Originator: Mendoza, Lori
Originator Company Name: Allegiance
Owner: Tallman, Shirley
Director:
CR PM:

Description Of Change

Allegiance is requesting that Qwest develop a process to give the CLEC the ability to request an estimate of cost for extending or moving a DMARC (NIU) beyond the MPOE prior to placing an order. In other ILEC territories, Allegiance can fill out a form requesting the extention or move of a DMARC beyond the MPOE, and can get an estimate of the cost prior to placing the order. This gives the CLEC an opportunity to know what costs are involved prior to submitting such an order. Currently in Qwest, we don't know what it will cost until the order is processed and the work has been completed. Allegiance is not aware of the cost until after it has been billed to us.


Status History

07/29/02 - CR Submitted by Allegiance

07/30/02 - CR acknowledged by P/P CMP Manager.

07/31/02 - CR Posted to Web

07/31/02 - Received revised CR title and description from Allegiance

07/31/02 - Coordinated Clarification meeting with Terry Wicks, Allegiance.

08/02/02 - Conducted Clarification meeting with Allegiance.

08/05/02 - Issued Clarification Meeting Minutes to Allegiance

08/05/02 - Allegiance provided response to its Action Item from the Clarification Meeting.

08/05/02 - Received comments from Allegiance on meeting minutes and incorporated them into the database.

08/21/02 - CMP Meeting - Allegiance advised that a conference call clarified the NID/Demarc relocation requirements. Allegiance advised that they were withdrawing the CR. No other CLEC opted to sponsor the CR. Minutes on this CR to be posted to the Project Meetings section.


Project Meetings

08/21/02 August CMP Monthly Meeting Minutes

Allegiance advised that they had a conference call with Qwest where it was clarified the difference between requesting an extension of a jack versus a NID/DEMARC. It is Qwest’s policy that CLECs cannot request an extension to a NID/DEMARC and only in Minnesota and Oregon is it mandated that CLECs can request and extension of a Jack. Allegiance advised that based on this clarification, they would like to withdraw their CR. Qwest asked if any other CLEC would like to sponsor the CR and no CLECs expressed an interest. It was agreed that the CR would be status as withdrawn.

-

Subject: RE: CR PC072902-1 Clarification Meeting Minutes Date: Mon, 5 Aug 2002 13:41:39 -0500 From: "Wicks, Terry" To: "'Richard Martin'"

The department that we fax a form to for Southwestern Bell , to get an estimate of cost, is called the LSC (Local Service Center). This is the department that processes our LSRs.

Terry Wicks LEC Account Manager allegiancetelecom, inc 469-259-4438 terry.wicks@algx.com

CLEC Change Request Clarification Meeting

August 2, 2002 10:00 a.m. (MT) Conference Call 877-564-8688 PC072902-1, Request for estimate of cost for extending or moving a DMARC beyond the MPOE prior to doing the work

Attendees: Ric Martin, Qwest Russ Urevig, Qwest Shirley Tallman, Qwest Bob Mohr, Qwest Linda Sanchez-Steinke, Qwest Terry Wicks, Allegiance

Introduction of Attendees Introduction of the participants on the Conference Call was made and the purpose of the call discussed

Review Requested (Description of) Change Terry indicated that when Allegiance is taking a customer, they may want to move or extend the DMARC beyond the MPOE. They want to get an estimate of the cost before the work is performed. Currently they put their request in when they place the order and get billed for the work after the order is completed. Terry indicated that another ILEC has a form that they complete and submit to get an estimate before the order is submitted. Terry indicated that they have an 800 number and a fax number to which this form is sent. He believes they are dealing with the ILECs engineering department. Terry will confirm what department they deal with. The department is the LSC, Local Service Center at Southwestern Bell. Terry indicated that they were billed for the estimate and would be willing to pay for the estimate. He agreed that an estimate was acceptable with actual costs being billed per their agreement with Qwest. Russ asked if Allegiance was looking at a multi-tenant facility and looking more at an individual customer’s DMARC. Terry indicated that Allegiance is looking at extending the DMARC or sometimes moving the DMARC beyond the MPOE for an individual tenant of a multi-tenant building.

Confirm Areas & Products impacted Terry indicated that their product focus was UBL. Qwest may have to look at other products that would have the same need. It was agreed that the area impacted was Pre-Ordering and Ordering.

Confirm Right Personnel Involved Qwest confirmed that the Network department would be responsible.

Identify/Confirm CLEC’s Expectation Terry confirmed that they wanted a process to request and receive a written cost estimate for extending or moving a DMARC beyond the MPOE prior to submitting an order.

Identify any Dependent Systems Change Requests There are no systems changes associated with this request.

Establish Action Plan (Resolution Time Frame) The CR will have the collective CLEC clarification and SME input at the August CMP meeting.


Open Product/Process CR PC050302-1 Detail

 
Title: Email Notifications of No Dial Tone at 48 Hours
CR Number Current Status
Date
Area Impacted Products Impacted

PC050302-1 Completed
4/15/2009
Other: Coordinated Hot Cuts and Regular Cuts Unbundled Loop, UNE
Originator: Mendoza, Lori
Originator Company Name: Allegiance
Owner: Houston, Neil
Director:
CR PM: Harlan, Cindy

Description Of Change

The current process for the QCCC is to call Allegiance with notifiction of No Dial Tone at 48 hours prior to cut date. Allegiance would like to receive all notifications of NDT at 48 hours prior to cut date through email using Qwest's PTA tool in place of receiving these notifications by telephone calls or leaving voice mails.This will allow proper tracking of NDT notifications by both Qwest and the CLECs. This will also insure the CLECs have sufficient time to achieve dial tone prior to cut date. Allegiance believes that receiving email notifications will save a lot of time for both Qwest and the CLECs


Status History

05/03/02 - CR Submitted by Qwest.

05/03/02 - CR acknowledged by P/P CMP Manager

05/06/02 - CR posted to Web

05/09/02 - Schedule Clarification Meeting with Allegiance for this date.

05/09/02 - Conducted Clarification Meeting with Allegiance.

05/14/02 - Issued Clarification Meeting minutes to Allegiance.

05/15/02 - CMP Meeting - Allegiance introduced its CR. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

06/10/02 - Received e-mail from Allegiance providing spreadsheet on the NDT trial.

06/19/02 - CMP Meeting - Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. CR status was changed to Evaluation.

07/10/02 - Initial response sent to Allegiance and posted to the Web

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status was changed to Development.

07/20/02 - Qwest issued formal response to the CLEC Community. Notification CMPR.07.29.02.F.01300.Final_CR_Responses.

08/21/02 - CMP Meeting - Qwest provided a status on issuance of the Level 3 notification. Minutes on this CR to be posted to the Project Meetings section. Status to remain in Development.

09/05/02 - Qwest issued Initial Notification on e-mail notification process. Notification PROD.09.05.02.F.00818.Analog_Loop_2_4_Wire.

09/18/02 - CMP Meeting - Qwest advised that the Level 3 notification was issued and the comments cycle ends 9/20/02. Minutes on this CR to be posted to the Project Meetings section. It was agreed that the CR would be status as CLEC Test.

09/26/02 - Qwest issued Final Notification on e-mail notification process. Notification PROD.09.26.02.F.00830.Analog_Loop_Final. Effective date of change is 10/11/02.

10/16/02 - CMP Meeting - Qwest explained this process was implemented 10/11/02. Minutes on this CR to be posted to the Project Meetings section. It was agreed this CR would stay in CLEC test until next month.

11/20/02 - CMP Monthly Meeting agreed to close this CR.


Project Meetings

Qwest explained this process was implemented effective October 11, 2002. No issues have been identified with the process and Qwest requested to close this CR. Lori Mendoza - Allegiance advised they are using the process and it is working without any issues. Allegiance and the other CLECs in attendance agreed to close the CR.

10/18/02 October CMP Monthly Meeting Minutes Qwest explained this process was implemented effective October 11, 2002. As of October 16, four CLECs have signed up to receive E-Mail Notification of NDT via the PTA tool. Eschelon verified that if you do not sign up for email notification via the PTA tool then you will not get any NDT notification, as the only method of NDT notification is now the PTA tool. CLECs can continue to sign up at any time. Qwest agreed to leave the CR in CLEC Test since this process was just implemented, with potential closure in November.

09/18/02 September CMP Monthly Meeting Minutes

Qwest advised that the Level 3 notification had been issued and that the comment cycle was scheduled to end this Friday, September 20th. Qwest advised that Qwest Service Managers had sent out notifications to their CLECs advising them to provide their e-mail address. The CLECs expressed concern over the 48-our language as written and intervals that were longer than the standard intervals. Qwest confirmed that the 48-hour notification was from the due date and this would be clarified in the PCAT or in writing. CLECs expressed concern over participation in the trial. It was agreed that next time Qwest does a trial, Qwest could evaluate if additional CLECs need to be involved. CLECs requested that the final notification advise the CLECs of the impact of the e-mail notification change. Qwest advised that they would add language in the final notification that advises the CLECs that if they do not provide an e-mail address they would not receive the No Dial Tone notifications.

08/21/02 August CMP Monthly Meeting Minutes

Qwest provided a status update on issuance of the Level 3 notice. Qwest indicated that they were holding off until the current 2-wire 4-wire PCAT language gets published to the Web on August 26, 2002. Allegiance expressed concern that issuance was based on the no dial tone PCAT language since they have taken exception to the language. Qwest advised that this could be addressed during the 1:00 p.m. discussion on issuance of the PCAT language. Eschelon advised that they were disappointed that they will need to wait longer for issuance of the Level 3 notice. They stated that Qwest advised last month that it would be issued by this month’s meeting and now they have to wait longer. AT&T asked if they could only have one e-mail. Qwest advised that they could only have one and it must be different than the e-mail if they are receiving test results.

-

07/17/02 - July CMP Meeting Minutes: Qwest will continue with the trial that began May 6, 2002. It is available to all CLECs. Allegiance asked if all CLECs had to request the process in order for it to proceed. Qwest responded that the answer is yes, it is all or nothing. Allegiance stated that there should be a choice and that the Qwest response does not reference the “all or nothing” position. Qwest responded that the Level 3 process will support this effort and will allow other CLEC participation.. Qwest will issue the Level 3 initial notice prior to the August CMP meeting. CR status was changed to development.

Subject: Allegiance - NDT Trial E-mail Notification Final Spreadsheet 5/6 - 5/31/02 Date: Mon, 10 Jun 2002 11:36:25 -0500 From: "Wicks, Terry" To: "'Cheri Hurless'" , "'Deni Toye'" , "'Kathie Simpson'" , "'Linda Hendricks'" , "'Mary Pat Cheshire'" CC: "Reece, Mamie" , "Best, Doreen" , "Hill, Todd"

Here is the finalized spreadsheet with the data and comments captured for May. The trial is continuing through June and I will have a separate spreadsheet for June.

<>

Terry Wicks LEC Account Manager allegiancetelecom, inc 469-259-4438 terry.wicks@algx.com

--

CLEC Change Request Clarification Meeting

May 9, 2002, 3:30 p.m. (MT) Conference Call 877-564-8688 PC050302-1, E-Mail Notification of No Dial Tone at 48 Hours

Attendees: Ric Martin, Qwest Neil Houston, Qwest Mike Raleigh, Qwest Deni Toye, Qwest Terry Wicks, Allegiance

Introduction of Attendees Introductions of the participants on the Conference Call were made and the purpose of the call discussed

Review Requested (Description of) Change Terry reviewed Allegiance’s CR. He explained that the initial phone call would roll to voice mail and the issue is with the voice mail notifications falling through the crack. He would like to get an e-mail to have a record to hold Allegiance personnel accountable. Terry advised that there is currently a trial with Qwest and Allegiance on this process that started in February with the QCCC. Deni advised that the trial started May 6th and is to be concluded May 31st. Currently they are having the PTA System send the e-mail. Terry advised that the CR was submitted in addition to the trial to have this process implemented for all CLECs.

Confirm Areas & Products impacted It was confirmed that the area impacted was Provisioning for coordinated hot cuts and basic cuts. The product impacted is UBL, LX—Reuses.

Confirm Right Personnel Nvolved Qwest confirmed that Neil Houston would be the SME for response to this Change Request.

Identify/Confirm CLEC’s Expectation Allegiance would like this process implemented for all CLECs.

Identify any Dependent Systems Change Requests There are no related Systems CRs.

Establish Action Plan (Resolution Time Frame) The trial will complete May 31st. The CR will have the collective CLEC clarification and SME input at the June CMP meeting.


CenturyLink Response

.July 10, 2002

Terry Wicks LEC Manager Allegiance Telecom, Inc.

SUBJECT: Qwest’s Change Request Response - CR # PC050302-1 E-mail notifications of NDT at 48 hours through PTA tool

This is in response to Allegiance’s Change Request (CR) PC050302-1. This CR requests that all notifications of No Dial Tone (NDT) at 48 hours prior to the cut date be provided to the CLEC via e-mail using Qwest’s Plant Test Access (PTA) tool. The current trial of PTA e-mail notifications with Allegiance began on May 6, 2002. The trial with Allegiance will continue during the implementation phase for this CR.

Qwest is able to provide all NDT notifications via e-mail using the PTA tool. PTA notifications require that CLECs provide Qwest with an e-mail address separate from the e-mail address provided for test results. CLECS should send their NDT PTA e-mail location to Deni Toye, dtoye@qwest.com. Qwest will add the CLECs NDT PTA e-mail address to the notification list upon receipt. To provide an efficient and uniform notification, Qwest will provide NDT notifications via the PTA tool to all CLECs.

Based upon Qwest’s understanding of the scope of this CR, Qwest views the implementation of this CR as a Level 3 Product & Process change. Timing of the implementation of this change will be dependent upon the quantity and nature of CLEC comments.

Qwest will seek concurrence for this approach at the July Monthly Product & Process CMP Meeting.

Sincerely,

Neil Houston Staff Advocate Policy & Law

cc: Mary Retka, Director, Technical Regulatory Interconnection Planning


Open Product/Process CR PC010302-1 Detail

 
Title: RSUs the inabilitiy to provision UNEs
CR Number Current Status
Date
Area Impacted Products Impacted

PC010302-1 Denied
7/17/2002
Ordering Collocation: Physical UNE: Loop
Originator: Mendoza, Lori
Originator Company Name: Allegiance
Owner: Mohr, Bob
Director:
CR PM:

Description Of Change

PON 928898-LP LSR#3330778 Orders D66190766, N66190767 - N66190789 The cancellation of these orders in the Dry Creek Colo states "This customer comes out of a remotely located central office and unbundled loop is not an available product."

Qwest does not allow the provisioning of an Unbundled Loop within a colocation when an End User is serviced by a Remote Switching Unit (RSU). The orders are cancelled and a reject notice is sent to the CLEC. At this time, the CLEC has absolutely no recourse to be able to switch this customer's local service over to that CLEC. The inability to switch an End User that is serviced by a RSU over to a facility based CLEC is unacceptable and anti-competitive. The End User also has no capability to choose another carrier for local service. Allegiance has spent tremendous amounts of money to co-locate in Qwest Central Offices in order to be able to swith Qwest customers over to Allegiance facilities. Allegiance is requesting that Qwest develope a means to allow the switching of End Users service by a RSU to CLEC facilities .


Status History

01/02/02 - CR submitted by Allegiance.

01/03/02 - CR acknowledged by P/P CMP Manager.

01/04/02 - Allegiance contacted to coordinate available times for clarification call.

01/11/02 - Conducted Clarification Meeting with Allegiance.

01/18/02 - Issued Clarification Meeting Minutes to Allegiance.

02/20/02 - CMP Meeting - CLEC Community Clarification held. It was agreed that the CR would move to Evaluation. Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package 03/20/02.

03/04/02 - Conducted additional Clarification Meeting with Allegiance.

03/07/02 - Issued 3/4/02 additional Clarification Meeting minutes to Allegiance.

03/13/02 - Issued Qwest's Draft Response dated March 12, 2002 to Allegiance.

03/20/02 - CMP Meeting - Qwest presented its Draft Response dated March 12, 2002. It was agreed that the CR could be moved into CLEC test. Qwest to respond to an action item where Allegiance will reevaluate the CR status. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

03/22/02 - Formal response dated March 12, 2002 issued to CLECs. Notification CMPR.03.22.02.F.01240.CR_Responses.

04/15/02 - Issued E-Mail to Allegiance with EEL and Loop pricing.

04/17/02 - CMP Meeting - Allegiance disagreed that the CR should be in CLEC Test. Allegiance restated its intent of the CR. Qwest to review and provide a revised response. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. The CR status will be revised to Presented.

05/08/02 - Issued Qwest's Supplemental Response dated May 2, 2002 to Allegiance.

05/10/02 - Supplemental response dated May 2, 2002 issued to CLECs. Notification CMPR.05.10.02.F.01265.Final_CR_Response.

05/15/02 - CMP Meeting - Qwest presented its Supplemental response. Qwest to respond to action items generated at the meeting. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. CLEC participants requested that the CR remain in a Presented status.

06/19/02 - CMP Meeting - Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. CR status will remain in Presented.

06/28/02 - Clarified with Covad their request identified under Action Item No. 4. Issued e-mail with uderstanding.

06/28/02 - Reviewed Qwest's response to Action Item No. 5 with John Sheehan, Frontier Communications (Electric LightWave) and sent e-mail with Interactive Report link.

06/28/02 - Received e-mail confirmation from Frontier Communications that Action Item No. 5 can be closed.

07/10/02 - Sent email to Covad, Allegiance, and Eschelon containing responses to additional questions associated with open action items 2 and 4.

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status was changed to Denied.and remaining open action items (2 and 4) were closed.


Project Meetings

07/17/02 - July CMP Meeting Minutes: Qwest presented the latest responses to open Action Items 2 and 4 which had been sent to Eschelon, Allegiance, and Covad on July 10, 2002 for comment. CLECs agreed the Action Items could be closed. CR status changed to deny.

Subject: Re: CR Location Date: Fri, 28 Jun 2002 14:05:05 -0400 From: John Sheehan Organization: Frontier / ELI Carrier Services To: Richard Martin

Rick, Sounds fine. This can be closed.

--

Subject: CR Location Date: Fri, 28 Jun 2002 10:56:25 -0600 From: Richard Martin Organization: Qwest Communications International, Inc. To: johnsheehan@frontiercorp.com

John,

Go to URL, http://www.qwest.com/wholesale/cmp/changerequest.html

Click on, "CLEC Qwest Change Request - Product/Process Interactive Reports" to launch the interactive report. The report is in Adobe Acrobat.

When in the report, click on the blue button with CR number PC010302-1. Review Action Item No. 5.

If the response satisfies the intent of Peder's question, please advise. If further clarification is required, please let me know.

Thanks

Ric

--

Subject: Action Item 4 to CR PC010302-1 Date: Fri, 28 Jun 2002 09:28:57 -0600 From: Richard Martin Organization: Qwest Communications International, Inc. To: Mike Zulevic CC: Craig Saunders , Kelly Trachsel

Mike,

Based on our conversation regarding Action Item 4 to the subject CR, the response, which is stated below, didn't fully answer what you were looking for.

Action Item 4 Question and Answer:

Q. Covad expressed the need to have the geographical area of a RSU and the number of lines served by the RSU included in the ICONN database tool.

A. The ICONN database has not been set-up to provide the geographical area of a RSU. This is done through utilization of the DA Maps (refer to CR PC110201-1 and PC012902-1). The number of lines in a RSU will be delineated if the RSU does not share a NXX with another wire center. The number of lines associated with a Central Office NXX can be identified by performing a search on the NPA NXX under the Cetral Office Find tool located at the same URL as Action Item No. 3.

It is my understanding, from our call, that Covad would like to identify what RSUs are tied to a CO, where are the RSUs and what area do they cover.

If this is not correct, please provide further clarification.

Thanks

Ric

-- Subject: CR PC010302-1 Action Item EEL Pricing Comparison Date: Mon, 15 Apr 2002 10:38:51 -0600 From: Richard Martin Organization: Qwest Communications International, Inc. To: Terry Wicks CC: Robert Mohr , Robyn Libadia , Cindy Buckmaster

Terry,

The attached rate sheet is in response to the Action Item on your Change Request PC010302-1 requesting that Qwest provide pricing for an EEL from the Denver Dry Creek to an end-user fed from the Denver Tech Center wire center. You also requested rates for an Unbundled Loop to feed this same user from the one wire center.

The attached rates are for the EEL and UNE products for an EEL from the Drycreek office to an end-user fed from the Tech Center wire Center. As the only way to feed a customer located in the Tech Center Wire Center on an Unbundled Loop is with a collocation placed in the Tech Center Wire Center, the pricing example for the Unbundled Loop is for an Unbundled Loop feed from a collocation space located in the Tech Center Wire Center.

The rates for the EEL were taken from the Qwest templated agreement and, because Allegiance currently doesn’t have the ability to order EELs in Colorado in their contract, a request of this kind would require an amendment to the Allegiance Interconnection Agreement (ICA) before ordering could commence on this product. Rates for the loop were taken from the Allegiance ICA . Collocation would also need to be established at the Tech Center wire center for this example.

Please contact us if you require additional information on these products, or have any questions.

Sincerely,

Ric Martin - CRPM (303) 896-9823 Robyn Libadia- EEL Product Manager (253) 445-0234 Bob Mohr- Unbundled Loop Product Manager (303) 896-2160

PC010302-1 Allegiance response 4-12-02.xls

--

CLEC Change Request Clarification Meeting

March 4, 2002, 9:00 (MT) Conference Call

PC010302-1, RSUs – the inability to provision UNEs

Attendees: Ric Martin, Qwest Cheri Hurless, Qwest Bernadette Derlein, Qwest Cindy Buckmaster, Qwest Terry Wicks, Allegiance

Introduction of Attendees Introduction of the participants on the Conference Call was made. Qwest explained that they wanted to review the current situation and get feedback from Allegiance.

Review Requested (Description of) Change Cindy advised that Qwest would be providing a drawing explaining how the Dry Creek CO was configured to the Tech Center RSU. Cindy explained that the Tech Center was connected to the Dry Creek CO by a transport medium (umbilical) and the end user would have a loop to the Tech Center. Cindy explained that there were two ways a CLEC could get a loop for the end user connected to the Tech Center. The first would be for the CLEC to be physically collocated in the Tech Center. The second would be to request an EEL from the dry creek office at whatever transmission level for the end user. Terry wanted to know how to tell if a customer was serviced out of an RSU. Cindy advised that the Raw Loop Data Tool cable field designation of EX would indicate this. Terry advised that it wasn’t practical for them to obtain a certificate for all their sales folks and to check each address separtely. Cindy explained that there is a Raw Loop Data Dump for each central office that would allow for various sorts on the data in the RLDT. A sort could be made on cables with EX and then by address. Terry asked if Qwest could provide information on how the transport for an EEL works and a narrative on the Raw Loop Data Dump. Terry asked about the RSUs that were tied to Dry Creek CO, Eagan, MN and Chandler AZ. Qwest will identify those RSUs tied to those Central Offices Qwest Identified the following Action Items to address: 1. Breakdown how an EEL works that uses a MUX, riding a higher capacity transport 2. Identify how collocation would occur in the different types of RSUs. 3. Identify the Raw Loop Data Tool Training available. Terry requested Qwest to address why the CLEC cannot obtain a loop for an end user that is identified out of the Central Office of record.

CLEC Change Request Clarification Meeting

Date: January 11, 2002, 9:00 (MT) Place: Conference Call 877-564-8688 Subject: PC010302-1, RSUs – the inability to provision UNEs

Attendees: Ric Martin, Qwest Neil Houston, Qwest Laurel Neher, Qwest Bernadette Derlein, Qwest Cindy Buckmaster Terry Wicks, Allegiance

Introduction of Attendees Introduction of the participants on the Conference Call were made and the purpose of the call discussed

Review Requested (Description of) Change Terry reviewed Allegiance’s CR. He explained that they had several orders they had to cancel due receiving reject notices on orders for UNEs. The problem indicated that COs customers given service by RSUs and routes to the CO where they are collocated and there is no place to cross connect. They are unable to port because they are in a RSU. He explained that they do not know they are in a RSU when processing an order. Laurel explained that the RSU would look like a CO. The switch depends on another switch for intelligence. She said that the LERG should have the CLLI. Qwest will look at the LERG to see if it has the information. Qwest thought that the NPNAXX would have the CO location. Neil advised that the Account Manager should advise which Colos have RSUs. The following COs have RSUs: Colorado – Dry Creek ? Center Park ? Denver SE ? Denver Tech Center – ISDN ? Aberdene ? Northglen Minnesota – Egan Arizona – Chandler Laurel explained that the RSU would need to the loop extended to the CO and this is done by ordering an EEL. Terry indicated that they look at customers that are serviced out of the CO where they are collocated at. Neil asked if Allegiance had any volume on the number of instances this is happening. Terry indicated that he did not. He advised that the reject notice was 10/24. Terry provided the TNs that were involved: RFG Management, Inc. 8400 E Cressent Parkway, suite 475, Greenwood Village, 80111, 303-771-0321. Banta, Hoyt, Everall 7979 Tufts Parkway, sutie 1050, Denver 80237, 303-220-8000 Terry indicated that he could go to the Raw Loop Data Tool and pull the address which provides the cable name fixed EX, but he could not identify on a CSR. Terry asked how Qwest determines a customer is in a RSU. Neil advised that it was a matter of Geography. The RSU is an electronic switch with a switch module connected by a TI to the CO. Neil advised that the customers referenced by Terry are in the Denver Tech Center. He explained that the loop is coming out of the RSC and doesn’t extend to the CO. Terry asked what is covered and what is available to view by CLEC. He does not want to have the cost of adding the EEL. He wants to be able to port from the CO where the records show the CO. His record is the CSR. Laurel indicated that the LERG should be used to determine the CO. Terry advised that another ILEC, GTE, put a card in their switch.

Identify/Confirm CLEC’s Expectation Allegiance wants to be able to port a UNE serviced out of an RSU from the CO where the records show the RSU’s CO is serviced and do not want to pay an additional cost.

Establish Action Plan (Resolution Time Frame) Qwest will identify what is contained in the LERG. The CR will have the collective CLEC clarification and SME input at the February CMP meeting.


CenturyLink Response

May 2, 2002

Terry Wicks Allegiance Telecom Inc

SUBJECT: Qwest Change Request Supplemental Response - CR PC010302-1 Remote Swiching Unit- Inability to provision UNEs

This letter is in response to the additional clarification requirements provided at the April 17, 2002 CMP Monthly Meeting on your Change Request PC010302-1 and supplements Qwest’s response dated March 12, 2002. The additional clarification requirements requested that Qwest:

1) Consider the reduction of the Non-Recurring Charge (NRC) for the EEL to allow a CLEC to order the EEL at the Loop NRC price. 2) Consider the elimination of transport rates where the transport would otherwise be billed in the EEL product. 3) Consider the identification of RSUs upon application of the CLECs for a collocation so as to ensure the CLECs make sound decisions about where to spend their collocation monies.

In response to items 1 and 2 above, Qwest’s research indicates that Qwest is in alignment with other ILECs on the handling of RSUs. As described in Qwest’s March 12, 2002 response, Qwest deploys RSUs in a number of situations. Primary among these situations is the deployment of augment switches to accommodate growth in a given geographic area. Installation efforts for EELs are more time and labor intensive than those for UBL, thus the higher NRC. In regard to transport, at times, the new RSU is either programmed to have the same NXX as the host, or has a unique NXX. Where the NXX is the same as the host, mileage is rated at $0. If the NXX is unique, mileage is calculated and the appropriate band rate applies. Reduction of the non-recurring charge or the elimination of the transport rate would tend to undermine both the embedded EEL and Collocation base. Based on our alignment with other ILECs, and the additional cost of the EEL product, Qwest is unable to reduce the NRC or eliminate the Transport charge from EELs provisioned under this arrangement.

In response to item 3, CLECs have access to several resources that indicate the structure of the Qwest network. Among these resources, the Raw Loop Data Tool indicates remotes via the ‘EX’ cable naming convention and the ICONN Database is being modified to identify remotes assigned to a given Central Office. As Qwest is not in a position to counsel CLECs on the construction of their network, Qwest would encourage CLECs to perform their own analysis and research.

Sincerely,

Cindy Buckmaster Product Manager Unbundled Loop Qwest Communications

CC: Bill Campbell – Product Director Qwest Communications Richard Martin – CMP Project Manager Qwest Communications

-

March 12, 2002

Terry Wicks Allegiance Telecom Inc

SUBJECT: Qwest Change Request Response - CR PC010302-1 Remote Swiching Unit- Inability to provision UNEs

This letter is in response to your Change Request PC010302-1 requesting that Qwest develop a process to allow the switching of end users service via an RSU to CLEC facilities.

General Information

The structure of the Qwest network occasionally results in the placement of Remote Switching Units (RSUs). These RSUs are a “spin off” of a host wire center and are created where geographic distance and/or population density requires. For the purposes of the Unbundled Loop, an RSU becomes the serving wire center for the end users it touches. As RSUs are deployed, end users served by the RSUs are terminated at the RSU. The structure between the host and the remote units becomes transport, therefore, there is no contiguous loop between the host and the end-users served by the RSU. End users of the remote are not individually identified at the host.

The underlying requirement of an Unbundled Loop is a Collocation in the serving wire center. The serving wire center for end users in the remote is the remote Central Office. Unbundled Loop can be ordered out of the remote only if the CLEC is collocated in the remote.

How to tell if an end user is in a RSU

The Raw Loop Data Tool (RLD) provides the CLEC with the information during pre-order to determine that the end user customer is served from an RSU. In the Raw Loop Data Tool the end user’s cable pair will indicate an “EX” prefix when the facility originates from an RSU (i.e., F1 ca EXA7).

There are two versions of the RLD tool. Using the IMA version a CLEC can view information specific to an end user address. With a digital certificate the CLEC can use the wire center version of the Raw Loop Data Tool. Data from this version of the RLD tool can be downloaded into an Excel spreadsheet or a database provided by the CLEC. Using the “File, Save As” commands from the browser software the CLEC can save the information to the location and in the format they prefer. Approximately 50 – 150 MB of disk space is needed per wire center. The process may be time intensive, as each wire center is checked separately.

See Loop Qualification and Raw Loop Data- CLEC Job Aid on URL http://www.qwest.com/wholesale/training/coursecatalog.html

How to serve customers in an RSU

The first option available to CLECs, to serve end users in a Remote Serving Unit (RSU), is to Collocate in the RSU.

Central Office Collocation:

For Central Office Collocation, each Central Office will be evaluated to determine if your Collocation requirements can be met (e.g., space, power, and heat dissipation).

Three types of Central Office Collocation are available:

Physical Caged Collocation – Allows the CLEC to physically collocate the CLECs own equipment in a Qwest Central Office in a space that is completely enclosed via chain link fencing. The CLEC installs, maintains and repairs their collocated equipment.

Physical Cageless Collocation - Allows the CLEC to physically collocate the CLECs own equipment in a Qwest Central Office in a space shared by Qwest and other CLECs that opt for Cageless Collocation. The CLEC installs, maintains and repairs their collocated equipment.

Virtual Collocation - Allows the placement of the CLECs equipment in a Qwest Central office, however, Qwest will install, maintain and repair the CLECs collocated equipment. In a Virtual Collocation arrangement, the CLEC does not have physical access to the virtually collocated equipment in the Qwest Central Office.

More information can be found in the Collocation Product Catalog (PCAT) at: http://www.qwest.com/wholesale/pcat/collocation.html

Enhanced Extended Loop (EEL):

The second option available to CLECs to serve end users in an RSU, is to request an Enhanced Extended Loop (EEL).

As the facility between the host Central Office and the remote Central Office is transport, the requested EEL would originate in the host office, extend through the remote Central Office and terminate at the end users premises. EEL can be ordered in two configurations; point-to-point (one transmission level from point of origination to point of termination) or Multiplexed EEL (a higher transmission level between the two central offices and a lower transmission level to the end user).

The "Multiplexed EEL" most closely resembles the network Allegiance has described. The CLEC can order a Multiplexed EEL with transport from their Collocation to another Qwest wire center. The Multiplexed EEL must be turned up before ordering EEL links (loops) to be connected to the Multiplexer. The EEL link orders must provide CFA (CKTID and slot number from the Multiplexed EEL). Each EEL, whether link or multiplexed, is ordered via an LSR. Standard intervals apply to each LSR EEL request. Intervals may be found under EEL/LMC in the Interconnection Service Interval Guide (SIG), also located on the Qwest wholesale website: http://www.qwest.com/wholesale/guides/sig/index.html

An abbreviated copy of that SIG has been attached to this document for ease of discussion (see Attached).

More information can be found in the EEL Product Catalog (PCAT) at: http://www.qwest.com/wholesale/pcat/eel.html

Billing elements are further described in the EEL PCAT and each billing element is labeled on the PCAT diagram. Billing elements for this situation are defined below.

Monthly recurring charges for a DS1 or DS3 multiplexed EEL, originating from a collocation, include: ITP, for the connection to the collocation, transport between the two Qwest wire centers, and multiplexing. Multiplexed EEL nonrecurring charges include transport and are applied to the multiplexer.

Monthly recurring charges for the DS1 or DS0 EEL links would be for the link only. EEL link nonrecurring charges include transport and are applied to the link.

Channel Performance charges may also apply (for DSO only).

A CLEC requiring EEL will need both EEL language and all applicable rate elements in their Interconnection Agreement in order to prevent rejection of the LSR. A CLEC with incomplete or no EEL information will need an amendment before EEL can be ordered. All rates and charges associated with EEL can be found in the CLEC Interconnection Agreement or the SGAT, Exhibit A.

Summary

As described above, Qwest will provide CLEC access to all end users, including those served by an RSU. As Qwest’s network complexities are vast, requests may require individual case basis (ICB) review. Qwest continues to modify its process to ensure CLEC access on a timely basis. Status will be provided in accordance with Change Management Process notification methods as updates to the process warrant.

Sincerely,

Bernadette Derelin Product Manager Unbundled Loop Qwest Communications

CC: Bill Campbell – Product Director Qwest Communications Cindy Buckmaster- Product Group Manager Unbundled Loop Qwest Communications Debra S Smith- Product Manager Unbundled Loop Qwest Communications Neil Houston – Network Qwest Communications Richard Martin – CMP Project Manager Qwest Communications


Open Product/Process CR PC081902-1 Detail

 
Title: The 30 minute rule for Coordinated Hot Cuts.
CR Number Current Status
Date
Area Impacted Products Impacted

PC081902-1 Completed
4/15/2009
Provisioning, Coordinated Hot Cuts UBL, UNE-Loop
Originator: Mendoza, Lori
Originator Company Name: Allegiance
Owner: Toye, Deni
Director:
CR PM: Harlan, Cindy

Description Of Change

The 30 minute rule wording was only added to the PCAT for CHC with and without cooperative testing on 7/19/02. Prior to 7/19/02 Allegiance had asked for the rule in writing and had not received it. The application of this rule by the QCCC has not been consistent over the past year as I have discussed with Allegiance's Service Manager on several occassions. I had asked that the written rule or policy be sent to me in writing so that Allegiance could document our internal processes to follow the Qwest policy. Up until the notice was sent out on 7/18/02 that it was being added to the PCAT, it was conveyed by word of mouth between the QCCC and our operations. For example, some Testers stated that if we had not confirmed with the tester that we were ready to start the cut within 30 minutes of the start time of a cut, then they would JEP the order at 31 minutes. Other QCCC Testers stated that we have to be working the cut within this time or they would JEP it. It has had various clarifications as to what this rule is under the various Managers that have worked in the QCCC over the past year.

Qwest has been pointed out that this is not a new or even a changed process. Qwest has stated that this information has been in the SGAT for approximately 6 years. Allegiance has never opted into the SGAT language for our ICA and up until 8/02/02, Allegiance was never aware that this information was documented in the SGAT.

Here is the wording for reference:

“If you are not ready within thirty (30) minutes of the scheduled appointment time, then you must reschedule the installation by submitting a supplemental LSR. If Qwest is not ready within thirty (30) minutes of the scheduled appointment time, Qwest will waive the nonrecurring charge for the installation option. You and Qwest will attempt to set a new appointment time on the same day and, if unable to do so, Qwest will issue a jeopardy notice and a FOC with a new Due Date.”

The statement implies that “if for any reason” the CLEC is not ready, then it will be SUPd at 31 minutes. It does not take into account that if Qwest fails to notify us of a no dial tone issue, according to the current 48 hour dial tone testing requirements, then the CLEC is still held accountable for not being ready and the order will be SUPd. At the maximum, we may have 1 hour and 30 minutes from the start time of the cut to resolve a no dial tone issue if no notification was sent prior to due date. This has happened to Allegiance several times, and some QCCC testers hold fast to this policy. We have had to escalate on these instances and in some cases it has been denied and the order was JEPd. The wording needs to change to identify exceptions to the rule.

If Qwest is not ready for whatever reason according to this policy, Qwest will work with the CLEC throughout the day to get it cut. But if the CLEC is not ready, Qwest is only allowing a maximum of 1 hour and 30 minutes ( less in many instances) to "get ready" or the order will be JEPd.

Qwest is not taking it into consideration when Qwest fails to follow all steps of the 48 hour dial tone testing requirements and timely notification to the CLEC. When Qwest fails to do this, Qwest is considering that the CLEC is not ready. Allegiance believes that in this type of situation, it is Qwest that is not really ready because Qwest has not followed all steps of the process. Qwest’s consequence for not doing the cuts on due date is the potential that Qwest may have to pay penalties. The current policy is allowing Qwest to work with the CLEC to get it done on cut date to avoid such penalties. The consequence to the CLEC is we can lose that customer if we cannot get the order cut on due date as promised and we only have a limited time to “get ready” in order to complete the cut.


Status History

08/16/02 - CR Submitted by Allegiance

08/19/02 - CR acknowledged by P/P CMP Manager.

08/20/02 - Contacted customer and scheduled Clarification meeting

08/21/02 - CR Posted to Web

08/26/02 - Conducted Clarification meeting with Allegiance

08/30/02 - Clarification minutes issued to Allegiance

09/18/02 - September CMP Meeting Allegiance introduced and explained CR. It was agreed that the CR could move into Evaluation. Qwest will provide Response at the October Meeting. Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product /Process CMP Meeting Distribution Package 10/16/02.

10/09/02 - Draft Response issued to Allegiance

10/16/02 - October CMP Meeting - Response accepted by CLEC community. Development of Level 3 Change will begin. This CR will move to Development status. Minutes will be posted to the Project Meeting section.

10/23/02 - Removed Draft from the Response and updated it to include comment from ATT to clarify this process does not over ride the VP Expedite Process

10/25/02 - Final Response posted to web

11/20/02 - November CMP Meeting advised process document is being updated.

12/16/02 - Level 3 Document Number: PROD.12.16.02.F.00877.AnalogLoop2_4Wire distributed. Proposed Effective Date: January 30, 2003

12/18/02 - December P/P CMP Meeting notes will be posted to the Project Meeting section. Changed status to CLEC Test.

12/19/02 - Message from CMP Comment Mail-In PROD.12.16.02.F.00877.AnalogLoop2_4Wire. Comments received on PCAT updates.

01/02/03 - Comments cycle closed for Notification PROD.12.16.02.F.00877.AnalogLoop2_4Wire. There were two CLEC comments received for this notification. The Qwest Final Release Notice and Response to the comments on this notification must be posted to the web by 1/15/03 with an effective date of 1/30/03.

01/07/03 - Changes Qwest owner and presenter to Deni Toye as Linda Hendricks is retired on Jan. 10, 2003. Cindi Dahlstedt will also support CR.

1/15/03 - Comments responded to and updates made to PCAT based on comments made.

1/1/5/03 - January P/P CMP Meeting notes will be posted to the Project Meeting section.

02/19/03 - February P/P CMP Meeting notes will be posted to the Project Meeting section.

3/19/03 - March P/P CMP Meeting notes will be posted to the Project Meeting section.


Project Meetings

03/19/03 March CMP Meeting Cindi Dahlstedt – Qwest reported she has checked to make sure we are sending the NDT notifications and all was okay. Bonnie Johnson – Eschelon asked if we do a spot or total check. Cindi replied a spot check. If any issues are found please notify Deni Toye at dtoye@qwest.com. Lori Mendoza – Allegiance reported NDT are working okay. Sometimes the CFA information is missing. Lori agreed to close this CR.

02/19/03 February CMP Meeting

Deni Toye–Qwest provided statistics regarding PTA NDT Notifications. All were sent within the 24-36 hour time frame. The QCCC has not been out of compliance so we have not executed the 30 minute rule. Lori Mendoza–Allegiance reported they have not had any problems, except they have gotten some PTA notifications without CFA information. This information has been provided to their Service Manager to investigate. Sharon Van Meter–ATT advised she will be meeting with her company to determine whether they will begin to use the PTA tool. This CR will be left in CLEC Test status until next month. At that time we will review additional feedback from the CLEC Community and determine a close date.

01/15/03 - Janaury CMP Meeting

Toye-Qwest stated that Qwest had distributed a notification on this CR and had responded to CLEC comments to the changes. Johnson-Eschelon stated that she had not yet read the Qwest response. Mendoza-Allegiance stated that Qwest has been much better, recently, on no-dial-tone notifications. This CR remains in CLEC Test.

12/18/02 - December CMP Monthly Meeting Minutes Qwest-Linda Hendricks advised the PCAT is out for CLEC comments with a planned implementation date of January 31. This CR will change to CLEC Test.

11/20/02 - November CMP Monthly Meeting Minutes Qwest (Hendricks) reported the PCAT is under development. This project will remain in Development status.

10/16/02 - October CMP Meeting Minutes Qwest reviewed the Acceptance Response to this CR and outlined when the exception will apply and when it will not apply. Eschelon clarified the following scenario: If Qwest can not reschedule the CHC for the same day the exception process will not apply. ATT expressed their concern that the exception process does not apply to VP Expedites. Qwest clarified the current VP Expedite Process does not change and this CR does not override the current VP Expedite Process. Qwest obtained agreement this CR would be handled as a Level 3 change and will follow the Level 3 process. This CR will move to Development status.

09/24/02 - September CMP Meeting Minutes Terry Wicks - Allegiance introduced and explained this CR would allow for an exception to the 30 minute rule for CHC process if CLECs do not get at least 24 - 48 hours NDT notification from Qwest. This applies to CHC only, not basic. In the case of not receiving notification QCC would work with the CLEC to reschedule the technician for sometime the same day instead of sup the LSR at 31 minutes. Jonathan-ATT said this should reduce the number of C01 misses. Linda Hendricks - Qwest explained if we are not doing the PTA email notification we won't be able to track whether the 48 hour NDT notifcation occurred. Eschelon and Allegiance expressed their support of the PTA tool. Qwest advised a response would be provided at the October meeting.

1:30 p.m. (MDT) / Monday 26th August 2002 1-877-561-8688 PC738 5723# Review CR PC081902-1 30 minute rule for Coordinated Hot Cuts

In Attendance: Terry Wicks - Allegiance Linda Hendricks - Qwest Bob Mohr – Qwest Cheri Hurless – Qwest Neil Houston – Qwest Cindy Macy – Qwest Ric Martin – Qwest Linda Sanchez-Steinke – Qwest Deb Smith – Qwest Deni Toye - Qwest

Introduction of Attendees

Review Requested (Description of) Change : Reviewed CR and confirmed business issues this CR will address. Terry requests the wording in the PCAT be changed to reflect an exception to the 30 minute rule if Qwest does not follow the 48 hour DT testing process. If Qwest notifies CLEC with 24 hours or less advance notice an exception process needs to be available. The exception process would allow Qwest and the CLEC to set a new appointment time on the same day, instead of jeopardizing the order and requiring the installation to be rescheduled by submitting a supplemental LSR. The business issue this CR is addressing is prevention of customer loss.

Confirm Areas & Products Impacted : Unbundled Loop / UNE / Loop Conversion orders existing customers PCAT – Ordering Wholesale UNE Installation Option Coordinated Installation with / with out testing

Confirm Right Personnel Involved : Linda Hendricks – confirmed as Lead SME Neil Houston – Network Regulatory Bob Mohr – Product Manager Cheri Hurless – Service Manager Cindy Macy – Change Request Project Manager

Identify/Confirm CLEC’s Expectation : Terry requests the wording in the PCAT be changed to reflect an exception to the 30 minute rule if Qwest does not follow the 48 hour DT testing process. If Qwest notifies CLEC with 24 hours or less advance notice an exception process needs to be available. The exception process would allow Qwest and the CLEC to set a new appointment time on the same day, instead of jeopardizing the order and requiring the installation to be rescheduled by submitting a supplemental LSR.

Identify any Dependent Systems Change Requests : CR PC 081902-2

Establish Action Plan (Resolution Time Frame) Document and issue meeting minutes within 5 business days (9-3-02) - Qwest Present CR at September CMP Meeting - Allegiance Present Draft Response at October CMP Meeting - Qwest


CenturyLink Response

October 16, 2002 For Review by CLEC Community and Discussion at October's CMP Meeting

Allegiance Telecom, Inc

SUBJECT: Qwest’s Change Request Response - CR #PC081902-1 The 30 minute rule for Coordinated Hot Cuts

Allegiance Telecom, Inc is requesting that Qwest change the wording and current process to allow the CLEC to work with Qwest on due date to get the cut done, when Qwest has failed to timely notify the CLEC according to the notification of NDT process, just as Qwest is allowing itself to do when Qwest is not ready. Update the PCAT with any changes resulting from this CR.

Qwest will accept the “30 Minute Exception” CR with the following guidelines:

-All CLECs must be enrolled in the NDT PTA Notification procedure in order to have accurate tracking and parity to ensure the success of the “30 minute rule” process.

-If Qwest fails to notify the CLEC within the timeframe of the NDT notification procedure, we will attempt to reschedule at a mutually agreed upon time for the same day.

-If Qwest is able to reschedule the same day it will not require a Customer Not Ready jeopardy and will not require a supp to the LSR. However the order will be in a CLEC delay status documented on the OSSCN screen in WFA/C.

- Rescheduling the Coordinated Hot Cut may not be workable on the same day. The appointment may require another date and time. This will result in a Customer Not Ready jeopardy.

- This process will be rework for Qwest in several departments and will require the CLEC to supp their LSR if another day and time is required.

The “30 Minute Exception” will not apply when:

- If Dial Tone is found at 48 hours before Due Date and noted in the OSSLOG, then at 1 hour before the due date the Dial Tone is no longer present.

- If the CLEC is not using the PTA NDT Email Notification.

- If the email systems of either Qwest or the CLEC were not working during the notification period, tracking would be invalid.

- If the CLEC has requested a VP Expedite and the interval does not allow the appropriate time for DT verification and CLEC notification (This process does not over ride the VP Expedite Process)

Qwest will issue this as a Level 3 change and seek concurrence of this approach at the October CMP Meeting.

Sincerely,

Linda Hendricks Lead Project Analyst Qwest

Cc: Mary Pat Cheshier, Diane Diebel


Open Product/Process CR PC081902-2 Detail

 
Title: The 48 Hour Dial Tone Testing Requirements
CR Number Current Status
Date
Area Impacted Products Impacted

PC081902-2 Completed
11/20/2002
Provisioning UBL, UNE-Loop
Originator: Mendoza, Lori
Originator Company Name: Allegiance
Owner: Hendricks, Linda
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

The following mailout was sent to CLECs on July 19, 2001 regarding Qwest's process for 48 hour dial tone testing:

*********************************************************************************************

Announcement Date: July 19, 2001

Effective Date: July 29, 2001

Document Number: PROS.07.19.01.F.00012

Notification Category: Process Update

Target Audience: CLEC

Subject: Dial Tone Test 48 Hours Before Due Date

Effective July 29, 2001, a process enhancement will be added to both the Coordinated and Basic Installation Option Processes. Qwest will verify the CLEC’s Dial Tone at the CLEC’s CFA 48 hours prior to the Due Date. This will assist CLECs in identifying dial tone concerns prior to the due date.

Central Office Technicians (COT’s) will check for CLEC Dial Tone 48 hours prior to the Due Date. The Dial Tone check will be for the Unbundled Loop Analog (Voice Grade) Product.

The COT will check for Dial Tone at the CLEC CFA. The COT will document the results from the Dial Tone test and the results will be forwarded to the Implementer/Coordinator (C/I).

If the COT does not detect Dial Tone 48 hours prior to the Due Date, then the (C/I) will contact the CLEC with the information. The CLEC should investigate and supply the dial tone by the Due Date or issue a supplement to the LSR to change the due date.

If the CLEC has requested a Coordinated Installation, the COT will check for Dial Tone one hour prior to the Coordinated Installation time. If dial tone is not detected at that time, then the COT will report this to the C/I who will in turn inform the CLEC.

This Process will be put in place to ensure that the CLEC will receive their circuit on the due date.

*********************************************************************************************

Allegiance believes that Qwest is not complying with the process as stated above. The testing for dial tone is actually being conducted on DVA date (48 hours after Application Date not 48 hours prior to Due Date). Also it is not clear as to when Qwest is notifying the CLEC of no dial tone conditions. This process implies that once the COT forwards the results to the QCCC tester at 48 hours prior to due date, then the tester will immediately notify the CLEC of No Dial Tone conditions. In actual practice, Qwest is not consistently notifying the CLEC at 48 hours prior to cut date. There are inconsistencies between the process and Qwest's actual application of the process. Qwest needs to comply with its published process. This process is not published in the PCAT. The only reference to this process that Allegiance could find was the mailout sent to CLECs on July 19, 2001.

Expected Deliverable

Qwest will comply with its published process. Qwest will update the PCAT to include this process.


Status History

08/16/02 - CR Submitted by Allegiance

08/19/02 - CR acknowledged by P/P CMP Manager.

08/21/02 - CR Posted to Web

08/22/02 - Contacted Allegiance to schedule Clarification Meeting

08/26/02 - Conducted Clarification Meeting with Allegiance.

08/30/02 - Clarification meeting minutes issued to Allegiance

09/18/02 - September CMP Meeting - Allegiance clarified this CR. Meeting minutes will be posted to this CR's Project Meetings section.

10/09/02 - Issued Qwest draft response dated 10/3/02 to Alex Pantazis at Allegiance Telecom.

10/16/02 - October CMP Meeting - Minutes on this CR to be posted to the Project Meetings section. CR status changed to CLEC test.

10/28/02 - Issued Qwest Response dated 10/3/02 to Lori Mendoza at Allegiance.

11/20/02 - November CMP Meeting - CR status changed to Completed. Meeting minutes will be posted to this CR's Project Meetings section.


Project Meetings

11/20/02 November CMP Meeting Qwest (Neil Houston) reviewed the status of this CR and Qwest said that final notification was sent to CLECs on 10/11/02. Neil proposed that this CR be closed. Lori Mendoza with Allegiance agreed this CR could be moved to complete status.

- 10/16/02 October CMP Meeting Linda Hendricks with Qwest reviewed the draft response to this CR dated 10/3/02. Language was updated in the 2-Wire 4-Wire PCAT Version 10 which was published on 10/11/02. There were no questions from the CMP participants and this CR will be updated to CLEC test.

- 09/18/02 September CMP Meeting Minutes Allegiance reviewed the CR submitted and explained that they would like to have the dial tone testing and notification sync up in the PCAT documentation because the process document, PROS.07.19.01.F.00012, is not clear. Allegiance and Eschelon would like the testing process and the notification process of a no dial tone condition on 5-day interval and on longer than standard interval orders clarified. If the CLECs understand when the dial tone testing is done, then, they can adjust the date their translations are complete. Qwest explained that the CLEC is notified 24 - 36 hours before the due date of a no dial tone condition. The dial tone test is performed on DVA, which on 5-day interval orders is 48 hours after application date. Qwest will clarify the process, for 5-day and longer than standard interval orders, in the PCAT. Allegiance said that clarification in the PCAT would satisfy this CR.

- CLEC Change Request Clarification Meeting 3:00 p.m. (Mountain Time) / Monday 26th August 2002

1-877-554-8688 1930099 # PC081902-2 The 48 Hour Dial Tone Testing Requirements

Attendees Terry Wicks, Allegiance Deb Smith, Qwest Linda Hendricks, Qwest Bob Mohr, Qwest Cindy Macy, Qwest Neil Houston, Qwest Linda Sanchez-Steinke, Qwest

Introduction of the participants on the Conference Call was made and the purpose of the call discussed.

Review Requested (Description of) Change Terry indicated that Qwest is not following the process in document number PROS.07.19.01.F.00012. The process is interpreted that Qwest does the dial tone test and then calls the CLEC right away. The following is extracted from the CR submitted by Allegiance: Allegiance believes that Qwest is not complying with the process as stated above. The testing for dial tone is actually being conducted on DVA date (48 hours after Application Date not 48 hours prior to Due Date). Also it is not clear as to when Qwest is notifying the CLEC of no dial tone conditions. This process implies that once the COT forwards the results to the QCCC tester at 48 hours prior to due date, then the tester will immediately notify the CLEC of No Dial Tone conditions. In actual practice, Qwest is not consistently notifying the CLEC at 48 hours prior to cut date. There are inconsistencies between the process and Qwest's actual application of the process. Qwest needs to comply with its published process. This process is not published in the PCAT. The only reference to this process that Allegiance could find was the mailout sent to CLECs on July 19, 2001.

Confirm Areas & Products Impacted Unbundled Loop 2 wire 4 wire Analog Voice Grade, Coordinated and Basic Option

Confirm Right Personnel Involved Qwest confirmed the correct personnel were on the call. Identify/Confirm CLEC’s Expectation

Allegiance requests the following deliverables on this CR: - Update the PCAT with the Qwest process, and the agreed upon number of hours before due date the dial tone check is done, and, the agreed upon number of hours before the due date that the CLEC is notified of a no dial tone condition. - Provide notification of the process above - Improve on the CLEC notification process when there is a no dial tone condition. Determine the minimum number of hours before due date that the CLEC’s would like to be notified of a no dial tone condition.

Identify any Dependent Systems Change Requests PC081902-1, PC050302-1

Establish Action Plan (Resolution Time Frame) Allegiance will clarify and review this CR at the 9/18/02 CMP Meeting. Qwest will present the draft response at the 10/18/02 CMP Meeting.


CenturyLink Response

October 3, 2002

Lori Mendoza LEC Account Manager Allegiance Telecom, Inc.

SUBJECT: Qwest’s Change Request Response - CR #PC081902-2 48 Hour No Dial Tone Notification

This in response to Allegiance Telecom’s Change Request (CR) PC081902-2. This CR requests that Qwest clarify its 48 Hour No Dial Tone notification process and to document the process in the PCAT.

Qwest accepts this CR and the following language has been added to the 2-Wire or 4-Wire Analog (Voice Grade) Loop V10 PCAT.

Qwest verifies for dial tone at your CFA 48 hours after Qwest’s APP (application) date. If Qwest finds No Dial Tone (NDT), Qwest will retest 48 hours prior to due date. If dial tone is still not present, Qwest will email the NDT results to you through Qwest’s Provider Test Access (PTA) email system. You will receive the NDT PTA email notification approximately 24 to 36 hours prior to the due date. Qwest will email only when there is No Dial Tone. You will need to supply the dial tone by the due date or supplement the LSR, changing the due date.

This language is in document review and will be published to the Wholesale PCAT web site on October 11, 2002.

Sincerely,

Neil Houston Staff Advocate Policy & Law

Linda Hendricks Lead Project Analyst

cc: Mary Retka, Director, Technical Regulatory Interconnection Planning


Open Product/Process CR PC061002-1 Detail

 
Title: LSR put in Jeopardy when no dial tone present when Qwests installs Unbundled Loop
CR Number Current Status
Date
Area Impacted Products Impacted

PC061002-1 Completed
11/21/2002
Ordering, Maintenance/Repair, Provisioning Loop
Originator: Dowding, Byron
Originator Company Name: Alltel
Owner: Hendricks, Linda
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

When ALLTEL orders an unbundled loop with a NC Code of LX--and the CHC marked N, Qwest checks for dial tone at the end user (new loops) or at the spot pair (reuse facilities). If there is no dial tone present, Qwest contacts the CLEC gives them 30 minutes to get dial tone on the loop or the LSR is put in Jeopardy and a new LSR has to be written with a new due date. If the order contains multiple loops and one of the loops does not have dial tone, all of the loops are placed in Jeopardy. Qwest has responded to our concerns saying that this has always been their procedure but it was not being followed. Because these orders are not coordinated hot cuts, Qwest can make their cut anytime during the day. It could even happen over a lunch hour. We have also had situations where Qwest has put a loop on the wrong spot pair, had no dial tone at the customer’s premise and placed the order in Jeopardy.

Expected Deliverable:

Qwest to change this process ASAP, give the CLEC a reasonable amount of time (90 minutes) to correct a no dial tone situation on a reuse of existing facilities and give loops to the CLEC if there is continuity to the spot pair on new facilities


Status History

06/10/02 - CR Submitted by Alltel

06/10/02 - CR acknowledged by P/P CMP Manager

06/12/02 - CR posted to Web

06/14/02 - Called Alltel and scheduled clarification call to be held 06/18/02 10:30 a.m. MST

06/18/02 - Clarification call held with Alltel

06/25/02 - Clarification call meeting minutes sent to Alltel and posted in database

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section.. CR status"Clarification" was not changed.

08/14/02 - Issued Qwest draft response dated 8/13/02 to Byron Dowding at Alltel

08/21/02 - Issued updated Qwest draft response dated 8/19/02 to Byron Dowding at Alltel and posted response to http://www.qwest.com/wholesale/cmp/teammeetings.html

08/21/02 - CMP Meeting - Qwest presented its draft response dated 8/19/02. Minutes on this CR to be posted to the Project Meetings section.

08/22/02 - Posted updated Qwest draft response dated 8/19/02 to CMP database

08/21/02 - August CMP Meeting - Meeting minutes posted to this CR's Project Meetings section

08/30/02 - Posted Alltel response dated 8/27/02 to Qwest draft response dated 8/19/02

09/12/02 - Posted e-mail dated 9/12/02 to Byron Downing at Alltel

09/12/02 - Issued revised response dated 9/12/02 to Alltel

09/18/02 - September CMP Meeting - Qwest presented revised response. CR will move to Development. Meeting minutes will be posted to this CR's Project Meetings section

10/11/02 - Qwest issued Final Notification. Notification PROD.10.11.02.F.00839.Final_2 _4_Wire_Loop. Effective date of change is 10/27/02.

10/16/02 - October CMP Meeting - Minutes on this CR to be posted to the Project Meetings section.

10/28/02 - CR status changed to CLEC Test.

11/20/02 - November CMP Meeting - This CR will remain in CLEC Test Meeting minutes will be posted to this CR's Project Meetings section. Approval given to close this off line with concurrence from Byron at Altel..

11/21/02 - Contacted Alltel to follow up on potential closure of this CR.

11/21/02- Received call from Byron Dowding, Alltel that this CR can be closed.


Project Meetings

11/20/02 November CMP Meeting Qwest reviewed the status of this CR as it was moved to CLEC test last month. Linda Hendricks with Qwest said there have not been questions or concerns from the CLEC Community on implementation. Qwest will follow up with Byron Dowding at Alltel to make sure they are not experiencing any problems and ask if the CR can be closed. The CLEC Community has agreed to close this CR if Alltel agrees.

- 10/16/02 October CMP Meeting Michael Buck with Qwest said that final notification PROD.10.11.02F.00839.Final24WireLoop was sent on 10/11/02 and the implementation date is 10/27/02. The CR is currently in Development Status and Qwest would like to move it to CLEC Test on the deployment date later this month. Byron Dowding with Alltel said that it was appropriate to move to CLEC test and discuss again at the November CMP meeting.

09/18/02 September CMP meeting Minutes Qwest discussed the revised draft response and provided an update that Qwest would no longer require dial tone on new unbundled loops effective mid-October. Conversion orders will continue to require dial tone. Qwest explained that the effective date is following the PCAT update for 2-wire 4-wire, Version 11, which is effective October 21, 2002. Allegiance and Eschelon appreciate Qwest changing to the no dial tone requirement on new unbundled loops. Allegiance also noted a clarification from the August Meeting minutes regarding the conversation on this CR. At the August meeting Lyndall Nipps – Allegiance asked why doesn't Qwest check for continuity on DS0 loops like you do for DS1 and above loops by plant test date. Qwest responded that it was not in the infrastructure to test for continuity on DS0 loops. A pre-survey is done for all UBL except for LX - -. LX - - is worked on the due date. This CR was moved to Development status.

9/12/02 2:29 p.m. To: cc:

Subject: RE: Updated Draft Response to CR PC061002-1

Byron -

The following is in response to Alltel's questions in your e-mail dated 8/27/02:

1. CHC means Coordinated Hot Cut (Y or N). You can have a Hot Cut with the Basic Option. Hot Cut means we go from one service provider to another on an existing service, this option can be ordered Coordinated or Basic.

2. Qwest is preparing to only require dial tone on reuse LX-- in mid-October.

3. The polarity of the Qwest wiring and facilities, from the CFA to the NI at the end user locations, can be checked using normal Qwest test systems and sets. The polarity of the supplied CLEC service can not be tested without the CFA operationally in service. If the CLEC provides service on the CFA with reversed polarity, Qwest will not reverse their wiring or facilities to correct, as this would impair Qwest’s ability to properly maintain the circuit in service. The polarity of a loop start line is of significant importance when the facility provided is anything but a plain copper loop. Pair Gain facilities require correct polarity of supplied service to operate correctly.

4. Qwest is preparing to only require dial tone on reuse LX-- in mid-October.

Please call me if you have any questions.

Thank you

Linda Sanchez-Steinke Change Request Project Manager Qwest

-- From: Byron.Dowding@alltel.com on 08/27/2002 08:03:51 a.m. To:

Subject: RE: Updated Draft Response to CR PC061002-1 Linda This is ALLTEL's response to the Qwest response I don't have any feedback yet to verify Qwest allowing more than 30 mintutes to provide dial tone on a loop. Byron

SUBJECT: ALLTEL response to Qwest response regarding change request PC061002-1 dated 08/19/2002

ALLTEL would like to make the following points.

1. The first statement in Qwest’s response states that this CR is about Qwest’s Hot Cut process. CR PC061002-1 has nothing to do with Hot Cuts. This CR is about ordering an unbundled loop with the Basic option and no testing (CHC is N). The service being ordered is 2/4 wire analog with the NC code of LX--. Due date on the loop being turned over to the CLEC and actual customer in service date don’t have a direct relationship. 2. The CLECs have stated several times that ordering a new loop and reuse should be handled as 2 different issues. We are willing to provide dial tone in a reasonable time when we are reusing a facility. When ordering a new loop no dial tone should be provided. 3. Our techs check for polarity when shooting trouble and can reverse the jumper/drop to correct the problem. Polarity should never be an issue with loop start dial tone. I would like to know how Qwest could check for polarity on loop start dial tone when dial tone is provided. 4. For the most part providing dial tone requires CLECs to program dummy numbers in their switch and then reprogramming when the service is actually turned up. This places a costly and unneeded burden on the CLECs.

ALLTEL is planning to charge Qwest for providing joint test capabilities when ordering unbundled loops that Qwest requires dial tone on. ALLTEL is also going to work with the regulatory agencies to significantly reduce the one-time charges associated with provisioning these types of loops.

-- 08/21/02 - August CMP Meeting Minutes: Qwest provided an updated draft response dated August 19, 2002 because information was missing in the August 13, 2002 draft response. The updated draft response is available on line and was handed out to participants in the meeting. Allegiance expressed concern that the 2-wire 4 wire PCAT updated language does not distinguish between new loops and conversions and that Allegiance and other CLECS are trying to find out the technical reasons why Qwest requires dial tone on new loops when there are other ways to check for continuity. Allegiance asked if Qwest checks for continuity from demarc to the central office before plant test date. Eschelon also asked for Allegiance’s question to be answered; does Qwest dispatch for continuity. Qwest stated (Hilleary) that we are pushing for dial tone on due date and dial tone 48 hours before due date is not a requirement. Allegiance disagreed. Qwest stated (Hendricks) that dispatch for continuity is not done, and the pre-survey is done to make sure there are facilities. Qwest stated (Braegger) that on services provided on UDC there is no way to verify correct service operation without Dial Tone on the circuit. Covad said that on digital loop carrier card verified set options correctly if have dial tone. Qwest (Braegger) stated that if Dial Tone is coming in reversed to the card, the card will not operate correctly and won’t operate unless there is battery to it.

Covad asked what would prevent Qwest technician from putting dial tone on temporarily from ICDF at cosmic frame. Qwest (Retka) asked that Covad send in procedure on a CR for Qwest to use spare dial tone temporarily from the ICDF.

Allegiance indicated that Qwest was the only ILEC requiring dial tone on new loops and is a burden on all CLECs when changing from T1 to UNE loop because translations are required for two different numbers and when Qwest checks for ANI the line is not the right number. Eschelon said there is effort that they must go through internally assigning dummy numbers to CFA to provide dial tone for Qwest.

Allegiance asked how Qwest identifies a fault and what does it mean in PCAT wording, pages 5-6 under the ordering section, asked if the purpose of notification is relationship managing. Eschelon asked if they should receive a jeopardy rather than a call if there was a short. Qwest (Boudhaouia) stated Qwest will re-write the PCAT. Allegiance said that the language creates concern over PIDS managing to process and Allegiance does not want the PCAT updated on 8/26/02. Qwest (Maher) stated that for Qwest and the CLECs to follow the CMP, the PCAT would be updated on 8/26/02 because there were comments from the CLEC community on the PCAT change, and Qwest had followed CMP and responded to those comments. Qwest (Schultz) clarified that the PCAT update included documentation of processes that were currently in effect. Allegiance objected to the PCAT update on 8/26/02.

Alltel asked for status of CR. Qwest (Graham) reviewed draft response part 1 reviewing why tests are done and the technical reasons for dial tone requirement.

Qwest (Hendricks) reviewed draft response part 2 reviewing the procedure for the basic option. When the CLEC selects the basic option and is not ready on due date, the technicians go on to their other work. If the CLEC calls back later in the day, then Qwest will try to get technicians back out. Alltel (Dowding) will check with Alltel people that asked for CR because they had said at 31 minutes the order has to be supplemented. Qwest explained that the 31 minutes would be applicable on the appointment time option but is not applicable on the basic option.

Due to another scheduled meeting, which many CMP participants wished to attend, the meeting was adjourned before discussion on the final disposition of the CR was concluded. Qwest will work offline with Alltel regarding the status of the CR and bring the CR back up for discussion at the September CMP meeting.

CLEC – Qwest Change Management Process Monday, August 12, 2002 Ad-Hoc meeting to discuss CLEC comments and CR Conference Bridge: 877.521.8688, passcode 7901848#

NOTE: These DRAFT meeting minutes were developed August 19, 2002 by Qwest following a meeting on the 2Wire 4Wire CLEC Dial Tone Requirement

MEETING MINUTES

The meeting was initiated by Qwest via Change Management notice CMPR.08.06.02.F.01307.CMPMtgFinalized that was distributed to the CLECs on August 6, 2002. Qwest scheduled the meeting to discuss the following two items with members of the CLEC community:

1) CLEC comments received for Notice PROD.07.12.02.F.00784.AnalogLoop24Wire 2) CMP Change Request PC061002-1 titled, “LSR put in Jeopardy when no dial tone present when Qwest installs Unbundled Loop” from Alltel.

The meeting began with Qwest reviewing the Qwest response to CLEC comments from Allegiance, Alltel, and Eschelon on the Level 3 notification sent out by Qwest on July 12th, 2002, PROD.07.12.02.F.00784.AnalogLoop24Wire. Several CLECs asked when the comments response had been distributed and Qwest responded that the notification had gone out the evening of August 9th, 2002, via notice PROD.08.09.02.F.00807.AnalogLoop24Wire and that the Qwest response to the comments had been posted under the Qwest CMP Product/Process Archive Document Review site under PROD.07.12.02.F.00784.AnalogLoop24Wire. Qwest then reviewed the response to comments with the attendees on the call. Allegiance stated that the Qwest posted comments referred to both conversion of analog loops as well as new installations, and that Allegiance did agree that CLEC dial tone should be required on conversion orders but not on new orders. Eschelon asked why the PCAT was being updated associated with PROD.07.12.02.F.00784.AnalogLoop24Wire. Qwest responded that the PCAT was being updated to reflect the requirement that Qwest currently has in place for these types of orders, and that the requirement was for CLEC dial tone prior to order completion. Eschelon, Allegiance, and ATT requested that the PCAT update be delayed until there was final resolution of the Alltel CR. Qwest responded that this request was out of process because the PCAT update needed to take place August 26th based on the final notice PROD.08.09.02.F.00807.AnalogLoop24Wire, but Qwest would take the request to delay the PCAT update back for final determination. Eschelon stated that there was no reason for CLEC comments if Qwest did nothing with them. Qwest responded that Qwest does take CLEC comments under consideration, but there is no CMP requirement to revise product/process changes based upon CLEC comments. Allegiance then stated that Qwest was the only ILEC requiring CLEC dial tone prior to order completion on NEW orders, and that Qwest needed to reevaluate the requirement. Covad stated that the issue could be resolved by Qwest providing Qwest dial tone to test the circuits, or that there were other test alternatives Qwest could implement. Qwest responded that the requirement for CLEC dial tone was still in effect due to technical requirements outlined in the response to CLEC comments, and that Qwest would provide a response to the Alltel CR at the August 21st CMP Monthly Product/Process meeting. The CLECs requested that a specific block of time be set aside at the CMP Monthly Product Process meeting to discuss this issue so they could have their technical subject matter experts on the call. Qwest agreed to set aside a specific time on August 21, 2002 to further discuss this. The time will be 1PM MT. The call-in number is 877 572-8687 passcode 3393947. The meeting then adjourned.

-

07/17/02 - July CMP Meeting Minutes: Alltel introduced their Change Request. Alltel requested the wording in the meeting minutes for the clarification meeting held on June 18, 2002 be changed from “48 hours before the Due Date” to “48 hours after application date”. Allegiance stated that Qwest is the only ILEC requiring dial tone testing for testing continuity. Covad stated it should be the CLECs responsibility for providing dial tone. Eschelon stated all CLECs are interested in this Change Request. CR status is presented.

Clarification Call Time/Date: 11:00 qa.m. (MDT) / Tuesday, June 18, 2002 Place: Conference Call Conference: TEL: 877.521.8688 Call-In No: CODE: 7901848 CR No: PC061002-1 "LSR put in Jeopardy when no dial tone present when Qwests installs Unbundled Loop"

Attendees: Byron Dowding, Alltel Neil Houston, Qwest Linda Hendricks, Qwest Steve Hilleary, Qwest Michael Keegan, Qwest

1.0 Attendees introduced. 2.0 Description: The following is extracted from the CR submitted by Alltel: When ALLTEL orders an unbundled loop with a NC Code of LX--and the CHC marked N, Qwest checks for dial tone at the end user (new loops) or at the spot pair (reuse facilities). If there is no dial tone present, Qwest contacts the CLEC gives them 30 minutes to get dial tone on the loop or the LSR is put in Jeopardy and a new LSR has to be written with a new due date. If the order contains multiple loops and one of the loops does not have dial tone, all of the loops are placed in Jeopardy. Qwest has responded to our concerns saying that this has always been their procedure but it was not being followed. Because these orders are not coordinated hot cuts, Qwest can make their cut anytime during the day. It could even happen over a lunch hour. We have also had situations where Qwest has put a loop on the wrong spot pair, had no dial tone at the customer’s premise and placed the order in Jeopardy.

Clarification Call Discussion: Alltel indicated that this problem started recently (60 – 90 days ago) and has occurred at both Omaha and Grand Island, Nebraska

Alltel said the problem is they get a call from Qwest on the due date when no dial tone is present and the order is placed in jeopardy if the problem is not corrected in 30 minutes.

Qwest does a Dial Tone check on both Basic and Coordinated LX - - (2W/4W Analog)type orders on DVA (Design Verify Assign) which is approximately 48 hours after application Date. If there is no Dial Tone at that time Qwest contacts the CLEC to let them know there is no dial tone at this time. The notification is approximately 24-36 hours before the Due Date. I have verified a couple of orders and we have called Alltel after the Dial Tone Check to notify them that there was No Dial Tone at DVA. On Due Date Qwest does another Dial Tone check before they do the install or hot cut before Qwest starts to do the work. If Dial Tone is not present, the COT calls the QCCC (Qwest CLEC Coordination Center) Coordinator. The QCCC Coordinator calls the CLEC and lets them know that Dial Tone is not present at their CFA (Connecting Facility Assignment). The CLEC is given 30 minutes to correct the Dial Tone situation. If the CLEC is not ready in 30 mintues they are requested to send a supplement to their LSR for a new Due Date. If the LX- - has a Reverse Battery or No Signal NCI (Network Channel Interface) Qwest does not require Dial Tone to be present at the CLEC’s CFA. If the order has multiple loops the CLEC may split out the LSR and accept those that do have Dial Tone. The order without Dial Tone may be put on a separate LSR. The Coordinated Appointment Time Option allows the CLEC to choose exactly when they want the installation or hot cut to be performed. The Basic Option allows Qwest to start the installation or hot cut any time between 8AM and 5PM regional time. The COT should be doing the ANI test on the loop before and after they perform the lift and lay. The correct number should be identified. This is the process in place and should be followed to insure the accuracy of the request.

Linda Hendricks will prepare the Qwest response.

3.0 Confirmed that UNE Loop is the product impacted.

4.0 Qwest confirmed the correct personnel were on the call.

5.0 CLEC expects Qwest to change this process ASAP, give the CLEC a reasonable amount of time (90 minutes) to correct a no dial tone situation on a reuse of existing facilities and give loops to the CLEC if there is continuity to the spot pair on new facilities

6.0 No Dependent Systems Change Requests were identified,.

7.0 Action Items Alltel can present this Change Request to the CLEC community at the July Product/Process CMP meeting scheduled for July 17 Qwest will issue draft response to this Change Request by Aug 14 (one week prior to the Aug 21 CMP meeting). Qwest will discuss the draft response at the Aug 21 CMP meeting.


CenturyLink Response

September 12, 2002

Byron Dowding OSS Coordinator Alltel

SUBJECT: Qwest’s Change Request Revised Response - CR #PC061002-1 LSR put in jeopardy when no dial tone present when Qwest installs unbundled loop Alltel is requesting that Qwest change its Hot Cut process to allow for 90 minutes when no Dial Tone is present at the CFA and not to reject orders with multiple service requests when one of the requests must be rescheduled. (Part 1, No Dial Tone) Dial tone is required to provide a quality installation of the service ordered. To ensure adequate circuit level performance, installation and operational tests are performed. Dial tone must be present to perform these tests across the entire circuit: - To verify the assurance of the assignment and translation of the CFA. - To confirm the Competitive Local Exchange Carrier (CLEC) Connecting Facility Assignment (CFA) is operational and test hard wiring from the Qwest Interconnection Distribution Frame (ICDF) to the CLEC CFA. - To perform a polarity test at the termination of the Network Interface Device (NID) and to perform an overall end to end operational circuit test to ensure reliability and functionality. - When provisioning over Digital Loop Carrier (DLC), to perform ground start, loop start and polarity check tests to assure the electronic card in the DLC is operational and optioned correctly. These operational tests require dial tone to minimize trouble reports immediately following test and turn up. If the NC/NCI codes are such that the circuits do not require Dial Tone, Qwest does not require Dial Tone to be present at the CLEC’s CFA.

Qwest is preparing to no longer require the CLEC to provide Dial Tone on new Unbundled Loops (LSR ACT = N) in mid-October and will follow all appropriate CMP timelines. Prior to new Unbundled Loop Basic or Coordinated Hot Cuts, the Qwest Technician will conduct performance testing to assure the new Unbundled Loop complies with its respective NC/NCI standards.

(Part 2, 90 minutes) Perhaps the CLEC request reflects a misunderstanding. Qwest believes that the process in place more than meets the needs of the CLECs. The Basic Option allows Qwest to start the installation or hot cut any time between 8AM and 5PM regional time. Qwest actually allows more than 90 minutes when a Basic Installation is ordered.

Here is the procedure when the Basic Installation Option is ordered:

On Due Date when Qwest is finished doing the installation and core tests, we call to notify the CLEC that we are done and that the test has been completed. If the CLEC wants to do more testing on their own or they can't get something working on their end, Qwest waits 30 minutes, then calls the CLEC again. If the CLEC still isn’t ready Qwest lets the field tech and the Central Office Technician (COT) go to their next jobs.

Qwest will hold the order open and if we do not have a CLEC resolution by the end of day we will have the COT disable the circuit. If the CLEC calls back on the same day and is ready, we will try to get a tech back out (if applicable) and the COT back in the central office. If it is too late in the day, or the resources are not available, Qwest will jeopardize the order and the CLEC must supplement the LSR with a new desired due date.

If the order has multiple loops the CLEC should accept the loops that have Dial Tone and supplement the LSR to remove the loop that does not have Dial Tone. The loop without Dial Tone should be put on a separate LSR with a new desired due date.

In mid-October, on a New order the Outside Technician (OST) will check for dial tone. If the OST does not have dial tone they will: - Call the Central Office and have the COT check for dial tone. If dial tone exists, the OST needs to check the facilities and resolve. - If no dial tone exists, the COT needs to check for dial tone at the Connecting Facility Assignment (CFA). If dial tone exists at the CFA, the COT needs to check the wiring in the CO and resolve. - If dial tone does not exist, the COT will notify the OST and the COT will wire in temporary Qwest dial tone for the OST to perform core tests to complete the order. The QCCC Coordinator / Implementor will not need to notify the CLEC.

Sincerely,

Linda Hendricks Lead Project Analyst Qwest

Cc: Mary Retka, Mary Pat Cheshier, Diane Diebel


Open Product/Process CR PC102802-1 Detail

 
Title: Correction/clarification of Qwest documentation (PCAT, IMA User’s Guide, etc.) describing customer authorization requirements for retrieval of CSRs.
CR Number Current Status
Date
Area Impacted Products Impacted

PC102802-1 Completed
3/31/2003
Pre-Ordering All Products
Originator: Dickinson Pardee, Carla
Originator Company Name: AT&T
Owner: Thacker, Michelle
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

Currently Qwest documentation contains conflicting requirements for CLECs to obtain customer authorization prior to reviewing a customer’s CSR. Qwest’s requirements are not only conflicting within the Qwest documentation, but also conflict with the requirements of applicable law. AT&T requests that Qwest correct its documentation to be clear and consistent with applicable law. The three websites that AT&T has identified with this problem (there may be more) of conflicting information are the websites for:

- Pre-ordering (http://www.qwest.com/wholesale/clecs/preordering.html),

- LOA/POA (http://www.qwest.com/wholesale/preorder/index.html), and

- the IMA User’s guide (http://www.qwest.com/wholesale/downloads/2002/020916/ugpreorder_101_091302.pdf).

The Pre-Ordering website states "Before initiating activity, obtaining a CSR and placing orders on behalf of an end-user, you are required to have a Letter of Authorization or Proof of Authorization giving you authorization to do activity on their behalf." In a separate paragraph, the website provides "While it is not necessary for the LOA to accompany your request, the indication of authorization is required when you request a CSR for an account owned by Qwest or another CLEC." The initial reference to “Letter of Authorization or Proof of Authorization” by itself is fine, but the later reference only to "LOA" suggests written approval from the customer is required for access to the CSR. This is not the case. AT&T understands that customer authorization is required, but a written authorization is not. See 47 CFR Section 64.2007(b). This section of the federal rules identifies the methods by which a carrier may obtain customer approval to access CPNI. It states that "A telecommunications carrier may obtain approval through written, oral or electronic methods." State requirements in the Qwest territory largely mirror the federal rules.

The LOA/POA document states "Prior to obtaining records or placing orders for an end-user you must obtain permission from the end-user to act on their behalf in matters pertaining to the communications services." The following paragraph states "Proof of authorization can be arranged through a Letter of Agency" -- indicating there are options for obtaining authorizations from the customer. The third option cited is "oral authorization verified by an independent third party (with third party verification as POA)." Third party verification is necessary for a transfer of service, but is not required just to view a CSR. The website further states "While the Letter of Agency need not accompany your request for records or services, the indication of agency authorization is a required field entry when you request customer service records or submit Local and Access Service Request forms." As written, this language seems to require a written letter of authorization from the customer in order to view customer records. This is not consistent with the federal and state rules referenced above.

In the IMA user’s guide, "Reviewing Customer Service Records", 10.01 page 1-18 also provides that "Proof that a CLEC has received a Letter of Authorization (LOA) is required if the CLEC attempts to retrieve a CSR for a customer account owned by Qwest or another CLEC". Once again, this language suggests that a written letter of authorization is required. It is not.

While AT&T understands it is necessary to obtain customer consent prior to reviewing CSRs, it is not necessary to obtain written consent or third party verification of oral consent. Qwest does not have the authority through its PCAT, or otherwise, to demand more of CLECs than applicable law requires. AT&T would like to believe that the Qwest language referenced in this CR is simply inadvertent and does not represent Qwest’s intent to require more of CLECs than applicable law requires. However, AT&T does find this documentation troubling and believes that it is important that Qwest clean up its documentation to reflect what is required by applicable law. Please make these corrections and clarifications as soon as possible to avoid further confusion among Qwest’s CLEC customers. Suggestions AT&T would offer include: (i) do not use LOA interchangeably with other forms of authorization that may be obtained; and (ii) simply refer to applicable law in the places where the requirement for authorization needs to be referenced.

Expected Deliverable

AT&T expects Qwest to provide uniform instructions, in accordance with applicable law, within 60 days of submission of this CR.


Status History

10/28/02 - CR Submitted by AT&T

10/29/02 - CR acknowledged by P/P CMP Manager.

11/01/02 - Contacted customer and scheduled Clarification meeting

11/01/02 - CR Posted to Web

11/05/02 - Conducted Clarification meeting with AT&T

11/08/02 - Clarification meeting minutes issued to AT&T

11/20/02 - November CMP Meeting - AT&T presented this CR. CR status changed to Presented. Meeting minutes will be posted to this CR's Project Meetings section.

12/10/02 - Issued Qwest draft response dated 12/3/02 to Carla Dickinson Pardee at AT&T

12/11/02 - Draft Response posted to the web site

12/18/02 - December CMP Meeting - Qwest presented draft response to this CR. CR status changed to Development. Meeting minutes will be posted to this CR's Project Meetings section.

01/08/03 - Issued Qwest response to Carla Dickinson Pardee at AT&T

01/15/03 - January CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section.

01/30/03 - Qwest issued Process Notification PROS.01.30.03.F.00998,PreorderingV14, Pre-Ordering Overview V14.0 updates to PCAT, effective date 1/31/03

01/31/03 - Qwest issued Process Notification PROS.01.31.03.F.0997.POA_LOA_V2, Proof of Authorization / Letter of Agency V2.0, planned updates to PCAT, proposed effective date 2/21/03.

02/14/03 - Qwest issued Final Notice and Qwest Response to CLEC Comments on Proof of Authorization Letter of Agency V2.0, effective 2/21/03

02/19/03 - February CMP Meeting - Qwest provided update on this CR. Meeting minutes will be posted to this CR's Project Meetings section.

03/07/03 - Qwest issued PROS.03.07.03.F.01023.LSOG_Updates Pre-Ordering Overview V18.0

03/19/03 - March CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section.

03/27/03 - Rec'd voice mail from Carla Pardee ok to close this CR.


Project Meetings

03/19/03 March CMP Meeting Michelle Thacker with Qwest provided status on this CR and said that the 12.0 IMA and LSOG documentation has been provided for review. Carla Pardee with AT&T will call Linda Sanchez-Steinke with Qwest after review of the documentation and advise if AT&T is ready to close this CR. The CLEC Community agreed that this CR could be closed if AT&T agrees.

02/19/03 February CMP Meeting This CR is in development status and Donna Osborne-Miller with AT&T said that Qwest will incorporate the PCAT changes requested, the submitted comments, and they would like to leave the CR open another month. This CR will remain in development status.

01/15/03 January CMP Meeting Michelle Thacker with Qwest gave an update on this CR. Documentation for IMA will be effective 1/21/03 with IMA release 11.01. PCAT documentation is targeted to be available in late January. LSOG documentation and Preparation Guide will be available with the 12.0 IMA release in April. This CR will stay in Development status.

12/18/02 December CMP Meeting Linda Sanchez-Steinke with Qwest presented the draft response to this CR and said that CLEC facing documentation and the IMA User’s Guide will be updated. AT&T agreed with the Qwest response and Liz Balvin with Worldcom asked if there would be updates to the Preparation Guide. Qwest will e-mail an answer to Liz Balvin’s question and include in meeting minutes. This CR will be moved to Development status.

11/20/02 November CMP Meeting Carla Pardee with AT&T presented this CR and said that three of the Qwest pre-ordering web sites have different requirements ranging from oral to written approval prior to CLECs reviewing the customer service record. AT&T Legal interpretation is that only oral approval from customers is required prior to reviewing the CSR. Qwest will present the draft response at the December CMP Meeting.

CLEC Change Request Clarification Meeting

November 5, 2002, 3:00 p.m. (MT) Conference Call 1-877-554-8688 PIN 1930099 # PC102802-1 Correction/clarification of Qwest documentation (PCAT, IMA User’s Guide, etc.) describing customer authorization requirements for retrieval of CSR’s.

Carla Pardee, AT&T Mike Johnson, Qwest Sharon King, Qwest Cap Hamilton, Qwest Beth King, Qwest Michelle Thacker, Qwest Linda Sanchez-Steinke, Qwest

Introduction of the participants on the Conference Call was made and the purpose of the call discussed.

Review Requested (Description of) Change The description of change requested in the CR was reviewed. Carla indicated that AT&T is asking that there be consistency in all Qwest documentation associated with the review of customer service records (CSRs). AT&T Legal interprets the wording in the following Qwest websites to be inaccurate according to federal rules, 47 CFR Section 64.2007(b) - Pre-ordering (http://www.qwest.com/wholesale/clecs/preordering.html), - LOA/POA (http://www.qwest.com/wholesale/preorder/index.html), and - the IMA User’s guide (http://www.qwest.com/wholesale/downloads/2002/020916/ugpreorder101091302.pdf) AT&T’s interpretation is that approval to view the customer service record (CSR) can be in written, oral or electronic format.

Confirm Areas & Products Impacted Carla indicated that all products are impacted.

Confirm Right Personnel Involved Qwest confirmed that the right personnel were involved in the conference call.

Identify/Confirm CLEC’s Expectation Carla confirmed that AT&T is not disputing oral approval from customer to review CSR. The documentation wording sounds like the CLECs have to get written permission from customers to view their CSR and AT&T is asking that Qwest documentation be revised.

Establish Action Plan (Resolution Time Frame) This CR will be presented by Carla at the November CMP Meeting.


CenturyLink Response

December 3, 2002

Carla Pardee LSAM Manager AT&T

SUBJECT:Qwest’s Change Request Response - CR # PC102802-1 (Correction/clarification of Qwest documentation (PCAT, IMA User’s Guide, etc.) describing customer authorization requirements for retrieval of CSRs.)

This is in response to AT&T’s Change Request CR PC102802-1. This CR requests that Qwest clarify and correct as needed Qwest documentation (PCAT, IMA User’s Guide, etc.) that describes customer authorization requirements for retrieval of CSRs.

Qwest accepts this CR and will review and clarify CLEC facing documents pertaining or referencing customer authorization requirements.

The IMA User Guide 11.01, is targeted for review in late December and Qwest External Documentation is targeted for review in late January.

Sincerely,

Michelle Thacker Process Specialist Qwest


Open Product/Process CR PC110702-1 Detail

 
Title: Request that rate change notifications/mailouts contain rates effected.
CR Number Current Status
Date
Area Impacted Products Impacted

PC110702-1 Completed
2/19/2003
Notifications/Mailouts All Products
Originator: Dickinson Pardee, Carla
Originator Company Name: AT&T
Owner: Cornwell, Barbara
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

Currently Qwest notifications/mailouts advising of a rate change do not identify the effected rates. Rather, the notifications/mailouts frequently reference a Commission Order from a cost docket, or some other reference, without identifying either the rates that have been effected or the newly implemented rates. It would be extremely helpful to the CLECs if these notifications/mailouts would list the precise rates effected, rather than having to track down the reference to the rate change.

Expected Deliverable

Notifications/mailouts list the precise rates effected.


Status History

11/07/02 - CR Submitted by AT&T

11/08/02 - CR acknowledged by P/P CMP Manager

11/11/02 - CR Posted to Web

11/13/02 - Contacted customer and scheduled Clarification meeting

11/14/02 - Held Clarification Meeting

11/20/02 - Clarification meeting minutes issued to AT&T

11/20/02 - November CMP Meeting - AT&T walked on this CR. Meeting minutes will be posted to this CR's Project Meetings section.

12/10/02 - Issued Qwest draft response dated 12/3/02 to Carla Dickinson Pardee at AT&T

12/11/02 - Draft Response posted to the web site

12/18/02 - December CMP Meeting - Qwest presented draft response to this CR. CR status changed to Development. Meeting minutes will be posted to this CR's Project Meetings section.

12/26/02 - Notification sent PROS.12.26.02.F.00973.CR_RateChange

01/08/03 - Issued Qwest response to Carla Dickinson Pardee at AT&T

01/15/03 - January CMP Meeting - Qwest presented updated response. Meeting minutes will be posted to this CR's Project Meetings section.

02/07/03 - Qwest Issued PROS.02.07.03.F.01008.AZ_Struc_Rates

02/19/03 - February CMP Meeting - CR was moved to completed status. Meeting minutes will be posted to this CR's Project Meetings section.


Project Meetings

02/19/03 February CMP Meeting This CR is in Development status and Donna Osborne-Miller with AT&T said that they received the rate change notification with new rates attached and they would like to close this CR. This CR will be moved to Completed status.

01/15/03 January CMP Meeting Barb Cornwell with Qwest gave an update on this CR and said that a generic Exhibit A will be provided with the Arizona Phase II A cost docket. This CR will remain in Development status.

12/18/02 December CMP Meeting Barb Cornwell presented the Qwest draft response and said that starting with the next Cost Docket, Qwest will include an Exhibit A in the notification. The Exhibit A will include the rates that are changing and timeframe the rates will be changed. Individual contract rate sheets are available from Qwest service managers. Joan Matzler added that SGAT rate changes are also available on the web site. This CR will be moved to Development status. Stichter-Eschelon provided updates to the notes to include the following: Would any change in the SGAT rate because of a cost docket apply to Eschelon? And Qwest responded yes.

11/20/02 November CMP Meeting Carla Pardee with AT&T presented this CR and said that the rate change notifications that Qwest currently provides do not meet AT&T’s needs. Carla said that they would like to have the new rates included in the notifications. Mike Zulevic with Covad said this is something he requests from the Account Team. Once rates are effective, Covad wants to understand the impact prior to implementation. Bonnie Johnson said that Eschelon has asked for rate changes many times and Kathy Stitcher added that previous change requests have been denied. A CR was denied in the May timeframe, because of the number of staff hours required. Sue Burson with Qwest said that she remembered the change request. Mike Zulevic said that Qwest might want to look at the dispute resolution process for billing and determine if providing the new rates is unduly burdensome. Judy Schultz with Qwest asked if AT&T was looking for rates associated with specific USOCs applying to AT&T. Carla Pardee said that last week they received notification about Arizona and the week before on Utah. They would like to know what the elements are, and what the new rate will be. With the Colorado UNE, we never received rates and it causes confusion, and the account team doesn’t always provide what is needed. Kathy Stitcher said that Eschelon submitted CR number PC053002-2X and it was denied because it was economically not feasible. Kathy said that on Arizona they did contact their service manager and also received a spreadsheet for Utah with some items missing. It was agreed this CR would move to clarification status.

- CLEC Change Request Clarification Meeting

November 14, 2002, 2:30 p.m. (MT) Conference Call 1-877-554-8688 PIN 1930099 # PC110702-1 Request that rate change notifications/mailouts contain rates effected. Introduction of the participants on the Conference Call was made and the purpose of the call discussed. Attendees Carla Pardee, AT&T Sue Kriebel, Qwest Barb Cornwell, Qwest Laurel Neher, Qwest Cliff Dinwiddie, Qwest Cindy Pierson, Qwest Dana Nielsen, Qwest Linda Sanchez-Steinke, Qwest

1 Introduction of Attendees Introduction of the participants on the Conference Call was made and the purpose of the call discussed.

2. Review Requested (Description of) Change The description of change requested in the CR was reviewed. Carla indicated that AT&T receives the mailouts when there is a Commission order or Cost Docket for rate changes and they would like to review the rates in a more efficient way and would like ability to compare the old rates to the new rates. Laurel Neher with Qwest asked if this would apply to Exhibit A SGATs. Carla said that most would be applicable and the Utah Order is what prompted the CR and it would be helpful to compare the new rates that were effective and be able to distribute throughout AT&T. Cindy Pierson with Qwest said that today on the Qwest web site Utah 10/16/02 is available in Exhibit A in the SGAT. Carla asked if there is a footnote that references the commission order and Cindy said that the note section lists the dockets approved in. Barb Cornwell with Qwest said that when the notice is received that if interested in AT&T specific rate sheets, an electronic copy of the rate sheet can be sent by the Service Manager. Barb also said that a notification for Arizona would be received today by AT&T. Carla will contact her Service manager and get with the AT&T people who requested the CR to provide information on the web site information available.

3. Confirm Areas & Products Impacted Carla indicated that all products are impacted.

4. Confirm Right Personnel Involved Qwest confirmed that the right personnel were involved in the conference call.

5. Identify/Confirm CLEC’s Expectation Carla confirmed that AT&T is interested in comparing the old rates to the new rates and that they are interested in AT&T specific rates.

6. Establish Action Plan (Resolution Time Frame) This CR will be walked on by Carla at the November CMP Meeting.


CenturyLink Response

January 6, 2003

Carla Dickinson Pardee ILEC Relations Manager AT&T

SUBJECT: Qwest’s Change Request Response - CR PC110702-1 Request rate change notifications/mailouts contain rates effected.

As a follow up to the December 18, 2002 CMP Meeting, Qwest will enhance the current process to additionally provide an Exhibit "A" rate sheet customized to specifically reflect only the rates Ordered in the Docket. This document will be attached as a communication piece with the rate change notifications/mailouts for CLEC distribution and reference.

Qwest plans to have this solution coordinated and operational to coincide with the implementation of the Arizona Cost Docket Phase IIA. Notification of the Arizona rate change is expected on or about January 15, 2003. Level 1 Process Change, PROS.12.26.02.F.00973.CRRateChange, was sent on December 26, 2002.

Sincerely,

Barb Cornwell Senior Process Analyst Qwest

December 3, 2002

DRAFT RESPONSE For Review by CLEC Community and Discussion at December’s CMP Meeting

Carla Dickinson Pardee ILEC Relations Manager AT&T

SUBJECT:Qwest’s Change Request Response - CR PC110702-1 Request rate change notifications/mailouts contain rates effected.

Currently, Qwest notifications/mailouts advising of a rate change do not identify the affected rates. The purpose of the notification is to advise the CLEC of the pending implementation of a rate change as Ordered by a Public Utilities Commission. Qwest’s standard operating procedure is to ensure Interconnect Contract Agreements are updated with the Ordered rates are available to CLECs during the implementation process.

In response to this request, Qwest will enhance the current process to additionally provide an Exhibit "A" rate sheet customized to specifically reflect only the rates Ordered in the Docket. This document will be attached as a communication piece with the rate change notifications/mailouts for CLEC distribution and reference.

Qwest plans to have this solution coordinated and operational to coincide with the implementation of the New Mexico Cost Docket. Notification of the New Mexico rate change is expected on or about January 15, 2003.

Sincerely,

Barb Cornwell Senior Process Analyst Qwest


Open Product/Process CR PC012302-1 Detail

 
Title: Qwest to provide more detail in embargoed central office notifications
CR Number Current Status
Date
Area Impacted Products Impacted

PC012302-1 Completed
3/20/2002
Other: Notifications LNP
Originator: Bahner, Terry
Originator Company Name: AT&T
Owner: Suellentrop, Craig
Director:
CR PM:

Description Of Change

AT&T would like to see more detail included in Qwest’s embargoed central office notifications. Specifically, AT&T seek great clarification about the cut-over process and the planned timing of cut-overs. AT&T also seek clarification on the product implications of this process.


Status History

01/22/02 - CR Submitted by AT&T.

01/23/02 - CR acknowledged by P/P CMP Manager.

01/29/02 - AT&T contacted to schedule clarification meeting for 01/30/02.

01/30/02 - Clarification Meeting conducted with AT&T.

02/06/02 - Clarification Meeting minutes transmitted to AT&T.

02/20/02 - CMP Meeting - CLEC community clarification conducted. CR status changed to "Evaluation." Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package (03/20/02).

03/12/02 - Draft response dated 03/01/02 issued to AT&T. CR Status changed to "Presented"

03/13/02 - Received e-mail from AT&T seeking clarification concerning LNP supplemental orders to cancel or reschedule a port out

03/20/02 - March CMP Meeting: CLECs agreed to close CR. CR Status changed to "Completed." Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site

03/21/02 - Formal response dated 03/01/02 posted to CMP database

03/22/02 - Formal response dated 03/01/02 issued to CLECs. Notification CMPR.03.22.02.F.01240.CR_Responses

04/17/02 - CR Open/Closed status changed to closed and inactive and checked for Archive 2002


Project Meetings

1:30 p.m. (MDT) / Wednesday 30th January 2002 Conference Call TEL: 877.554.8688 CODE: 3269208 PC012302-1 "Qwest to provide more detail in embargoed central office notifications"

Attendees: Terry Bahner, AT&T Esther Scherer, AT&T Sharon Van Meter, AT&T Jonathan Spangler, AT&T Laurel Burke, Qwest Craig Suellentrop, Qwest Joan Wells, Qwest Peter Wirth, Qwest

Introduction of Attendees: Attendees introduced.

Review Requested (Description of) Change: AT&T would like to see more detail included in Qwest’s embargoed central office notifications. Specifically, AT&T seek great clarification about the cut-over process and the planned timing of cut-overs. AT&T also seek clarification on the product implications of this process.

Terry Bahner, AT&T reviewed the CR and added the following points that need to be addressed: 1) AT&T would like additional information on notices for both “switch embargoes” and “frame conversions” including the specific URL in the Qwest Wholesale web page identifying the schedule dates for embargoes/conversions in Qwest CO facilities. Joan Wells, Qwest identified the URL [http://www.qwest.com/cgi- bin/iconn/iconnembargoreport.pl?function=14]. Information was also requested regarding the Qwest contact for notice issuance, and the frequency and time interval for notices transmitted via e-mail to potentially affected CLECs. 2) AT&T indicated that current Qwest notices are incomplete in that “ordering embargo implications” are not addressed. AT&T expressed a need for written language in the notice directing the CLEC to the applicable Qwest procedures for product ordering during the associated “quiet time” and “embargo” periods. This would assist AT&T in planning orders, thus minimizing potential rejected orders during the actual embargo timeframes. Craig Suellentrop, Qwest indicated that current Qwest notices provide information on the physical cut-over process only and not overall product ordering during the entire embargo timeframe. Joan Wells, Qwest will investigate the location of Qwest procedures within the SGAT and PCAT. An example notification was submitted to Qwest via e-mail. This notification was transmitted to the Qwest participants prior to the clarification meeting. 3) AT&T raised questions regarding IMA 9.0. Terry Bahner, AT&T asked “what the different product embargo intervals are in regards to an LSR being rejected because of the IMA 9.0 edit?” Jonathan Spangler, AT&T indicated that the IMA edit was generated under a Qwest internal UR sometime in the November 2002 time frame. Qwest will investigate this IMA edit and determine the impact to product orders during the embargo time frame.

Confirm Areas & Products Impacted: LNP product added to CR.

Confirm Right Personnel Involved: Qwest & AT&T confirmed appropriate personnel were in attendance. Qwest will engage any other additional personnel, as required, to address the IMA 9.0 edit.

Identify/Confirm CLEC’s Expectation: Qwest to evaluate CR. During the February 2002 Monthly P&P CMP Meeting, Qwest will either solicit input from CLEC community & provide potential solutions to the CR; or provide an expedited response to the CR.


CenturyLink Response

March 1, 2002

Terry L. Bahner Supervisor AT&T 1875 Lawrence St Denver, CO 80202-1847

SUBJECT: Qwest’s Change Request Response - CR # PC012302-1: Qwest to provide more detail in embargoed central office notifications.

AT&T is asking Qwest for more information regarding service order embargoes that occur because of switch conversions. During clarification meetings AT&T had several items that required information. AT&T would like the notices that are sent out about switch conversions to contain specific information about service order embargoes and what products are affected. AT&T is also interested in information about whether a service order embargo applies to LNP port-out activity. Finally, AT&T asked about the IMA 9.0 edit and what orders would be rejected because of this edit. AT&T was particularly concerned about LNP port-out activity regarding the IMA 9.0 edit.

Notices regarding trunk-side services are sent out 90 days and 30 days prior to conversion. These notices are sent to carriers (CLEC’s, IXC’s, and wireless providers) that have LIS, Feature Group, or Type II trunks in the affected switch. If any carrier would like to augment their existing trunks in the new switch, orders to disconnect from the old switch and connect to the new switch must be provided 60 days prior to the conversion. If the carrier only wants to have their trunks transferred on a “like-for-like” basis, the disconnect and new orders must be received 30 days prior to the conversion. Service orders for trunk side facilities are embargoed for 35 days during the conversion process. This interval is established as 30 days prior to the conversion until 5 days post conversion. These dates are stated on the notices.

For line side facilities a service order embargo is in place approximately 5 days prior to the conversion and continues until 2 days after the conversion. Centrex orders will have a standard 5 week embargo (10 days prior to the conversion and 4 weeks post conversion). Service orders with due dates falling within these periods will be rejected. The only exceptions are for disconnects, service denial/restoral, and LNP port-out activity. Some switch conversions (an ISDN only switch for example) have no associated service order embargo. Service order embargo dates are contained on the ICONN website (database http://www.qwest.com/cgi-bin/iconn/iconnembargoreport.pl?function=14).

The IMA 9.0 edit went into effect on February 23, 2002. This edit was put into place to reject line-side orders with due dates that fall within the embargo period. A patch was put into effect on February 27, 2002 to allow LNP port-out orders to flow through.

Sincerely,

Craig Suellentrop Interconnection Planner Qwest

Cc: Joan Wells, Senior Process Analyst, Qwest Mary Retka, Director Legal Issues, Qwest


Open Product/Process CR PC013102-1 Detail

 
Title: DMS100 SR/ALI
CR Number Current Status
Date
Area Impacted Products Impacted

PC013102-1 Completed
4/15/2009
Provisioning 911
Originator: Osborne-Miller, Donna
Originator Company Name: AT&T
Owner: Kaster, Jim
Director:
CR PM: Harlan, Cindy

Description Of Change

AT&T has been officially served by Arapahoe County Colorado that current 911 default routing is inadequate. Current 911 call routing for some jurisdictions that define designated serving areas for service providers, is not routed using the ALI database, but is routed via selective router in the DMS 100 switches. If no number is found, then routing should be done by utilizing information associated with the incoming trunk group of the service provider. Current routing methods can, in some cases, route calls to the wrong PSAP, requiring the call to be re-routed to the correct PSAP, resulting in a loss of time in a possible life threatening situation. This issue impacts all CLEC's providing business or residential service.


Status History

01/30/02 - CR Submitted by AT&T.

01/31/02 - CR acknowledged by P/P CMP Manager.

02/06/02 - Clarification Meeting conducted with submitting CLEC.

02/08/02 - Clarification Meeting minutes transmitted to submitting CLEC & posted in CMP data base.

02/13/02 - Requested additional information from AT&T (Arapahoe County documents & list of mis-routed telephone numbers).

02/18/02 - Requested additional information from AT&T receicved.

02/20/02 - CMP Meeting - CLEC community clarification conducted. CR status remains in "Clarification" due to request to meet with Arapahoe County. Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package (03/20/02).

02/27/02 - Agenda forwarded to AT&T for technical discussion meeting scheduled for Monday, 03/04/02.

03/04/02 - Conducted technical information exchange meeting with AT&T.

03/04/02 - Received e-mail from AT&T advising that the document received for review at the technical information exchange meeting was not considered AT&T proprietary.

03/11/02 - Issued meeting minutes from technical information meeting to AT&T.

03/20/02 - CMP Meeting - AT&T presented its CR and Qwest discussed its White Paper that was being finalized. Qwest advised that there was a meeting scheduled for tomorrow at 9:00 am with the Colorado PUC, AT&T, Qwest and perhaps a couple of PSAPs. Qwest to send a copy of the White Paper to AT&T when it is approved. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. Qwest advised that the status would move to Evaluation. AT&T disagreed.

03/20/02 - Issued Qwest's White Paper, DMS 100 E9-1-1 Routing, to AT&T.

03/21/02 - Meeting held with Colorado PUC, AT&T and Qwest.

03/22/02 - AT&T requested, via e-mail, that the CR be statused in evaluation.

04/10/02 - CR status changed to Presented

04/10/02 - Draft response sent to originating CLEC and posted to the CMP database.

04/17/02 - CMP Meeting - Qwest presented its response. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. It was agreed that the CR would be status as Development.

04/23/02 - Formal response dated April 23, 2002 issued to CLECs. Notification CMPR.04.23.02.F.01260.Final_CR_Response.

05/15/02 - CMP Meeting - Qwest provided a status update. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. CR status will remain in Development.

06/12/02 - Conducted conference call with AT&T to address action items from the May CLEC Forum, 911 Breakout Session and to discuss disposition of the CR.

06/18/02 - Conducted conference call with AT&T to review initial framework and agreed to conduct two follow-on meetings with vendor, ILEC, CLEC, CO PUC, Intrado, NENA, Independents and RBOC participation. The first half day meeting is scheduled for July 23, 2002 and the second all day meeting is scheduled for July 30, 2002.

06/19/02 - CMP Meeting - Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. CR status will remain in Development.

07/01/02 - Issued Mailout notification advising of subcommittee meetings scheduled for July 23, 2002 and July 30, 2002. Notification CMPR.07.01.02.F.01289.Default_Routing_Mtg.

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status "Development" was not changed.

07/22/02 - Issued Mailout notification with meeting material for 7/23 conference call. Notification CMPR.07.22.02.F.01293.DefaultRoutingMtgDoc.

07/23/02 - Conducted CLEC and Industry Conference Call. It was agreed that the 7/30 Meeting with CLECs and Industry would be canceled and Qwest and AT&T would meet to discuss the outcome of the meeting and path forward.

07/30/02 - Issued meeting minutes from CLEC Conference Call held on 7/23 through mailout process. Notification CMPR.07.30.02.F.01302.MtgMinDefaultRouting.

07/30/02 - Conducted conference call with AT&T to discuss the 7/23 meeting and discuss the path forward.

08/02/02 - Issued meeting minutes from 7/30/02 conference call to AT&T.

08/21/02 - CMP Meeting - Qwest provided a status on CR. Minutes on this CR to be posted to the Project Meetings section. Status to remain in Development.

09/18/02 - CMP Meeting - Qwest provided a status on CR. Minutes on this CR to be posted to the Project Meetings section. Status to remain in Development.

10/09/02 - Received e-mail from AT&T advising that they were not going to be able to submit their plan as scheduled and this would impact the Novembe Colorado PUC meeting.

10/16/02 - CMP Meeting - Qwest provided a status on CR. Minutes on this CR to be posted to the Project Meetings section. Status to remain in Development.

11/20/02 - November CMP Meeting - Qwest provided a status on CR. ATT is working on process and planning to present to the Colorado PUC in January.

12/18/02 - December P/P CMP Meeting notes will be posted to the Project Meeting section. Proposal still in progress. ATT may present either in January or March as they have some data and issues that needs to be clarified before they can present their findings/decisions.

01/07/03 - Qwest - Jim Kaster advised ATT is working with the PUC and have decided to make their presentation in March. The process is still under development.

01/15/03 -CMP Meeting - Qwest - Jim Kaster advised ATT is working with the PUC and have decided to make their presentation in March. The process is still under development.

02/19/03 - February CMP Meeting minutes will be posted to the Project Meeting section.

03/19/03 - March CMP Meeting minutes will be posted to the Project Meeting section.

04/04/03 - Donna Osborne Miller advised it is okay to close this CR and when she receives a copy of the presentation it will be shared with the CLEC community.

4/16/03 - April CMP Meeting minutes will be posted to the database


Project Meetings

04/16/03 - April CMP Meeting Donna Osborne Miller agreed it was okay to close this item. A copy of the presentation will be included in the notes.

03/19/03 - March CMP Meeting James Kaster Qwest reported ATT gave a presentation to the Colorado PUC on March 13, 2003. This was a very forward looking presentation and the PUC is currently reviewing the information. This team will continue as an ongoing task force. Cindy Macy Qwest asked if ATT would be able to share the presentation with the Forum and also if we could close this CR since the team will be an ongoing task force. Donna –ATT agreed to check with Ervin Rea and let us know if we could close the CR and share the presentation. The suggestion was made to share the presentation at the next CLEC Forum. Donna will advise Cindy of her decision.

02/19/03 - February CMP Meeting Kaster–Qwest advised the team is targeting to present to the PUC in March. The date of the meeting was not known at this time. Sharon Van Meter – ATT asked if Ervin Rea from ATT is involved and Qwest advised yes.

01/15/03 - January CMP Meeting

Kaster-Qwest stated that AT&T will present their report to the FCC in March. The CR remains Development.

12/18/02 December CMP Monthly Meeting Qwest-Kaster and ATT-Spangler advised SME Jim W. and Rich Kaplin are finalizing the presentation. Jim W is working on obtaining the cost estimate and reviewing the data that Entrado provided. They have found some inaccuracies in the data from Entrado that need to be clarified. They have approximately 43 pages of data that needs to be paired down into a presentation. There is a 911 Task Force meeting in January and then again in March. The team would like to present at the January meeting if their data is accurate, otherwise they will continue working on the presentation and present in March. This CR will remain in Development status.

11/20/02 November CMP Monthly Meeting ATT (Spangler) advised they are continuing to work on this project. ATT will plan on presenting their process at the January Colorado PUC meeting. This project will remain in Development status.

10/16/02 October CMP Monthly Meeting ATT advised they are continuing to work on this project but do to additional investigation needed they will not be able to submit their plan as scheduled and will not be able to present at the November Colorado PUC meeting, but plan on presenting at the January meeting. This project will remain in Development status.

Subject: RE: PC013102-1 DMS 100 SR/ALI Change Request Action Item Date: Wed, 9 Oct 2002 19:03:06 -0400 From: "Spangler, Jonathan F, NCAM" To: "Martin, Rick" CC: "Boykin, Timothy (Tim), NCAM" , "Kaplan, Richard S (Rich), NLNS" , "Roth, Diane F, LGA" , "Morgenstern, Dale C, NLNS" , "Bruno, Vincent G, NLNS" , "Friesen, Letty S, LGA" , "Ann Adkisson" , "Carla Pardee" , "Donna Osborne-Miller" , "Ervin Rea" , "Esther Scherer" , "Sharon Van Meter" , "Teresa Bahner"

Per AT&T's action item for CR PC013102-1 DMS 100 SR/ALI, AT&T will not be able to provide a presentation regarding solutions to the 911 default routing in the Denver MSA. AT&T recognizes that this delay jeopardizes our plan to present our solutions to the CO 911 Task Force to be held in November.

If you have any questions, please let me know.

Jonathan Spangler Carrier Performance - Western Region AT&T Local Services & Access Management Voice: 303-298-6240 Fax: 303-298-6455 Email: jfspangler@att.com Pager: 888-858-7243 pin 106241 or jonathan.spangler@my2way.com

09/18/02 September CMP Monthly Meeting Minutes

Qwest advised that AT&T was developing a plan for the Denver area to have 9-1-1 calls default routed by CLEC. Qwest indicated that they would then review the plan and if acceptable schedule a preliminary meeting with the Colorado PUC and another CLEC (ICG). The next step would be to present the plan to the PSAPs at the PUCs formal meeting in November. Eschelon asked if the CLECs would be involved in any of the meetings and if they would have a chance to review the plan. Qwest advised that the meeting in November might be open and they would provide notification when the meeting was taking place. Qwest also indicated that they would post AT&T’s plan to this CR in the CMP Product/Process Change Request Interactive report. The CR will remain in Development.

-

08/21/02 August CMP Monthly Meeting Minutes

Qwest advised that there was a meeting on July 23, 2002 with a wide range of participation including other ILECs, Nortel, NENA Working Committee Chairperson, BellSouth and Idaho PUC. The result of the meeting was that the NENA Working Committee would work towards a national standard, and for the Denver Market, AT&T would be developing a plan for default routing by CLEC. AT&T is currently working with BellSouth to put a recommendation to submit to Qwest for Qwest to pursue funding. The goal is to have everything complete by 10/15/02 for presentation to the PUC and PSAPs. AT&T advised that they concurred with Qwest’s status and appreciated everybody’s participation. They were participating in the NENA working committee and were happy with the progress. They indicated that they would be sending some minor comments to the minutes.

--

CLEC Change Request Qwest & AT&T Conference Call

July 30, 2002, 8:30 am (MT) Conference Call

877-572-8687, P/C 7994817 PC013102-1, DMS100 SR/ALI

Attendees: Ric Martin, Qwest Jim Kaster, Qwest Jim Winegarden, Qwest Matt Kruzick, Qwest Jonathan Spangler, AT&T Ervin Rae, AT&T Richard Kaplan, AT&T

Introduction of Attendees Introduction of the participants on the Conference Call was made and the purpose of the meeting discussed.

Discussion Items Rich Kaplin indicated that based on 7/23/02 conference call, AT&T would like to pursue Tom Breen’s recommendation, for the Denver Market, as set forth in paragraph 2.13 of the 7/23/02 meeting minutes. The language from the meeting minutes is as follows: "Tom Breen responding as the NENA Network Technical Committee Chairperson indicated that if the need is to be able to default route at something more granular than the rate center, one would need to assume that the PSAPs play fair, and, with cooperation from Qwest, there would need to be negotiations with the PSAPs. Recommendation could be to get one default PSAP for a rate center or by carrier. Get a PSAP to volunteer to be the default PSAP for the rate center. If picked well, they would most likely be the PSAP handling most default routed calls anyway. Tom indicated that all PSAPs need to be involved in the process. Tom indicated that the long-term solution resides in NENA committees. He indicated that Tom Hinkleman could provide the pre-release final technical recommendation on rate center consolidation. It will be published by NENA shortly. Tom Breen stated that if the above could not be achieved, alternatively, all CLEC’s could ask to negotiate with Qwest for not using NPANXX based routing, however, once the TN/ESN is established (without the delete function on disconnects), the legacy record will remain and could misguide the call. This cannot be on a CLEC by CLEC basis because Number portability will mean that the NPA-NXX ranges will NOT be or will not remain unique to any given CLEC or ILEC. If the wild cards are to be removed it will require it being a switch wide process on each affected Selective Router/SR-ALI database. Tom Breen recommends trying to educate the PSAPs in the area on the technical limitations of the system, and ask them to cooperate in identifying a default PSAP per Rate Center, even if there has to be more than one to spread the load from all of the area’s carriers."

The general discussion was that we needed to look at the reduction in the number of trunks (7) going to the primary PSAPs in the Denver area. The general consensus was that there would be PSAP jurisdictional issues to overcome and we should first get the Colorado PUC buy-in and support from another CLEC. It was agreed that ICG would be an acceptable CLEC. In addition to the jurisdictional issues with the PSAP, the cost issues will need to be addressed.

It was agreed that Rich Kaplin would develop a plan with associated PSAP benefits for reducing the number of Trunks. Jim Winegarden would provide technical support to Rich. Jim Kaster would be Qwest’s point of contact for receipt of documentation of AT&T.

It was understood that the plan would look at the reduction in the number of trunks and does not change Qwest’s standard on default routing. Based on the PSAPs designated to the reduced number of trunks, Qwest will need to change their default wild card to that PSAP and update the NPA NXX, which will require a complete reload. This could be accomplished by staggered cuts.

The following plan was agreed to: - AT&T will submit a working plan by the end of September - Qwest will perform its cost evaluation by mid October - ICG support and participation will be obtained. - If Qwest agrees to move forward, Qwest will initiate a preliminary meeting with the PUC staff by the end of October. - Presentation will be made at the PUC Task Force meeting on November 14, 2002. - With support from the PUC, a presentation will be made to the PSAPs – timing to be determined.

It was agreed and recognized that participation in the NENA Default Path subcommittee was very important.

-

CLEC Change Request CLEC and Industry Conference Call

July 23, 2002, 8:30 am (MT) Conference Call

877-572-8687, P/C 7994817 PC013102-1, DMS100 SR/ALI

Attendees: Ric Martin, Qwest Linda McKelvey, Qwest Jim Kaster, Qwest Jim Winegarden, Qwest Mary Wallace, Adelphia Jonathan Spangler, AT&T Vince Bruno, AT&T Dale Morgenstern, AT&T Richard Kaplan, AT&T Bernard Brabant, Bell Canada – NENA Default Path Working Group Chairperson Tom Breen, BellSouth Gretchen Leedy, Cbeyond Michael Lipread, Cbeyond Susan Bumstead-Smith, Century Tel Sheila Stewart, Century Tel John Walker, Complete Telecommunications Amanda Owens, Eschelon David Frame, Eschelon Paul Hanser, Eschelon Wayne Hart, Idaho PUC Joe Schumacher, Intrado Steve Sipple, Nortel James Baron, Talking Nets Rana Peeling, US Link Kim Sattler, US Link

Introduction of Attendees Introduction of the participants on the Conference Call was made and the purpose of the meeting discussed.

Jim Kaster provided background on the AT&T Change Request and directed participants to the CMP Web site to review the CR. Jim addressed the parties involved being the end user, independent telephone companies, CLECs, Qwest, Public Service Answering Point (PSAP) and the State. The PSAP and the State would be left to accept or reject any recommendations on Default Routing.

Discussion Items Jim Winegarden provided a brief history of 9-1-1 default routing. Jim Winegarden provided a technical explanation of Qwest’s 9-1-1 process. Jim explained that the main issue is with the period of time delay between when the end user has service and the related Service Order Input (SOI) order is entered into the Selective Router Database (SRDB). Jim also indicated that a concern with the use of 10 digit number in the SRDB is that with a disconnect, the number will always remain in the SRDB.

Rich Kaplan indicated that the basis for AT&T’s provisioning found some misroutes caused by the NPA-NXX wildcard. Their issue with Arapahoe County facilitated their issuance of the CR. Arapahoe County withdrew their request. They are still looking for a collective solution for reducing the time period for updates after SOI record submission. The TN Emergency Service Number (ESN) legacy records could still cause misroutes and would require removal. Need to address the first few hours new customers could go to any of the (40) PSAPs in Denver. Jim Kaster explained the PSAPs will transfer the call to the appropriate PSAP.

General consensus in the meeting was that the best thing that could be done is to get the most timely SOI order updates processed.

Tom Breen advised the AT&T’s situation is similar to what BellSouth did in Atlanta with their Rate Center consolidation and linking one primary default PSAP to the Rate Center. Tom indicated that the best solution is timely updates of the database, speed-up the front end processing and PSAP designation to the appropriate Rate Center.

Jim Kaster advised the he believed there was another National Emergency Number Association (NENA) Work Group addressing real time updates.

Rich Kaplan addressed their request on the removal of wild cards and route to the trunk group ESN.

Bernard Brabant indicated that if we’re talking Denver, Colorado has gone through a major rate center consolidation. Records in the Selective Router Database (SRDB) would increase, as every TN/ESN records would have to be transmitted and kept in the SRDB. One of the issue would be uploading that information, due to transport and interface limitations. Need to apply 1 rule nationally. Removal of NPA-NXX wild card would require assignment of trunk group default by Customer entity (Municipality, Region, County, State, Primary PSAP, etc.) and at a minimum by rate center. Canada has deployed a province wide 9-1-1 system arrangement where trunk group default is provided at the Customer/entity/Primary PSAP level. NENA should address the needs of the wireline, wireless and IP worlds.

Jim Winegarden indicated that a default by trunk group would only happen with an ANI failure or no record found.

Tom Breen indicated that in addition to the ALI Database Manager, it is the responsibility of all carriers to improve their service order provisioning process. This may require significant changes to exisiting Operational Support Systems.

Jim Kaster addressed the additional impacts imposed by states. Example is the State of Washington that SOI orders can’t be sent until midnight the day after cut.

Tom Breen addressed NENA future planning. Tier 1 data delivered with each 9-1-1 call would have the incoming call location coded into the call. There is a Powerpoint presentation that was presented at Indianapolis that he could share. Tom also indicated that they were looking at the ability to make the TN ESN address info on the fly and simultaneously update the SRDB (for calls made from a PBX or CTX) .

Vince Bruno suggested that there are some long term solutions, some not so long term solutions and some solutions available today. He wanted to know what solutions are available today (i.e. get SOI orders delivered more quickly, explore issue of disconnects to reduce exposure). Bernard Brabant indicated that the NENA Default Call Path Working Group was being reinstated and there would be a meeting around mid-August. The goal is to come up with a Technical Information Document (TID) on E911default routing standards. Tom Breen suggested using the data technical committee working on ALI database. With his Network Technical Committee hat on Tom Breen suggested the Denver area matter may require special arrangements to solve. His statement in no way implies any obligation on Qwest, AT&T, any other CLEC or any PSAP(s). Rich Kaplan asked if their request to remove wild cards is an option. Tom Breen indicated that the removal of wild card doesn’t correct the problem when there is old record information in the SRDB. Rich Kaplan asked if with a new customer assigned an existing TN, does the legacy record get removed with a disconnect? Jim Winegarden explained that there is no disconnect and the record will remain but the new SOI overlays the old record covering the TN.

Steve Sipple clarified that a range of TNs could not be batch and loaded into the SRDB. Each individual TN needs to be loaded. It was established that the DMS100 could not accept a single tape load of the SRDB and instead must be loaded through individual transactions. Bernard Brabant indicated that an Ethernet Interface Unit (EIU) card allows for faster transactions processing to the selective router. Bernard further indicated that Bell Canada is using an Intrado's Management System set of software applications that does process delete for those TNs that are currently in exception in the MS' SRDBQ file, by sending the deleted TN with the NPA NXX default ESN to the 9-1-1 SRDB (selective router switch) for an overwrite. Tom Breen indicated that some E911 SSPs don’t use that faster TCP/IP port yet, and it would require changes to their ALI DBMS-to-SR update processes.

Bernard Brabant cautioned that before deciding on the best way to go, we need to look at the overall impact. Bernard suggested interested parties are welcome to join his NENA working group. If interested they should send an e-mail to bernard.brabant@bell.ca.

Rich Kaplan asked if Qwest was confident that the 40 PSAPs could effectively transfer calls between PSAPs. Jim Winegarden said yes.

Rich Kaplan asked Tom Breen if he had any recommendations. Tom Breen responding as the NENA Network Technical Committee Chairperson indicated that if the need is to be able to default route at something more granular than the rate center, one would need to assume that the PSAPs play fair, and, with cooperation from Qwest, there would need to be negotiations with the PSAPs. Recommendation could be to get one default PSAP for a rate center or by carrier. Get a PSAP to volunteer to be the default PSAP for the rate center. If picked well, they would most likely be the PSAP handling most default routed calls anyway. Tom indicated that all PSAPs need to be involved in the process. Tom indicated that the long-term solution resides in NENA committees. He indicated that Tom Hinkleman could provide the pre-release final technical recommendation on rate center consolidation. It will be published by NENA shortly. Tom Breen stated that if the above could not be achieved, alternatively, all CLEC’s could ask to negotiate with Qwest for not using NPANXX based routing, however, once the TN/ESN is established (without the delete function on disconnects), the legacy record will remain and could misguide the call. This cannot be on a CLEC by CLEC basis because Number portability will mean that the NPA-NXX ranges will NOT be or will not remain uniqie to any given CLEC or ILEC. If the wild cards are to be removed it will require it being a switch wide process on each affected Selctive Router/SR-ALI database. Tom Breen recomends trying to educate the PSAPs in the area on the technical limitations of the system, and ask them to cooperate in identifying a default PSAP per Rate Center, even if there has to be more than one to spread the load from all of the area’s carriers.

Tom Breen explained that BellSouth’s plan is to move to a centralized Off-Board Selective Routing (OBR) Interface developed by Nortel (ENS00011). Initially they would default route by incoming trunk group and in the future the originating switch’s Tier 1 call data will likely contain the info to route to the correct PSAP. It is anticipated that the OBR database will NOT use wild cards.

Joe Schumacher indicates that Intrado processes SOI records three times a day: 3 AM, 11 AM, and 3 PM

It was agreed that the follow-on CLEC and Industry meeting scheduled for July 30, 2000 would be canceled. Qwest and AT&T will meet to address the discussions from today’s meeting and discuss the appropriate steps to be taken.

07/17/02 - July CMP Meeting Minutes: Qwest is moving forward with the list of attendees for meetings scheduled for July 23, 2002 and July 30, 2002. Meetings are to look at establishing an Industry recommendation on 911 Default Routing. CR status remains development.

06/18/02 Conference Call

Attendees:

Susie Bliss – Qwest Jim Kaster – Qwest Jim Winegarden – Qwest Ric Martin Qwest Jonathan Spangler – AT&T Ervin Rea – AT&T Rich Kaplan – AT&T Vince Bruno – AT&T Tim Boykin – AT&T

It was agreed that two follow-on meetings would be held.

First - July 23, 200 8:30 to 11:30 MT conference bridge 877-572-8687, ID 7994817 Second - July 30th 8:30 to 4:30, hosted by AT&T at their Denver office on Lawrence street.

06/12/02 Conference Call

Attendees:

Susie Bliss – Qwest Matt Kruzick – Qwest Jim Kaster – Qwest Jim Winegarden – Qwest Ric Martin Qwest Jonathan Spangler – AT&T Ervin Rea – AT&T Rich Kaplan – AT&T Vince Bruno – AT&T Dale Morgenstern – AT&T Tim Boykin – AT&T

Conference call was held with AT&T to address action items from the May CLEC Forum, 911 Breakout Session and to discuss disposition of the CR

Qwest advised that they had received written communication from Arapahoe County that the issue with AT&T has been put to rest. AT&T is to work with Arapahoe County on obtaining the written communication that Qwest received.

Both Parties agreed that the solution to AT&T’s Change Request should come from NENA. NENA has a subcommittee on the topic of Default Routing. In addition there is another subcommittee on the topic of Global Dynamic Updates. It was agreed that each party would review internally what each party could contribute to developing a recommendation to take to NENA.

It was agreed that there would be another conference call on Tuesday, 6/18 to review a high-level framework of what this recommendation should be to move forward. AT&T will issue a draft high-level framework document by Friday 6/14 for review on Tuesday.

-

CLEC Change Request Information Exchange Meeting March 4, 2002, 10:00 (MT) Conference Call PC013102-1, DMS100 SR/ALI

Attendees: Ric Martin, Qwest Linda McKelvey, Qwest Jim Kaster, Qwest Patty Joe Ryan, Qwest Jim Winegarden, Qwest Phil Linse, Qwest Jonathan Spangler, AT&T Ervin Rea, AT&T Tim Boykin, AT&T Letty Friesen, AT&T Vince Bruno, AT&T Dale Morgenstern, AT&T Richard Kaplan, AT&T

Introduction of Attendees Introduction of the participants on the Conference Call was made and the Agenda was reviewed. Qwest explained that the purpose of the meeting was for each party to provide an exchange of technical information for each to fully understand each others respective 911 network architectures. AT&T expressed that they wanted the CR to be expedited. AT&T indicated that they also wanted as an outcome of the meeting a perspective of a path forward with Action Items. Qwest advised that they would not commit to coming up with solutions.

Discussion Items AT&T provided a power point presentation of their Architecture via e-mail to all Qwest participants. AT&T clarified that the AT&T Proprietary Statement was not applicable and AT&T would send and e-mail stating such. AT&T reviewed page 2 of their presentation and indicated that bullet number 6 is where the issue resides. Qwest provided the following comments: ? Bullet 3- ALI processed into Intrado and next day file received. ? Bullet 4 & 5 – These bullets are strictly on ANI failures and PSAPs have been aware of this since the inception of 911. ? Bullet 6 – This issue is understood due to the memory constraints and is also understood by the PSAP community. Qwest further explained that the issue in Bullet 6 can’t happen within a few days and that there are memory constraints in the in the DMS100. There was discussion on Nortel upgrades – the ENS 005 for 911 provides all the features and ENS004 would accommodate 32mm records. The original switch feature only allowed 300,000 records in the table, which set the standards for default entries on NPA-NXX. The current switch capability has 800,000 records. Qwest explained that any upgrade would be like doing an office upgrade, which is time consuming and presents an inherent risk to break existing things that are in place. This would be communities that come in on the same trunk group which are tied to different NPA NXXs. For these communities, an ANI failure would pick the larger PSAP and this would show on the screen. Qwest didn’t know if these communities fell within the Denver area. AT&T indicated that they didn’t believe Arapahoe County is aware of this and then what would the solution be. Qwest indicated that all default routing goes to 1 PSAP and a check that was made indicated that the dBase hadn’t been updated. AT&T questioned whether this was ANI failures or what. Qwest advised that this was complete defaults where no record was found and when there was a check with the dBase folks the records were not in the dBase. AT&T questioned that calls went to Arapahoe for anywhere in the Denver Rate Center because the NPA NXX was pointed to Arapahoe, but could have gone anywhere based on the assigned wild card. Qwest indicated that they could validate if the NPA NXX is correct. Qwest asked if the problem was prevalent due to AT&T’s change in testing procedure. Qwest indicated that they were aware that AT&T has multiple NPA NXXs. AT&T asked to get a listing of the Wild Cards used by Qwest. Qwest indicated that on moves with LNP there is a current record and the customer would be miss routed until the record gets updated. AT&T advised that the LERG has all of their NXX codes. Qwest clarified that change in its standard use of the wild card would use up memory, have timing constraints, be costly and would have follow-on impact with existing customers. AT&T asked how there would be a breaking and fixing of the communities that come in from one trunk. Qwest explained that when the community was added, they told us which PSAP the call would go to (i.e. 999 goes to PSAP A, 998 goes to PSAP B and 997 goes to PSAP C). This would be set in the system with its default. Any orders for selective routing are set to the 7 digit if there is a wild card with the same NXX. AT&T indicated that they would not put in any record and the new design would have separate trunk groups and not have the wild card. Qwest explained that with a default ESN to the NXX and you ripped out the NXX would act in the same manner. With a trunk in for 998 PSAP B and you pulled the wild card out the call would have gone to PSAP B. If the number borders 998 and 997, the entry would still show PSAP C. AT&T asked how the system gets built. Qwest explained that it boils down to the state and whether they build per trunk groups or number of lines. It was explained that the PSAP builds to the number of trunks and look at the concentration. In Colorado you are required to build to the number of records, which depend on the number of trunks and switch capacity. Qwest asked how AT&T builds its system. AT&T explained that they monitor to P.01 grade of service and augment/add as required. AT&T stated that Arapahoe is asking to add 6 trunk groups. AT&T feels they are asking for something that can be done in another way. Qwest explained the concentration factor as follows: With 6 communities A – F 3 trunks each for 911 going to the Selective Router would mean a total of 18 trunks. If a PSAP only has 8 trunks they would have to look at the potential volume of calls that could come in from the 18 trunks knowing they can only handle 8. AT&T asked if there were any other issue with eliminating wild cards. Qwest explained that the use of wild cards saves memory. Eliminating wild card could adversely impact others. There would be a ripple effect – Qwest would need a new contract with Intrado. AT&T indicated that the Selective Router has a data field. Qwest indicated that the Selective Router dBase is linked to Intrado. AT&T questioned if the Intrado dBase – data field could look for the information. Qwest advised that if the wild cards are removed, Intrado would have to put it in the table. Intrado would have to do a reload with the entry for the wild card. Denver has approximately 3 mm customers that would have to be reloaded – this would mean down time. Further the switch is in a tandem arrangement which duplicates the effort. AT&T asked if there was any way of arriving at what the situation would be for doing Cap Hill and Broomfield. Qwest indicated that it would come down to time, money and risk. Risk would be the human factor, we really don’t know what they are receiving on a trunk group, etc. Qwest explained that Cap Hill was initially 20 tapes and 10 days brand new. We now have 2 switches. Qwest explained that the dual tandem switch was installed for disaster recover purposes. The tandem switch could not be used as a back-up and both switches would need to be done in parallel. AT&T asked if Qwest could quantify the effort. Qwest identified they would have their costs, Nortel costs and Intrado costs. Qwest couldn’t commit to having quantifiable costs. Qwest asked if AT&T’s dBase has been updated. AT&T indicated that they had an updated report. Qwest advised that they would evaluate the options.

Action Items AT&T is to provide Qwest with their NXXs. Qwest to provide AT&T a list of their wild cards. Qwest to report back to AT&T with a preliminary plan for responding. Qwest will obtain information on how many misrouted calls have been reported by the PSAP, Arapahoe County.

-

1:30 p.m. (MDT) / Tuesday 05th February 2002 Conference Call TEL: 877.554.8688 CODE: 3269208 PC013102-1 "DMS100 SR/ALI"

Ervin Rea, AT&T Donna Osborn-Miller, AT&T Jonathan Spangler, AT&T Jim Kaster, Qwest Phil Linse, Qwest Christine Quinn-Struck, Qwest Peter Wirth, Qwest

1.0 Introduction of Attendees Attendees introduced.

2.0 Review Requested (Description of) Change {review long description from change request, confirm with all parties there is agreement on the change requested} Description: AT&T has been officially served by Arapahoe County Colorado that current 911 default routing is inadequate. Current 911 call routing for some jurisdictions that define designated serving areas for service providers, is not routed using the ALI database, but is routed via selective router in the DMS 100 switches. If no number is found, then routing should be done by utilizing information associated with the incoming trunk group of the service provider. Current routing methods can, in some cases, route calls to the wrong PSAP, requiring the call to be re-routed to the correct PSAP, resulting in a loss of time in a possible life threatening situation. This issue impacts all CLEC's providing business or residential service.

Expected Deliverables: DMS100 switches to be modified to ensure that the switch is routing calls according to the ALI database and not the selective router. Should a number not be located in the ALI database the routing should utilize information associated with incoming trunks.

1) Urban Ray reviewed the CR. Requested that "modified" be changed to "programmed" in the "Expected Deliverables" text. Basically, AT&T indicated that outside county "911" calls are being misdirected to Arapahoe County, CO. AT&T’s position is that programming of the router (Nortel DMS100) is required to correctly route using the Automatic Line Identification (ALI) database to the appropriate Public Service Access Provider (PSAP) (i.e., Arapahoe County). 2) Previous AT&T communications with Qwest were identified. Urban Ray, AT&T agreed to forward correspondences to the CRPM. 3) Qwest asked for a listing of any phone numbers that were misdirected to the Arapahoe County PSAP, if available, for Qwest investigation. Urban Ray, AT&T indicated he may speak with Arapahoe County in the near future and will request the listing. 4) Jonathan Spangler, AT&T asked if Qwest could respond to the CR in the February 20, 2002 Monthly Product & Process CMP Meeting. The CRPM indicated that due to the short timeframe, Qwest could give a status update & review the CR with the CLEC community.

3.0 Confirm Areas & Products Impacted {read from change request, modify if needed} Confirmed.

4.0 Confirm Right Personnel Involved {ensure the Qwest SME can fully answer the CLEC request. Confirm whether anyone else within Qwest has been involved with this issue, or whether we need to bring anyone else in} Qwest & AT&T confirmed appropriate personnel were in attendance.

5.0 Identify/Confirm CLEC’s Expectation {Identify specific deliverables from CLEC – what does Qwest have to do in order to close this CR? (in measureable terms ie provide a documented process, change a process to include training etc)} Qwest to evaluate CR. During the February 2002 Monthly P&P CMP Meeting, Qwest will solicit input from CLEC community.


CenturyLink Response

April 23, 2002

Donna Osborne-Miller and Ervin Rea LSAM Managers AT&T

SUBJECT: Qwest’s Change Request Response - CR #PC013102-1 DMS100 SR/ALI

This letter is in response to AT&T’s Change Request PC013102-1 requesting Qwest to modify its DMS100 switches to ensure that the switch is routing calls according to the ALI database and not the selective router. Further, if a number cannot be located in the ALI database, AT&T is requesting that the routing utilize information associated with incoming trunks, as one possible solution supported by the manufacturer.

On March 21, 2002, Qwest and AT&T held a meeting with the Colorado Public Utilities Commission (PUC) Staff. In the meeting, the issue of timely ALI database updates was discussed and it was agreed that timely updates would reduce default routing occurrences. It was agreed that the parties would hold off on pursuing default routing by trunk group ESN until a meeting could be held with the PUC and other industry stakeholders. The parties also agreed to participate in the appropriate Industry Forum on Global Dynamic Updates. In addition a meeting is to be scheduled by the PUC Staff with Arapahoe PSAP, Qwest and AT&T to review specific issues and discuss how the parties can address the Arapahoe PSAP’s concerns.

After the meeting Qwest and AT&T agreed that the CR should be placed in a hold status while the aforementioned issues are addressed.

At April 17, 2002 CMP Monthly Meeting it was agreed that the CR would be status as Development until further direction is agreed to.

Sincerely,

Richard H Martin Change Request Project Manager


Open Product/Process CR PC020802-1 Detail

 
Title: Correct and accurate transmission of ADUF or category 011 DUF records.
CR Number Current Status
Date
Area Impacted Products Impacted

PC020802-1 Completed
7/17/2002
Originator: Dickinson Pardee, Carla
Originator Company Name: AT&T
Owner: Zimmerman, Alan
Director:
CR PM:

Description Of Change

CLECs depend on accurate and correct transmission of access DUF records (category 011 or ADUF) in order to bill IXCs access records. Qwest is not transmissting complete accurate DUF records for category 011, or ADUF records. Consequently AT&T and other CLECs are unable to accurately and completely bill other IXCs.

Modification:

Revised Category reference from "013" to "011"


Status History

02/08/02 - CR Submitted by AT&T

02/08/02 - CR acknowledged by P/P CMP Manager.

02/11/02 - Scheduled Clarification Meeting by e-mail notification to AT&T for 02/15.

02/15/02 - Conducted Clarification Meeting with AT&T.

02/19/02 - Issued Clarification Meeting Minutes to AT&T.

02/24/02 - Issued Revised Clarification Meeting Minutes to AT&T.

03/14/02 - AT&T issued e-mail requesting additional input on the fixes for DUF records.

03/20/02 - CMP Meeting - AT&T presented its CR. Qwest to set-up a meeting with CLECs. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. It was agreed that the CR would move to Evaluation.

04/04/02 - CLEC Notification, CMPR.04.04.02.F.01250.CR_Mtg_Logistics, issued scheduling conference call per Action Item 1.

04/10/02 - Issued Qwest's Draft Response dated April 5, 2002 to AT&T.

04/10/02 - Voice Mail received from AT&T requesting that the CLEC conference call scheduled for 4/12/02 be rescheduled.

04/11/02 - CLEC Notification, CMPR.04.11.02.F.01253.CR_MTG_Cancelled , issue to cancel Conference Call.

04/17/02 - CMP Meeting - Qwest Presented its response. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. It was agreed that the CR would be status as Development.

04/19/02 - Formal response dated April 5, 2002 issued to CLECs. Notification CMPR.04.19.02.F.01258.Final_CR_Responses.

04/26/02 - Conducted CLEC Conference Call to review system fixes implemented by Qwest to address third party test issues.

05/03/02 - Issued meeting minutes from CLEC Conference call to CLEC participants for comments.

05/09/02 - Issued meeting minutes from CLEC Conference Call to CLEC Community. Notification CMPR.05.09.02.F.01263.Mtg_Minutes_4_26_02.

05/15/02 - CMP Meeting - Qwest advised that the CLEC Conference Call was conducted and meeting minutes issued. Eschelon advised that Qwest's answers to questions were not accurate. Eschelon to send e-mail to Qwest. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. It was agreed that the CR would remain in Development.

06/17/02 - Conducted conference call with Eschelon to clarify their concerns on Qwests response to Action Item No. 2.

06/18/02 - Issued e-mail to Eschelon confirming that the issue of CICs being 0000 in the 110125 access records was limited to the Central Region.

06/19/02 - CMP Meeting - Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. CR status was changed to CLEC Test.

06/25/02 - Issued e-mail to Eschelon and copied AT&T with clarifications to questions raised by Eschelon at the 4/26/02 CLEC conference call.

07/03/02 - Follow-up telephone conversation with Eschelon to confirm that clarifiation response was acceptable. Eschelon to advise.

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status was changed to Completed.


Project Meetings

07/17/02 - July CMP Meeting Minutes:

AT&T agreed to close this Change Request

Subject: Clarification Response to Questions from 4/26/02 CLEC Conference Call Date: Tue, 25 Jun 2002 09:06:57 -0600 From: Richard Martin Organization: Qwest Communications International, Inc. To: Kathy Stichter , wdmarkert CC: Alan Zimmerman , "Pardee, Carla"

Kathy/Bill,

Based on our conference call, Monday June 17, 2002, the following clarifications were made to the previous questions asked and anwered from our 4/26/02 CLEC Conference Call to review System Fixes Implemented Pursuant to Third Party Tests on DUF Transmission:

Meeting Minute item 3.2 - The original question had to do with why access records appear on the DUF with zero's in the CIC. The original answer discussed Feature Group A usage. There is one more circumstance when an access record would show a CIC of zero's. That has to do with 110125 records in the Central region when Qwest is the underlying provider of the 8XX service.

Those records currently go out with a zero CIC as well.

Meeting Minute item 3.3 - It was confirmed that Eschelon will be getting two separate files for Meet Point Billing and DUF. The type of file and mehtod of transmission will depend on the agreements made between Eschelon and Qwest.

To: wdmarkert@eschelon.com, Richard H Martin/Mass/USWEST/US@USWEST cc:

Subject: 0000's in the CIC

Hello; Yesterday I mentioned that I thought that the issue of CICs being 0000 in the 110125 access records was limited to the Central region. I have since confirmed that this is correct. Central is the only region where this occurs. As discussed in our call yesterday, this is usage that was carried by Qwest, so we would be the billable carrier. This should be the only FG-D usage you see with 0000 in the CIC field.

Have a good day!

Alan Zimmerman Qwest Wholesale Billing Manager (303)896-8346

--

CLEC Conference Call

April 26, 2002 10:00 am (MDT) Conference Call TEL: 877-564-8688 CODE: 8973036 System Fixes Implemented Pursuant to Third Party Tests on DUF Transmission (Product/Process CR PC020802-1)

Attendees: Ric Martin, Qwest Wendy Thurnau, Qwest Brad Wickes, Qwest Alan Zimmerman, Qwest Carla Pardee, AT&T Jonathan Spangler, AT&T Kathy Stichter, Eschelon Bill Markert, Eschelon Jack Mungia, Eschelon Deb Hoffman, US Link

Introduction of Attendees Introduction of the participants on the Conference Call was made. Ric Martin explained that the call was a result of an Action Item from March’s CMP Monthly Meeting under Change Request PC020802-1. Details on the CR can be viewed in the CLEC Change Request – Product/Process Interactive Report located at the following URL: http://www.qwest.com/wholesale/cmp/changerequest.html This call will discuss the system fixes that were implemented by Qwest to become compliant with third party tests on the transmission of DUF Records and provide an update on the Central Regions compliance. Ric Martin requested that all CLEC participants send their e-mail address for receipt of meeting minutes.

Review of System Fixes Alan Zimmerman explained the 3rd Party Testing of the DUF conducted by KPMG Consulting and Cap Gemini, Ernst & Young (CGE&Y). The tests involved thousands of calls, and about 43 different call types. Both KPMG and CGE&Y have now concluded that Qwest’s DUF does adequately reflect usage made from Resale and UNE lines. To get to this successful conclusion, Qwest had to make several system changes, as detailed in KPMG’s Exceptions 3036, 3037, 3113 and 3098, as well as CGE&Y IWO 2129. Alan explained that these system changes are generally grouped into two categories: Pending Order File implementations and specific Local Measured Service issues, with a few additional fixes for specific other circumstances. Alan described the fixes and fix dates from those KPMG Exceptions, and answered questions from Eschelon and AT&T. The major fixes discussed included: Pending Order File Process --The pending order file (POF) Process was installed September 13th to more precisely handle usage made within a few days of customer conversion between local service providers. --The Western region had some inconsistencies in the way local measured service usage made on conversion day was handled. This was fixed Nov. 22. --8XX usage did not go to POF process in Western region until Nov 12. Central region had some specific circumstances where 8XX usage delayed in the POF process could be dropped. These circumstances were fixed November 20. --There were timing issues with POF processing in Central such that conversions done via a C order posted on a Thursday or Friday could have some of the usage released from POF for processing before all toll guides and databases were updated. This was fixed Feb. 7th. Local Measured Service (LMS) Records --Central & Eastern had problems that caused a very small percent of Local Measured Svc usage to error. These were fixed in December 2001. --Sent Paid LMS calls that were operator assisted were not properly sent on the DUF in the Western region. This was fixed Nov 22. --Central region LMS calls that originated from a UNE and billed to a resold line did not get a DUF record passed to the reseller until Dec 17. Additional Fixes --WATS attempts that originated from UNEs and did not complete did not have a DUF record generated for the Central region until Feb 18th. --Toll calls that intraLATA calls originated from a coin phone, were sent paid (not alternately billed), were carried by Qwest, and terminated to a UNE account did not have access records generated on the DUF until March 28th. --The Eastern region had a problem that resulted in duplicate records being generated to the DUF when an operator handled LMS call was made. This duplicate record condition was fixed 2/04.

Questions Raised During Discussion AT&T asked what products were covered and Qwest confirmed UNE-P and Resale. Eschelon asked what 0 meant and Qwest replied that if it comes from Qwest and it is a 0, bill Qwest. Qwest was requested to advise what condition access calls show up with a kick of 5123 versus 0 in all 3 regions. Eschelon asked what the meet point billing is on the same DUF. Qwest to provide response.

Closing Ric Martin advised that meeting minutes would be issued to the CLEC participants for review before posting to the CLEC community. Also responses to the Qwest action items would be issued to the all CLEC participants.

Subject: FW: CR PC020802-1 - Clarification Date: Thu, 14 Mar 2002 12:00:18 -0500 From: "Pardee, Carla D, NCAM" To: CC: "Hayes, Robert W (Bob), NCAM"

Ric:

AT&T has been discussing this CR (asking for correct and accurate transmission of DUF records) internally. AT&T would like to know the scope of the problem that was fixed. Did this fix correct only billing systems for UNE-P, or did this DUf transmission problem extend to meet point billing records as well? Does this fix have anything to do with the recent notification about the UNE-P records credits? We would like to set up another meeting to discuss this, or, if it is appropriate to discuss it in the CMP meeting next week, we are amenable to that as well. Let me know what works best for you. Thank you.

ps - I don't have Allan Zimmerman's correct e-mail address, if you wouldn't mind forwarding this to him also. Thank you.

Carla Dickinson Pardee Manager - LSAM (303) 298-6101

Revised (2/24/02) CLEC Change Request Clarification Meeting

2:30 p.m. (MDT) / Friday February 15, 2002 Conference Call TEL: 877-564-8688 CODE: 8973036 PC020802-1, Correct and Accurate Transmission of ADUF, DUF Records

Attendees: Carla Pardee, AT&T Richard Martin, Qwest Lynn Stecklein, Qwest Peggy Esquibel-Reed, Qwest Alan Zimmerman, Qwest Mark Pomeroy, Qwest Doug Warren, Qwest

Introduction of Attendees Introduction of the participants on the Conference Call were made and the purpose of the call discussed

Review Requested (Description of) Change Carla advised that the 013 DUF was to transmit Access records. She indicated that the ADUF records were not being transmitted correctly for UNE-P. She indicated that AT&T didn’t believe they were getting all DUF records and subsequently couldn’t bill their IXCs. Carla indicated that she thought that this was something the ROC was monitoring. Alan advised that the test were in the 3036 ROC Test. Alan further stated that the tests indicated that the Eastern and Western regions were 100% compliant. He indicated that the Central region is having issues with access of records received within a couple of days from a Change Order. Carla asked if there was any documentation on this. Alan advised that the documentation is on the WEB under Exception 3036. Alan explained that there is no Category 013, it is 011 for UNEs. Ric explained that there was a Systems Change to split the ADUF and ODUF records

Confirm Areas & Products Impacted It was confirmed that AT&T was interested in the product covered under Cat 011, which is Switched Access. . Confirm Right Personnel Involved It was confirmed that this is a Product/Process CR and Alan Zimmerman is the appropriate SME.

Identify/Confirm CLEC’s Expectation It was confirmed that AT&T wants confirmation that the Central Region is in compliance with providing 100% of the records.

Identify any Dependent Systems Change Requests It was confirmed that there is a System CR to break out Category 010 from 011.

Establish Action Plan (Resolution Time Frame) Qwest will report back on Central compliance progress by March’s CMP meeting


CenturyLink Response

April 5, 2002

Carla Pardee LSAM Manager AT&T

SUBJECT: Qwest’s Change Request Response - CR #PC020802-1 Correct and Accurate Transmission of ADUF or Category 011 DUF Records

This letter is in response to AT&T’s Change Request PC020802-1 requesting accurate and correct transmission of access DUF records (category 011 or ADUF).

During the February 15, 2002 Clarification Meeting, Qwest advised that the 3036 ROC Tests indicated Qwest’s Western and Eastern Regions were 100% compliant with issuance of DUF records. Qwest’s Central Region was still under testing by KPMG.

On Wednesday, KPMG officially closed the last issues associated with the DUF test for the 13 state ROC test area. These last issues had to do with correct population of Indicator 4 and the matches of calls made to DUF records passed in the Central region. KPMG found no records with incorrect Indicator 4 values, and found about 96% of the calls expected on the DUF. KPMG has now sent us the calls that comprise the four- percent of expected calls that KPMG did not find. Qwest will investigate these messages to see if any problems are found. Historically, however, there have been several percent of KPMG's expected calls that did not generate AMA records, did not complete a billable call, did not in fact belong to a wholesale account, or were passed on the DUF but were missed by KPMG. So Qwest expects to be able to explain essentially all the KPMG calls with these valid reasons. That analysis has just begun.

Qwest will provide the results of the analysis when they become available.

Sincerely,

Alan Zimmerman (303)896-8346 azimmer@qwest.com

Cc: Susan Burson


Open Product/Process CR PC030802-1 Detail

 
Title: Local Service Freeze Process to remove LEFV from Qwest residential accounts (being executed under the exception process)
CR Number Current Status
Date
Area Impacted Products Impacted

PC030802-1 Completed
6/19/2002
Pre-Ordering, Ordering, Provisioning, Billing LNP, Private Line, Unbundled Loop, UNE
Originator: Osborne-Miller, Donna
Originator Company Name: AT&T
Owner: Berry, Harriett
Director:
CR PM: Thomte, Kit

Description Of Change

VALIDATE THESE FOLLOWING BULLET ITEMS AS PART OF THE PROCESS:

- Caller must be a Qwest retail customer

- Customer must call business office and say they wish to "remove the freeze off of their local service"

- Do not instruct the customer to use the word "PIC". This is used for inter and intra lata services and causes confusion which can delay removing the LEFV

- CLEC can be a third party on the call to Qwest by the local customer

- Customer can call up to 7pm in his local service area to remove the freeze

- The LEFV resides in a repository that is worked overnight which means it will be removed off the customer's account that night and the LSR can be sent the next day without rejection

- Although updates to a CSR can take up 3-5 days, the removal of the freeze is not dependent on that CSR being updated.

- Qwest does not charge $5 to remove the freeze

- A Communicator will be sent to the CLEC community when the PCAT is updated

The last 2 bullet points can be removed from the CR as per clarification call 03/18/02

Scope expanded to include business accounts as well (per CLEC request 03/20/20)


Status History

03/08/02 - CR Submitted by AT&T (03/08/02 reflects the date notification was sent advising the receipt of this CR at cmpcr@qwest.com and not the 03/05/02 submitted date shown on the CR.)

03/08/02 - CR acknowledged by P/P CMP Manager

03/08/02 - CLEC contacted (e-mail) to organize clarification meeting

03/14/02 - Clarification call cancelled by Qwest. Call rescheduled for Monday March 18th.

03/18/02 - Clarification call held with AT&T

03/19/02 - Clarification draft meeting minutes sent to AT&T by e-mail

03/19/02 - AT&T advised Qwest they would like this CR expedited (on letter dated March 18)

03/20/02 - March CMP Meeting: AT&T 'walked-on' this CR and requested the use of the exception process. CMP meeting participants agreed. AT&T also requested a call next week with Qwest SME’s and the CLEC community. CR Status changed to "Evaluation." Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site

03/20/02 - AT&T e-mail requesting Qwest to work with them on specific customer issues related to removing local service freeze

03/20/02 - Reply e-mail from Judy Schultz stating she would be investigating the issue

03/21/02 - Notification CMPR.03.21.02.F.01239.CR_Meeting issued to CLECs informing them of a call on 03/26/02 to discuss this issue

03/26/02 - CR scope expanded to include business accounts

03/26/02 - General clarification call held

03/27/02 - Draft general clarification meeting minutes sent to participating CLECs via e-mail

03/28/02 - E-mail from AT&T seeking clarification on the IMA 9.0 edit

03/28/02 - Letter from AT&T expressing their disappointment with the general clarification call held on 03/26/02

03/29/02 - E-mail from AT&T asking for status and description of potential systems fix

04/01/02 - Minutes from general clarification call (03/26/02) updated to reflect AT&T’s comments. Last bullet point modified to reflect AT&T’s request to lift freeze until all issues addressed.

04/01/02 - E-mail from AT&T to Qwest with an example of rejected LSR

04/01/02 - Reply e-mail from Qwest with R-Order details

04/01/02 - Notification CMPR.04.01.02.F.01248.CR_Meeting issued to CLECs informing them of a call on 04/04/02 for a follow up discussion on this issue

04/01/02 - Reply e-mail from AT&T expressing their reservation about the effectiveness of the escalation process

04/02/02 - Draft response dated 04/02/02 sent to AT&T for discussion at Thursday's (04/04/02) general call. CR Status changed to "Presented"

04/02/02 - Notification PROS.04.02.02.F.00414.Local_Service_Freeze issued informing CLECs of PCAT update

04/03/02 - Draft response dated 04/02/02 posted to the P&P Interactive report on the CMP web site at: http://qwest.com/wholesale/cmp/changerequest.html

04/04/02 - Follow-up meeting held

04/04/02 - Notification CRCMPR.04.04.02.F.01251.Draft_CR_Response informing all CLECs a draft response had been posted in the Product/Process Interactive Report for this CR

04/05/02 - Letter from AT&T expressing their disappointment with Qwest's response presented in the follow-up meeting on 04/04/02

04/05/02 - Status update from Qwest on AT&T's request to immediately lift the freeze

04/08/02 - E-mail from AT&T seeking clarification on the correct 800 number to use

04/08/02 - Draft follow-up meeting minutes sent to participating CLECs via e-mail

04/08/02 - Formal Escalation received from AT&T, status changed to "Escalated"

04/09/02 - Reply e-mail with correct 800 number - 877-719-4294 (outside of the retail/business office number 800-244-1111)

04/09/02 - Qwest response sent acknowledging receipt of Formal Escalation from AT&T (PC030802-1-E06).

04/09/02 - Escalation posted to the web: http://qwest.com/wholesale/cmp/escalations.html

04/09/02 - All CLECs notified this CR has been escalated Notification CMPR.04.09.02.F.01252.CR_Escalation

04/10/02 - Worldcom joins escalation PC030802-1-E06 as a participant

04/10/02 - AT&T comments on Qwest's draft response

04/10/02 - E-mail from AT&T asking for clarification on whether the LEFV is always on the CSR

04/10/02 - "Participate" button removed from escalation web site at 5 p.m. (MST) as per CMP guidelines

04/11/02 - Qwest binding response dated 04/11/02 sent to Worldcom and AT&T

04/11/02 - Qwest binding response dated 04/11/02 posted to the web: http://qwest.com/wholesale/cmp/escalations.html

04/11/02 - E-mail from AT&T asking whether the binding response is effective immediately

04/12/02 - Reply e-mail from Qwest confirming binding response is effective immediately

04/17/02 - April CMP Meeting: Qwest and AT&T read out their binding responses. Status remains "Escalated." Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site

04/18/02 - Received AT&T binding response and posted to the escalation web site: http://qwest.com/wholesale/cmp/escalations.html Attached binding response to CR

04/19/02 -Received AT&T letter regarding numerous issues associated with the CMP System and Product and Process meeting

04/23/02 - Received email from AT&T regarding process updates Business Procedures RN: Removal of Local Service freeze letter addressed questions with this CR as well as others

04/26/02 - Reply email from Qwest to AT&Ts response of April17th

04/26/02 - Qwest binding response dated 04/26/02 posted to the web: http://qwest.com/wholesale/cmp/escalations.html

04/29/02 - Qwest AT&T and other CLECs participated in a call to review Qwests response to AT&T questions from 04/17/02

05/06/02 - Qwest sent email containing minutes for CLEC review from meeting on 4/29/02

05-15-02 - May CMP Meeting: Status remains "Escalated." Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. AT&T to issue letter outlining problems that still exist.

06/19/02 - June CMP Meeting: AT&T agreed to close this CR. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.


Project Meetings

04/19-02 This is an excerpt from a letter sent by Terry Bahner at AT&T. This is the only portion of the letter that pertained to this CR.

Documentation and disposition of AT&T CR PC 03802-1 – Local Service Freeze

As you know, I submitted this CR and requested application of the CMP “Exception Process”. I then escalated the issue based on discussions with Qwest. It’s a strange dichotomy for Qwest to state at the CMP Product and Process meeting that AT&T had five business days to respond to Qwest’s binding response to AT&T’s escalation of PC 030802-1 and then infer it was at Qwest’s own discretion whether to even document AT&T’s comments let alone where. At a minimum, the correspondence generated as part of the escalation should be included with the documentation of the CR, just as all other correspondence and minutes relating to CRs are documented. Since Qwest indicated in its binding response to AT&T’s escalation that Qwest would continue “to do problem solving working sessions with AT&T”, I don’t understand why my request to move the escalated change request to a ”Development” status was denied. AT&T understood the main purpose of escalating a change request was to ensure it received top priority based on business needs, not to house it in the dead-end file once Qwest provides its binding response. Qwest was clearly not prepared to present the binding response at the CMP meeting. No copies were provided to the CLEC community at the meeting and Sue Burson appeared unsettled by the request to present the binding response and respond to questions. While I have provided detailed written comments on Qwest’s binding response, AT&T has not rejected it. The areas addressed by Qwest’s response may satisfy most of AT&T’s needs, however, it is not clear from Qwest’s response that the problems AT&T has been experiencing have actually been resolved. AT&T expects that Qwest will work collaboratively with AT&T to resolve these issues. We are extremely disappointed that Qwest chose to then send out the local service freeze notice as a Level 1 notification (Announcement Date: April 18, 200; Document Number: PROS.04.18.02.F.00426.LocalServFreeze) . Judy, you had articulately explained the five levels of Qwest-initiated product/process changes in the morning portion of the April 17th meeting. Yet, the notice was sent on April 18th as a Level 1 instead of the Level 3 AT&T had strongly recommended in our written and oral responses on April 17th. We have repeatedly indicated to Qwest the local service freeze has had a daily negative impact on our ability to meet the end customers’ requests for a change in local service provider. For Qwest to indicate at this juncture of the change request that no comment cycle is available to the CLEC community shows a true disregard for the redesigned CMP, to the commitment made by the entire CMP re-design team since its work began in July 2001 and to Qwest’s commitment in its binding response “to do problem solving working sessions with AT&T.”

04/10/02 - AT&T comments on Qwest's draft response

1. Caller must be a Qwest retail customer This is a true statement. The Qwest Retail end user may contact their Qwest Retail business office to have their local service freeze removed. Their new CLEC may be on the phone with them at the same time (Three-way call).

AT&T - AT&T should be able to call the retail office without having the customer on line, this would eliminate the unnecessary time it takes to reach the customer. (Portland Metro Market – AT&T Broadband)

2. Customer must call business office and say they wish to "remove the freeze off of their local service" This is a true statement. When the end user customer contacts the Qwest Retail business office, they should ask to have their local service freeze removed. If the end user customer simply states that they are moving to AT&T, there may be some confusion as to whether this is a PIC change or the customer is moving their local service to AT&T.

AT&T - Does the retail office see the pending order to port to the CLEC? End users are being told their Qwest number(s) are disconnected and therefore Qwest cannot remove the LEFV. Perhaps they are confusing the "pending" disconnect. Notation on the Qwest side is very poor. Customers are given information such as their number is disconnected, but when they call back again, there is no note of the information they were given or even that they called in earlier. (Denver Metro Market - AT&T Broadband) AT&T believes the Qwest Retail business office is not the best arm of Qwest to be responsible for removing the LEFV. Sales’ organizations are based on revenue generating actions. They should not be responsible for lifting the LEFV when this clearly indicates a loss of revenue when the end customer moves to another competing CLEC for their local service. We believe this accounts for the lack of notations on the customer’s account after he has called nine times to remove the LEFV. (Terry Bahner - LSAM)

3. Do not instruct the customer to use the word "PIC". This is used for inter and intraLATA services and causes confusion which can delay removing the LEFV This is true. It is helpful in guiding the end user customer through the process since they may have a PIC, LPIC, and Local Service Freeze. The Sales Consultants have been provided training and job aids to help determine the customer’s need.

AT&T - Again, Qwest’s notation is very poor. The notes need to indicate what "type" of freeze the customer wishes to remove. The customer will use the word "LOCAL" and the Qwest notes will indicate "PIC". This is still a training issue on the Qwest side. The "R" order number should be noted so both sides of Qwest’s offices have access to this information. (Denver Metro Market - AT&T Broadband) AT&T believes the lack of notation or the wrong notation on the customer’s account and the multiple times the end customer has to call Qwest to lift the LEFV is indicative of a failed process and a serious training deficit. (Terry Bahner - LSAM)

4. CLEC can be a third party on the call to Qwest by the local customer See question #1

AT&T - AT&T believes Qwest needs to send out additional internal memos to drive home this statement. (Terry Bahner - LSAM)

5. Customer can call up to 7pm in his local service area to remove the freeze Qwest has customers across three different time zones. The Residence end user customer may call their Qwest Retail business office until the close of business in the Pacific time zone. - Central time zone until 9:00 PM (they will be routed to a center in the Mountain or Pacific time zones after 7:00 PM local time) - Mountain time zone until 8:00 PM (they will be routed to a center in the Pacific time zone after 7:00 PM local time) - Pacific time zone until 7:00 PM The hours for the Business, Federal Government, Education, Public Access Lines business offices are listed in the April 3, 2002 update to the PCAT.

AT&T - The window of opportunity to reach the retail office should be extended to include Saturdays. (Portland Metro Market - AT&T Broadband) Prime selling hours are until 9pm. The 7pm time could prevent us from closing the sale if the customer has a freeze on. It is not enough to rationalize that the customer can always call back later to remove the freeze. Sales organizations know that any obstacle thrown in the way of completing the sale at the time of offering the sale diminishes the chances of completing the sale. This places Qwest at an unfair competitive advantage. (Salt Lake Metro Market - AT&T Broadband) AT&T requests expanded hours to include Saturdays. (Denver Metro Market - AT&T Broadband) AT&T believes that Qwest for the time being should at least match their hours of removing the LEFV to the Monday-Saturday schedule already in existence. A second option would be for the CSIE to field the calls and note the customer’s account. (Terry Bahner - LSAM)

6. The LEFV resides in a repository that is worked overnight which means it will be removed off the customer service record. Qwest has a Local Freeze Repository where all frozen phone numbers are stored. That repository is updated on a daily basis as orders are issued to add or remove local freeze. When an order is issued to remove the freeze, the telephone number is removed from the Repository that night. The LEFV will not be removed from the CSR for 3-5 days. See further explanation in response to question 7.

AT&T - If the "R" order number is supplied in the remarks field...why cannot this be done manually and resubmitted the same day? See # 7’s explanation that SDC’s are already checking for system notations and if there is a notation, they will process the LSR. If Qwest does include Saturday hours but not same day supps, what day would the number update in the repository? (Denver Metro Market - AT&T Broadband)

7. Although updates to a CSR can take up 3-5 days, the removal of the freeze is not dependent on the CSR being updated. The Customer Service Record does not update for 3-5 days after the R order is issued to add or remove the Local Service Freeze. When a LSR is issued and there is LEFV on the CSR, the Wholesale Service Delivery Coordinators are checking system notations to determine if an order has been issued to remove the local service freeze. If there is a notation, they will process the LSR. In addition, if the LSR contains the R order number (of the freeze removal) the SDC will allow the order to be processed.

AT&T - The centers should be able to send the LSR immediately after calling the retail office to remove the freeze. Waiting 24hrs to submit is unacceptable unless Qwest is willing to reduce the 3-business day port rule. (This point was made my Jonathan Wolf on last week’s call. (Portland Metro Market - AT&T Broadband) However, the LSR will be rejected if submitted the same day as the LEFV removal request. This adds an additional day to the installation process. This may also require AT&T to contact the customer again to reschedule the originally promised installation date. This, in turn, could cause the original install to be missed if the customer cannot be contacted again in enough time to meet the due date. (Salt Lake Metro Market - AT&T Broadband)

The following questions were submitted by AT&T in a letter to Qwest dated 03/19/02

8. Customer required to call Qwest multiple times to remove LEFV The customer should be able to accomplish removal of the local service freeze in one call to Qwest.

AT&T - Simply remove the freeze with one call. (Portland Metro Market - AT&T Broadband) Should be able to and can are two different things. (Salt Lake Metro Market - AT&T Broadband) AT&T has provided examples where this demonstrates that it does not occur. As stated in earlier meetings with Qwest, this is one of the three process requirements that must be addressed to move the CR towards a workable process. (Terry Bahner - LSAM)

9. No established process to remove the LEFV at the Qwest retail offices Qwest has had established processes in place for local service freeze removal since March 10, 2001 when Local Service Freeze was first implemented.

AT&T - There are no established process by Qwest, until a workable process is in place a all frozen accounts should be lifted per Mike Mason’s request on the last two calls. (Portland Metro Market - AT&T Broadband) It’s apparent these "established processes" are broken. (Denver Metro Market - AT&T Broadband) AT&T has repeatedly indicated the process is not consistent. This has been demonstrated to Qwest by examples that range from Qwest refusing to help the end customer when AT&T Broadband is on the call to actually adding the LEFV and issuing a "D" order to disconnect the customers service instead of the "R" order. (Terry Bahner - LSAM)

10. No consistent confirmation number provided by the Qwest retail offices to note customer account Qwest Sales Consultants are currently providing the R order number to any end user customer or CLEC (on 3-way call) who requests it. We have determined that a specific work group has been providing "confirmation numbers" instead of the R order numbers. That situation has been corrected by the issuance of internal memo (MCC) and managing the performances of the involved individuals. Do not hesitate to request the R order that is being issued to remove the freeze.

AT&T - AT&T believes Qwest needs to continue to monitor how the LEFV is noted on the customer’s account by the Qwest representative. Although AT&T acknowledges and appreciates Qwest identifying a specific work group who was incorrectly providing a "good" confirmation number, a problem still surfaced after the MCC was sent. Once again we reference when Qwest issued either a "D" order or a "C" order for removing the LEFV. (Terry Bahner - LSAM)

11. Inconsistent information between the account team and the PCAT pertaining to submission of the LSR The PCAT is the Qwest official source for CLEC information.

AT&T - AT&T believes Qwest subject matter experts did provide inconsistent information to the service managers. It placed them in a precarious position by having to always "go to the SPOC" for every issue concerning the LEFV. This caused delays in developing a working process and delays in the status of the examples provided. It created a unnecessary extra layer in resolving outstanding LEFV issues. (Terry Bahner - LSAM)

12. Inconsistent Quality Check process at the Sierra Vista Center Calls and orders are monitored on a regular basis to ensure quality.

AT&T - Improved communication between the retail office and Sierra Vista (Portland Metro Market - AT&T Broadband) Inconsistencies still exist. (Denver Metro Market - AT&T Broadband) If this is true, why is Qwest saying they can cancel an LSR related to an LEFV issue? If this is true, why are some orders rejected and others are issued a jeopardy condition after the FOC? (Terry Bahner - LSAM)

13. Inconsistent escalation process at the Denver CSIE once confirmation has been received There are several determining factors as to how the escalation is handled. Each escalation is reacted to on an individual case basis.

AT&T - A single point of contact for escalations. (Portland Metro Market - AT&T Broadband) AT&T believes this does not meet our business requirements. Our third standing request is for Qwest to provide an escalation process that addresses LEFV issues that occur out of process. AT&T should not be penalized and lose their requested due date when Qwest fails to remove the LEFV. Our customer should never be placed in jeopardy when he wishes to have another CLECS’ local service because a Qwest system or agent failed to respond properly to a LSR issue regarding LEFV. (Terry Bahner - LSAM)

14. IMA 9.0 edit pulled and no notice sent to the CLEC Qwest did not remove any IMA 9.0 edits; therefore, notification to the CLECs was not necessary. There was a non-IMA edit in place that was checking the CSRs for LEFV which was relaxed so LSRs could flow through and allow the Service Order Processors to check the Freeze Repository and edit for a freeze at that point in the process.

AT&T - Qwest has stated on numerous occasions that back end systems are not considered CLEC impacting. Therefore, these back end system edits are neither subject to a CLEC review nor a CLEC upgrade notification. AT&T believes these edits did affect our orders. We believe they changed whether a LSR was rejected up front or issued a jeopardy condition after the FOC. This alters how a CLEC responds to an LSR. AT&T has repeatedly asked how these non-IMA edits affect our orders. Qwest has not provided an answer. AT&T has reconfirmed the information provided on March 15th by the Qwest service managers that an edit did occur on March 14th, 2002. If we cannot question Qwest’s backend systems, then we will refer to it as an IMA change when we believe our orders have been impacted. (Terry Bahner - LSAM)

15. IMA 9.0 edit to be implemented at a future date without CLEC notice All planned CLEC Impacting changes to IMA are currently being presented to the CLECs for prioritization. There are no plans to implement a 9.0 edit pertaining to Local Service Freeze.

AT&T - AT&T wants Qwest to not implement any edits in any systems (IMA, non-IMA) until a workable process to remove the LEFV has been agreed upon by AT&T and the CLEC community. (Terry Bahner - LSAM)

16. Jeopardy condition codes issued after the FOC affecting CLEC due date Qwest has listened to the concerns raised by AT&T on this issue and has taken steps to fortify existing processes to alleviate this problem.

AT&T - However, since we have to wait to supp the Pon AFTER the freeze is removed, this still results in a due date push out/reschedule for the customer. (Denver Metro Market - AT&T Broadband) AT&T wants to know what these steps are. The action of issuing a jeopardy condition after the FOC drastically affects our due date. If this jeopardy condition is a result of Qwest’s inability to successfully lift the LEFV, we believe we should not lose our due date under any circumstances. (Terry Bahner - LSAM)

17. Inconsistent Qwest retail process where CLEC can be a third party on the call with end customer See question #1

18. Inconsistent process between removing the LEFV and the updating of the CSR See question #6

19. Confusing reject /jeopardy condition message issued by Qwest The reject/jeopardy message currently being used is the only existing message that fits the local service freeze situation. Requests for new reject messages go through the CMP CR process. LSRs received to change lines/accounts with a local service freeze are rejected with the error message "Features on account are not compatible with requested features". In the Customer Comments section of the Reject Notice Qwest will include the following: "Please have end user contact current local service provider to have local service freeze removed."

AT&T - According to an earlier Qwest communication, Qwest stated the error message would read "Change activity not allowed, CLEC does not own account". Is this the message if the reject is caught up front (fatal reject) as opposed to the message for a jeopardy reject after the FOC? Or has this been changed altogether? (Denver Metro Market - AT&T Broadband) AT&T believes Qwest has not adequately addressed this issue. AT&T has requested LEFV be listed as a reason for a reject/jeopardy message in the PCAT. The jeopardy matrix needs to address LEFV. (Terry Bahner - LSAM)

20. AT&T reiterated they would like all of the above bullet points validated by Qwest and the process clearly documented in the PCAT The PCAT will be updated April 3, 2002.

AT&T - Under the current circumstances, Qwest needs to provide a collaborative atmosphere in resolving LEFV issues before any future PCAT documentation takes place. (Terry Bahner - LSAM)

21. What kind of questions does Qwest ask a Retail end user customer before adding a local service freeze? Upon initial contact with the end user customer, the Qwest Sales Consultant informs the customer of the availability of the freeze as follows: "We offer free protection to ensure that your provider of local service, long distance service, and local long distance service cannot be changed unless you contact us directly. You may remove this protection from your account at any time by contacting Qwest directly with a verbal, written, or electronically signed authorization. Would you be interested in setting that up now?" If the end user customer indicates they would like a freeze established, they are transferred to a Third Party Verifier (TPV) who asks the customer for the Billing Name on the account, Billing Address, the last four digits of their Social Security Number, and their date of birth. In addition, they ask if the caller is over 18 years old and is responsible for the account, and if they have permission to place the local service freeze on each specific line of the account.

AT&T - AT&T believes Qwest needs to go beyond the statement provided. It’s apparent the end customer is unaware of the cumbersome process to remove the LEFV when he wishes to obtain local service from a different company. (Terry Bahner - LSAM)

22. What changes have been made in the Local Service Freeze Removal process since 02/18/02? The process was working well before that date. Qwest has had established processes in place for local service freeze since March 10, 2001 when Local Service Freeze was first implemented. The only changes made to the process have been made within the past two weeks as a result of this CR.

AT&T - It is very clear to AT&T that Qwest did not have a working process in place on March 10, 2001. If Qwest had a good process in place that didn’t harm both the end customer and the CLEC, this CR would have never been submitted. (Terry Bahner - LSAM)

As a general proposition, Qwest has responded in the theoretical realm to many of the questions versus saying what the actual situation is (like in #8 above, but there are many other examples in their responses). It's easy to set up a theoretical process, but that is meaningless if the practical implementation is not being accomplished effectively. (Salt Lake Metro Market - AT&T Broadband)

-

04/08/02 - Draft follow-up meeting minutes sent to participating CLECs via e-mail

CLEC Change Request Follow-up Meeting 11:30 a.m. (MDT) / Thursday 4th April 2002 1-877-564-8688 ID 626-5401 # PC030802-1 Local Service Freeze - Process to remove LEFV from Qwest residential accounts

Attendees: Terry Bahner / AT&T Sharon Van Meter / AT&T Lindel Watkis / AT&T Mike Mason / AT&T Cynthia Linenberger / AT&T Rick Wolters / AT&T Johnthon Wolf / AT&T Joan Russell / AT&T Mitchell Menezes / AT&T Bonnie Johnson / Eschelon Karen Clauson / Eschelon Terry Wicks / Allegiance Leilani Hines / Worldcom Susan Travis / Worldcom Monica Avila / VarTec Telecom, Inc. Judy Schultz / Qwest Todd Mead / Qwest Harriett Berry / Qwest Pam DeLaittre / Qwest Scott Riley / Qwest Pete Budner / Qwest Carylon Brown / Qwest Sue Burson / Qwest

Introduction: - Qwest presented a brief history of the CR, (submitted 03/08/02, clarification call 03/18/02, AT&T expedite letter 03/19/02, AT&T walked-on @ CMP 03/20/02, general clarification call 03/26/02, Qwest draft response issued 04/02/02). The purpose of this call is to review Qwest’s draft response dated 04/02/02 - Note: Notification CMPR.04.01.02.F.01248.CRMeeting issued to CLECs on the 1st of April, informing them of a call on 04/04/02 for a follow up discussion on this issue. Standard P&P Redline guidelines of 5 business days for notifications to CLECs not followed due to expedited status of this CR.

Review Qwest Draft Response - Harriett Berry reviewed Qwest’s draft response dated April 2, 2002 - AT&T commented that using Aegis is currently their only option, as when they call the Qwest Business Offices they be on hold for long periods and the staff do not appear to be familiar with this process. AT&T asked that the 866-311-0222 number remain in effect. Qwest agreed that the Aegis number will remain in effect until this issue is resolved. - AT&T stated that the Qwest web site states the Local Service Freeze can be removed immediately, which has not been their experience. Qwest reiterated that it is effective the same day, but the LSR has to be submitted the next day. AT&T then asked Qwest to reduce the process time by one business day. Qwest took an action to reply to this. - AT&T stated that their desire is for Qwest to lift the Local Service Freeze so the LSR can be submitted the same day - see 2.10 - Eschelon asked if the LSR can be submitted using the R-Order number in the PON field? Qwest believed this would work. Qwest will investigate and report back. - AT&T reiterated they believe something changed on February 18th. They believe this process is broken and asked Qwest to lift the Freeze to before February 18th conditions - see 2.10 - Eschelon stated that Qwest could go to the State Commissions and seek a waiver on the Local Service Freeze. Eschelon also asked about a written process to remove the Freeze. Besides the presence of a form, Eschelon wanted to know whether there was a back end process in place to deal with this and what had been communicated to the CLECs? Qwest took an action to respond to this. - AT&T reiterated they are seeking: 1. To only have to make one call 2. To send in their LSR without rejection 3. A clear and concise escalation process 4. Have the AGIS number available on Saturday’s - AT&T also stated they continue to see large numbers of customers with the Freeze implemented, who believe they have never asked for it on their account. Qwest replied that they are continuing to investigate the AT&T examples and have already found most of the TPV’s for the AT&T examples. AT&T replied they have heard this before but have yet to receive any validation from Qwest. AT&T stated the implementation of a freeze is not clear as too many customers are not aware of this action on their account. Qwest will provide validation to Terry Bahner (AT&T) - AT&T stated they were going to escalate this CR as they expected resolution today, but believed this call had failed in its intent. AT&T want the freeze lifted and want an official response on this from Qwest in 24 hours. AT&T also offered to support an application by Qwest to the commission to get a waiver on Local Service Freeze until this issue is resolved. - AT&T also stated they believe the interim exception process has not worked for them as they had expected a response to this CR immediately.

Establish Action Plan - Qwest will respond to the above actions as soon as possible. - Qwest will either respond or provide a status update on lifting the freeze within 24 hours

-

04/05/02 - Status update from Qwest on AT&T's request to immediately lift the freeze

Status Update: Per action from April 4th CLEC Meeting

All, Qwest continues to review and analyze AT&T's request made yesterday to lift the Local Service Freeze. Qwest has not arrived at its final position at this time, however executive management is deeply engaged. We will follow up with another status update prior to close of business Monday April 8th 2002.

CR details can be found in the Product & Process Interactive report. The Product & Process Interactive report can be found at: http://qwest.com/wholesale/cmp/changerequest.html

Thanks Todd Mead

-

04/05/02 - Letter from AT&T expressing their disappointment with Qwest's response presented in the follow-up meeting on 04/04/02

1875 Lawrence St. Denver, CO 80202-1847

April 5, 2002

Todd Mead CMP Manager Qwest Communications 1801 California Street Denver, Colorado 80202

RE: Change Request PC 030802-1

Dear Todd:

This reconfirms AT&T’s repeated request that Qwest suspend the local service freeze until a collaborative Qwest-CLEC process can ensure an effective, efficient and prompt way to remove the LEFV with no impact to the end customer. AT&T does not believe Qwest’s draft response presented at the April 4th conference call meets our company’s immediate needs.

AT&T is disappointed that Qwest cannot recognize the impact the LEFV has on our daily LNP operations. It is very disturbing when Qwest continues to fail to bring to the table a workable solution. It is discouraging when Qwest continues to ignore our requests to engage the appropriate Qwest subject matter experts to participate in discussions with AT&T to help resolve this issue quickly. Had the appropriate operational SMEs from Qwest participated on the call yesterday, we might have made progress resolving these issues. Unfortunately, once again such individuals were absent.

AT&T’s expectations of the LEFV process is really quite simple. The end customer should be able to remove the LEFV with one call. AT&T Broadband should then be able to submit the LSR to port the customer immediately after the customer has taken the appropriate step to remove the LEFV without fear of an order rejection or a jeopardy condition being issued after the FOC. And last, if the process fails, there is a working escalation process to effectively handle the issue quickly.

Up to this point, Qwest has made minimal effort to work with AT&T to hammer out a workable solution. We view this as a dismal Qwest failure. First, it demonstrates Qwest’s inability to perform a normal function adequately. Second, it clearly shows Qwest does not acknowledge nor recognize the urgency related to the CMP exception process. Third, it demonstrates Qwest’s inability to effectively manage changes to its processes when they adversely impact CLECs.

AT&T will send to Qwest written comments embedded in Qwest’s April 2, 2002, rough draft response to change request PC 030802-1. It will also include AT&T’s proposed resolutions. In the meantime, AT&T will continue to direct the end customer to call AEGIS directly to remove the LEFV from his account. We are expecting at least a verbal response from Sue Burson by close of business today regarding AT&T’s request to suspend LEFV until a workable process can be implemented. AT&T would expect Sue to then send a written response to AT&T. Please insure the minutes from the April 4th conference call reflect AT&T has officially escalated this to Sue Burson.

Sincerely,

Terry Bahner Supervisor AT&T Local Services Access Management Western Region 303-298-6149

Cc: Tim Boykin Sharon Van Meter Donna Osborne-Miller Judy Schultz Mike Mason

-

04/02/02 - Notification PROS.04.02.02.F.00414.LocalServiceFreeze issued informing CLECs of PCAT update

Announcement Date: April 2, 2002 Effective Date: April 3, 2002 Document Number: PROS.04.02.02.F.00414.LocalServiceFreeze Notification Category: Process Notification Target Audience: CLECs, Resellers Subject: Options to Remove Local Service Freeze

Beginning April 4, 2002, Qwest will issue updates to its Wholesale Product Catalog that includes new/revised documentation for Local Service Freeze.

The Local Service Freeze PCAT will be updated to outline the options of requesting the removal of the Local Service Freeze. The PCAT also lists the information the retail end-user needs to provide to have the Local Service Freeze removed.

You will find a summary of these updates on the attached Web Change Notification Form. Actual updates are found on the Qwest Wholesale Web site at this URL: http://www.qwest.com/wholesale/clecs/lsfreeze.html

You are encouraged to provide feedback to this notice through our web site. We provide an easy to use feedback form at http://www.qwest.com/wholesale/feedback.html. A Qwest representative will contact you shortly to discuss your suggestion.

-

03/28/02 - Letter from AT&T expressing their disappointment with the general clarification call held on 03/26/02

1875 Lawrence St. Denver, CO 80202-1847

March 28, 2002

Todd Mead CMP Manager Qwest Communications 1801 California Street Denver, Colorado 80202

RE: Change Request PC 030802-1

Dear Todd:

AT&T is greatly disappointed with the conference call Qwest facilitated March 26, 2002 to discuss the expedited CR PC 030802-1. Qwest stated at the March 20, 2002 Product and Process CMP monthly meeting they understood the urgency of this change request regarding the local service freeze (LEFV). There was no need for a second clarification call. A clarification call had already been held on March 18, 2002.

We believed Qwest was willing to resolve the issue expediently, Todd, when you indicated you would have your subject matter experts available on the March 26th call. I then indicated to you that I was expecting my AT&T Broadband subject matter experts to also be available to help resolve the issue in the e-mail I sent March 22, 2002 (RE: CR # 5582295 - Updated Matrix). I suggested, in order getting to immediate resolution, that you include operational subject matter experts. I was very clear about AT&T’s expectations for the March 26th conference call.

AT&T also believes Qwest implied a resolution would be forthcoming by indicating the temporary 800 telephone number was directly dependent on the outcome of the March 26th meeting. If Qwest was not ready to problem solve the issue then there should never have been a question about keeping the 800 number available. While AT&T appreciates Qwest extending the use of the 800 telephone to help ease the burden of this issue, we should not have had to explain why we needed the extended use of it.

AT&T once again reminds Qwest of the negative impact the LEFV has imposed on our ability to port a customer. It continues to affect our daily ability to port a customer who wants our local service. This truly is unacceptable to us. AT&T has identified and shared with Qwest some of the most basic obstacles in a letter sent March 18, 2002 (RE: Change Request PC 030802-1).

Since Qwest has indicated a formal response will be issued to the CLEC community on April 3rd without a collaborative effort between Qwest and the CLEC community, AT&T clearly expects Qwest to be open to additional suggestions on the follow up conference call scheduled April 4th. AT&T expects that conference call to resolve outstanding issues and the appropriate decision-making individuals from Qwest will attend.

We believe going forward explicit timelines should be provided and adhered to by Qwest for an expedited CR. It should mirror the expedited CR Qwest presented as a walk on at the same March 20 meeting. Qwest clearly defined the timeframe and expectations of the CLEC community during that presentation. It should not be any different for an expedited CLEC CR.

AT&T looks forward to partnering with Qwest and the CLEC community to enhance the Interim Exceptions Process for OSS interfaces, Product and Process Changes (RE: Qwest Re-Design Web site) in future re-design CMP sessions. We believe use of the process, as it now stands for this specific change request, clearly indicates its’ lack of substance.

Sincerely,

Terry Bahner Supervisor AT&T Local Services Access Management Western Region 303-298-6149

Cc: Tim Boykin Sharon Van Meter Donna Osborne-Miller Judy Schultz Mike Mason

-

03/27/02 - Draft general clarification meeting minutes sent to participating CLECs via e-mail

General Clarification Meeting

3:00 p.m. (MDT) / Tuesday 26th March 2002

1-877-564-8688 ID 626-5401 # PC030802-1 Local Service Freeze - Process to remove LEFV from Qwest residential accounts

Attendees: Terry Bahner / AT&T Carla Dickinson-Pardee / AT&T Sharon Van Meter / AT&T Lindel Watkis / AT&T Mike Mason / AT&T Cynthia Linenberger / AT&T Noriko Wilson / AT&T Anthony Robert / AT&T Leilani Hines / Worldcom Susan Travis / Worldcom Monica Avila / VarTec Telecom, Inc. Judy Schultz / Qwest Todd Mead / Qwest Harriett Berry / Qwest Pam DeLaittre / Qwest Gay Abrahamson / Qwest Joan Smith / Qwest Connie Winston / Qwest

Introduction: Qwest presented a brief history of the CR, (submitted 03/08/02, clarification call 03/18/02, AT&T expedite letter 03/19/02, AT&T walked-on @ CMP 03/20/02 and general notification to all CLECs advising them of this meeting 03/21/02) Note: Notification CMPR.03.21.02.F.01239.CRMeeting issued on 03/21/02 to CLECs informing them of a call on 03/26/02 to discuss this issue. Standard P&P Redline guidelines of 5 business days for notifications to CLECs not followed due to expedited status of this CR.

Review Description of Change: Terry Bahner read out the following from Change Request PC030802-1: VALIDATE THESE FOLLOWING BULLET ITEMS AS PART OF THE PROCESS: - Caller must be a Qwest retail customer - Customer must call business office and say they wish to "remove the freeze off of their local service" - Do not instruct the customer to use the word "PIC". This is used for inter and intra lata services and causes confusion which can delay removing the LEFV - CLEC can be a third party on the call to Qwest by the local customer - Customer can call up to 7pm in his local service area to remove the freeze - The LEFV resides in a repository that is worked overnight which means it will be removed off the customer's account that night and the LSR can be sent the next day without rejection - Although updates to a CSR can take up 3-5 days, the removal of the freeze is not dependent on that CSR being updated. - Qwest does not charge $5 to remove the freeze * - A Communicator will be sent to the CLEC community when the PCAT is updated * *Removed as per clarification meeting 03/18/02 Terry also read out additional scope as per AT&T’s expedite request (AT&T letter dated 3/19/02) - Customer required to call Qwest multiple times to remove LEFV - No established process to remove the LEFV at the Qwest retail offices - No consistent confirmation number provided by the Qwest retail offices to note customer account - Inconsistent information between the account team and the PCAT pertaining to submission of the LSR - Inconsistent Quality Check process at the Sierra Vista Center - Inconsistent escalation process at the Denver CSIE once confirmation has been received - Qwest retail office confusing end customers by referring to the LEFV as a PIC freeze (Repeated above 3rd bullet) - IMA 9.0 edit pulled and no notice sent to the CLEC - IMA 9.0 edit to be implemented at a future date without CLEC notice - Jeopardy condition codes issued after the FOC affecting CLEC due date - Inconsistent Qwest retail process where CLEC can be a third party on the call with end customer - Inconsistent process between removing the LEFV and the updating of the CSR - Confusing reject /jeopardy condition message issued by Qwest

- AT&T reiterated they would like all of the above bullet points validated by Qwest and the process clearly documented in the PCAT - AT&T confirmed they would like the CR scope expanded to include Business Accounts as per CLEC request at the March CMP meeting. Todd will adjust CR documentation. - AT&T stated that 68% of all orders for removing LEFV in the Portland region had to be rescheduled last month. AT&T are seeking clarification on what exactly is the process for removing LEFV. AT&T also asked for an extension on the 800 number until the LEFV process is clarified and documented. - Qwest reiterated that they are working as expeditiously as possible to resolve this issue, and they aim to present a written draft response to the CLECs next week. - AT&T said they are willing to wait for the written response next week but need immediate ‘relief’ now. Immediate ‘relief’ was defined by AT&T as: - Keeping the 800 number live until next week (and include Saturday availability) - Someone in CSIE to take the lead on this issue and be nominated as the Single Point of Contact (SPOC) - Qwest would confirm later in the day on the status of this request. - AT&T also stated that they believe 100% of customers they talk too, insist they never asked for the freeze to be installed. AT&T would like to know what type of validation/questions Qwest ask to believe the customer has requested this product. - AT&T also asked for clarification on the R-Number and whether the order number is sufficient as some LSRs are currently being rejected with this information. - Worldcom and VarTec Telecom expressed their continued interest in this issue. - Qwest restated that they are currently not aware of anything that was ‘backed out’ of IMA 9.0 and also reiterated that the only work currently pending for IMA is in the prioritization list for all CLECs to vote on. - AT&T stated that since February 18th 2002, this process has not been working. They requested that in light of Qwest’s inability to support the process and the fact that the freeze placed on accounts were questionable as far as customer approval to begin with. That the best and quickest way to fix this matter was to lift the freeze and go back to the way we were prior to February 18th and not go back until all the issues were properly addressed and good process was actually in place. Qwest stated that a number of States were ‘turned-up’ on Feb 18th so this may be a volume issue. AT&T believe their volume did not change on Feb 18th and asked for the freeze to be lifted until a working process is put in place by Qwest. Qwest replied they understood AT&T’s concern and reiterated they are working as fast as possible on getting an accurate and workable solution for all CLECs.

Establish Action Plan: Next Meeting: Thursday 4th April @ 11:30 am (MDT) - same bridge number as this call. Qwest will present written response. Qwest will investigate and report back to AT&T this afternoon on providing ongoing ‘relief’

-

03/21/02 - Notification CMPR.03.21.02.F.01239.CRMeeting issued to CLECs informing them of a call on 03/26/02 to discuss this issue

Qwest will host a general clarification meeting on CLEC Change Request (CR) PC030802-1 (Process to remove LEFV from Qwest residential accounts) on Tuesday March 26, 2002.

Date: Tuesday, March 26, 2002 Time: 3:00 p.m. MST Conference Line: 1-877-564-8688 Passcode 626-5401 #

Details of the CR can be found in the Product/Process Interactive report at: http://qwest.com/wholesale/cmp/changerequest.html Sincerely,

Todd Mead

-

03/19/02 AT&T advised Qwest they would like this CR expedited

1875 Lawrence St. Denver, CO 80202-1847

March 18, 2002

Todd Mead CMP Manager Qwest Communications 1801 California Street Denver, Colorado 80202

RE: Change Request PC 030802-1

Dear Todd:

AT&T is requesting Qwest to officially expedite PC 030802-1. The local service freeze (LEFV) is critically affecting AT&T Broadband’s ability to port customers. This LEFV has presented multiple obstacles. We are requesting to have an immediate discussion between Qwest and AT&T Broadband subject matter experts to discuss the many problems associated with LEFV. What have been identified to date are the following:

- Customer required to call Qwest multiple times to remove LEFV - No established process to remove the LEFV at the Qwest retail offices - No consistent confirmation number provided by the Qwest retail offices to note customer account - Inconsistent information between the account team and the PCAT pertaining to submission of the LSR - Inconsistent Quality Check process at the Sierra Vista Center - Inconsistent escalation process at the Denver CSIE once confirmation has been received - Qwest retail office confusing end customers by referring to the LEFV as a PIC freeze - IMA 9.0 edit pulled and no notice sent to the CLEC - IMA 9.0 edit to be implemented at a future date without CLEC notice - Jeopardy condition codes issued after the FOC affecting CLEC due date - Inconsistent Qwest retail process where CLEC can be a third party on the call with end customer - Inconsistent process between removing the LEFV and the updating of the CSR - Confusing reject /jeopardy condition message issued by Qwest

It is critical Qwest establish a team to address the customer impact and at the same time improve the processes. As I have indicated both in e-mail and on the clarification call to Qwest, this is now a high profile issue between both companies. Mike Mason, Vice-President AT&T Broadband, has escalated this to Scott Shipper, Vice-President Qwest.

AT&T’s account team has declined to work directly with AT&T to resolve this issue and has instructed AT&T to move all discussion to CMP. In addition Todd, you stated on the clarification call held March 18, 2002, Qwest would not provide a resolution to this CR until the monthly CMP forum in May. This is unacceptable to AT&T.

AT&T requests Qwest to expedite PC 030802-1 immediately. AT&T will present this CR as a "walk on". Please inform Jim Beers. Under the Interim Exception Process for OSS Interfaces, Product and Process Changes (RE: Qwest Re-Design Web site) this can be addressed at Wednesday’s monthly CMP meeting and voted on as an expedited issue by the CLEC community.

Sincerely,

Terry Bahner Supervisor AT&T Local Services Access Management Western Region 303-298-6149

Cc: Tim Boykin Sharon Van Meter Donna Osborne-Miller Judy Schultz

-

Clarification Meeting

11:00 a.m. (MDT) / Monday 18th March 2002 1-877-564-8688 ID 626-5401 # PC030802-1 Local Service Freeze – Process to remove LEFV from Qwest residential accounts

Attendees: Terry Bahner / AT&T Donna Osborne-Miller / AT&T Cynthia Linenberger / AT&T Lindel Watkis / AT&T Mike Harggert / AT&T Harriett Berry / Qwest Chris Quinn-Struck / Qwest Pete Budner / Qwest Todd Mead / Qwest

Review Requested (Description of) Change: Terry read out the change request: VALIDATE THESE FOLLOWING BULLET ITEMS AS PART OF THE PROCESS: * Caller must be a Qwest retail customer * Customer must call business office and say they wish to "remove the freeze off of their local service" * Do not instruct the customer to use the word "PIC". This is used for inter and intra lata services and causes confusion which can delay removing the LEFV * CLEC can be a third party on the call to Qwest by the local customer * Customer can call up to 7pm in his local service area to remove the freeze * The LEFV resides in a repository that is worked overnight which means it will be removed off the customer's account that night and the LSR can be sent the next day without rejection * Although updates to a CSR can take up 3-5 days, the removal of the freeze is not dependent on that CSR being updated. * Qwest does not charge $5 to remove the freeze * A Communicator will be sent to the CLEC community when the PCAT is updated

- AT&T asked for more clarification around the 6th Bullet as the updated PCAT indicated the LSR can be submitted immediately after the LEFV is removed (not the next business day). - The last two bullet points can be removed from the original CR. Todd will adjust the CR documentation. - AT&T asked for clarification around the edit that is going into IMA - AT&T asked for Qwest to explain the role and also train the duty pager on the Local Service Freeze process. AT&T have experienced significant problems with issues they have escalated to the duty pager - AT&T also asked Qwest to provide clarification on what remarks to expect in the remarks section of the jep notification re: Joan Wells

Confirm Areas & Products Impacted: Products: LNP, Private Line, Unbundled Loop & UNE Areas: Pre-ordering, Ordering & Provisioning - Billing was added

Confirm Right Personnel Involved: Harriett confirmed she is the correct person to be the Qwest SME in relation to this CR.

Identify/Confirm CLEC’s Expectation: AT&T want to see a clear and concise process around removing the Local Service Freeze, verified and documented in PCAT.

Establish Action Plan (Resolution Time Frame): General clarification – April CMP meeting. Qwest’s initial response presented at May CMP meeting. AT&T will send Change Management a letter this afternoon requesting Qwest expedite this CR. AT&T will ‘walk-on’ this CR at Wednesday’s CMP meeting.


CenturyLink Response

Draft Response for Discussion on General Clarification Call to be held April 4th

April 2, 2002

Terry Bahner Supervisor AT&T Local Services Access Management 1875 Lawrence St. Denver, CO 80202-1847

SUBJECT: Qwest’s Change Request Response - CR # PC 030802-1 "Local Service Freeze Removal for Residence and Business Customers"

Following are responses to your list of issues and questions from CR #PC030802-1, your additional list of issues dated March 19, as well as questions from our March 26, 2002 conference call.

1. Caller must be a Qwest retail customer This is a true statement. The Qwest Retail end user may contact their Qwest Retail business office to have their local service freeze removed. Their new CLEC may be on the phone with them at the same time (Three-way call).

2. Customer must call business office and say they wish to "remove the freeze off of their local service" This is a true statement. When the end user customer contacts the Qwest Retail business office, they should ask to have their local service freeze removed. If the end user customer simply states that they are moving to AT&T, there may be some confusion as to whether this is a PIC change or the customer is moving their local service to AT&T.

3. Do not instruct the customer to use the word "PIC". This is used for inter and intraLATA services and causes confusion which can delay removing the LEFV This is true. It is helpful in guiding the end user customer through the process since they may have a PIC, LPIC, and Local Service Freeze. The Sales Consultants have been provided training and job aids to help determine the customer’s need.

4. CLEC can be a third party on the call to Qwest by the local customer See question #1

5. Customer can call up to 7pm in his local service area to remove the freeze Qwest has customers across three different time zones.

The Residence end user customer may call their Qwest Retail business office until the close of business in the Pacific time zone.

- Central time zone until 9:00 PM (they will be routed to a center in the Mountain or Pacific time zones after 7:00 PM local time) - Mountain time zone until 8:00 PM (they will be routed to a center in the Pacific time zone after 7:00 PM local time) - Pacific time zone until 7:00 PM

The hours for the Business, Federal Government, Education, Public Access Lines business offices are listed in the April 3, 2002 update to the PCAT.

6. The LEFV resides in a repository that is worked overnight which means it will be removed off the customer service record. Qwest has a Local Freeze Repository where all frozen phone numbers are stored. That repository is updated on a daily basis as orders are issued to add or remove local freeze. When an order is issued to remove the freeze, the telephone number is removed from the Repository that night. The LEFV will not be removed from the CSR for 3-5 days.

See further explanation in response to question 7.

7. Although updates to a CSR can take up 3-5 days, the removal of the freeze is not dependent on the CSR being updated. The Customer Service Record does not update for 3-5 days after the R order is issued to add or remove the Local Service Freeze.

When a LSR is issued and there is LEFV on the CSR, the Wholesale Service Delivery Coordinators are checking system notations to determine if an order has been issued to remove the local service freeze. If there is a notation, they will process the LSR. In addition, if the LSR contains the R order number (of the freeze removal) the SDC will allow the order to be processed.

The following questions were submitted by AT&T in a letter to Qwest dated 03/19/02

8. Customer required to call Qwest multiple times to remove LEFV The customer should be able to accomplish removal of the local service freeze in one call to Qwest.

9. No established process to remove the LEFV at the Qwest retail offices Qwest has had established processes in place for local service freeze removal since March 10, 2001 when Local Service Freeze was first implemented.

10. No consistent confirmation number provided by the Qwest retail offices to note customer account Qwest Sales Consultants are currently providing the R order number to any end user customer or CLEC (on 3-way call) who requests it. We have determined that a specific work group has been providing 'confirmation numbers' instead of the R order numbers. That situation has been corrected by the issuance of internal memo (MCC) and managing the performances of the involved individuals. Do not hesitate to request the R order that is being issued to remove the freeze. 11. Inconsistent information between the account team and the PCAT pertaining to submission of the LSR The PCAT is the Qwest official source for CLEC information.

12. Inconsistent Quality Check process at the Sierra Vista Center Calls and orders are monitored on a regular basis to ensure quality.

13. Inconsistent escalation process at the Denver CSIE once confirmation has been received There are several determining factors as to how the escalation is handled. Each escalation is reacted to on an individual case basis.

14. IMA 9.0 edit pulled and no notice sent to the CLEC Qwest did not remove any IMA 9.0 edits; therefore, notification to the CLECs was not necessary. There was a non-IMA edit in place that was checking the CSRs for LEFV which was relaxed so LSRs could flow through and allow the Service Order Processors to check the Freeze Repository and edit for a freeze at that point in the process.

15. IMA 9.0 edit to be implemented at a future date without CLEC notice All planned CLEC Impacting changes to IMA are currently being presented to the CLECs for prioritization. There are no plans to implement a 9.0 edit pertaining to Local Service Freeze.

16. Jeopardy condition codes issued after the FOC affecting CLEC due date Qwest has listened to the concerns raised by AT&T on this issue and has taken steps to fortify existing processes to alleviate this problem.

17. Inconsistent Qwest retail process where CLEC can be a third party on the call with end customer See question #1

18. Inconsistent process between removing the LEFV and the updating of the CSR See question #6

19. Confusing reject /jeopardy condition message issued by Qwest The reject/jeopardy message currently being used is the only existing message that fits the local service freeze situation. Requests for new reject messages go through the CMP CR process.

LSRs received to change lines/accounts with a local service freeze are rejected with the error message "Features on account are not compatible with requested features." In the Customer Comments section of the Reject Notice Qwest will include the following: "Please have end user contact current local service provider to have local service freeze removed."

20. AT&T reiterated they would like all of the above bullet points validated by Qwest and the process clearly documented in the PCAT. The PCAT will be updated April 3, 2002. 21. What kind of questions does Qwest ask a Retail end user customer before adding a local service freeze? Upon initial contact with the end user customer, the Qwest Sales Consultant informs the customer of the availability of the freeze as follows: "We offer free protection to ensure that your provider of local service, long distance service, and local long distance service cannot be changed unless you contact us directly. You may remove this protection from your account at any time by contacting Qwest directly with a verbal, written, or electronically signed authorization. Would you be interested in setting that up now?"

If the end user customer indicates they would like a freeze established, they are transferred to a Third Party Verifier (TPV) who asks the customer for the Billing Name on the account, Billing Address, the last four digits of their Social Security Number, and their date of birth. In addition, they ask if the caller is over 18 years old and is responsible for the account, and if they have permission to place the local service freeze on each specific line of the account.

22. What changes have been made in the Local Service Freeze Removal process since 02/18/02? The process was working well before that date. Qwest has had established processes in place for local service freeze since March 10, 2001 when Local Service Freeze was first implemented. The only changes made to the process have been made within the past two weeks as a result of this CR.

Sincerely,

Harriett Berry Senior Process Analyst Qwest

Cc: Sue Burson, Director Process Management, Qwest


Open Product/Process CR PC010702-1 Detail

 
Title: For Qwest to develop appropriate blocking for Directory Assistance and National Directory Assistance for Resellers
CR Number Current Status
Date
Area Impacted Products Impacted

PC010702-1 Completed
2/20/2002
Ordering, Billing & Other Resale: Toll restriction, possible new USOC
Originator: Harsila, Roy
Originator Company Name: Comm South Companies, Inc.
Owner: Van Dusen, Janean
Director:
CR PM:

Description Of Change

At this time, Comm South Companies, Inc. uses the appropriate toll restriction USOC for our blocking; however, the toll restriction does not block any types of Directory Assistance calling. Qwest provides to their customer's the product of Dial Lock, which is USOC: OC4, that blocks Directory Assistance. Qwest has stated that this product was not developed to be used by Resellers. Other RBOC's include this type of blocking in the toll restriction option. I would like to see Qwest add the Directory Assistance blocking feature in the toll restriction. At this time, Comm South Companies, Inc. is being billed thousands of dollars for Directory Assistance and then we have to bill our end users, if Qwest would add this Directory Assistance blocking functionality in their toll restriction product it would help reduce these charges.


Status History

1/7/02 - CR Submitted by Comm South Companies, Inc.

1/7/02 - CR acknowledged by P&P CMP Manager

1/9/02 - Comm South contacted to coordinate clarification call. Call scheduled for 1/15/02

1/15/02 - Clarification call held.

1/15/02 - Draft meeting minutes from clarification call issued to Comm South Companies

1/25/02 - Draft response dated 01/24/02 posted to CMP database and issued to Comm South Companies. Status changed to "Presented"

2/19/02 - E-mail from Comm South asking follow-up questions

2/20/02 - February CMP meeting: Qwest response dated 01/24/02 presented to CLECs. Comm South agreed their request had been answered. CR status changed to "Completed". Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the P/P CMP Meeting Distribution Package 03/20/02

2/22/02 - Formal response dated 01/24/02 issued to CLECs - Document Number: CMPR.02.22.02.F.01229.CR_Responses

3/20/02 - CR Open/Closed status changed to closed and inactive and checked for Archive 2002


Project Meetings

02/19/02 E-mail from Comm South asking follow-up questions Subject: CR Form PC010702-1 Date: Tue, 19 Feb 2002 12:52:25 -0600 From: Roy Harsila To: "'tmead@qwest.com'" To whom it may concern: Thank you for the response to the CR that I submitted. I do have some questions pertaining to CustomNet, and these questions are as follows: The definition of CustomNet is as follows: "CustomNet provides operator screening when originating a call by dialing 0/0+, thereby restricting the types of calls billed to third number, collect or calling card depending on the Call Screening Code used." My questions are as follows. 1) Could a call get passed the operator without the call being alternately billed? If this is possible, who is responsible for the bill of this call, Qwest or Comm South or the end user? 2) When will the nonrecurring charge for the CustomNet be applicable? On every order type? Thank you for your time. Sincerely, Roy Harsila Comm South Companies, Inc. 972-643-6417

--

01/15/02 Alignment/Clarification Meeting 10:00 a.m. (MST) / Tuesday 15th January 2002

Attendees: Roy Harsila / Comm South Companies Todd Mead / Qwest Janean Van Dusen / Qwest Jolene Wees / Qwest

Review Requested (Description of) Change: Roy introduced the CR. Janean asked whether the Directory blocking was for local or long distance? Roy responded for both local and National. Jolene asked whether retail have this product? Need someone from retail on the call. Jolene recommended Sandy Foster.

Area Impacted: Ordering, Billing & Other Products Impacted: Resale: Toll restriction, possible new USOC

Confirm Right Personnel Involved: Janean is the owner for this CR. She will need to coordinate with people in retail to assist with response.

Identify/Confirm CLEC’s Expectation: For Qwest to add the Directory Assistance blocking functionality in the toll restriction product or develop a USOC that can be used by Reseller's to block all types of Directory Assistance.

Establish Action Plan: This CR can be walked on this month. However, the General Clarification will take place during the February CMP Meeting (02/20/02). Qwest response will be presented in the March CMP Meeting (03/20/02)


CenturyLink Response

FORMAL RESPONSE

January 24, 2002

Roy Harsila Carrier Relations Manager Comm South Companies, Inc.

CC: Bill Campbell

This letter is in response to your CLEC Change Request Form, number PC010702-1 – For Qwest to develop appropriate blocking for Directory Assistance and National Directory Assistance for Resellers.

REQUEST: At this time, Comm South Companies, Inc. uses the appropriate toll restriction USOC for our blocking; however, the toll restriction does not block any types of Directory Assistance calling. Qwest provides to their customer's the product of Dial Lock, which is USOC: OC4 that blocks Directory Assistance. Qwest has stated that this product was not developed to be used by Resellers. Other RBOC's include this type of blocking in the toll restriction option. I would like to see Qwest add the Directory Assistance blocking feature in the toll restriction. At this time, Comm South Companies, Inc. is being billed thousands of dollars for Directory Assistance and then we have to bill our end users, if Qwest would add this Directory Assistance blocking functionality in their toll restriction product it would help reduce these charges.

RESPONSE: Qwest understand the problem Comm South is facing with unapproved charges being made against its network. Qwest has a product called CustomNET that will provide the National and International Directory Blocking product for Comm South. Details about this product can be found at:

http://www.qwest.com/wholesale/clecs/features/customnet.html#prod

If you have any questions or would like to purchase this product, please contact your Service Manager.

Sincerely,

Janean Van Dusen Product Manager


Open Product/Process CR PC011502-1 Detail

 
Title: Joint testing of Qwest installed transmission cables
CR Number Current Status
Date
Area Impacted Products Impacted

PC011502-1 Completed
4/15/2009
Ordering, Maintenance/Repair Colocation, UDIT, Unbundled loop, UNE, LIS / Interconnect
Originator: Zulevic, Michael
Originator Company Name: Covad
Owner: Campbell, Ben
Director:
CR PM: Harlan, Cindy

Description Of Change

Provide a 60 calendar day "window of opportunity" for joint testing, at no additional charge, of newly installed transmission cables and cables associated with installation of virtual splitter collocation, to ensure no electrical faults (ie; opens, grounds, reversals, etc.) between the CLEC collocation arrangement and the Qwest DS0, 1 or 3 ICDF.

Additional Information: Covad has experienced a significant number of cable augments with electrical faults, requiring a technician dispatch to the central office.


Status History

01/14/02 - CR Submitted by Covad.

01/15/02 - CR acknowledged by P/P CMP Manager.

01/18/02 - Coordinated optional dates/times for Clarification Meeting with Covad.

01/23/02 - Conducted Clarification Meeting with Covad.

01/28/02 - Issued Clarification Meeting Minutes to Covad.

02/20/02 - CMP Meeting - CLEC Community Clarification held. It was agreed that the CR would move to Evaluation. Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package 03/20/02.

03/13/02 - Issued Qwest's Draft Response dated March 11, 2002 to Covad.

03/20/02 - CMP Meeting - Qwest presented its Draft Response dated March 11, 2002. The participants agreed that the CR could move into Development. Qwest to contact Covad, who was not in attendance, to confirm that they agree to move the CR to Development.

03/21/02 - Telephone conversation with Covad - Qwest reviewed its response and explained the discussions at the CMP Meeting. Covad was in agreement to move into Development and see how the facility installations are improving.

03/22/02 - Formal response dated March 11, 2002 issued to CLECs. Notification CMPR.03.22.02.F.01240.CR_Responses.

04/17/02 - CMP Meeting - Qwest provided a status on the process development. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. CR status will remain in Development.

05/15/02 - CMP Meeting - Qwest provided a status on the process development. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. CR status will remain in Development.

06/19/02 - CMP Meeting - Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. CR status will remain in Development.

06/27/02 - Issued Mailout notification of CLEC conference call to review product description. Notification CMPR.06.27.02.F.01284.ICDF_Meeting.

07/11/02 - CLEC conference call held to review the ICDF Joint Testing product offering and the Test Access Points document

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status "Development" was not changed.

08/06/02 - Issued Mailout notification of CLEC conference call scheduled for 8/16/02 to review revised product description. CMPR.08.06.02.F.01308.Joint_Testing_Mtg.

08/09/02 - Issued Mailout notification with meeting material for 8/16/02 conference call. Notification CMPR.08.09.02.F.01313.Mtg_Material.

08/21/02 - CMP Meeting - Qwest provided a status on issuance of the Level 3 notification. Minutes on this CR to be posted to the Project Meetings section. Status to remain in Development.

09/18/02 - CMP Meeting - Qwest provided a status on issuance of the Level 3 notification. Minutes on this CR to be posted to the Project Meetings section. Status to remain in Development.

10/16/02 - CMP Meeting - Qwest provided a status on issuance of the Level 3 notification. Minutes on this CR to be posted to the Project Meetings section. Status to remain in Development.

10/17/02 - Contacted Covadd to advise new issue identified and process document is still under review.

11/05/02 - Notification due out 11-06, comment cycle 11-07 - 21, publish plan date 11-21.

11/20/02 - CMP Monthly Meeting agreed to move this CR to CLEC Test status.

12/06/02 - No comments received. Final Notification sent out 11-27 effective 12-12. Move to close this CR at the December CMP meeting.

12/10/02 - Contacted Covad to check if process working. No orders have gone through this process as of yet so we will plan on leaving this project in CLEC Test.

12/18/02 - December P/P CMP Meeting minutes will be posted to the Project Meeting section. PCAT completed and no comments came in. Qwest and Covad discussed the forms that are used to order this product and agreed that the product has not been ordered yet so we will leave the CR in CLEC Test until the product is ordered and working.

01/15/03 - CMP Meeting - CR remains in CLEC Test.

02/19/03 - Feb CMP Meeting - CR remains in CLEC Test. Product has been ordered and is going through the entire process. Should be able to close this CR after order is completed. CMP Meeting minutes will be posted to the Project Meeting Section.

3/11/03 - Qwest Steve Nelson checking on 3 pending jobs for Covad - quote has been issued but not accepted yet. Nelson will be advised when the jobs go to joint testing.

3/19/03 - March CMP Meeting minutes will be posted to the database

4/16/03 - April CMP Meeting minutes will be posted to the database

5/16/03 - May CMP Meeting minutes will be posted to the database

6/18/03 - June CMP Meeting minutes will be posted to the database

7/16/03 - July CMP Meeting minutes posted to the database


Project Meetings

07/16/03 July CMP Meeting Minutes John Berard – Covad advised on one test there was a scheduling issue between the technicians. Steve Nelson – Qwest explained that was at the Dry Creek Central Office and the technicians were not able to coordinate their schedules. Qwest has completed multiple tests successfully with Covad and Integra. The SICMs were present at all tests. One of the tests included 400 DSO lines, which were tested without any defects. The test with Integra had one defect, which was later cleared. Qwest reviewed the process and explained if there are problems we will continue to work with the CLECs. John Berard – Covad agreed to close this CR.

06/18/03 June CMP Meeting Minutes Steve Nelson – Qwest reported the Dry Creek test is still pending. Qwest and Covad completed the test in Washington. They tested 200 cables, all were good, and we found 2 splitter card problems that we resolved. The joint test took 1 hour to do the test, and 1-hour travel time each way. Qwest will reduce the interval to 1 hour. Mike Zulevic-Covad advised we need to work on sharing and recording test results. Covad requested to leave in CLEC Test one more month.

05/21/03 May CMP Meeting Minutes Steve Nelson – Qwest reported he is monitoring two RFS; one for Covad and one for Cyber Mesa. There is a call scheduled today which will set up the time for the Joint Test to occur. Steve and Mike will try to attend the Joint test. Steve will advise Cindy Macy when the joint test is scheduled and completed. This CR will remain in CLEC Test.

04/16/03 April CMP Meeting PC011502-1: Joint Testing of Qwest Installed Transmission Cables

Steve Nelson – Qwest reported a total of 13 joint test results have been submitted and are pending from 3 different CLECs. None are completed as of yet so we are unable to report on the test results until they go through that phase. These requests came in with Augment orders. Steve advised Qwest will be updating the document to include improvements on the process. Steve is working with the CPMC and will get the RFS dates and call Mike Zulevic. Mike advised he would like to keep this CR open until an order has gone through the entire process. This CR will remain in CLEC Test status.

03/19/03 March CMP Meeting Steve Nelson – Qwest reported Covad has issued orders and Qwest is waiting for Covad to accept the quote. After Covad accepts the quote Steve Nelson will monitor the process to make sure the joint test goes okay. Mike Zulevic agreed to check and see why Covad has not accepted the quote as of yet. Steve Nelson agreed to call Mike with BAN numbers.

02/19/03 Steve Nelson-Qwest and Mike Zulevic-Covad advised they have updated the Interconnection Agreement and Covad has placed augment orders. We are now waiting for the orders to go through the entire process which normally has a 45-60 day interval to complete. After the orders go through the entire process we will determine a close date.

01/15/03 January CMP Meeting

White-Qwest described the CR. Zulevic-Covad stated that Qwest and Covad were in the process of amending Covad’s interconnection agreement and that when that was complete Covad would begin placing orders. This CR remains in CLEC Test.

12/18/02 December CMP Monthly Meeting Minutes Qwest - Nelson advised the PCAT was published and no comments were received. Nelson reported he is working with Covad to clarify how to order the product. Section M of the Collocation Order Form and the Joint Testing at ICDF Form is used for ordering. Covad advised an amendment to their Interconnect Agreement will be issued to modify the increments. The team agreed another CR would need to be issued and handled as a Level 2. This CR will be left in CLEC Test until an order is placed for the product or until the team determines otherwise.

11/20/02 November CMP Monthly Meeting Minutes Qwest (Steve Nelson) reported the PCAT was updated and posted for review with the comment cycle ending 11-21. It was agred to move this CR to CLEC Test.

10/18/02 October CMP Monthly Meeting Minutes Qwest reported the process document for the Test Access Points is under review and anticipated to be available for review effective October 18, 2002. The Qwest documentation review team surfaced an issue after the CMP meeting that is currently under investigation. This issue will impact the October 18 availability date. The document will remain in review and this project will remain in Development status.

09/18/02 September CMP Monthly Meeting Minutes

Qwest advised that documentation on the Joint Test Process should be published by the end of next week. Comments from the last collaborative review meeting are being incorporated into the document and the Collo Application form is being updated. The CR will remain in Development

-

08/21/02 August CMP Monthly Meeting Minutes

Qwest provided a status update on issuance of the Initial Notification. They indicated that the process with being revised to incorporate the CLECs request to have Qwest contact the CLEC to notify when they are ready and that there would be no additional QPF. Covad advised that they had a conversation with the Collocation Product Manager and he provided the same update.

-

07/17/02 - July CMP Meeting Minutes: Qwest stated a meeting was held July 11, 2002 to discuss the proposed product offering. Qwest stated another meeting is planned for the first week of August with the CLECs to discuss proposed resolutions to the questions raised during the July 11 meeting. Qwest will issue a notice to the CLEC community containing proposed dates for the meeting.

CLEC conference call held to review the ICDF Joint Testing product offering and the Test Access Points document

10:00 a.m. (CST) / Thursday, July 11, 2002 Conference Call TEL: 877.521.8687 CODE: 5699655 PC011502-1 Joint testing of Qwest installed transmission cables

Attendees Brent Debrock Cbeyond Communications Al Villiam Allegiance Steve Marks Allegiance David Stauter Allegiance Mike Zoulvik Covad Beckey Neesen Covad Byron Dowing Alltel Laurel Burke Qwest Jerry Bocke Eschelon Lana Messenger FreeTel Communication Mike Keegan Qwest Benjamin Campbell Qwest Johnathan Spangler AT&T

Introduction of the participants on the Conference Call was made. Qwest explained that the purpose of the call was to review the IDCF Joint Testing product offering and the Test Access Points document.

Qwest discussed the new process offering of Joint Testing, and the Test Access Points Document. The CLEC community expressed that they want: 1) Qwest to take an active role in the test process during Joint Test 2) CLECs do not want to pay for the Joint Test if there are errors found in the Qwest installed Cable.

Qwest stated it would explore these two requests to see if they can be incorporated into the new product offering. Based upon this new feedback, Qwest will delay delivery of the Joint Test Process until resolution on these additions have been resolved. Qwest stated that it would set up another meeting to review the Joint Test Process once a decision is made on their request.

Qwest asked Eschelon if the Test Access Points Document provided the detail requested by Eschelon at the June 19, 2002 CMP meeting (reference Action Item AI041702-1 "Prepare high level documented process of what CLECs are allowed to do in Qwest Central Offices". Eschelon replied the document has not yet been reviewed.

CLEC Change Request Clarification Meeting

12:30 p.m. (MDT) / Wednesday 23 January 2002 Conference Call TEL: 877.554.8688 CODE: 3269208 PC011502-1 “Joint Testing of Qwest Installed Transmission Cables”

Attendees: Michael Zulevic, Covad Jeffery B. Cook, Qwest Richard Martin, Qwest Peter Wirth, Qwest

Introduction of Attendees Introduction of the participants on the Conference Call were made and the purpose of the call discussed

Review Requested (Description of) Change Mike indicated that he recognized that at the time the tie cables are placed, they do not do an actual test when the tie cables are terminated to the equipment. They were looking to be able to do continuity tests, etc before they terminated to the equipment and wanted a period of time for them to do their test and acceptance. Jeff asked why Covad wanted to test DS1 & 3 cables. Mike advised that they wanted to ensure that installation was correct. It was agreed that Covad didn’t want to limit the scope to the cables at the colo splitter arrangement and wanted to cover actual installation(s) at their colo location. Mike confirmed that they were looking for a formal test and turnover process and wanted an acceptance period after actual installation of the facility took place. This would be a joint testing process. Mike indicated that he would be willing to have discussion on the interval time of 60 days. Covad is limited to the number of techs that cover various states and a reasonable time would be required for their techs to get from place to place.

Confirm Areas & Products Impacted It was confirmed that Covad would like any products covered to be included in the process. . Confirm Right Personnel Involved Jeff indicated that Laurel Burke would probably take ownership of the CR and he would help facilitate.

Identify/Confirm CLEC’s Expectation It was confirmed that Covad is looking for a process for Test and Turnover of facility installations to their collocations.

Identify any Dependent Systems Change Requests There is no corresponding System CR

Establish Action Plan (Resolution Time Frame) Ric advised that the CR would be clarified with the CLEC Community at the next CMP Meeting and Qwest will verbally present potential solutions.


CenturyLink Response

March 11, 2002

Michael Zulevic Director Technical Regulatory Support Covad Communications

SUBJECT: Qwest’s Change Request Response - CR # PC011502-1 Joint Testing of Qwest Installed Transmission Cables

This letter is in response to your Change Request PC011502-1 requesting a formal test and turn up process and an acceptance period after the collocation installation work completes – after Ready For Service (RFS). Covad envisions this process as joint testing at no additional cost to take place within 60 days of the RFS that allows for scheduling of their technicians.

Qwest is committed to providing quality facilities installations by the RFS date and Qwest’s warranty obligations will be enforced. Qwest installation forces perform continuity testing where appropriate when the collocation is turned over to Covad for acceptance. We perform quality audits on a random basis to check the quality of our work on the collocation CLEC cable installations. Streaker tests are performed on Line Sharing installations.

Recent results of Qwest internal quality audits have identified the following as it relates to the line sharing installations performed as a project in the summer of 2000: ? Of 249 jobs checked, 25.7% had some percentage of defects. ? One way to describe it is in # of pairs provisioned - (1 pair/job w/problem) x (25.7% of jobs w/connection problems)/300 pairs/job = 0.086% of all terminations wired had problems open/cross/reversal problems. ? This type of error is not common, but not unheard of in Telecommunications Installation. ? 7 jobs (3%) had the cards not seated in the splitter. Normally, Central Office Equipment installation hands off cards to the CO Operations for final test/turn-up. Line Sharing differed from this ingrained work-norm, and thus resulted in 2% of those jobs exhibiting this problem. ? 3 (1%) of the jobs had items that were found to be attributed to CLEC-issues (e.g. telling Qwest to cannibalize circuits that already had jumpers run for CLEC-customers, and 1 item that was traced back to the Customer Premise - end user equipment). ? 5 jobs had a combination of the above issues.

Given the newness of the product and associated processes and technologies, this project proved more challenging than any standard collocation build. Thus, the quality of those standard builds are even better than the Line Sharing results.

After the facility installation has been turned-over and the CLEC has had the opportunity to terminate their bulk end of the cable, full testing of the terminations between their collocation space and the vertical side of the ICDF can be done by the CLEC. In the case that these CLEC test indicate Qwest-defects, Qwest is willing to revisit the site and resolve any such defects for no additional charge should they exceed a 2% threshold. The attached diagram captures the existing test points as they are defined today in the Unbundled Loop process and collocation test access.

The piece of cable between the CLEC’s collocation space and the vertical side of the ICDF (commonly referred to as CLEC cabling) is the responsibility of CLEC and is paid for by the CLEC, as part of the collocation build out. With that stated, the CLEC is responsible for the testing, maintenance and subsequent repair if they were to find trouble in this cable “piece” after any acceptance or continuity test on their part requiring Qwest installation revisit initially.

Qwest evaluated the possibility of having a coordinated Joint Test on a regularly scheduled basis, but determined quality results indicate it would not be productive to do so and would indeed be costly. Nevertheless, we are willing to Joint Test should a CLEC still feel the need for such a service and agree to do so under our Special Request process and price the service accordingly.

We are committed to define the Joint Test process over the next few months.

Sincerely,

Steve Nelson Group Product Manager-Collocation

Cc: Laurel Burke Mary Retka William Campbell

(See end of this CR Detail Report for Attachment)


Open Product/Process CR PC011502-2 Detail

 
Title: Collocation Point of Demarcation cross connect wiring documentation
CR Number Current Status
Date
Area Impacted Products Impacted

PC011502-2 Completed
7/17/2002
Ordering, Maintenance/Repair Collocation, UDIT, Unbundled Loop, UNE, LIS / Interconnect
Originator: Zulevic, Michael
Originator Company Name: Covad
Owner: Burke, Laurel
Director:
CR PM:

Description Of Change

Provide documentation at every Point of Demarcation cross-connect point, clearly available to both Qwest and CLEC technicians, which clearly describes the appropriate method of making cross-connects, in order to eliminate reversed circuits and/or incorrectly wired circuits. This documentation will provide a consistent product for CLECs and establish a common understanding between the CLEC and Qwest technicians as to the proper wiring of DS0 (UNE and Line Shared), DS1 and DS3 circuits, eliminating unnecessary trouble reports and costly dispatches.

Additional Information: Covad has experienced a significant number of incorrectly wired customer circuits. These include incorrectly wired DS0 UNE and Line Shared services and also DS1/3 services which have been delivered with the transmit and receive conductors reversed, requiring a technician dispatch to the central office.


Status History

01/14/02 - CR Submitted by Covad.

01/15/02 - CR acknowledged by P/P CMP Manager.

01/18/02 - Coordinated optional dates/times for Clarification Meeting with Covad.

01/21/02 - Clarification Meeting conducted with submitting CLEC.

01/21/02 - Clarification Meeting minutes transmitted to submitting CLEC.

02/18/02 - Follow-up clarification meeting conducted with submitting CLEC.

02/20/02 - CMP Meeting - CLEC community clarification conducted. CR status changed to "Evaluation." Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package (03/20/02).

03/12/02 - Qwest draft response posted to database and sent to submitting CLEC

03/13/02 - Qwest draft response posted to Web

03/20/02 - CMP Meeting - Qwest presented its Draft Response dated March 20, 2002. Covad not present at meeting. It was agreed that the CR status be changed to Development . Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

03/21/02 - Revised draft response dated March 20, 2002 sent to Covad and posted to database.

03/21/02 - Telephone conference with Covad - Qwest explained the discussion at the CMP Meeting. Covad requested another call for more clarification regarding Qwest draft response.

03/21/02 -2nd Telephone conference call with Covad. Covad agreed to provide list of busiest CO's where they would like to see diagrams for DS1 and DS3 posted in bays at cross connects. This list will be sent to CRPM by March 29. Qwest will investigate cost of getting decals of the diagrams created in order to maintain fire rating in the bays.

03/21/02 - Snap shot of the diagrams for DSX1 & 3 crossconnection taken directly from the T1X1 T1.102 ANSI Standard document sent to Covad

04/10/02 - Revised response sent to originating CLEC and posted to CMP database

04/17/02 - CMP Meeting - Qwest presented its final response . CR status as Development unchanged. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

04/19/02 - Formal response dated April 10, 2002 issued to CLECs. Notification CMPR.04.19.02.F.01258.Final_CR_Responses.

05/15/02 - CMP Meeting - CR status "Development" unchanged. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

06/19/02 - CMP Meeting -- Covad was not present at meeting. CR status "Development" unchanged. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status was changed to Completed.


Project Meetings

07/17/02 - July CMP Meeting Minutes: Qwest stated all collocation point of demarcation cross-connect wiring documentation had been placed in the central offices. Covad agreed to change status to closed.

9:00 a.m. (MDT) / Monday 18th February 2002 Conference Call TEL: 877.554.8688 CODE: 3269208 PC011502-2 "Collocation Point of Demarcation cross-connect wiring diagram" [Follow-up Meeting]

Michael Zulevic, Covad Laurel Burke, Qwest Steven Hilleary, Qwest Michael Lanoue, Qwest Peter Wirth, Qwest

1.0 Introduction of Attendees Attendees introduced.

2.0 Review Requested (Description of) Change {review long description from change request, confirm with all parties there is agreement on the change requested} Description: Provide documentation at every Point of Demarcation cross-connect point, clearly available to both Qwest and CLEC technicians, which clearly describes the appropriate method of making cross-connects, in order to eliminate reversed circuits and/or incorrectly wired circuits. This documentation will provide a consistent product for CLECs and establish a common understanding between the CLEC and Qwest technicians as to the proper wiring of DS0 (UNE and Line Shared), DS1 and DS3 circuits, eliminating unnecessary trouble reports and costly dispatches. Additional Information: Covad has experienced a significant number of incorrectly wired customer circuits. These include incorrectly wired DS0 UNE and Line Shared services and also DS1/3 services which have been delivered with the transmit and receive conductors reversed, requiring a technician dispatch to the central office.

Additional discussion occurred regarding specifics of the request. Covad indicated that it would like to have wiring diagrams in the collocation areas for the cross connects for DS0/DS!/DS3 circuits. Steve Hilleary & Michael Lanoue, Qwest indicated that current test procedures should identify polarity (transmit/receive) reversals, unless "loop backs" are utilized during testing. Qwest will review procedures and determine if "loop backs" are allowable. Laurel Burke, Qwest requested more recent specific examples dealing with the CR from Covad. Qwest will conduct the CLEC community clarification in the 20-Feb-02 meeting, to solicit any additional input.

3.0 Confirm Areas & Products Impacted {read from change request, modify if needed} Appropriate products & areas identified in CR.

4.0 Confirm Right Personnel Involved {ensure the Qwest SME can fully answer the CLEC request. Confirm whether anyone else within Qwest has been involved with this issue, or whether we need to bring anyone else in} Qwest & Covad confirmed appropriate personnel were in attendance.

5.0 Identify/Confirm CLEC’s Expectation {Identify specific deliverables from CLEC " what does Qwest have to do in order to close this CR? (in measureable terms ie provide a documented process, change a process to include training etc)"} Covad is requesting Qwest to provide process/documentation available to both Qwest and CLEC at the ICDF detailing the correct cabling (& terminations) for a cross-connection.. Qwest to evaluate CR. During the February 2002 Monthly P&P CMP Meeting, Qwest will either solicit input from CLEC community & provide potential solutions to the CR.

--

10:00 a.m. (MDT) / Monday 21th January 2002 Conference Call TEL: 877.554.8688 CODE: 3269208 PC011502-2 "Collocation Point of Demarcation cross-connect wiring diagram"

Michael Zulevic, Covad Shirley Tallman, Qwest Peter Wirth, Qwest

1.0 Introduction of Attendees Attendees introduced.

2.0 Review Requested (Description of) Change: Description: Provide documentation at every Point of Demarcation cross-connect point, clearly available to both Qwest and CLEC technicians, which clearly describes the appropriate method of making cross-connects, in order to eliminate reversed circuits and/or incorrectly wired circuits. This documentation will provide a consistent product for CLECs and establish a common understanding between the CLEC and Qwest technicians as to the proper wiring of DS0 (UNE and Line Shared), DS1 and DS3 circuits, eliminating unnecessary trouble reports and costly dispatches. Additional Information: Covad has experienced a significant number of incorrectly wired customer circuits. These include incorrectly wired DS0 UNE and Line Shared services and also DS1/3 services which have been delivered with the transmit and receive conductors reversed, requiring a technician dispatch to the central office.

Michael Zulevic, Covad reviewed CR stressing the following: 1) focus primarily on DS1 and DS3 cross-connects utilizing ICDF’s; 2) polarity (Transmit/Receive) of connections incorrectly wired; and 3) need process/documentation for access by both Qwest & CLEC to completed connection correctly, thus avoiding cross-connection re-work. Examples were cited in the Seattle, WA and Minneapolis, MN CO’s. Covad indicated that Susan Early, Qwest [Covad account manager] is aware of incorrect wiring examples. Incorrect wiring results in service affecting conditions, along with need for re-work.

Shirley Tallman, Qwest asked clarifying questions and indicated that research with the methods group appears to be warranted to identify current Qwest practice, and determine what could be done to address the CR.

3.0 Confirm Areas & Products Impacted {read from change request, modify if needed} Appropriate products & areas identified in CR.

4.0 Confirm Right Personnel Involved {ensure the Qwest SME can fully answer the CLEC request. Confirm whether anyone else within Qwest has been involved with this issue, or whether we need to bring anyone else in} Qwest & Covad confirmed appropriate personnel were in attendance.

5.0 Identify/Confirm CLEC’s Expectation {Identify specific deliverables from CLEC – what does Qwest have to do in order to close this CR? (in measureable terms ie provide a documented process, change a process to include training etc)} Covad is requesting Qwest to provide process/documentation available to both Qwest and CLEC at the ICDF detailing the correct cabling (& terminations) for a cross-connection.. Qwest to evaluate CR. During the February 2002 Monthly P&P CMP Meeting, Qwest will either solicit input from CLEC community & provide potential solutions to the CR; or provide an expedited response to the CR.


CenturyLink Response

April 10, 2002

COVAD Communications Michael Zulevic Director Technical Regulatory Support

SUBJECT: Qwest’s Change Request Response - CR # PC011502-2 Collocation Point of Demarcation cross-connect wiring documentation

This letter responds to COVAD Communications’ Change Request PC011502-2 requesting the posting of the DS1/3 circuit wiring diagram on the Central Office ICDF DSX frames. Covad indicated that the purpose of the diagram posting was to eliminate reversed circuits as in line sharing situations and other incorrectly wired circuits as well as to provide cross connection wiring consistency between CLEC and Qwest technicians.

Qwest maintains responsibility for correctly provisioning cross connections on all order types. Qwest Central Offices contain a large and variable number of InterConnection Distribution Frame ("ICDF") Digital Signal Level X(DSX) frames, estimated to exceed 10, 000 frames, that would in turn require a large number of DSX circuit cross connection diagrams. Qwest also recognizes that concerns and questions arise surrounding the provisioning of DS1 or DS3 cross connections. Therefore, Qwest will provide a copy of the Qwest Method and Procedure ("M&P") in each Central Office location. Central Office personnel responsible for provisioning and repairing DS1/DS3 circuits will be able to access the M&P. The M&P will be available beginning in June 2002. Further, after following the office wiring steps loaded into Qwest systems for the order, Qwest ensures that the proper transmit to receive connectivity has been achieved by performing the proper post wiring tests.

Qwest reiterates its commitment to correctly wire cross connections on all types of orders and believes that providing the Qwest M&P in each Central Office will alleviate the concerns expressed. If Covad has information related to specific instances of improper wiring, Qwest continues to request that Covad provide such information so that Qwest can take the appropriate action.

Sincerely,

Laurel L. Burke Staff Adovcate Technical Regulatory Interconnection Planning Local Networks

cc: Deborah Heckart, Director Program/Project Management Mary Retka, Director Legal Issues


Open Product/Process CR PC011502-4 Detail

 
Title: Documentation of block and splitter port numbering for Virtual Splitter Collocation
CR Number Current Status
Date
Area Impacted Products Impacted

PC011502-4 Completed
5/15/2002
Ordering, Maintenace / Repair Colocation, UDIT, UNE, LIS / Interconnect
Originator: Zulevic, Michael
Originator Company Name: Covad
Owner: Cook, Jeff
Director:
CR PM:

Description Of Change

Provide documentation at every ICDF cross-connect point, clearly available to both Qwest and CLEC technicians, which clearly describes the relationship between the Covad tie cable numbering, splitter port/card numbering and the numbering of the combined voice/data and voice only cross-connect blocks on the Qwest side of the ICDF. Qwest’s decision to cable and number using a 1 to 96 numbering convention instead of 1 to 100, as is the convention used by Covad’s tie cables and equipment, has resulted in serious provisioning and trouble isolation problems.

Additional Information: Qwest agreed to provide this documentation when this problem was discovered during the initial deployment of splitters. Covad preferred to have the installations re-wired using the 1 to 100 convention, but agreed to the posting of documentation. This documentation is not currently posted in Qwest central offices. When a trouble report is identified with a customer using Covad tie pair 26, Qwest technicians must know that the customer’s service is on pair 25 on the Qwest cross-connect blocks. Without clear and available documentation available to the Qwest and CLEC technicians, service could be interrupted for the wrong customer, and resolution of the original trouble report will be further delayed.


Status History

01/14/02 - CR Submitted by Covad.

01/15/02 - CR acknowledged by P/P CMP Manager.

01/18/02 - Coordinated optional dates/times for Clarification Meeting with Covad.

01/23/02 - Clarification Meeting conducted with submitting CLEC.

01/23/02 - Clarification Meeting minutes transmitted to submitting CLEC.

02/07/02 - Draft response (dated 02/06/02) transmitted to submitting CLEC and posted in CMP data base.

02/20/02 - CMP Meeting - Qwest presented "Draft" response. CR status changed to "Development. Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package (03/20/02).

02/22/02 - Qwest "Formal" response (dated 02/06/02) posted in CMP data base.

02/28/02 - Qwest "Formal" response reissued to incorporate an updated Qwest / CLEC Interconnect Distribution Frame (ICDF) Cable Numbering table

03/20/02 - CMP Meeting - Qwest povided update. It was announced that the Job Aid will be complete and deployed in the Central Offices by April 1, 2002. Covad was not at the meeting. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

03/21/02 - Telephone conference with Covad - Qwest explained the discussion at the CMP Meeting. It was agreed CR status would remain in Development.

04/17/02 - CMP Meeting - CR status changed to CLEC Test. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

05/15/02 - CMP Meeting - CR status changed to Completed. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.


Project Meetings


CenturyLink Response

February 28, 2002

Michael Zulevic Director, Technical Regulatory Support Covad Communications

The following response was originally issued in a letter dated February 6, 2002. It is being reissued to incorporate an updated Qwest / CLEC Interconnect Distribution Frame (ICDF) Cable Numbering table (see attachment).

SUBJECT: Change Request Form Number PC011502-4 “ Documentation of Block and Splitter Port Numbering for Virtual Splitters,” dated January 14, 2002.

Qwest has evaluated the Change Request (CR) PC011502-4, and has determined the following:

? Covad is correct with their assessment of the potential confusion that may arise from the different cable wiring schemes utilized by Qwest and the CLECs at the Interconnection Distribution Frame (ICDF). Qwest or CLEC technicians may incorrectly install or service these connections, resulting in potential customer service impacts.

? Qwest will draft a “Job Aide Table” identifying the relationship between the Qwest and CLEC cable wiring schemes. The table will augment the existing information in the current internal Central Office Job Aide. The table will be placed within the vicinity of the individual ICDF(s) in the Central Office (CO) on the back of the previously agreed to existing job aide as discussed with the Federal Communications Commission (FCC). The target date for issuing the “Job Aide Table” is March 31, 2002. Qwest will notify the CLEC community of formal issuance via the Notification Process through the Change Management Process (CMP).

Sincerely,

Jeff Cook Network Planner – Technical Regulatory Qwest

Cc: Mary Retka, Director Legal Issues, Qwest Brett Fesler, Associate Product Manager, Qwest

Attachment (See Supplemental Information)


Open Product/Process CR PC011502-3 Detail

 
Title: Provide test documentation for all collocation activity including transport cable augments
CR Number Current Status
Date
Area Impacted Products Impacted

PC011502-3 Completed
4/17/2002
Ordering, Maintenance / Repair Collocation, UDIT, Unbundled Loop, UNE, LIS / Interconnect
Originator: Zulevic, Michael
Originator Company Name: Covad
Owner: Burke, Laurel
Director:
CR PM:

Description Of Change

Provide documentation to CLECs upon completion of new collocation activity or augments to existing collocations, that specify all tests performed to ensure that the work completed by Qwest, or a Qwest designated vendor, was completed properly. These test records must reflect the absence of any physical or electrical faults, including incorrect numbering of cables or cross-connect blocks. Completion of test records is a requirement of Covad’s non-ILEC contractors and the same requirements must apply to Qwest. This requirement has always been placed upon Qwest’s contractors when they are performing work for Qwest.

Additional Information: Covad has experienced a significant number of incorrectly cabled, or designated tie cables from Qwest which has resulted in our not being able to remotely provision customer service.


Status History

Evaluation."01/14/02 - CR Submitted by Covad.

01/15/02 - CR acknowledged by P/P CMP Manager.

01/18/02 - Coordinated optional dates/times for Clarification Meeting with Covad.

01/21/02 - Clarification Meeting conducted with submitting CLEC.

01/21/02 - Clarification Meeting minutes transmitted to submitting CLEC & posted in CMP data base.

02/20/02 - CMP Meeting - CLEC community clarification conducted. CR status changed to "Evaluation." Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package (03/20/02).

03/12/02 - Qwest draft response posted to database and sent to submitting CLEC

03/13/02 - Qwest draft response posted to Web

03/20/02 - CMP Meeting - Qwest presented its Draft Response dated March 1, 2002. Covad not present at meeting. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

03/21/02 - Telephone conference with Covad - Qwest explained the discussion at the CMP Meeting. Covad was in agreement that the CR would move into CLEC Test.

03/22/02 - Formal response dated 03/01/02 issued to CLECs. Notification CMPR.03.22.02.F.01240.CR_Responses

04/17/02 - CMP Meeting - CR status changed to Completed. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.


Project Meetings

10:30 a.m. (MDT) / Monday 21th January 2002 Conference Call TEL: 877.554.8688 CODE: 3269208 PC011502-3 "Provide test documentation for all collocation activity including transport cable augments"

Michael Zulevic, Covad Laurel Burke, Qwest Cathy Paradiso, Qwest Peter Wirth, Qwest

1.0 Introduction of Attendees Attendees introduced.

2.0 Review Requested (Description of) Change: Description: Provide documentation to CLECs upon completion of new collocation activity or augments to existing collocations, that specify all tests performed to ensure that the work completed by Qwest, or a Qwest designated vendor, was completed properly. These test records must reflect the absence of any physical or electrical faults, including incorrect numbering of cables or cross-connect blocks. Completion of test records is a requirement of Covad’s non-ILEC contractors and the same requirements must apply to Qwest. This requirement has always been placed upon Qwest’s contractors when they are performing work for Qwest. Additional Information: Covad has experienced a significant number of incorrectly cabled, or designated tie cables from Qwest which has resulted in our not being able to remotely provision customer service.

Michael Zulevic, Covad reviewed the CR and added the following points: 1) Covad is requesting testing/acceptance documentation for collocation augment and new location builds; 2) documentation to be available upon turn-over to CLEC; 3) provides some assurances to CLEC that collocation space has been properly installed/tested; and 4) Covad’s experiences have been that some problems (i.e., grounding, cable labeling, etc). Covad also suggested that some type of co-acceptance by Qwest & the CLEC may assist in this request.

Examples of occurrences were requested by Laurel Burke & Cathy Paradiso, Qwest. Examples were transmitted earlier to Laurel Burke.

3.0 Confirm Areas & Products Impacted {read from change request, modify if needed} Appropriate products & areas identified in CR.

4.0 Confirm Right Personnel Involved {ensure the Qwest SME can fully answer the CLEC request. Confirm whether anyone else within Qwest has been involved with this issue, or whether we need to bring anyone else in} Qwest & Covad confirmed appropriate personnel were in attendance.

5.0 Identify/Confirm CLEC’s Expectation {Identify specific deliverables from CLEC – what does Qwest have to do in order to close this CR? (in measureable terms ie provide a documented process, change a process to include training etc)} Covad is requesting Qwest to provide documentation available to both Qwest and CLEC for collocation space augments/builds to document install/testing status for acceptance. Qwest to evaluate CR. During the February 2002 Monthly P&P CMP Meeting, Qwest will either solicit input from CLEC community & provide potential solutions to the CR; or provide an expedited response to the CR.


CenturyLink Response

March 1, 2002

Michael Zulevic Director Technical Regulatory Support Covad Communications

SUBJECT: Qwest’s Change Request Response - CR # PC011502-3 Testing Documentation

This letter provides a draft response to your CLEC Change Request Form, number PC011502-3 dated January 14, 2002 - "Provide test documentation for all collocation activity including transport cable augments". Covad requested that documentation be provided upon the completion of collocation activity specifying all tests that performed to ensure cabling work by Qwest or a Qwest designated vendor, was completed properly. During the Change Management Process forum, February 20, 2002, Covad provided further clarification indicating that they would limit this request to virtual and line sharing collocations. Since no discussion included remote collocation applications, this response only addresses central office based virtual collocation and the installation of line sharing.

As part of its standard procedure, Qwest performs cable tests where needed and appropriate. As the CLEC community recognized during the forum, testing of the bulk cable in the physical collocation job does not provide much value as the cable is not terminated to CLEC equipment. However, continuity testing associated with virtual like collocations, including line sharing does not have the same limitation. Thus, on a going forward basis, Qwest agrees to provide the completed Cable Test Record (COE) document RG47-0157 (attached to this response), beginning April 1, 2002, to CLECs involved with new or augmented virtual collocations and line sharing orders, upon CLEC request.

Sincerely,

Laurel L. Burke Staff Advocate Technical Regulatory Interconnection Planning, Local Networks Qwest

cc: Mary Retka, Director, Technical Regulatory Interconnection Planning David Fong, Director, Qwest Central Office Technologies Installation Chuck Points, Director, Qwest Central Office Technologies Installation


Open Product/Process CR PC020502-1 Detail

 
Title: Eliminate Requirement to Provide Tie Cable Specification (Reference Systems CR # SCR020502 1x)
CR Number Current Status
Date
Area Impacted Products Impacted

PC020502-1 Completed
5/15/2002
Ordering, Maintenance/Repair Collaction, Private Line, UDIT, Unbound Loop, UNE, LIS /Interconnect
Originator: Zulevic, Michael
Originator Company Name: Covad
Owner: earley, Susan
Director:
CR PM:

Description Of Change

This Change Request seeks to eliminate the requirement to provide tie cable type or technical specifications of tie cable on LSRs and ASRs.

Products Impacted: Any products requiring tie cables to a collocation arrangement.

Qwest policy currently requires Covad to provide specific information relative to the tie cable assigned for use on a LSR/ASR. This information includes the type and gauge of cable of the assigned facility (CFA). If this information is not included or is not in agreement with Qwest records, the LSR/ASR is rejected, which results in delays for Covad customers. Covad believes that it should not be necessary to provide tie cable technical specifications on an LSR. This information is available to Qwest, as they originally installed the tie cables and determined the appropriate technical specifications at that time. This information should be available to them in TIRKS, if required. Further, Qwest is the only ILEC that requires this information to be provided on an LSR/ASR, indicating that the Qwest process is not consistent with industry "Best Practices."

Covad has experienced a significant number of order rejections for DS0, 1 and 3 services due to the omission of tie cable technical information or perceived discrepancies relating to these specifications resulting in delayed customer service provisioning.


Status History

02/04/02 - CR Submitted by Covad

02/05/02 - CR acknowledged by P/P CMP Manager.

02/06/02 - Left voice mail messages on M Zulevic's office and cellular phone to advise of available time for clarification conference call.

02/11/02 - Scheduled Clarification meeting with Covad for 2/15/02.

02/15/02 - Conducted clarification meeting with Covad.

02/19/02 - Issued Clarification Meeting Minutes to Covad.

02/21/02 - Sent Covad e-mail requesting response to a couple of questions.

03/01/02 - Sent e-mail to Covad requesting an additional clarification meeting be scheduled. Changed Owner in dBase to Crystal Soderlund.

03/07/02 - Conducted additional Clarification Meeting with Covad.

03/11/02 - Issued additional Clarification Meeting Minutes to Covad.

03/18/02 - Covad sent e-mail with an example.

03/20/02 - CMP Meeting - Qwest presented the CR to the participants in Covad's absence. Qwest indicated that to implement the CR would require a Systems Change Request. Qwest will provide its response next month. It was agreed that the CR would move to Evaluation. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

03/21/02 - Telephone conference with Covad - Qwest explained the discussion at the CMP Meeting. Covad was in agreement that the CR would move into Evaluation.

04/10/02 - Issued Qwest's Draft Response dated April 3, 2002 to Covad.

04/17/02 - CMP Meeting - Qwest presented its response. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. It was agreed that a Systems Cross Over CR would be created on behalf of Covad. Qwest to respond to Action Items.

04/19/02 - Formal response dated April 3, 2002 issued to CLECs. Notification CMPR.04.19.02.F.01258.Final_CR_Responses.

04/24/02 - Issued Systems CR to cmpcr@qwest.com on behalf of Covad.

04/24/02 - Sent e-mail to Covad requesting ILEC contacts.

04/24/02 - Received e-mail from Covad requesting that Qwest work through the TIRKS User Group or Telcordia.

04/30/02 - Sent e-mail to Covad inquiring on CO identification.

04/30/02 - Received e-mail from Covad advising that they were waiting on a TIRKS report from Qwest.

05/02/02 - Sent e-mail to Covad responding to Covad's 4/30/02 e-mail.

05/07/02 - Conducted Clarification call with Covad to review the requirements for Action Item No. 1.

05/10/02 - Issued Meeting Minutes from 5/7/02 conference call to Covad.

05/15/02 - CMP Meeting - Qwest advised that a Systems CR was issued and provided its response to the Action Item. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. It was agreed to close the CR, track the Systems CR and open a Global Action Item for CFA validation..


Project Meetings

CLEC Change Request Additional Clarification Meeting

May 7, 2002 9:00 am (MDT) Conference Call TEL: 877-564-8688 CODE: 8973036 PC020502-1, Action Item No. 1

Attendees: Mike Zulevic, Covad Judy Hotovec, Covad Becky Neessen, Covad Ric Martin, Qwest Susan Earley, Qwest Crystal Soderlund, Qwest

Introduction of Attendees and Purpose of Meeting Introduction of the participants on the Conference Call was made. Ric explained that the purpose of the call was to clarify the action item requirements identified in April’s CMP meeting versus the requirement that was discussed in a Covad/Qwest conference call after the CMP meeting.

Review of Action Item Requirements Ric explained that it was Qwest’s understanding from the April CMP meeting that Covad was to identify a Central Office (CO) to Qwest (Susan) and Qwest Crystal would validate the CFA information at that CO. A subsequent conference call between Qwest and Covad identified the action that Qwest was to advise if a report could be generated from TIRKS to provide all of Covad’s CFA information for all COs. Ric asked which direction Covad wanted Qwest to take. Mike advised that there is a miss-match with the cable gauge information on the final CFA and what is in TIRKS. He understood the System CR needs, but indicated that would take a while to get through the process. He would like to have a 100% validation of their CFA information. Becky indicated that at the call between Qwest and Covad, Bill Fellman was to do a sampling of COs. Susan advised that she could do a sampling of a few offices. It was agreed that Covad would provide 4 COs which Qwest would validate the CFA information for each CO. Covad is to provide their APOT information, which Qwest will validate against. Becky advised that it would be a day or two before she could provide the information. Mike re-emphasized the need to have a 100% validation and would like to get a mechanized dump from TIRKS. Susan advised that she wasn’t aware if there had ever been an electronic dump. Susan will follow-up to determine if this is feasible. Judy indicated that there should be an OVC & APOT dump query. Qwest advised that they would respond to the items by May’s CMP meeting, or sooner.

Subject: RE: CFA Validation Date: Thu, 2 May 2002 12:24:11 -0600 From: "Susan Earley" To: "Michael Zulevic" CC: "Richard Martin" , "Susan Earley" , "Crystal Soderlund" , "Beckie Neesen (E-mail)"

In the meeting we had last month on line sharing and line splitters. I thought Becky brought this up and Bill Fellman was going to check with Tirks staff to see if they could run some kind of report to pull the CFA information for all of Covad's collos. Other then pulling up each one individually Bill and I knew of no way to pull all the collo information at once. I have left Bill a message asking about this. I will get back to you as soon as I hear from Bill.

Susan

--

Subject: RE: CFA Validation Date: Tue, 30 Apr 2002 17:08:49 -0700 From: "Michael Zulevic" To: "Richard Martin" CC: "Susan Earley" , "Crystal Soderlund" , "Beckie Neesen (E-mail)"

Ric,

According to Beckie, we are still waiting to see how you can provide us with a report from TIRKS that will allow us to validate it against our systems. Maybe Susan has an update on this.

Mike Z.

From: Richard Martin [mailto:rhmart2@qwest.com] Sent: Tuesday, April 30, 2002 2:04 PM To: Mike Zulevic Cc: Susan Earley; Crystal Soderlund Subject: CFA Validation

Mike,

At the last month CMP meeting, you requested that Qwest validate CFA information. Crystal Soderlund would work with Susan Early on this. You were to get with Susan to identify a Central Office they can take a look at.

Please let me know if this was your understanding and if you have had a chance to provide the information to Susan.

Thanks

Ric

--

Subject: RE: Action Item from April's CMP on CR PC020502-1 Date: Wed, 24 Apr 2002 16:07:48 -0700 From: "Michael Zulevic" To: "Richard Martin"

Ric,

I would like Qwest to find out why your TIRKS system has this requirement when other ILECs don't. My thought was for Qwest to use it's contacts from TIRKS user groups, or Telcordia, to determine if there is an easy way to address this. I don't think any contacts we may have would be useful in making this determination.

Mike Z.

--

Subject: Action Item from April's CMP on CR PC020502-1 Date: Wed, 24 Apr 2002 15:18:52 -0600 From: Richard Martin Organization: Qwest Communications International, Inc. To: Mike Zulevic

Mike,

At April's CMP meeting, we took an action item to contact ILECs regarding their practice of not requiring cable gauge information.

With the issuance of the Systems CR, do you still want Qwest to pursue this item. If so, could you provide the various contacts at the other ILECs that you deal with on the subject.

Thanks

Ric

Subject: APOT cable gauge problem Date: Mon, 18 Mar 2002 15:08:30 -0700 From: "Michael Zulevic" To: "Richard Martin" CC: "Judi Hotovec"

Ric,

Here is another example of the problem we are having with the cable guage. I'm told this office in Denver has become a major problem.

Thanks for your help.

Michael Zulevic Director- External Affairs Office(520)575-2776 Cel(303)884-5657 Fax (520)575-2785

Order# 1900877, pon# 1519719 out of central office DNVRCOCH on pair 8 > has the cable gauge info as 24-NL. The correct cable gauge for this CO > is pairs 1-300 = 26-NL pairs 301-900= 24-NL. Could you change this > information for me?

-

CLEC Change Request Additional Clarification Meeting

March 7, 2002 8:00 am (MDT) Conference Call TEL: 877-564-8688 CODE: 8973036 PC020502-1, ASR/LSR Cable Specification

Attendees: Mike Zulevic, Covad Judy Hotovec, Covad Richard Martin, Qwest Diana Rasmussen, Qwest Crystal Soderlund, Qwest

Introduction of Attendees Introduction of the participants on the Conference Call was made and the purpose of the call discussed

Additional Change Request Clarification Covad provided clarification that they would provide the cable name and/or cable pair number as required. They do not inventory the cable specification (i.e. cable gauge) and would prefer not to provide this. They indicated that no other ILEC required cable gauge information. They advised of past experience where the cable gauge changed and they were not aware. Qwest advised that they use TIRKS to inventory the cable information. Covad indicated that they thought the other ILECs also used TIRKS. Qwest advised that from the ASR stand point, the CLEC was required to provide the cable information if they were responsible for the cable assignment. Qwest advised that they would need to check what IMA validates in TIRKS and what is required for a partial/full flow through. It was agreed that the product type would cover UBL, UDIT and maybe Private Line, but would exclude shared loop. Qwest confirmed that the cable information is provided with the APOT and any revisions would generate a revised APOT.

Action Plan Qwest advised that they would be prepared to provide verbal options at the next CMP meeting.

Subject: CR PC020502-1 Date: Thu, 21 Feb 2002 10:50:24 -0700 From: Richard Martin Organization: Qwest Communications International, Inc. To: Mike Zulevic CC: Karen Kraas , Diana Rasmussen , Laurel Burke

Mike,

Could you please address the following questions:

1. What field(s) on the LSR and ASR do you populate with the tie cable specifications that causes the reject/delay?

2. I believe the LSR numbers you provided on our clarification call are Covad's internal LSRs. They do not appear in our system. Could you provide the corresponding Qwest LSR or PON.

Thanks

Ric

CLEC Change Request Clarification Meeting

2:30 p.m. (MDT) / Friday February 15, 2002 Conference Call TEL: 877-564-8688 CODE: 8973036 PC020502-1, Collocation Point of Demarcation cross-connect wiring

Attendees: Mike Zulevic, COVAD Richard Martin, Qwest Jeff Cook, Qwest Diana Rasmussen, Qwest Karen Krass, Qwest Laurel Burke, Qwest Bob Mohr, Qwest

Introduction of Attendees Introduction of the participants on the Conference Call were made and the purpose of the call discussed

Review Requested (Description of) Change Mike advised that on LSRs and ASRs information requested relates to the make-up of the specific tie-cable (1.e. 22/24 ga. Or 734/735 cable). Qwest provides the cable information. If COVAD doesn’t provide the cable information, or the cable information is different than what is in Qwest’s database, their order is delayed or rejected. Qwest advised that the cable information was part of the APOT number. It was confirmed that in IMA, this is a mandatory field. Qwest asked if there was a timing issue with providing the cable specification. Mike advised that there wasn’t a timing issue, but was concerned that there is no real value for the information, since Qwest has the information. Qwest advised that the cable information is provided in the APOT. COVAD indicated that sometimes the preliminary & final do not match up. COVAD provided the LSR examples: 1773574, 1738856, and 1850263. Qwest will look into these examples to determine what the downstream impact would be if the cable specification wasn’t provided.

Confirm Areas & Products Impacted COVAD advised that they would be interested in addressing any product that requires a tie cable going back to their Collo. . Confirm Right Personnel Involved Ric advised that we would need to identify another SME for this CR. The examples provided were for LSR. The SME on the call was responsible for Collo and dealt with ASRs. Qwest will identify the appropriate SME. Ric advised that if an additional clarification meeting were required, they would coordinate.

Identify/Confirm CLEC’s Expectation COVAD confirmed that they would like to remove the mandatory requirement to provide the cable specifications with the LSR/ASR.

Identify any Dependent Systems Change Requests It was confirmed that there is no corresponding Systems Change Request.

Establish Action Plan (Resolution Time Frame) Qwest to obtain appropriate SME(s). The CR will be open to the CLEC community clarification at March’s CMP Meeting.


CenturyLink Response

April 3, 2002

Michael Zulevic Director, Technical Regulatory Support Covad Communications

SUBJECT: Qwest’s Change Request Response - CR #PC020502-1 Eliminate Requirement to Provide Tie Cable Specification

This letter is in response to Covad’s Change Request PC020502-1 requesting that Qwest revise its LSR and ASR requirement for providing tie cable type or technical specification (i.e. cable gauge).

The APOT CFA data for cable gauge information is a requirement for the Qwest TIRKS database. If the cable gauge information is not passed via the service order, it does not allow the order to flow through without manual design intervention. This could cause delays for the CLEC and an increase in costs and resources for Qwest to perform this manual work. Increasing manual intervention defeats Qwest’s goal to promote flow through mechanization.

Programming for retrieving the cable gauge information from TIRKS and passing it to the order would require multiple systems changes. A Systems Change Request would be required to accomplish this. If Covad would like to pursue the systems changes that could accommodate their Change Request, Qwest will open a Systems Change Request on Covad’s behalf.

Sincerely,

Crystal Soderlund Sr Process Analyst

Cc: Diana Rasmussen Karen Kraas Susie Bliss


Open Product/Process CR PC101802-1 Detail

 
Title: Electronic Access to Demarc Information
CR Number Current Status
Date
Area Impacted Products Impacted

PC101802-1 Crossover
7/27/2009
Ordering, Repair UNE and line shared loops, Unbundled Loop
Originator: Cutcher, Minda
Originator Company Name: Covad
Owner: Buckmaster, Cindy
Director:
CR PM: White, Matt

Description Of Change

Revised Description of Change

Submitted 02-11-03

PC101802-1 – Description of Change

Currently, Covad obtains demarc information from Qwest as part of the joint acceptance testing process. In the event that demarc in not transmitted at that time, Covad can obtain demarc info by calling Qwest’s Interconnect Group. By making demarc info available offline, electronically, Qwest will eliminate the need to staff this function and Covad and other CLECs can access that information at any time. All CLEC’s require demarc information on any install performed by Qwest regardless of the product. The CLEC itself or a Vendor will need to finish or extend the install to the customer and often cannot locate the line or circuit. The result is a call to obtain the information.

Expected Deliverable

Electronic Access to demarc information

==============

Currently, Covad obtains demarc information from Qwest as part of the joint acceptance testing process. In the event that demarc in not transmitted at that time, Covad can obtain demarc info by calling Qwest’s Interconnect Group. By making demarc info available offline, electronically, Qwest will eliminate the need to staff this function and Covad and other CLECs can access that information at any time.

Expected Deliverable

Electronic Access to demarc information


Status History

10/18/02 - CR Submitted by Covad

10/18/02 - CR acknowledged by P/P CMP Manager.

10/23/03 - Qwest and CLEC mutually agreed to hold Clarification Meeting on 11/5

11/05/03 - Held Clarification Meeting

11/20/02 - CR Presented at CMP Meeting

12/11/02 - Qwest response e-mailed to originator

12/11/02 - Qwest response inserted in the interactive report and posted to the Web site

12/18/02 - Qwest response presented at the CMP Meeting

01/15/03 - Qwest revised response presented at the CMP Meeting

02/07/03 - Qwest conducted Ad Hoc Meeting

02/12/03 - Qwest response e-mailed to originator

02/19/03 - Qwest response presented at CMP Meeting

03/17/03 - Qwest conducted Ad Hoc Meeting

03/19/03 - Discussion at CMP Meeting

04/16/03 - Discussion at CMP Meeting

05/21/03 - Discussed at CMP Meeting - Crossed over to systems


Project Meetings

05-21-03 - CMP Meeting

Buckmaster-Qwest presented the response and stated that the CR would cross over to the systems side for development and implementation. The CR was crossed over.

======================================

04-16-03 - CMP Meeting

Buckmaster-Qwest stated that Qwest had researched the Eschelon request from the March meeting and determined that it would signifigantly change the scope and cost of the solution. She suggested that current testing had shown that 100 percent of the samples included binding post information. She cautioned that Qwest could not guarantee that information would be in the report. She asked the CLECs to evaluate the strength of the Qwest solution and submit another CR if they felt that it did not meet their specific needs. The CR was moved to development status.

================================================

03-19-03 - CMP Meeting

White-Qwest stated that an Ad Hoc meeting to discuss this CR was held on 3/17. He stated that Qwest presented a proposed solution at this meeting and, based on questions here, would present a formal response to the web after this meeting and present it at the April CMP Meeting. Johnson-Eschelon asked if binding post information would be available to the CLECs. Buckmaster-Qwest stated that binding post information would be available for POTS and designed services when it was available. She stated that the focus of this CR was on the information that was in WFA/C for designed services; primarily the location of the demarc. She stated that this database may include additional information, and that Qwest would provide all information it had. She stated that she had reviewed several examples and that all of them had the information Bonnie was interested in. Johnson-Eschelon stated that she did not want to alter this CR and would submit a separate CR if there were many instances where there was no binding post information. Buckmaster-Qwest pointed out that Qwest provides the CLECs demarc information two times, by voice and e-mail, immediately following the completion of work. Mendoza-Allegiance stated that the Qwest technicians should provide binding post information. Buckmaster-Qwest stated that the description of change for this CR did not include changing the processes for Qwest technicians. Zulevic-Covad agreed that the CR was only written to obtain access to demarc information. Thomte-Qwest asked Zulevic and Johnson if they would be amenable to opening an additional CR for this if necessary. Johnson-Eschelon and Zulevic-Covad stated that they would.

==================================================

Ad Hoc Meeting 10:00 a.m MT, March 17, 2003

Attendees Matt White – Qwest Cindy Buckmaster – Qwest Dan Busetti – Qwest Jeanne Whisenant – Qwest Dave Hahn - Qwest John Berard – Covad Rick Paine – US Link Lori Mendoza – Allegiance Liz Balvin – WorldCom Terrance Morgan - WorldCom Erica Beamus – WorldCom Jeff Gelwick - WorldCom Stephanie Prull – McLeod USA Bonnie Johnson – Eschelon

White-Qwest welcomed attendees and explained the purpose of the meeting. He asked Buckmaster to review the potential solution Qwest had identified for the CR.

Buckmaster-Qwest reviewed the issues identified on the prior Ad Hoc call and stated that Dan Busetti came up with a potential solution. Busetti-Qwest reviewed the solution. He stated that Qwest would add functionality in CEMR to meet this request. He stated that for non-design circuits, CLECs would go to the non-design services action page and select a radial button to view the demarc information. He stated that a similar process would be in place for design services.

Mendoza-Allegiance asked if this functionality would include orders that have been dispatched or only those that have not been dispatched. Buckmaster-Qwest stated that Qwest would provide any information Qwest has. She explained that there would be occasions when Qwest doesn’t have all the information. She clarified that Qwest would not dispatch just to provide information to the database. She stated that the information for Designed Services would be pulled from WFA/C. She stated that information is populated into the database by Qwest technicians at many different locations. Johnson-Eschelon stated that at the previous Ad Hoc meeting Buckmaster had stated that the times when information was not available would be rare. Buckmaster-Qwest stated that at the previous Ad Hoc call the participants discussed that the Demarc information is most important in multi-tenant environments. She stated that binding post information was ancillary to the original request. She explained that Qwest would provide all the information that it can. Johnson-Eschelon asked if Qwest would provide binding post info if it is available. Buckmaster-Qwest stated that Qwest would.

Mendoza–Allegiance asked how the information got into the database if the order was not dispatched. Buckmaster–Qwest stated that if a technician anywhere provides the information, it would provided to the CLECs. She stated that Qwest was not modifying the existing processes for Qwest technicians. She stated that any information in the databases would be available to the CLECs. She explained that POTS has a different source than the Design Services side. Busetti–Qwest stated that LMOS was the database that Qwest would be be pulling the POTS information from. He stated that this database, if properly populated, includes terminal and binding post information.

Berard–Covad asked if specials would be pulled from WFA-C. Busetti–Qwest stated that the would.

Berard–Covad asked if Qwest was setting up a separate database and if Qwest could send the information to the CLECs. Busetti–Qwest stated that Qwest would not send reports to the CLECs, but that the functionality would take a live look at the data in WFA/C and LMOS at the time of the request. Berard–Covad stated that he was happy to hear that it was a live look. He confirmed that when CLECs went into CEMR and made a request it would be live look. Busetti–Qwest stated that the information would be pulled directly from WFA/C and LMOS.

Mendoza-Allegiance asked how the data would be in these databases. Busetti–Qwest stated that it would be in the database as long as the circuit is alive. Prull–McLeod asked how long it took the technicians to update the information in the database. Buckmaster–Qwest stated that she would check. She stated that it was updated within the same workday and that the practice is to do it as soon as the work is completed.

Mendoza–Allegiance asked if the technicians would go out on the plant test date for designed services. Buckmaster–Qwest stated that she needed to check to get an accurate answer to that question.

White-Qwest asked if this met Covad’s intent for the request. Berard–Covad stated that Covad would still like the information sent to them, but that this was a good solution. Buckmaster-Qwest stated that the information is delivered to the CLECs twice for Designed Service circuits: verbally upon closure, and via e-mail within 48 hours of closure. Berard-Covad stated that was good to hear. He stated that Covad could work with that.

White-Qwest stated that Qwest would present a verbal response at the March 19 CMP Meeting and would post a written response on the interactive report following the meeting. He thanked the attendees and adjourned the meeting.

==================================================================

02-19-03 - CMP Meeting

Buckmaster-Qwest presented the Qwest response. Zulevic-Covad stated that his preference was to have the information sent to the CLECs, and his second preference was to have Qwest make the information available to the CLECs. Buckmaster-Qwest stated that she understood that this CR requested three things: 1. An electronic means of accessing information regarding the Demarc and Binding Post location - for orders that were provisioned by Qwest at the CLEC’s request. 2. The CLECs would like this information for both Designed and POTS. 3. Provided as soon as possible upon completion of Qwest’s work. There were no further questions.

==========================================================

Ad Hoc Meeting 02-07-03

Attendees Matt White – Qwest Cindy Buckmaster – Qwest Deni Toye - Qwest Bonnie Johnson - Eschelon Rick Paine – U.S. Link Kelly Hamilton – U.S. Link Karla Kaatz – 180 Communications Mike Zulevic – Covad Glenn Gill – ATG

White-Qwest announced attendees and explained that the purpose of this meeting was to allow Qwest to ask Covad some questions about the CR.

Buckmaster-Qwest stated that she thought the Covad was requesting demarc information in an accessible form so the company could route its technicians properly. Zulevic-Covad stated that this was the gist of the request. Johnson-Eschelon stated that she would like Qwest to give the demarc information including the where the cross-connect is made. She would like the information to include terminal and binding post information. Zulevic-Covad stated that he would revise the Description of Change to reflect this information.

Buckmaster-Qwest asked if the location of the demarc information was only important for large (primarily commercial) buildings. Zulevic-Covad stated that the majority of the sites they wanted demarc information for were commercial sites or large buildings, but there were some unique residential locations they also needed it for.

Buckmaster-Qwest stated that the demarc information may not be available on 100% of the circuits. Zulevic-Covad asked if the Qwest installation technicians reported the demarc information into WFA. Buckmaster-Qwest stated that she did not know. Toye-Qwest stated that the demarc information was communicated via the PTA e-mail after and order is completed. Johnson-Eschelon stated that the e-mail did not include binding post information except for T1’s. She stated that they CLECs were asking for a report that included POTS.

Buckmaster-Qwest stated that she might have to issue a response that commits to only giving the CLECs the information that Qwest currently has. Johnson-Eschelon stated that she understood that the information might not be everything the CLECs would like. Buckmaster-Qwest stated that currently the demarc information is supplied to the CLECs at two different times: verbally when the order is closed and electronically (via e-mail) within 48 hours after the order is closed.

Johnson-Eschelon stated that the real issue was the CLECs are having a problem finding demarc locations and binding post assignments. As a result, the CLECs call QCCC. She stated that completing this CR would result in a small call flow to the center. Zulevic-Covad stated that Covad calls the QCCC to determine demarc information for every order their technicians went on. He stated that he was not sure that Qwest had the complete information for every call.

Buckmaster-Qwest recapped that the CLECs were looking for an electronic method to access information on demarc and binding post locations. Gill-ATG stated that the appropriate means to communicate this information would be on the loop DLR/DSR. Johnson-Eschelon stated that the DLR is not available soon enough. Buckmaster-Qwest reviewed that the CLECs want access to the information about the physical location that Qwest did its work. Johnson-Eschelon stated that Buckmaster had adequately summarized the essence of the request. Zulevic-Covad stated that the CLECs wanted this information as soon as the Qwest technicians finish their work.

Zulevic-Covad stated that he was not familiar with the PTA e-mail results. He stated that that method of communication would not work for POTS.

Buckmaster-Qwest recapped that the CLECs were looking for: 1. An electronic means of accessing information regarding the Demarc and Binding Post location - For orders that were provisioned by Qwest at the CLEC’s request 2. The CLECs would like this information for both Designed and POTs services 3. Provided as soon as applicable after the close of the order

There were no further questions. White-Qwest and Buckmaster-Qwest thanked the attendees and adjourned the meeting.

===================================================================

01/15/03 - CMP Meeting

Moreland-Qwest presented the Qwest response. White-Qwest recommended the CR be placed in Evaluation status when it is crossed over. Johnson-Eschelon asked if a representative from IT could explain in more detail why the CR needed to be crossed over. Schultz-Qwest stated that they could. The CR was crossed over to systems with a status of Evaluation.

===================================================================

12/18/02 - CMP Monthly Product/Process Meeting

Moreland-Qwest described the CR and presented the Qwest response. Berard-Covad stated that Qwest was looking at a database but Covad was open to Qwest introducing any type of electronic means of presenting the information, not just EDI. He stated that Covad would prefer EID, however. Boudhaouia-Qwest stated that stated that Verizon doesn’t have a database and Qwest is trying to determine if there is a feasible way for Qwest to make this information available to the CLECs. Johnson-Eschelon stated that regardless of how Verizon delivers, the fact is that they do make the information available and Qwest does not. She continued that this would be a good change for all companies involved. The attendees agreed to move the CR into Evaluation status.

===================================================================

11/20/02 - CMP Monthly Product/Process Meeting

Berard-Covad presented the CR. He stated that Covad wanted electronic access to demarc information and was given that access by other ILECs. White-Qwest asked which ILECs provided this information and how they provided it. Berard-Covad stated that Verizon provides CLECs a downloadable file that contained demarc information and updated this file four times a day. He stated that the information included floor/closet/binding post or language like “northwest corner of the basement.” Schultz-Qwest asked how having electronic access to this information helped Covad. Berard-Covad stated that it allowed them to access the information at any time and that Covad was hoping to streamline the process in the future to allow JAT without a phone call. Berard-Covad stated that Covad would prefer a file be sent to them every day, but would be happy with a download. Spangler-AT&T and Johnson-Eschelon stated that they would prefer delivery as well and that this should apply to all resale products as well. The CR status was updated to Presented.

===================================================================

CLEC Change Request – PC1018002-1 Clarification Meeting 2:00 PM (Mountain Time) / Tuesday, November 5, 2002

1-877-550-8686 2213337#

Attendees Matt White – CRPM Minda Cutcher – Covad Brett Fesler – Qwest Neil Houston - Qwest

Introduction of Attendees White-Qwest welcomed all attendees and reviewed the request.

Review Requested (Description of) Change Cutcher-Covad reviewed the CR and stated that Covad was seeking the same information about the physical location of demarcs at customer prems through electronic means as they got when they called the interconnect center QCCC. She said an example would be to say the demarc was in the northwest corner of the basement of a building.

Houston-Qwest confirmed that Covad was seeking a physical description so the Covad Technician could find the demarc.

Cutcher-Covad stated that they currently get the information during Joint Acceptance Testing, and that she would like a means to access the information electronically. She stated that Qwest must have a database in which it records this information and surmised that to grant this request, Qwest could design a means for Covad to access that database.

Houston-Qwest asked if Covad was seeking a Web site format.

Cutcher-Covad stated that they weren’t necessarily seeking a Web site that could be accessed 24x7, just a means of getting the information electronically during normal business hours. She stated that other ILECs (Verizon and PacBell) had offered this functionality to Covad.

Houston-Qwest stated that he would work with some of his contacts at those companies to understand how they offered this information to CLECs.

Confirm Areas and Products Impacted White-Qwest confirmed that the attendees were comfortable that the request appropriately identified all areas and products impacted. Confirm Right Personnel Involved White-Qwest confirmed with the attendees that the appropriate Qwest personnel were involved.

Identify/Confirm CLEC’s Expectation White-Qwest reviewed the request to confirm Covad’s expectation.

Identify and Dependant Systems Change Requests White-Qwest asked the attendees if they knew of any related change requests.

Establish Action Plan White-Qwest asked attendees if there were any further questions. There were none. White-Qwest stated that the next step was for Covad to present the CR at the November Monthly Product/Process Meeting and thanked all attendees for attending the meeting.


CenturyLink Response

May 14, 2003

DRAFT RESPONSE For Review by CLEC Community and Discussion at the May 21, 2003, CMP Product/Process Meeting

Mike Zulevic Director - GEA Covad Communications

SUBJECT: Qwest’s Change Request Response - CR #PC101802-1

Qwest accepts this change request. Qwest will implement a solution to this request in the CEMR release currently scheduled for implementation in first quarter 2004.

Functionality, scheduled for inclusion in this release, will include: - For Designed services – any information related to demarc location and binding post termination available - For Non-Designed services – any information related to binding post termination available.

There may be instances when no information is available in the source data. In such instances, the information will not be available via the new functionality. Additionally, Qwest will continue to provide customers with all applicable demarc/binding post information, by voice and e-mail, immediately following completion of work to connect a designed services circuit.

Qwest will provide updates on the progress of the implementation of this solution at Monthly CMP Product/Process Meetings.

Sincerely, Cindy Buckmaster Product Manager

==============================================================================

February 12, 2003

DRAFT RESPONSE For Review by CLEC Community and Discussion at the February 19, 2003, CMP Product/Process Meeting

Mike Zulevic Director - GEA Covad Communications

SUBJECT: Qwest’s Change Request Response - CR #PC101802-1

Qwest recently conducted an Ad Hoc Clarification meeting with several CLECs that revealed additional complexity in this CR. Qwest recommends this CR remain in Evaluation Status while Qwest fully explores a potential solution. Qwest will provide a status of Qwest’s research at the March CMP meeting.

Sincerely, Cindy Buckmaster Product Manager

=================================================================================

January 6, 2003

REVISED RESPONSE For Review by CLEC Community and Discussion at the January 15, 2002, CMP Product/Process Meeting

Minda Cutcher VP Government and External Affairs Covad Communications

SUBJECT: Qwest’s Change Request Revised Response - CR #PC101802-1

This is a revised response regarding Covad CR PC101802-1.

The scope of this request is extremely large and detailed, as there are literally tens of thousands of demarc locations in Qwest’s fourteen-state region.

Qwest has researched the requirements to accomplish this request and has found it to be technically feasible. Implementing this request, however, will require changes to IMA. As a result, Qwest recommends that this CR cross over to become a Systems CR.

Sincerely,

Heidi Moreland Staff Advocate Policy and Law Qwest

=================================================================

December 6, 2002

DRAFT RESPONSE For Review by CLEC Community and Discussion at the December 18, 2002, CMP Product/Process Meeting

Minda Cutcher VP Government and External Affairs Covad Communications

SUBJECT: Qwest’s Change Request Response - CR #PC101802-1

This is a preliminary response regarding Covad CR PC101802-1.

The scope of this request is extremely large and detailed, as there are literally tens of thousands of demarc locations in Qwest’s fourteen-state region.

Covad indicated that Verizon provides a database for CLECs to get this information themselves, eliminating the need to call. Qwest research determined that Verizon currently supplies CLECs with demarc location information on an order by order basis using an existing database called Wholesale Provisioning Tracking System (WPTS) which they created for CLECs to track orders (see URL below). Demarc location information is only available for orders that have been dispatched and completed. Verizon’s system does not accumulate the information as an ongoing repository for general searches, thus there is no Verizon demarc database. At this time, Qwest does not have a similar WPTS-type database available and this request would require development of such a database.

Qwest recommends that this CR be placed in Evaluation status until Qwest completes an evaluation of the scope and feasibility of the process changes necessary to implement the Covad request.

Sincerely,

Heidi Moreland Staff Advocate Policy and Law Qwest


Open Product/Process CR PC101802-3ES Detail

 
Title: Interval reduction for Line Sharing, Line Splitting and Loop Splitting Services from 3 to 2 days
CR Number Current Status
Date
Area Impacted Products Impacted

PC101802-3ES Completed
2/19/2003
Provisioning Line sharing, line splitting and loop splitting
Originator: Zulevic, Michael
Originator Company Name: Covad
Owner: Buckmaster, Cindy
Director:
CR PM: White, Matt

Description Of Change

Covad would like a shorter interval for Qwest’t completion of Line Shared LSRs. The current 3 day interval does not meet our business needs and given the maturing of the provisioning process, a reduction to 2 days seems both reasonable and realistic. This is particularly true in light of BellSouth’s recent voluntary reduction of their interval to 2 days. This interval should also be applicable to Line Splitting and Loop Splitting.

Expected Deliverable

Reduction of interval from 3 to 2 days effective Dec. 1, 2002


Status History

10/18/02 - CR Submitted by Covad

10/18/02 - CR acknowledged by P/P CMP Manager.

10/22/02 - Qwest and CLEC (Mike Zulevic) mutually agreed to hold clarification meeting on 11/06/02

11/06/03 - Held Clarification Meeting

11/20/02 - CR Presented at CMP Meeting

12/11/02 - Qwest response e-mailed to originator

12/11/02 - Qwest response inserted in the interactive report and posted to the Web site

12/18/02 - Qwest response presented at the CMP Meeting

01/15/03 - Qwest revised response presented at the CMP Meeting

01/29/03 - Qwest conducted Ad Hoc Meeting.

02/12/03 - Qwest response e-mailed to originator

02/19/03 - Qwest response presented at CMP Meeting

03/05/03 - CR escalated by Covad

03/06/03 - AT&T indicated Escalation participation


Project Meetings

02-19-03 - CMP Meeting

Buckmaster-Qwest presented the revised Qwest denial. Zulevic-Covad stated that he found the number of resources Qwest claimed it required to shorten the interval by one day to be mind-boggling. He asked if Qwest’s DSL was a flow-though process. Buckmaster-Qwest stated that she did not know if it was a flow through process. Zulevic-Covad stated that the Qwest DSL interval was a 5 day end-to-end interval. He stated that the intervals for Line Sharing, Line Splitting and Loop Splitting services were not end-to-end. Covad often took more than 2 days to finish their portion of the provisioning process. He stated that this was not parity. He stated that Qwest could continue with whatever recommendation it liked. White-Qwest stated that Qwest was denying the CR. Zulevic-Covad stated that he would escalate the CR.

=========================================================

Ad Hoc Meeting 01-29-03

Attendees Matt White – Qwest Cindy Buckmaster – Qwest Deb Smith – Qwest Judy Schultz - Qwest Mike Zulevic – Covad Liz Balvin – WorldCom Sam Tenerelli – WorldCom Sharon Van Meter – AT&T

White-Qwest announced attendees and explained that the purpose of this meeting was to allow Qwest to clarify its reason for denying this CR and to answer and CLEC questions that were not addressed at the January CMP Meeting. He asked Buckmaster-Qwest to review the Qwest Response to the CR. Buckmaster-Qwest reviewed the response. She stated that Qwest was denying the CR for economic infeasibility because of resources impacts, including addition of resources, and volume of orders. She stated that the cost to Qwest when taken into consideration with the volume of Line Sharing orders compared to the volume of like orders resulted in the economic infeasibility conclusion.

Balvin-WorldCom stated that there was discussion at the Monthly Meeting around products with two-day intervals. Buckmaster-Qwest stated that the only Qwest products with two-day intervals involved record work. She explained that none of these products had any technician intervention.

Van Meter-AT&T stated that she would like to see more detail in the response. Schultz-Qwest stated that Qwest would revise the response.

Balvin-WorldCom stated that there was a Systems CR that involved flowthrough that might influence Qwest’s decision to deny this CR. Schultz-Qwest suggested that the Product/Process CR remain in Denied status and that Buckmaster-Qwest review the Systems CR to further analyze its relevance to the Product issues. Zulevic-Covad stated that it would be fine to leave the CR in Denied status but that he wanted Qwest to consider that there was another ILEC that had voluntarily changed their intervals. He also asked that Qwest reevaluate this request when the flowthrough CR was completed.

Balvin-WorldCom stated that she would like to see a more detailed discussion of the rationale for denying the CR for economic infeasibility. White-Qwest asked if there were any additional questions. There were none. Schultz-Qwest thanked the attendees.

======================================================================================

01/15/03 - CMP Meeting

Smith-Qwest presented the Qwest response. Zulevic-Covad stated that he had forwarded additional information to Qwest after Qwest had distributed the response. He asked if that information changed Qwest’s response to the CR. Smith-Qwest stated that it did not. Buckmaster-Qwest stated that the information had not changed Qwest’s response, that Qwest was exceeding their obligation of parity with retail, and that the request was economically infeasible. She continued that there was an agreement between Qwest and Covad in March 2002 when Qwest had voluntarily revised the interval from 5 to 3 days that Covad would not approach Qwest for another interval reduction. Balvin-Worldcom asked for clarification of the reason the CR was economically infeasible. Buckmaster-Qwest stated that the work to implement the CR was extremely manually intensive and costly, especially in light of the relatively low volume of orders. Balvin-Worldcom asked if there was a systems CR open that might help this process change be less expensive. Zulevic-Covad stated that there was a systems CR open for line sharing flow through. Buckmaster-Qwest stated that the change requested in PC101802-3 would not be facilitated by the systems CR. She stated that this change did not involve order fallouts. She continued that there were three manual changes Qwest would need to make to the IMA system, the FOC system and the Operations system to implement this change. Zulevic-Covad asked if the same cost would apply if the interval were reduced to 4 days. Buckmaster-Qwest stated that the same costs would still apply. She stated that in order for this interval to change in any way, Qwest would have to implement extensive manual handling of orders. She stated that the issue behind the denial of this CR was the amount of manual operations and the relatively low volume of orders. Zulevic-Covad stated that he did not recall any agreement that Covad would not request an additional reduction of this interval. Balvin-Worldcom recommended that the CR remain open for an additional month for Qwest to conduct additional research. Buckmaster-Qwest stated that additional would not change Qwest’s response. Zulevic-Covad recommended rewriting the response to more clearly emphasize the reasons that the CR was economically not feasible. Thomte-Qwest stated that Qwest would hold an ad hoc meeting before the next monthly meeting to discuss this CR. The CR remains in Evaluation.

=========================================================================================

12/18/02 - CMP Monthly Product/Process Meeting

Smith-Qwest presented the Qwest response. The attendees agreed to move the CR into Evaluation status.

=========================================================================================

11/20/02 - CMP Monthly Product/Process Meeting

Zulevic-Covad presented the CR. He stated that BellSouth already offered shorter intervals, and that Qwest should be able to as well. Burke-Qwest stated that she had no questions. The CR status was updated to Presented.

=========================================================================================

CLEC Change Request – PC1018002-3 Clarification Meeting 10:30 AM (Mountain Time) / Wednesday, November 6, 2002

1-877-550-8686 2213337#

Attendees Matt White – CRPM Laurel Burke – Qwest Crystal Soderlund – Qwest Deb Smith – Qwest Mike Zulevic – Covad Make Lanoue - Qwest

Introduction of Attendees White-Qwest welcomed all attendees and reviewed the request.

Review Requested (Description of) Change Zulevic-Covad reviewed the CR. He stated that Covad would most prefer an interval of 1 day, but would be happy with a 2 day interval.

Confirm Areas and Products Impacted White-Qwest confirmed that the attendees were comfortable that the request appropriately identified all areas and products impacted.

Smith-Qwest stated that the current interval for line splitting and line sharing was 3 days, and the interval for loop splitting was 5 days.

Zulevic-Covad stated that loop splitting was not a product Covad currently used (although that may soon change) and that Covad was OK with an interval other than 2 days for Loop Splitting, but they want some reduction of the current interval. Confirm Right Personnel Involved White-Qwest confirmed with the attendees that the appropriate Qwest personnel were involved.

Identify/Confirm CLEC’s Expectation White-Qwest reviewed the request to confirm Covad’s expectation.

Identify and Dependant Systems Change Requests White-Qwest asked the attendees if they knew of any related change requests.

Burke-Qwest stated that the current Line Sharing CR may be related to this one.

Establish Action Plan White-Qwest asked attendees if there were any further questions. There were none. White-Qwest stated that the next step was for Covad to present the CR at the November Monthly Product/Process Meeting and thanked all attendees for attending the meeting.


CenturyLink Response

February 12, 2003

AMENDED RESPONSE For Review by CLEC Community and Discussion at the February 19, 2003, CMP Product/Process Meeting

Mike Zulevic Director - GEA Covad Communications

SUBJECT: Qwest’s Change Request Revised Response - CR #PC101802-3

This letter is in response to CLEC Change Request PC101802-03. This CR is a request by Covad to reduce the interval for Line Sharing, Line Splitting and Loop Splitting from 3 days to 2 days as Covad suggested that BellSouth had done.

This response confirms Qwest’s denial of this CR, for the reasons identified in the January 8, 2003, response, and clarifies the justification for the economically not feasible reason for denial. The following are the major reasons supporting Qwest’s decision to consider the CR economically not feasible:

Line Sharing Volumes: - Total In-Service Line Sharing Orders as of 12/31/02 – 26,083 (average 1,400 incremental lines per month). - Total In-Service UBL* Orders as of 12/31/02 – 483,308 (average 14,000 incremental lines per month). - Line Sharing represents just 5% of the total of these 2 product lines (10% of the average monthly volumes). - This is considered a Low Volume of requests.

Process Changes: - One additional Resource in the Service Center to move Orders more quickly. - A minimum of 60 to 90 additional Central Office Resources across Qwest’s 14 state region to move Orders more quickly. (Line Sharing is currently ordered in 12 of Qwest’s 14 in-region states)

The economic magnitude of adding the indicated resources is too large for the small number of orders. Therefore, Qwest has determined that reducing the interval on Line Sharing orders is economically not feasible. Qwest respectfully declines this change request.

The Line Sharing product is already provisioned in an interval that is shorter than the Retail interval. As the requirement is parity with retail, this requirement is more than met with the current interval.

Qwest continuously evaluates its ability to deliver products in a more timely fashion. If such an opportunity presents itself in the future, Qwest will implement and notify CLECs via the established processes.

Sincerely, Cindy Buckmaster Product Manager

*The comparison made to UBL is made solely on the basis of the functions required to install both services. These functions are comparable for both the Order Processing and Central Office provisioning.

==========================================================================

January 6, 2003

REVISED RESPONSE For Review by CLEC Community and Discussion at the January 15, 2002, CMP Product/Process Meeting

Mike Zulevic Director - GEA Covad Communications

SUBJECT: Qwest’s Change Request Revised Response Response - CR #PC101802-3

This letter is in response to CLEC Change Request PC101802-03. This CR is a request by Covad to reduce the interval for Line Sharing, Line Splitting and Loop Splitting from 3 days to 2 days as Covad suggested that BellSouth had done.

At this time, Qwest has no plans to reduce the interval for the Line Sharing, Line Splitting and Loop Splitting Products. Qwest is denying this request because it is economically not feasible. The following are the major reasons supporting Qwest’s decisions:

Installation intervals for these products were negotiated during the ROC TAG forums held in 2001 and 2002. SGAT Exhibit C Service Interval Tables provides the agreed upon intervals. Qwest will continue to be consistent with these agreements.

Qwest retail interval for the DSL product is 5 business days. As the wholesale interval is already less than retail, Qwest is not inclined to reduce the wholesale interval further. This is consistent with the discussions that took place with the CLECs earlier in 2002, when Qwest reduced the interval from 5 to 3 business days on Line Sharing and Line Splitting.

Both system and process changes would be required. System changes are required any time an interval is modified. These system changes are both manually intensive and time consuming, therefore costly. Due to low volumes of new Line Sharing and Line Splitting requests, and the lack of Loop Splitting requests, changes to the system for the small volume of Line Sharing products would be prohibitive. (The Line Sharing, Line Splitting and Loop Splitting products represent less than 5% of the total product volumes.) In addition, Qwest processes cannot guarantee a 2-business day interval causing potential problems with missed commitments for the end user customer.

Upon reviewing BellSouth’s service interval guide, Qwest has found that Qwest is already providing a comparable interval to BellSouth’s, if not superior in some cases. BellSouth applies their interval differently than Qwest. BellSouth applies their 2-business day interval after the request goes through their LSR processing interval. The LSR processing interval ranges from 10 business hours (or 1 business day) to 24 business hours (or 2 ½ business days). Total order completion interval for BellSouth is their service interval added to their LSR processing interval, which is 3 – 4 ½ business days. Qwest, on the other hand applies their 3 business day interval at the time the LSR is received (application date). Qwest includes the LSR processing time within their 3-business day interval; thus Qwest’s total order completion interval is 3 days.

In any case, it is Qwest’s understanding that BellSouth applies the interval that matches their retail offering. Qwest’s retail offering is currently 5 business days.

Therefore, Qwest respectfully declines this change request.

Sincerely, Debra Smith Product Manager

=================================================================

December 6, 2002

DRAFT RESPONSE For Review by CLEC Community and Discussion at the December 18, 2002, CMP Product/Process Meeting

Mike Zulevic Director - GEA Covad Communications

SUBJECT: Qwest’s Change Request Response - CR #PC101802-3

This is a preliminary response regarding Covad CR PC101802-3.

Qwest has reviewed the current Line Sharing provisioning interval. There are a number of issues to be analyzed in answering this request. For this reason, Qwest would like to move this Change Request into the Evaluation Status to provide a complete answer to this request.

Qwest will provide a status update at the January CMP meeting and will outline their response at that time.

Sincerely,

Debra Smith Product Manager Qwest Corporation


Open Product/Process CR PC102102-1 Detail

 
Title: Dual Inventory of DSL tie cables in TIRKS and SWITCH/FOMS
CR Number Current Status
Date
Area Impacted Products Impacted

PC102102-1 Completed
10/21/2002
Ordering Collocation, Physical, Virtual
Originator: Zulevic, Michael
Originator Company Name: Covad
Owner: Cook, Jeff
Director:
CR PM: White, Matt

Description Of Change

Revised Request: Covad requests that beginning April 1, 2003, we have the capability to check the availability of or place orders to use our DS0 tie cables for either Line Sharing or UNE/second line DSL services. This capability would not be required for existing TIE cables that are used for Line Sharing, Line Splitting or Loop Splitting in conjunction with a Common Area Splitter Collocation arrangement. These TIE cables are cabled to the splitter port either directly or through a hard-wired arrangement using the existing 410 block. Currently, we must designate the type of service we intend to provide on each cable in advance and if we find we need to re-designate the use of a specific tie cable, we are assessed a cable reclassification charge. SBC currently provides the capability to check the availability of both Line Sharing and UNE/second line DSL services. Having to declare the use of tie cables in advance greatly inhibits our ability to efficiently use our investment in tie cable.

Expected Deliverable

April 1, 2003

Original Request: Covad requests that our collocation DS0 tie cables be inventoried in both TIRKS and SWITCH/FOMS so that we can use our available inventory of tie cables for either Line Sharing or UNE/second line DSL services. Currently, we must designate the type of service we intend to provide on each cable in advance and if we find we need to re-designate the use of a specific tie cable, we are assessed a cable reclassification charge. The concept of dual inventorying has been proven in SBC and is no longer an issue. Having to declare the use of tie cables in advance greatly inhibits our ability to efficiently use our investment in tie cable.

Expected Deliverable

Dec. 1, 2002


Status History

10/21/02 - CR Submitted

10/21/02 - CR Acknowledged

10/25/02 - Qwest and CLEC (Mike Zulevic) mutually agreed to hold clarification meeting on 11/06/02

11/06/03 - Held Clarification Meeting

11/20/02 - CR Presented at CMP Meeting

12/11/02 - Qwest response e-mailed to originator

12/11/02 - Qwest response inserted in the interactive report and posted to the Web site

12/18/02 - Qwest response presented at the CMP Meeting

01/02/03 - Held additional Clarification Meeting

01/03/02 - Covad submitted revised Description of Change

01/06/03 - Qwest hosted Ad Hoc Meeting

01/15/03 - Qwest presented revised response as CMP Meeting. Attendees agreed to cross CR over to Systems. New CR number will be SCR102102-1X.


Project Meetings

01/15/03 - CMP Meeting

Cook-Qwest presented the Qwest response. White-Qwest recommended the CR be placed in Evaluation status when it is crossed over. Zulevic-Covad stated that this was fine. The CR was crossed over to systems with a status of Evaluation.

===========================================

Ad Hoc Meeting 1:00 PM (Mountain Time) / Monday, January 6, 2003

Attendees Matt White – Qwest Jeff Cook – Qwest Becky Neesen – Covad John Berard – Covad Kim Issacs – Eschelon Bonnie Johnson - Eschelon Sharon Van Meter – AT&T

Introduction of Attendees White-Qwest welcomed all attendees and described the purpose of the meeting. He explained that Qwest and Covad had had further discussions about the request over the last several weeks and that Qwest had identified several differences between Qwest and SBC’s architecture that made the request, as written, difficult to implement. After discussion of these differences, Covad had revised their description of change. White-Qwest asked Cook-Qwest to describe the network architecture differences. Cook-Qwest explained the differences between the Qwest network architecture and the SBC architecture. He stated that in order to grant the Covad request as it was currently written Qwest would have to rewire much of its existing network in order to allow CLECs using Common Area Splitter Collocation the ability to use its DSL terminations from the DSLAMs for either xDSL Unbundled Loops or Line Sharing-type services. He stated that he had some questions about Covad’s request as it pertained to their intentions to use it to provision xDSL Unbundled Loops through the data only 410 termination block.

Neesen-Covad stated that her understanding was that this request now asks that Covad will be able to look up all future and presently unused facilities on the same functionality. Cook-Qwest stated that this was his impression. Neesen-Covad asked if this only applied to collocated splitters or for both collocated and common area splitters. Cook-Qwest stated that it only applied to only collocated splitters. Neesen-Covad stated that Covad has set a soft due date of April 1, 2003. She explained that Covad is doing an internal OSS change and may end up changing the date.

White-Qwest stated that Qwest’s analysis had revealed that in order to fully meet Covad’s request there were IMA changes that needed to be made. He explined that this required the CR to be crossed over into the systems side of CMP. Berard-Covad asked for an explanation of the IMA implications. Cook-Qwest stated that Qwest was looking at doing a dual look into both inventories and implementing an up-front ability to look into both systems on a pre-order basis.

Neesen-Covad stated that Covad’s original objective was to minimize collocation costs, use existing inventory on command and reduce wiring errors. Berard-Covad asked how this would work to convert existing blocks? Jeff-Qwest stated that there had been no discussion of blocks would be converted. He explained that if a block used a common area splitter, it would not be converted.

White-Qwest asked if there were any other questions. There were none. White-Qwest thanked the participants and adjourned the meeting.

=======================================================================

Additional Clarification Meeting 2:00 PM (Mountain Time) / Thursday, January 2, 2003

Attendees Matt White – CRPM Jeff Cook – Qwest Scott Sharket – Qwest Mike Zulevic – Covad Becky Neesen – Covad

Introduction of Attendees Cook-Qwest welcomed all attendees and reviewed the request and his reason for calling the meeting. He explained the differences between the Qwest network architecture and the SBC architecture. He stated that in order to grant the Covad request as it was currently written Qwest would have to rewire much of its existing network in order to allow CLECs using Common Area Splitter Collocation the ability to use its DSL terminations from the DSLAMs for either xDSL Unbundled Loops or Line Sharing-type services. He stated that he had some questions about Covad’s request as it pertained to their intentions to use it to provision xDSL Unbundled Loops through the data only 410 termination block.

Zulevic-Covad stated that Covad was trying to establish a situation where Covad could convert existing DSO’s to line sharing without extensive delays.

Neesen-Covad stated that Qwest currently enforces a 90 day interval and completed work often includes errors.

Cook, Zulevic and Neesen discussed several potential ways to overcome the gap between the request and what was physically possible on the Qwest network. The three agreed that this request would be better implemented of the description was rewritten to be more forward looking.

Sharkey-Qwest asked if Covad was interested in this functionality for pre-order as well as ordering.

Neesen-Covad stated that they were.

White-Qwest stated that he and Cook would revise the Description of Change and forward it to Zulevic and Neesen for review.

==================================================================

12/18/02 - CMP Monthly Product/Process Meeting

Cook-Qwest described the CR and presented the Qwest response. Zulevic-Covad stated that if Qwest had any questions when it was deciding options to pursue it should contact Covad for an ad hoc meeting. Van Meter-AT&T asked that she also be included in the ad hoc meeting. She also asked how Qwest would determine the best solution. Cook-Qwest stated that Qwest would decide based on the most efficient option that fully satisfied the CLEC request. Balvin-WorldCom stated that Qwest should document all the options it is considering and why it chooses to pursue, or not pursue, each. Zulevic-Covad stated that he would like to see this option because Covad may opt to use the SCRP to fund a systems change that Qwest feels is too expensive. White-Qwest stated that he would work with Cook-Qwest and Zulevic-Covad to set up an ad hoc meeting. The CR was moved into Evaluation status.

===================================================================

11/20/02 - CMP Monthly Product/Process Meeting

Zulevic-Covad presented the CR. He stated that SBC had already allowed its wholesale customers to do a one-time conversion of DSO tie cables to both databases for no charge. Cook-Qwest stated that he had no questions. The CR status was updated to Presented.

===================================================================

CLEC Change Request – PC102102-1 Clarification Meeting 2:00 PM (Mountain Time) / Wednesday, November 6, 2002

1-877-550-8686 2213337#

Attendees Matt White – CRPM Jeff Cook – Qwest Brett Fesler – Qwest Mike Zulevic – Covad Becky Neesen – Covad

Introduction of Attendees White-Qwest welcomed all attendees and reviewed the request.

Review Requested (Description of) Change Zulevic-Covad reviewed the CR. He stated that there is a delay if Covad uses the existing inventory for tie pairs with line sharing because the pairs need to be reclassified from UNE to line sharing. He stated that this was because Qwest maintains two different databases for the two inventories. He continued that there was a similar problem at SBC until SBC solved by adopting a dual inventory system where the same pairs were inventoried in TIRKS and SWITCH/FOMS. He summarized that Covad wanted some way to utilize tie cables from either service without additional cost of delay to transfer.

Zulevic-Covad stated that he had recently come from a meeting with Steve Nelson. He stated Nelson was aware of this CR and would probably send someone to work on it.

Fesler-Qwest stated that he worked with Nelson’s group and was the product SME for this CR.

Confirm Areas and Products Impacted White-Qwest confirmed that the attendees were comfortable that the request appropriately identified all areas and products impacted. Confirm Right Personnel Involved White-Qwest confirmed with the attendees that the appropriate Qwest personnel were involved.

Identify/Confirm CLEC’s Expectation White-Qwest reviewed the request to confirm Covad’s expectation.

Identify and Dependant Systems Change Requests White-Qwest asked the attendees if they knew of any related change requests.

Establish Action Plan White-Qwest asked attendees if there were any further questions. There were none. White-Qwest stated that the next step was for Covad to present the CR at the November Monthly Product/Process Meeting and thanked all attendees for attending the meeting.


CenturyLink Response

January 6, 2003

REVISED RESPONSE For Review by CLEC Community and Discussion at the January 15, 2002, CMP Product/Process Meeting

Mike Zulevic Director - GEA Covad Communications

SUBJECT: Qwest’s Change Request Revised Response - CR #PC102102-1

Qwest conducted a meeting on January 6th to discuss with the CLECs Covad’s request for dual inventory of tie cables. From this meeting, it was determined that one solution to Covad’s request is to have the IMA systems automatically check SWITCH and TIRKS to ensure that the requested pair is not in use in either system. This verification will be required on all Line Sharing, Line Splitting, Loop Splitting (excluding orders requesting the use of Common Area Splitters), and xDSL capable loops. Qwest recommends that this CR crossover to become a Systems CR. It should be understood that Qwest cannot agree to implement this solution until Qwest determines its operational functionality and/or the cost associated with it.

Sincerely,

Jeff Cook Staff Advocate – Policy & Law

===============================================================

December 6, 2002

DRAFT RESPONSE For Review by CLEC Community and Discussion at the December 18, 2002, CMP Product/Process Meeting

Mike Zulevic Director - GEA Covad Communications

SUBJECT: Qwest’s Change Request Response - CR #PC102102-1

Currently, Qwest does not have an automated process in place to inventory the DS0 terminations in both the TIRKS and SWITCH systems. Duplicating DS0 terminations in both systems requires there be a mechanism to synchronize assignments for DS0 terminations between the systems. As a result, manual processes would be necessary to ensure the DS0 inventories in TIRKS match those in SWITCH.

To better understand this issue and to gain clarity around how SBC has successfully employed this capability, Qwest pursued a very high-level explanation from SBC of the SWITCH/TIRKS enhancements implemented by SBC. While on the surface it appears that SBC does maintain a dual inventory of DS0 terminations, Qwest has not yet been able to determine how SBC maintains the data in both systems to ensure inventory consistency and accuracy.

Qwest would like to move this Change Request into the Evaluation Status in order to explore the potential options available to address this request. Qwest will provide a readout of where we are at the December CMP meeting and will outline the next steps to be accomplished at the January CMP meeting.

Sincerely,

Jeff Cook Staff Advocate – Policy & Law Qwest


Open Product/Process CR PC122302-1 Detail

 
Title: Removal of DAML's to allow installation of DSL
CR Number Current Status
Date
Area Impacted Products Impacted

PC122302-1 Completed
4/15/2009
Pre-Ordering, Provisioning, Ordering Unbundled Loop - Line Share DSL
Originator: Berard, John
Originator Company Name: Covad
Owner: Boudhaouia, Jamal
Director:
CR PM: Harlan, Cindy

Description Of Change

In the 1990's many customers began to request a second line into their homes for dial up modem internet access. This created a high demand for outside plant facilities. In order to meet this demand, Qwest deployed DAML technology which multiplexed one copper line into two lines. As customers now desire the always on DLS Technology in many cases it is no longer necessary to use a DAML to serve thses customers since DSL is deployed over a single copper line.

Covad requests that Qwest remove DAML's at locations where the end users are currently only served one voice line to the premise. In addition, Covad would like Qwest to create a process where we can request the removal of a DAML when the customer is currenlty using their second line for dial up and are now seeking DSL.

DAML - Digital Added Main Line

Expected Delivery:

A process to flag DAML's that are currently only serving one voice line that is served via a DAML and allow for the removal of the DAML in the placement of the DSL order. (This order should be allowed to be placed against DAML's that have one or two working voice lines to the premise.


Status History

12/23/02 - CR Acknowledged

12/27/02 - CR posted to CMP Database

12/27/02 - Contacted customer- Covad, John Berard. John is out of office until 1/6/03. I will schedule clarification meeting with John on 1/6/03.

01/02/03 - Scheduled Clarification Meeting with Covad and Qwest SME for 1/8/02.

01/08/03 - Held Clarification Meeting with Covad and Qwest SME. John Berard advised Mike Z will present this CR at the January CMP meeting as he will not be attending the January Qwest CMP meeting.

01/09/03 - Clarification Meeting notes entered in database and provided to Covad

01/15/03 - CR presented at CMP Meeting

02/11/03 - Initial Response posted to database and emailed to Covad

2/19/03 - February CMP Meeting minutes will be posted to the Project Meeting section. Changed status to Evaluation.

3/11/03 - Posted Response to database

3/12/03 - Emailed Response to Covad

3/13/03 - Corrected Response to reflect 5 day interval and emailed to Covad

3/19/03 - March CMP Meeting minutes are posted in the Project Meeting section

4/16/03 - April CMP Meeting minutes are posted in the Project Meeting section

5/21/03 - May CMP Meeting minutes are posted in the Project Meeting section


Project Meetings

05/21/03 - May CMP Meeting Minutes Jamal – Qwest advised the State, TN and Wire Center data is available on the ICONN web site as of April 15, 2003. Covad agreed to close this CR.

04/16/03 - April CMP Meeting PC122302-1: Removal of DAMLs to allow installation of DSL

Jamal B – Qwest advised this report is available on the ICONN web site as of today. The CLEC can access by wire center/TN. This CR will move to CLEC Test and potentially close in May. John Berard – Covad asked if there is a DAML against the order and there is 1 line or DAML is removed, do we get a jep back? Jamal replied that if you place an order and line has a single line DAML the order will be jep. For the double line DAML the order will be rejected. Mike Zulevic asked what the intervals are. Jamal advised removal of a DAML is 5 days, and conditioning interval is 15 days. Mike asked if the process is going to be documented in one place with dates for each procedure. Cindy Buckmaster replied there is a link from the PCAT to the assignments document. This discussion will continue when we get to the CR that this conversation relates to.

03/19/03 - CMP Meeting Neil Houston – Qwest reported the CR has been accepted and Qwest also has initiated a CR that addresses this. Neil reported we are currently developing a process for flagging DAMLs and this will be placed on the ICONN web site by April 15, 2003. Mike Zulevic asked when the prototype will be ready. Neil advised approximately 2 weeks. We agreed to move this CR to Development status until April 15 and then move to CLEC test.

02/19/03 - CMP Meeting

Neil Houston–Qwest provided the initial response to this CR. Qwest advised we do not presently remove DAMLs for our retail customers. However, should Qwest change this policy Qwest will remove DAMLs for Wholesale customers in substantially the same time and manner. Qwest advised they are reviewing this in more detail. Qwest also described how the CLECs can use the Raw Loop Data Tool to determine the presence of a DAML. Qwest advised this CR will stay in evaluation status until our analysis is complete. An update will be provided at the March CMP meeting. Mike Zulevic-Covad clarified they would like to request the removal of DAMLs when there are 2 lines, one is disconnected and the 2nd line is used for high speed data transmission.

01/15/03 - CMP Meeting

Zulevic-Covad presented the CR. The CR moves to Presented.

Clarification Meeting January 8, 2003 1-877-561-8688 7385723# CR PC122302-1 Removal of DAMLs to allow installation of DSL

Attendees Name/Company: John Berard Covad Neil Houston Qwest Russ Urevig Qwest Brett Fesler Qwest Heidi Moreland Qwest Cindy Macy Qwest

Meeting Agenda: 1.0 Introduction of Attendees Team members introduced themselves. Neil Houston will be the lead SME on the CR

2.0 Review Requested Change John Berard Covad reviewed the CR with the team. We discussed what DAML (Digital Added Main Line) or UDC (Universal Digital channel) technology is. John and Russ explained it is a piece of network equipment that is placed on a facility. It multiplexes the TN across the facility so the provider is able to service multiple lines from one facility (analog service is provided). John explained 2 situations how this service could be used: 1st- end user that has a second line in house and provided a UDC. This 2nd line has been disconnected but is being serviced via a UDC and now the customer wants DSL. We would need to disconnect the UDC.

2nd-end user has 2nd line served over UDC and is using a dial up and now wants DSL. We would need to convert or disconnect the UDC.

Qwest confirmed to remove the UDC it would require a dispatch

Qwest should be able to identify if the customer has UDC via LFACS and Raw Loop Data Tool. It is identified as a carrier, not via a usoc on the CSR.

The team clarified this CR only applies when the end user who has a UDC is the only customer on the line. If the end user had a second line and the UDC is servicing more than one customer we could not remove the UDC. This CR would only apply to single customer situations.

Qwest asked John to provide examples / account information of customers that have UDC so we can investigate this CR and determine what the account looks like in our systems and identify the impacts of this CR. John will send to Cindy Macy-Qwest account examples. Accounts in different states would give us the best sample to investigate. We would like data on UDC that serve 1 and 1+ customers in multiple states.

Heidi Qwest asked if other ILEC/CLECs provide this data and Neil Houston advised Bell South may provide this data.

3.0 Confirm Areas & Products Impacted Unbundled Loop, Lineshare DSL, Line splitting, Distribution Feeder, Customers with existing service or service already in place at location. Pre Ordering, Ordering, Provisioning IMA EDI GUI and Bulk Extract Pre Qual Database and EDI

4.0Confirm Right Personnel Involved Yes

5.0 Identify/Confirm CLEC’s Expectation John confirmed he is looking for a process to FLAG these customers. Potentially something in Raw Loop Data tool that would identify the customer has UDC, or be able to extract data and perform a query against the data to identify the TNs that have UDC

6.0 Identify any Dependent Systems Change Requests none

7.0Establish Action Plan (Resolution Time Frame) Next steps will be for John or Covad representative to ‘Clarify this CR’ at the January CMP meeting. John advised he will not attend the January meeting but Mike Z will be there to clarify the CR. John will send to Qwest Cindy Macy examples of customers with UDC on their service so we can investigate. Qwest will meet internally and begin investigation of this CR to determine the impacts.


CenturyLink Response

For Review by CLEC Community and Discussion at the March 19, 2003 CMP Meeting

March 11, 2003

Covad Communications John Berard

SUBJECT: Qwest’s Change Request Response - CR # PC122302-1 Process to remove DAMLs off line to provide DSL to Qwest Customers

This letter is in response to Covad Communications Change Request (CR) PC122302-1. This CR requests that Qwest create a process to remove Digitally Added Main Lines (DAMLs) off of working residential lines, to enable Covad Communications to provide DSL data service to Qwest’s voice customers.

Qwest uses many different technologies to provision voice services to its end user customers. DAMLs, also known as Universal Digital Channels (UDCs) in Qwest’s Network, are one of these technologies and are deployed throughout the Network to meet growth and service demands for POTS (voice) service. The voice paths that are constructed by use of the DAMLs are local loops and the DAML is an essential element of such loops. In addition to customer requests for POTS voice service, loops derived from DAMLs can be used to provision resold, UNE-P and Internet dial-up services to CLECS.

Qwest accepts this Change Request with the conditions identified below and will remove DAMLs for wholesale customers in the same time and manner that DAML’s are removed for Qwest’s retail customers. This process will align with the process change currently being submitted by Qwest on CR PC022403-7, Perform UDC Removal for Line Shared orders at no charge to the CLEC/DLEC. DAMLs will be removed at no charge and only where the following conditions apply: - Loop used for line sharing will be non-design - DAML serves only one end user customer premise - 2 line DAML only - Only 1 voice line in service (only 1 channel is being used, the other channel is vacant) - 5 day provisioning interval will apply to the orders for DAML removal

This CR also requests that Qwest implement a process to flag DAMLs that are currently only serving one voice line. Qwest is presently investigating the appropriate means to inform the CLECs and Qwest retail of the existence of this situation. This information will be available via the ICONN web site by April 15, 2003.

Qwest requests that this CR remain in the Evaluation Status. Qwest will provide an update at the April CMP.

Sincerely,

Neil Houston Staff Advocate Policy & Law

Cc: Mary Retka

INITIAL RESPONSE For Review by CLEC Community and Discussion at the February 19, 2003 CMP Meeting

February 12, 2003 Covad Communications John Berard

SUBJECT: Qwest’s Change Request Response - CR # PC122302-1 Process to remove DAMLs off line to provide DSL to Qwest Customers

This letter is in response to Covad Communications Change Request (CR) PC122302-1. This CR requests that Qwest create a process to remove Digitally Added Main Lines (DAMLs) off of working residential lines, to enable Covad Communications to provide DSL data service to Qwest’s voice customers.

Qwest uses many different technologies to provision voice services to its end user customers. DAMLs are one of these technologies and are deployed throughout the Network to meet growth and service demands for POTS (voice) service. The voice paths that are constructed by use of the DAMLs are local loops and the DAML is an essential element of such loops. In addition to customer requests for POTS voice service, loops derived from DAMLs can be used to provision resold, UNE-P and Internet dial-up services to CLECS.

Qwest does not presently remove DAMLs for its retail customers in order to provision digital services. However, should Qwest change this policy, Qwest will remove DAMLs for wholesale customers in substantially the same time and manner.

This CR also requests that Qwest implement a process to flag DAMLs that are currently only serving one voice line. Qwest presently has a process in place that identifies the use of DAMLs. The Raw Loop Data Tool (RLDT) indicates the presence of a DAML when queried, the Pair Gain Type field will indicate UDC where the loop is provisioned via a DAML. Additionally, telephone numbers and addresses served by a DAML will indicate UDC in the Terminal I and Cable Name fields.

Qwest requests that this CR be placed in Evaluation Status. Qwest will provide an update at the March CMP.

Sincerely,

Neil Houston Staff Advocate Policy & Law

Cc: Mary Retka


Open Product/Process CR PC123002-1 Detail

 
Title: Migrate and move documentation on Qwest Wholesale Web site for the process used when the customer is converting and moving to a different CO and remaining in the same rate center.
CR Number Current Status
Date
Area Impacted Products Impacted

PC123002-1 Completed
12/30/2002
Provisioning, Ordering Resale, UNE-P
Originator: Johnson, Bonnie
Originator Company Name: Eschelon
Owner: Anderson, Jill (Merry)
Director:
CR PM: White, Matt

Description Of Change

As a result of the Quality Team lead by Toni Dubuque (Closed CR PC091901-1), Joan Wells Qwest Process Specialist documented process flows on the Qwest Wholesale web site. These process flows included customers that were changing to a new Local Service Provider (LSP) and moving to a new Central Office (CO) but were within the same rate center, as well as those customers that were remaining in the same CO. When the EUM field was activated with the implementation of 11.0 (applies to only customers changing their LSP and moving within the same CO), Qwest updated the documentation for the use of the EUM field, but Qwest removed the documentation that once applied to both scenarios. Under the process that exists but now is not documented on the Wholesale Web site, customers keep their existing TNs, but the order requires a port within. Eschelon personnel referred to these process flows for submitting “migrate and move” LSRs. Removing the documented process flows for this type of LSR can cause LSR errors up to and including customer out of service conditions. In addition, CLECs that have not been involved in this issue to date may not know this process is available to them. Eschelon asks Qwest to restore to the Qwest Wholesale web site the process used when the customer is converting and moving to a different CO and remaining in the same rate center.


Status History

12/30/02 - CR Submitted

01/02/03 - CR Acknowledged

01/10/03 - Clarification Meeting

01/15/03 - CR Presented at CMP Meeting

02/12/03 - Qwest response e-mailed to originator

02/19/03 - Qwest response presented at CMP Meeting

03/19/03 - Update presented at CMP Meeting

04/16/03 - Update presented at CMP Meeting

05/21/03 - Discussed at CMP Meeting


Project Meetings

05-21-03 - CMP Meeting

This CR was implemented with the changes in PC100401-1XMN.

==================================================

04-16-03 - CMP Meeting

Wells-Qwest stated that Qwest would respond to CLEC comments to the changes on 4/28 and implement the changes on 5/13. No status change.

=====================================================

03-19-03 - CMP Meeting

Anderson-Qwest stated that the documentation in support of this change would be out for CLEC review on 4/1.

======================================================

02-19-03 - CMP Meeting

Anderson-Qwest presented the Qwest response. Johnson-Eschelon stated that all she was asking for was for Qwest to document the existing process. She appreciated Qwest’s acceptance of the CR but was curious about why it would take until April 1 to distribute the documentation for review. She asked if it was because the documentation would represent a combined process. Anderson-Qwest stated that Johnson-Eschelon was correct; the integrated process document was more functional but took longer to develop. White-Qwest stated that the CR would move into Development status.

=========================================================

01/15/03 - CMP Meeting

Johnson-Eschelon presented the CR. CR moved to Presented.

============================================================

Clarification Meeting 1:30 PM (Mountain Time) / Friday, January 10, 2003

1-877-550-8686 2213337# PC123002-1; Migrate and move documentation on Qwest Wholesale Web site for the process used when the customer is converting and moving to a different CO and remaining in the same rate center

Attendees Matt White – CRPM Bonnie Johnson – Eschelon Jill Anderson – Qwest Joan Wells - Qwest

Introduction of Attendees White-Qwest welcomed all attendees and asked Johnson to review the request.

Review Requested (Description of) Change Johnson-Eschelon reviewed the submitted description of change. She stated that she just wanted the manual process back out on the web site. Well-Qwest stated that there is a CR that will change the process for Port-In. Once that CR is approved, Qwest may create documentation for both CRs at the same time. Johnson and Wells discussed the means of documenting this change. Wells-Qwest stated that Jill Anderson will take over that piece to get this documented. Anderson-Qwest stated that she had no questions. Johnson-Eschelon described a related process that she would submit a CR for in the near future. Wells-Qwest stated that was fine and that she could take a look at it when the CR came in. Confirm Areas and Products Impacted White-Qwest confirmed that the attendees were comfortable that the request appropriately identified all areas and products impacted.

Confirm Right Personnel Involved White-Qwest confirmed with the attendees that the appropriate Qwest personnel were involved.

Identify/Confirm CLEC’s Expectation White-Qwest reviewed the request to confirm Eschelon’s expectation.

Identify and Dependant Systems Change Requests White-Qwest asked the attendees if they knew of any related change requests.

Establish Action Plan White-Qwest asked attendees if there were any further questions. There were none. White-Qwest stated that the next step was for Eschelon to present the CR at the January Monthly Product/Process Meeting and thanked all attendees for attending the meeting.


CenturyLink Response

February 12, 2003

INITIAL RESPONSE For Review by CLEC Community and Discussion at the February 19, 2003, CMP Product/Process Meeting

Bonnie Johnson Eschelon Communications

SUBJECT: Qwest’s Initial Change Request Response - CR #PC123002-1

This change request is accepted. Qwest will add documentation to the Wholesale web site to address this issue. This documentation will be included in a general document, which will also include the Port In Trial process (CR-PC081302-1). Qwest will provide a status of this documentation effort at each Monthly CMP Product/Process Meeting until this change is implemented.

Qwest recommends this CR be updated to Development status.

Sincerely,

Jill Anderson Process Analyst


Open Product/Process CR PC112502-1 Detail

 
Title: CSR process documentation to correct inaccuracies for Qwest CSR’s posted on the Qwest Wholesale web site.
CR Number Current Status
Date
Area Impacted Products Impacted

PC112502-1 Completed
2/19/2003
Pre-ordering, Provisioning, Ordering Qwest CSR related. Could apply to all products where LSR is dependant on accurate Qwest CSR.
Originator: Johnson, Bonnie
Originator Company Name: Eschelon
Owner: Manning, Monica
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

Previously Eschelon requested a process be developed to correct a CSR for a customer prior to the conversion. Qwest completed the CR and issued an MCC on 7/13/01 with two options (see CR 5608163) however, the process was never documented on the Qwest Wholesale web site (or any CLEC facing document). Often Qwest CSR’s have inaccurate information and need to be corrected to minimize adverse impact to the CLEC or customer at the time of conversion. Since the implementation of this process, Eschelon has experienced a significant amount of LSR rejects in error using the process outlined in the closed CR. Because there is no documentation for that process for Eschelon to refer the Qwest CSIE to, Eschelon has the onus to point out the closed CR and details to Qwest on its own process. In addition, Eschelon is aware of this process, however, a new CLEC or a CLEC that does not participate in CMP may not even know this process exists and may still be referring the end user to Qwest Retail to have their records updated. This may leave the customer feeling like the new Local Service Provider they have selected cannot meet their needs. Qwest employees have the benefit of internal Qwest process documentation used for its Wholesale customers. Qwest has an obligation to provide documentation on the Wholesale web site that mirrors the MCC’s that are generated at Qwest so the CLECs are aware of all processes and have a documented process to refer to when escalating issues with Qwest. Consequently, as a result of this process not being documented on the Qwest Wholesale web site, Eschelon sometimes has to rely on its Service Management Team (Tier 3 and above) to resolve the issue. These reject in error issues could be easily resolved at the Tier 1 or even Tier 0 level if the CLEC and Qwest had access to the same documentation in a readily accessible format. The escalation process is time consuming and has a negative impact on CLECs productivity and wastes valuable time and resources for both the CLEC and Qwest.

Expected Deliverable

Document on the Qwest Wholesale web site the existing defined process for correcting an inaccurate CSR prior to conversion (CR 5608163). CLECs have already waited several months for the process. Per the CMP process section 2.4.4 Qwest had an obligation to modify is external as well as its internal documentation and train all appropriate Qwest personnel as to change. If Qwest had done so, Eschelon would not have to train Qwest personnel on the appropriate procedures as it has had to do. Also per section 2.4.4 the documentation and training should have taken place by the implementation date therefore implementation is already past due and should be completed without delay.


Status History

11/25/02 - CR Submitted by Eschelon

11/26/02 - CR acknowledged by P/P CMP Manager

12/03/02 - Scheduled Clarification call with Bonnie Johnson on 12/4/02

12/04/02 - Held Clarification call

12/10/02 - Clarification meeting minutes issued to Eschelon

12/18/02 - December CMP Meeting - Eschelon presented CR to CLEC Community. CR status changed to Presented. Meeting minutes will be posted to this CR's Project Meetings section.

01/08/03 - Issued Qwest draft response to Bonnie Johnson at Eschelon

01/08/03 - Draft Response posted to the web site

01/15/03 - January CMP Meeting - Qwest presented draft response. Meeting minutes will be posted to this CR's Project Meetings section.

01/30/03 - Qwest issued Process Notification PROS.01.30.03.F.00996.OrderingV24, effective immediately

02/19/03 - February CMP Meeting - CR will move to completed status. Meeting minutes will be posted to this CR's Project Meetings section.


Project Meetings

02/19/03 February CMP Meeting Linda Sanchez-Steinke with Qwest stated that Qwest issued Process Notification PROS.01.30.03.F.00996.OrderingV24, effective 1/30/03. Bonnie Johnson with Eschelon said that the change request could be closed. The CR status was changed to Completed.

01/15/03 January CMP Meeting Michelle Thacker with Qwest presented the draft response to this CR and said that CLEC facing documentation changes are already in progress and they are targeted for review January 31, 2003. This CR is in Presented status.

12/18/02 December CMP Meeting Bonnie Johnson with Eschelon presented this CR and explained that CR5608163 was submitted and in response to that CR, Qwest provided two options to correct CSRs prior to customer conversion. Eschelon is asking that the process for updating the CSR be posted on the Qwest Wholesale web site for viewing as soon as possible because the process is not changing, but needs to documented for CLECs. Judy Schultz and Bonnie discussed that this should be a Level 1 change because the existing process is not changing, but is being documented. This CR will move to Presented status.

CLEC Change Request Clarification Meeting

December 4, 2002, 3:00 p.m. (MT) Conference Call 1-877-554-8688 PIN 1930099 # PC112502-1 CSR process documentation to correct inaccuracies for Qwest CSR’s posted on the Qwest Wholesale web site.

Attendees Name/Company: Bonnie Johnson, Eschelon Kim Issacs, Eschelon Monica Manning, Qwest Michelle Thacker, Qwest Linda Sanchez-Steinke, Qwest

Introduction of Attendees Introduction of the participants on the Conference Call was made and the purpose of the call discussed.

Review Requested (Description of) Change The description of change requested in the CR was reviewed. Bonnie said the CR is asking for the 2 processes for CSR corrections, described in CR 5608163, be documented on the Wholesale Web site because Eschelon still gets rejects in error and then have to escalate to service management to resolve.

Confirm Areas & Products Impacted Bonnie & Kim indicated that all products are impacted.

Confirm Right Personnel Involved Qwest confirmed that the right personnel were involved in the conference call.

Identify/Confirm CLEC’s Expectation Eschelon would like Qwest to document, on the wholesale web site, the two options for updating a CSR, 1) indication of manual handling with remarks, and 2) opening an escalation ticket with the Call Center. Eschelon uses both processes and still receives rejects in error that are difficult to resolve. Bonnie said that Eschelon knows up front that the CSR is wrong and supp the LSR for manual handling and have received rejects from the SDC and then are told that the customer should call the business office to update the CSR. Eschelon then has to go to the service management team and provide the closed CR number, explain how the process should work, before the CSR gets updated. Kim and Bonnie said they would like to take out the need to escalate these rejects in error and feel that with the previous CR, documentation on the Qwest web site there should have been provided.

Establish Action Plan (Resolution Time Frame) This CR will be presented by Bonnie for review CLEC Community Review at the December CMP Meeting.


CenturyLink Response

January 3, 2003

DRAFT RESPONSE For Review by CLEC Community and Discussion at January’s CMP Meeting

Bonnie Johnson Sr. Manager ILEC Relations Eschelon

SUBJECT: Qwest’s Change Request Response - CR # PC112502-1 (CSR process documentation to correct inaccuracies for Qwest CSR’s posted on the Qwest Wholesale web site.)

This is in response to Eschelon’s Change Request PC112502-1, requesting that Qwest provide documentation on the Wholesale Web Site that provides details explaining how a CLEC issues an LSR when the CSR has inaccuracies.

Qwest accepts this CR and will update CLEC facing documentation. Updates to Qwest External Documentation are targeted to be available for review by January 31, 2003.

Sincerely,

Michelle Thacker Process Specialist Qwest


Open Product/Process CR PC100102-1CM Detail

 
Title: Change format on the Web change notification form to a Red Line format
CR Number Current Status
Date
Area Impacted Products Impacted

PC100102-1CM Completed
4/15/2009
Notification Process Notification Process
Originator: Johnson, Bonnie
Originator Company Name: Eschelon
Owner: Blackmun, Jarby
Director:
CR PM: Harlan, Cindy

Description Of Change

Currently the web change notification form is sent in a format where the changes are highlighted with 'add' and 'delete' to identify changes being made to the document. It is very difficult to identify what is changing in the document using the current format. I have had repeated feedback from several Eschelon employees who are required to review these documents that they are not certain they have fully captured the changes taking place. Since most people are familiar with the Red Line format for understanding changes, Qwest should change to a Red Line format. The CLEC runs the risk of interpreting a change incorrectly that may impact the ability to do business or negatively impact a customer.

Expected Deliverable:

Qwest will change to a Red Line format for Web Change Notification Forms.


Status History

09/30/02 - CR Submitted by Eschelon

10/01/02 - CR Acknowledged by CRPM P/P Manager

10/03/02 - CR Posted to Web

10/03/02 - Customer contacted and scheduled clarification call for 10/09/02 9:30 am mdt

10/09/02 - Clarification call completed with Eschelon

10/15/02 - Provided Clarification Meeting notes to Eschelon and posted to database

10/16/02 - October CMP Meeting - Collective CLEC clarification occurred at the October CMP Meeting. Minutes will be posted to the Project Meetings section.

10/22/02 - Proposed 3 meeting options via the Notification mailout process.

10/24/02 - Posted October 31 as meeting choice via Notification mailout process. Completed mailout notification with agenda, and attachments (documents to review)

10/31/02 - Held October 31 meeting to further discuss CR. Agreement was reached to vote on CR at November 20 P/P CMP Meeting. Notification to vote will be sent out November 1, 2002. Qwest will determine if other options are available. If so, Qwest and notify CMP Community that discussion of options will take place at the November CMP Meeting.

11/01/02 - Vote Notification CMPR..11.01.02.F.01352.CMP_Mtg_Vote distributed via mailout process. In addition, if Qwest is able to develop an alternate option in regard to this topic, this will be identified via a notification by November 12, 2002. This notification will briefly discuss the option and call for discussion at the November 20, 2002 Product Process meeting.

11/12/02 - Notification distributed advising of Qwest's effort (trial Nov.11-27) to determine the feasibility of providing redline documents as a means to assess changes to documentation, and delivery of redlined documents will require a change in the Level 1 notification delivery process. Qwest suggests to delay the vote until the results of the trail are available (early December).

11/20/02 - November CMP Meeting - discussed the trial that Qwest is conducting to determine feasibility of providing redlined documents and explained the potential impact to the Web Notification form for Level 1 changes. Proposed and reached agreement to delay the vote until after the trial.

11/26/02 - Notification sent out offering 3 meeting options to review resutls of Red Lined Trial

12/03/02 - Notification sent out advising meeting scheduled for December 10, 2002 from 9:00 - 10:30 am mdt

12/04/02 - Notification sent out providing attachments to use during meeting; results of trial and changes to the CMP document.

12/10/02 - Held CLEC Meeting and shared Qwest's proposal for changes to the CMP process and described the new method to access Level 1 changes. Qwest agreed they can change to Red Line updates for Level 1-4 CRs. CLECs and Qwest agreed we would vote on the proposal at the December CMP Meeting. Qwest agreed to distribute a Vote Notification by 12/11/02.

12/11/02 - Vote Notification distributed via mailout process. VOTE will take place during 12-18 Product Process CMP Meeting.

12/18/02 - December P/P CMP Meeting notes will be posted to the Project Meeting Section. Vote took place and passed with a 'yes' vote. Changed status to Development.

01/02/03 - Level 1 Notification sent out advising this process is effective January 6, 2003. Will propose to change this CR to CLEC Test status at the January meeting.


Project Meetings

12/18/02 - December CMP Monthly Meeting Minutes Qwest-Blackmun explained we are able to update PCATs using Red Lined instead of Green Highlight for Level 1-4 changes. In addition, for Level 1 changes the Web Notification form would not be used any longer. Instead, the PCAT would be updated and posted to the Archive Document review site. World Com-Balvin asked if the History Log would still be referenced and the changed identified on that. Qwest advised yes. The vote process was then explained and conducted. The change passed by unanimous vote 7 ‘Yes’ and 0 ‘No’. White-Qwest proposed the change to the CMP Document be made in combination with the change from CR PC102502-1CM in a January 6, 2003, Level 1 notification. The attendees agreed.

12/10/02 - CLEC / Qwest Meeting to review trial results Held CLEC Meeting and shared Qwest's proposal for changes to the CMP process and described the new method to access Level 1 changes. Qwest agreed we can change to Red Line updates for Level 1-4 CRs. CLECs and Qwest agreed we would vote on the proposal at the December CMP Meeting. Qwest agreed to distribute a Vote Notification by 12/11/02.

11/20/02 - November CMP Monthly Meeting Minutes Qwest advised a trial is underway until November 27 to determine the impact to changing to Red Line format. Due to the trial Qwest is requesting the vote be delayed until after the trial is completed. Qwest explained if we are able to change to Red Lind format a change to the Web Notification process would also need to occur as the Microsoft Word program does not accommodate 'cut and paste' of Red Lined changes from one document to another. If the result of the trial allows Qwest to change to Red Lined format we will also present the suggested change to the Web Notification process. It is anticipated the change for Level 1 Web Notifications would be to post the description of the change and the PCAT document to the web site minus a comment cycle, instead of cutting and pasting the updated sections to the Web Notification form. Eschelon and other CLECs in attendance agreed to postpone the vote until after the trial. Qwest agreed they would offer 3 options for meetings to review the results of the trial. After the results are reviewed a meeting will be held to vote on this CR.

10/31/02 - CLEC Input Meeting held to discuss this CR. Scope was confirmed that this CR affects Web Notification forms and all Levels of PCATs. Green highlighted and Red lined documents were reviewed and compared. Discussion of concerns from CLECs and Qwest occurred. No feasible options were agreed upon during the meeting. Agreement was reached that Qwest would determine if we have any options to present. In addition, Qwest would issue the Vote Notification so a vote could take place at the November Monthly Product Process CMP meeting, if Qwest is not able to determine other acceptable options.

10/16/02 - October CMP Monthly Meeting Minutes Eschelon clarified the CR and reasons for submitting the CR. Qwest confirmed this CR will follow section 2.1 of the CMP process. Agreement was reached on the input approach. Qwest will propose multiple meeting dates. The agreed upon meeting will be held to gather additional data, understand the scope of the CR to make sure the CLEC community is aware of what will be voted on, and potentially identify new options for document updates. The CMP process identifies a vote would not occur earlier than the November meeting. Eschelon requested an example of both update methods (Green highlight and Red Lined) be shared in the meeting. Notification of meeting time options will be sent out via the Notification process.

CLEC Change Request Clarification Meeting Time/Date: 9:30 p.m. (MDT) / Wednesday 9th October 2002 Conference Call-In No.: 1-877-561-8688 7385723# CR No.: PC100102-1CM Change format of the Web change notification form to a Red Line Format

Attendees: Bonnie Johnson – Eschelon Jarby Blackmun – Qwest Mark Coyne – Qwest Cindy Macy – Qwest

Meeting Agenda: 1.0 Introduction of Attendees

1.1 Introduction of the participants on the Conference Call was made and the purpose of the call discussed.

2.0 Review Requested (Description of) Change

2.1 Reviewed the details of the change request and confirmed that Bonnie requested updates to the PCAT be made using Red Line format instead of Green Highlight format. This applies to Level 1- 4 changes. Bonnie sent in a redlined version of the CMP process identifying changes should be made to Level 1, but we clarified she is requesting the change be made to Level 1- 4.

3.0Confirm Areas & Products Impacted It was confirmed that Bonnie is requesting changes to the ‘Notification Process’.

4.0Confirm Right Personnel Involved Jarby Blackmun will be the SME on this CR. Mark Coyne will participate.

5.0Identify/Confirm CLEC’s Expectation Eschelon requests Qwest to change to a Red Line format for Web Change Notification forms (update PCATs using Red Line format, just as Tech Pubs are done)

6.0 Identify any Dependent Systems Change Requests None

7.0Establish Action Plan (Resolution Time Frame) Bonnie will present this CR to the CLEC community at the October 16 CMP P/P Monthly Meeting.


Open Product/Process CR PC070202-1X Detail

 
Title: Time & Material Repair Charges invoice process. (Crossover CR SCR070202 01X)
CR Number Current Status
Date
Area Impacted Products Impacted

PC070202-1X Completed
9/18/2002
Maintenance/Repair Centrex, Unbundled Loop, UNE Loop, UNE-P
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Suellentrop, Craig
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

Currently Qwest leaves a "Time and Materials Invoice" with its retail customers during a repair visit when the trouble was not found in the Qwest network. Qwest does not supply anything to CLECs. This "Invoice" would assist Eschelon in reconcilling its bill. Eschelon asks Qwest to develop, document and train an adhered to process to supply CLECs with this same "Invoice" or something similar, with the same detail, that will state the charges that Qwest plans to bill at the time of the repair visit. The "Invoice" should contain the Qwest repair ticket number, the number or circuit ID which was reported in trouble, the customer's name and address, the Qwest technicians name and telephone number, the date, the USOCs that Qwest will bill, the quantity of each USOC, the cost of each USOC, the total cost and the reason for the charge.

Expected Deliverable

A process to supply CLECs with an "Invoice" of repair charges at the time of the repair visit.


Status History

07/02/02 - CR Submitted by Eschelon

07/02/02 - CR acknowledged by P/P CMP Manager

07/03/02 - CR posted to Web

07/09/02 - Eschelon contacted to set up clarification call for 07/10/02 at 2:00 PM MDT

07/10/02 - Clarification call held

07/12/02 - Clarification call meeting minutes sent to Eschelon

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status was changed to Clarification.

08/14/02 - Issued Qwest draft response to Kathy Stichter with Eschhelon

08/19/02 - Issued Mailout Notification to CLECs confirming the Synergy Meeting for Multiple Trouble Ticket and Billing CRs scheduled for 8/27/02, 2:00 pm MT. Notification CMPR.08.19.02.F.01317.CMP_CR_Mtg.

08/21/02 - CMP Meeting - Qwest presented its draft response dated 8/13/02. This CR will move to Evaluation status and will be discussed at the Synergy Meeting for Multiple Trouble Ticket and Billing CRs scheduled for 8/27/02, 2:00 pm MT.

8/27/02 - CR included in the Synergy Meeting for Multiple Trouble Tickets & Billing CRs. See Meeting Notes in Attach O, Sept Systems CMP Package.

08/28/02- Crossover CR issued SCR070202-1X

09/18/02 - September CMP Meeting - CR will move to Completed. Meeting minutes will be posted to this CR's Project Meetings section.


Project Meetings

09/18/02 September CMP Meeting This CR has been moved to a cross over SCR070202-01X. Last Thursday a clarification call was held LOE is being investigated. CRPC070202-1 will be moved to “Completed” status.

08/21/02 - August CMP Meeting Minutes: Qwest reviewed its draft response and advised that this CR would be reviewed in conjunction with other CRs related to trouble tickets, repair charges, etc. scheduled for August 27, 2002. The CLEC participants agreed to have this CR reviewed at that meeting. Eschelon stated that the systems CR timeframe may be too long for Eschelon and would like to see the data that Qwest provides to its retail end users because the retail invoice provides quite a bit of information such as; Name of technician and date. Qwest said that we don’t want to mail an invoice and that the system report may capture data Eschelon would like to receive. Eschelon agreed we don’t want to mail the invoice. This CR was moved to evaluation status.

07/17/02 - July CMP Meeting Minutes: Eschelon presented their Change Request. CR status is clarification

Alignment/Clarification Meeting Conference Call Time/Date: 2:00 p.m. (MDT) / Wednesday, July 10, 2002 Place:TEL: 877.521.8688 Conference Call-In No.: CODE: 7901848 CR No.:CLEC Change Request PC070202-1"Time & Material Repair Charges invoice process"

Kathy Stichter, Eschelon, ILEC Relations Manager Craig Suellentrop, Qwest, 271 Network Technical Regulatory Alice Matthews, Qwest, Process Specialist Michael Keegan, Qwest, CMP Manager

Introduction of Attendees Attendees introduced.

Review Requested (Description of) Change Description: Currently Qwest leaves a "Time and Materials Invoice" with its retail customers during a repair visit when the trouble was not found in the Qwest network. Qwest does not supply anything to CLECs. This "Invoice" would assist Eschelon in reconcilling its bill. Eschelon asks Qwest to develop, document and train an adhered to process to supply CLECs with this same "Invoice" or something similar, with the same detail, that will state the charges that Qwest plans to bill at the time of the repair visit. The "Invoice" should contain the Qwest repair ticket number, the number or circuit ID which was reported in trouble, the customer's name and address, the Qwest technicians name and telephone number, the date, the USOCs that Qwest will bill, the quantity of each USOC, the cost of each USOC, the total cost and the reason for the charge.

Discussion: Eschelon is requesting that the same type of time & material invoice that is generated by Qwest technicians for Qwest retail customers be generated for the CLECs prior to billing and mailed to the CLEC for review and signature.

Qwest indicated that they understood the scope of this CR. Craig Suellentrop will coordinate the production of the Qwest response. N/A

Confirm Areas & Products Impacted Areas Impacted: Maintenance/Repair Products Impacted: Centrex, Unbundled Loop, UNE Loop, UNE-P, Resale N/A

Confirm Right Personnel Qwest confirmed the correct personnel were on the call.

Identify/Confirm CLEC’s Expectation A process to supply CLECs with an "Invoice" of repair charges at the time of the repair visit.

Identify any Dependent Systems Change Requests None

Establish Action Plan (Resolution Time Frame) Eschelon can present this Change Request to the CLEC community at the July Product/Process CMP meeting scheduled for July 17 Qwest will issue draft response to this Change Request by Aug 14 (one week prior to the Aug 21 CMP meeting). Qwest will discuss the draft response at the Aug 21 CMP meeting.


CenturyLink Response

See Crossover SCR070202-1X

August 13, 2002

DRAFT RESPONSE For Review by CLEC Community and Discussion at August’s CMP Meeting

Kathy Stichter ILEC Relations Manager Eschelon

SUBJECT: Qwest’s Change Request Response - CR PC070202-1 “Time and Material Repair invoice process.”

This CR states that “Qwest leaves a ‘Time and Materials Invoice’ with its retail customers during a repair visit when the trouble was not found in the Qwest network.” The CR requests that Qwest “supply CLECs with this same ‘invoice’ or something similar, with the same detail that will state the charges that Qwest plans to bill at the time of the repair visit.”

Qwest does leave a Time and Materials Invoice with retail customers when a repair dispatch will result in a charge. This invoice is informational in nature. The technician that is dispatched leaves it at the premises. The actual bill (for both wholesale and retail customers) is generated through automated systems and manual processes that occur when a technician closes a trouble ticket. Qwest does not have a billing relationship with CLEC end-users; therefore, Qwest’s process is to not leave invoices with CLEC end-users. CLECs may use electronic maintenance and repair systems (CEMR) to view trouble ticket history as it appears in Qwest’s systems. This information would be valuable in disputing or substantiating repair charges.

Qwest does not have an organization that is responsible for collecting and distributing these invoices. Qwest believes that a systems CR should be opened to generate an automated report that would provide CLECs with data regarding maintenance and repair billing in the timeframe requested. A meeting will be scheduled for late August to discuss CR’s involving maintenance and repair billing, including this CR. Further clarification and direction for this CR will be determined after this meeting.

Sincerely,

Craig Suellentrop Staff Advocate, Policy & Law Qwest

Cc: Mary Retka, Director-Legal Issues, Qwest Susie Bliss, Director-Process Management, Qwest Alice Matthews, Senior Process Analyst, Qwest


Open Product/Process CR PC062702-12 Detail

 
Title: Update Qwest back end systems to show DSL feature information for Repair
CR Number Current Status
Date
Area Impacted Products Impacted

PC062702-12 Withdrawn
10/17/2007
Provisioning Resale - Centrex Plus/Centron UNE-P - Centrex Plus/Centron
Originator: Johnson, Bonnie
Originator Company Name: Eschelon
Owner: Bliss, Susan
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

Currently when a CLEC orders the DSL feature on a Cntrex Plus or Centron line, the order can be processed and installed, however, the critical technical information needed to manage the DSL after installation does not flow to Qwest back end systems. Though the DSL feature appears on the CSR, technical information needed for repair on the DSL feature does not appear in any of Qwest's systems. The result is an inability to get a customers DSL service repaired once installed.

Expected Deliverable:

Capture the critical information needed for DSL feature on a Centrex Plus/Centron line. Develop an interim process for the CLEC's to work with repair until that is done. Identify all existing DSL on CLEC's accounts when the fix is in place and populate the information needed in the systems. Identify any other Qwest product this may apply to.

Expected Deliverable:

Update Qwest systems to capture the critical information needed for DSL feature on a Centrex Plus/Centron line. Develop an interim process for the CLEC's to work with repair until that is done. Identify all existing DSL on CLEC's accounts when the fix is in place and populate the information needed in the systems. Identify any other Qwest product this may apply to.


Status History

06/27/02 CR submitted

07/1/02 - CR acknowledged

07/2/02 - Clarification Meeting scheduled

07/10/02 - Clarification Meeting held

07/10/02 - Status changed to clarification

07/17/02 - July CMP Meeting: CR status changed to "Presented". Meeting minutes posted to this CR's Project Meetings section.

08/14/02 - Sent Draft Response to Eschelon

08/21/02 - August CMP Meeting: CR status changed to "Development" Meeting minutes will be posted to this CR's Project Meeting section and the CMP Web site.

09/18/02 - September CMP Meeting: CR status will remain in "Development" Meeting minutes will be posted to this CR's Project Meeting section and the CMP Web site.

10/16/02 -October CMP Meeting: This CR will remain in "Development" Meeting minutes posted to this CR's Project Meetings section and the CMP Web site.

11/20/02 - November CMP Meeting: This CR will remain in "Development" Meeting minutes posted to this CR's Project Meeting section and the CMP Web site.

12/12/02- Provided updated status to Eschelon regarding this CR.

12/18/02 - Eschelon agreed that the status of the Cr could change to Deferred. P


Project Meetings

October 17, 2007 October CMP Meeting

Mark Coyne-Qwest stated that Eschelon had been contacted regarding this CR and agreed to withdraw this request. This CR will now drop off the list. Bonnie Johnson-Eschelon nodded in agreement. This CR moves to Withdrawn status.

October 3, 2007 Email Sent to Eschelon: Thanks Bonnie. I will place the CR in Pending Withdrawal status; and do the formal withdrawal at the October CMP Meeting. Looking forward to seeing you.

- October 3, 2007 Email Received From Eschelon: Hi Peggy, Eschelon agrees to withdraw this CR per your request based on the fact that Qwest has made changes that provide Eschelon with this information. Bonnie Johnson Director Carrier Relations

October 3, 2007 Email Sent to Eschelon: Good Morning Bonnie, RE: PC062702-12 Update Qwest Back End Systems to Show DSL Feature Information for Repair This email is in regard to a CMP CR that Eschelon submitted, to Qwest, in June 2002, requesting DSL feature information. Attached to this email is a copy of that Change Request. In the 5+ years since this CR was submitted, there have been some changes. The Qwest DSL product was grandparented via PC110205-2 and as of January 28, 2006, Qwest offers Qwest DSL (transport only - no ISP) as a non-common carrier service via a commercial agreement only. Because Qwest DSL is no longer a product that can utilize the CMP Process, will Eschelon agree to withdraw PC062702-12? Thank you, in advance, for your prompt reply. Peggy Esquibel-Reed Qwest Wholesale CMP

12/18/02 December CMP Meeting Qwest Susie Bliss reported that the short-term process is working. The order volume does not justify mechanizing another solution. CLEC Community and Eschelon (Johnson) agreed to move this CR to Deferred Inactive status.

11/20/02 November CMP Meeting

Qwest (S Wells) indicated that the interim process was still functioning. Qwest has a request out to determine the magnitude of change that might be required. That information should be available soon. Qwest (S Wells) indicated that they were expecting some information back from Eschelon. Eschelon indicated that they had responded. Qwest clarified that they were still waiting for concurrence on the list of existing Centrex with DSL accounts. Eschelon indicated that they were having someone look over the list, and would be sending concurrence or additions as soon as possible. This CR will remain in Development status.

10/16/02 October CMP Meeting

Qwest (Wells) provided status on the four components of the CR. Only one component remains open. A response is due in mid October outlining a proposed mechanical solution. The implementation plan will be developed for early November. This CR remains in Development status.

09/18/02 September CMP Meeting Qwest (Bliss) this CR has three components:

1. The interim process: The interim process seems to be working well from a Qwest perspective. A handful of orders came in and have been processed using the interim solution. Eschelon (Bonnie) is aware of the interim process but hasn’t received any feedback from her personnel. Bonnie will use the orders provided by Susie to take back internally for feedback. The interim process is applicable to all CLECs submitting orders that fit the criteria.

2. Long term system solution: Exploration of a mechanized solution is ongoing.

3. Embedded base: This addresses the existing customers, the repair centers need to have the information available, this is not completed but the list of customers will be available soon.

Participants agreed that this CR will remain in "Development" status

08/21/02 - Auguast CMP Meeting Minutes Qwest (Bliss) indicated that the CR was still open. Qwest and Eschelon are ready to trial a manual process that was established on August 6th. On August 6th a request came in from Eschelon but Qwest was unaware the request was to trial this manual process. Qwest is assessing the feasibility of a mechanized solution. Eschelon is working on a forecast to determine if Qwest should pursue a mechanized solution. Meanwhile, Qwest has received a worksheet that identifies all existing DSL on CLEC's accounts and are working towards ensuring the Repair Center has the needed information. This CR was moved to"Development" status.

07/17/02 - July CMP Meeting Minutes: Eschelon (Johnson) reviewed the CR and indicated that the appropriate information does not show up in the repair systems. This problem is not experienced by Qwest Retail customers because Retail does not use DPA. DPA is not a problem in Western region. Qwest (Bliss) indicated that this was an issue that was being addressed by the DSL Swat Team.

7/10/02 Clarification Meeting

Attendees: Bonnie Johnson - Eschelon, Susie Wells - Qwest, Kit Thomte - Qwest, Cindy Schwartz - Qwest, Paulette Westerfield - Qwest, Dan Busetti - Qwest, Jean Novak - Qwest

Introduction of Attendees Introductions of the participants on the Conference Call were made and the purpose of the call discussed.

Review Requested (Description of) Change

Bonnie Johnson - Eschelon reviewed the change request. Currently when a CLEC orders the DSL feature on a Centrex Plus or Centron line, the order can be processed and installed but the critical information does not flow through to repair. The result is an inability to get a customers DSL service repaired once installed.

She also said that this problem only applies to the Eastern and Central Regions only.

Confirm Areas and Products Impacted Bonnie Johnson said that the Products impacted are Resale - Centrex Plus/Centron and UNE-P Centrex Plus/Centron

Confirm Right Personnel Involved Susie Wells will be the SME at this time.

Identify/Confirm CLECs Expectation Bonnie Johnson confirmed that Eschelon would like Qwest to develop an interim process that would capture the critical information needed for the DSL feature on a Centrex Plus or Centron line and provide the information to repair.

Identify any Dependent Change Requests Lynn Stecklein advised Bonnie Johnson that Qwest has determined that this change request will be handled as a Product/Process CR. Bonnie Johnson asked why this would not be considered a system request and Lynn Stecklein said that the CLECs do not have access to the interface/system impacted. The interface impacted is internal to Qwest.

Establish Action Plan (Resolution Time Frame) Lynn Stecklein will create a Product/Process CR. This CR will comply with the CMP Product/Process CR process and is eligible for presentation at the appropriate July Monthly CMP meeting


CenturyLink Response

For Review by CLEC Community and Discussion at December CMP Meeting

December 10, 2002

Bonnie Johnson Senior Manager ILEC Relations Eschelon

SUBJECT: CR PC062702-12 Update Qwest back end systems to show DSL feature information for Repair

When we discussed this during last month’s CMP meeting, there were two outstanding issues. Those issues and their current status is as follows: 1. What was the long term implementation plan? Current status: we received the estimate for the system changes and the benefits do not outweigh the expenses at this time due to the low volume of orders. We recommend moving this to an inactive deferred status and if the volume of orders get in the range of 400 orders, we would reopen the CR at that time. The existing process that we implemented July 29, 2002 does fulfill the requests of this CR and we have not encountered any problems with the new process. 2. We needed concurrence from Eschelon on the list of existing Centrex with DSL accounts. Current status: Qwest has received confirmation from Eschelon that the embedded base of accounts is in agreement between the two companies.

Given the above, Qwest is recommending that we defer this CR pending a change in order volumes and would like to discuss this during the December CMP meeting.

Sincerely,

Susie Bliss Director Process Management Qwest

-- October 3, 2002

Bonnie Johnson Senior Manager ILEC Relations Eschelon

SUBJECT: CR PC062702-12 Update Qwest back end systems to show DSL feature information for Repair

There are four pieces to the CR. They are: Capture the critical information needed for DSL features on a Centrex Plus/Centron line. Develop an interim process for the CLEC's to work with repair until that is done. Identify all existing DSL on CLEC's accounts when the fix is in place and populate the information needed in the systems. Identify any other Qwest products this may apply to.

The CR is still open. The current status is as follows: Open - Qwest is currently investigating potential implementation of a long term mechanized solution. An automated system solution is still in discovery. Qwest has less than 20 occurrences of the service requirement, both from correction to the embedded base and new service activity. We expect to have system recommendations by October 18 and an implementation plan by November 1, 2002.

Closed - Qwest has developed a manual process by which Qwest's repair personnel will have access to the information they need to take repair reports on DSL service provided with Resold/UNE-P Centrex Plus and Resold/UNE-P Centron. After an order completes in the SOP, Qwest's personnel will manually intervene to stop the order processing before the order posts in CRIS. The repair record is automatically created based on the way the order is written following the manual process. The manual process after the fact is only to get the order to post correctly to generate an accurate CSR. We have successfully trialed the manual process on eight orders that have been submitted by Eschelon.

Closed - Qwest has identified all accounts that required updated repair records, and has issued orders to correct those records effective September 27, 2002.

Closed - This situation is unique only to Central and Eastern Region Resold and UNE-P Centrex and Centron.

Sincerely,

Susie Bliss Director Process Management Qwest

August 13, 2002

Bonnie Johnson Senior Manager ILEC Relations Eschelon

SUBJECT: CR PC062702-12 Update Qwest back end systems to show DSL feature information for Repair

There are four pieces to the CR. They are: Capture the critical information needed for DSL features on a Centrex Plus/Centron line. Develop an interim process for the CLEC's to work with repair until that is done. Identify all existing DSL on CLEC's accounts when the fix is in place and populate the information needed in the systems. Identify any other Qwest products this may apply to.

The CR is still open. The current status is as follows: Open - We are pursing a system solution to capture this information. We are looking at a few possible solutions and will report the current status at the next CMP meeting. Open - Qwest has developed a manual process by which Qwest's repair personnel will have access to the information they need to take repair reports on DSL service provided with Resold/UNE-P Centrex Plus and Resold/UNE-P Centron. After an order completes in the SOP, Qwest's personnel will manually intervene to stop the order processing before the order posts in CRIS. At that time, Qwest personnel will add the appropiate repair organization information to the order. Finally the order will be released to continue through its normal processing and posting to CRIS. We will trial the interim process with Eschelon. Open - Qwest is still looking at how we would identify these accounts and ensure the Repair Center has the needed information. Closed - This situation is unique only to Central and Eastern Region Resold and UNE-P Centrex and Centron.

Sincerely,

Susie Bliss Director Process Management Qwest


Open Product/Process CR PC071202-1 Detail

 
Title: Use Qwest design services ticket number in the PON on Service Orders for Maintenance of Service Charges, Dispatch Charges and Optional Testing Charges so that information is shown on the completion report.
CR Number Current Status
Date
Area Impacted Products Impacted

PC071202-1 Withdrawn
9/18/2002
Billing / Maintenance Repair Unbundled Loop
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Matthews, Alice
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

Currently Qwest issues orders to bill Maintenance of Service Charges, Dispatch Charges and Optional Testing Charges for design services trouble tickets when the trouble was not found in the Qwest network. The completion report sent to Eschelon includes a PON TIC and then information. Sometimes that information is a billing telephone number (BTN) and sometimes the information is the Qwest ticket number. During the reconciliation process Eschelon has found that when Qwest uses the Qwest ticket number in the PON it is easier to find the original Eschelon ticket for reconciliation purposes. Therefor Eschelon requests that Qwest implement a process to use the Qwest repair ticket number in the PON so that the PON would be TIC + the Qwest repair ticket number.

Expected Deliverable

A process to ensure that the PON on service orders for Maintenance of Service Charges, Dispatch Charges and Optional Testing Charges include the Qwest repair ticket number so that information is shown on the completion report..


Status History

07/12/02 - CR Submitted by Eschelon.

07/12/02 - CR acknowledged by P/P CMP Manager.

07/16/02 - Eschelon contacted and clarification meeting scheduled for 07/16/02 at 10:30 a.m. (MDT)

07/16/02 - Clarification call held with Eschelon

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status was changed to Clarification.

07/18/02 - Clarification Call meeting minutes were sent to Eschelon

08/19/02 - Issued Mailout Notification to CLECs confirming the Synergy Meeting for Multiple Trouble Ticket and Billing CRs scheduled for 8/27/02, 2:00 pm MT. Notification CMPR.08.19.02.F.01317.CMP_CR_Mtg.

08/21/02 - CMP Meeting - This CR is being reviewed in Synergy Meeting for Multiple Trouble Ticket and Billing CRs scheduled ro 8/27/02, 2:00 pm MT. CR will be moved to evaluation status.

8/27/02 - CR included in the Synergy Meeting for Multiple Trouble Tickets & Billing CRs. See Meeting Notes in Attach O, Sept Systems CMP Package.

9/11/02 - Issued Qwest draft response dated 9/11/02 to Kathy Stitcher at Eschelon

09/18/02 - September CMP Meeting - Qwest presented draft response. CR will move to Withdrawn. Meeting minutes will be posted to this CR's Project Meetings section.

09/27/02 - Issued Qwest Revised Response dated 9-24-02 to Kathy Stitcher at Eschelon. CR Withdrawn.


Project Meetings

09/18/02 September CMP Meeting Qwest reviewed the draft response and Eschelon said they don’t need the PON for the completion report if the billing office will give the Qwest trouble ticket number on the spreadsheet. Qwest said the billing office can provide the trouble ticket number on the spreadsheet and will update the response to indicate the Qwest trouble ticket number will be on the spreadsheet until the related systems CRs are completed. Eschelon said they would withdraw the CR and this CR status will be changed to “Withdrawn.”

-

08/21/02 - August CMP Meeting Minutes: Eschelon reviewed their CR requesting that Qwest trouble ticket number be included with their PON because it would provide another piece of information to help Eschelon verify charges. Qwest advised that this CR would be reviewed in conjunction with other CRs related to trouble tickets, repair charges, etc. scheduled for August 27, 2002. The CLEC participants agreed to have this CR reviewed at that meeting and will be changed to evaluation status.

07/17/02 - July CMP Meeting Minutes: Eschelon presented their Change Request. CR status is clarification.

Clarification Call Time/Date: 10:30 a.m. (MDT) / Tuesday, July 16, 2002 Place: Conference Call Conference: TEL: 877.521.8688 Call-In: CODE: 7901848 CR No: PC071202-1 "Use Qwest design services ticket number in the PON on Service Orders for Maintenance of Service Charges, Dispatch Charges and Optional Testing Charges so that information is shown on the completion report."

Attendees: Kathy Stichter, Eschelon, ILEC Relations Manager Alice Matthews, Qwest, Sr Process Analyst - Billing Craig Suellentrop, Qwest, 271 Network Technical Regulatory Bob Mohr, Qwest, Product Manager Michael Keegan, Qwest, CMP Manager

Introduction of Attendees Attendees introduced. Review Requested (Description of) Change Description:

Currently Qwest issues orders to bill Maintenance of Service Charges, Dispatch Charges and Optional Testing Charges for design services trouble tickets when the trouble was not found in the Qwest network. The completion report sent to Eschelon includes a PON TIC and then information. Sometimes that information is a billing telephone number (BTN) and sometimes the information is the Qwest ticket number. During the reconciliation process Eschelon has found that when Qwest uses the Qwest ticket number in the PON it is easier to find the original Eschelon ticket for reconciliation purposes. Therefor Eschelon requests that Qwest implement a process to use the Qwest repair ticket number in the PON so that the PON would be TIC + the Qwest repair ticket number.

Discussion: Qwest asked if the scope of the change request is for the design services side only. Eschelon agreed, and confimed that non design (resale) is excluded.

Confirm Areas & Products Impacted Areas Impacted: Billing and Maintenance/Repair Products Impacted: Unbundled Loop Confirm Right Personnel Qwest confirmed the correct personnel were on the call.

Identify/Confirm CLEC’s Expectation A process to ensure that the PON on service orders for Maintenance of Service Charges, Dispatch Charges and Optional Testing Charges include the Qwest repair ticket number so that information is shown on the completion report.. Identify any Dependent Systems Change Requests None Establish Action Plan (Resolution Time Frame) Eschelon can present this Change Request to the CLEC community at the August Product/Process CMP meeting scheduled for August 21 Qwest will issue draft response to this Change Request by Sep 11 (one week prior to the Sep 18 CMP meeting). Qwest will discuss the draft response at the Sep 18 CMP meeting. Alice Matthews will coordinate the production of the Qwest response.


CenturyLink Response

September 24, 2002

Kathleen Stichter ILEC Relations Manager Eschelon

SUBJECT: Qwest’s Change Request Revised Response – PC071202-1 “Use Qwest design services ticket number in the PON on Service Orders for Maintenance of Service Charges, Dispatch Charges, and Optional Testing Charges so that information is shown on the completion report.”

This CR requests that Qwest populate the Qwest trouble ticket number as the data in the PON field of service orders issued to generate Designed Services Maintenance of Service, Dispatch and Optional Testing charges. This Change Request was discussed during the CR synergies meeting between Qwest and the CLEC Community on August 27, 2002. During that discussion Eschelon indicated that they issued this Change Request because they are concerned two other CRs: SCR042902-01 and SCR060402-04, may not be implemented or may be delayed. In addition, Eschelon indicated that their solution of choice is for Qwest to provide the CKT ID or Telephone Number, Qwest ticket number, CLEC ticket number and date work was completed on all bill formats (as requested in SCR042902-01 and SCR060402-04).

If implemented, CR PC071202-1, would provide only the Qwest ticket number, which is only one of the data elements Eschelon has specified as critical. With this CR, the Qwest trouble ticket number would appear on the Completion Report in lieu of the account information, e.g., AN, MAN or SBN, that appears today. The implementation of this CR would result in providing different information not more information.

Implementation of this Change Request would require scripting changes to populate the PON field with the Qwest ticket number and, due to PON field character limitations, Qwest would no longer be able to populate the billing account information. Because this CR would change a process changed at the CLEC’s request in February 2002, Qwest asked for feedback from the CMP Community at the September 18th Product and Process CMP Meeting.

At the CMP Meeting, Eschelon agreed to withdraw this CR, and, the Qwest Billing Center will provide the Qwest trouble ticket number on the CLEC spreadsheet until SCR042902-01 and SCR06402-04 are completed.

Sincerely,

Alice Matthews Senior Process Analyst, Qwest

Cc: Sue Burson, Director Process Management, Qwest Alan Zimmerman, Manager Process Management, Qwest Craig Suellentrop, Staff Advocate Policy and Law, Qwest

September 11, 2002

Kathleen Stichter ILEC Relations Manager Eschelon

SUBJECT: Qwest’s Change Request Response – PC071202-1 “Use Qwest design services ticket number in the PON on Service Orders for Maintenance of Service Charges, Dispatch Charges, and Optional Testing Charges so that information is shown on the completion report.”

This CR requests that Qwest populate the Qwest trouble ticket number as the data in the PON field of service orders issued to generate Designed Services Maintenance of Service, Dispatch and Optional Testing charges. This Change Request was discussed during the CR synergies meeting between Qwest and the CLEC Community on August 27, 2002. During that discussion Eschelon indicated that they issued this Change Request because they are concerned two other CRs: SCR042902-01 and SCR060402-04, may not be implemented or may be delayed. In addition, Eschelon indicated that their solution of choice is for Qwest to provide the CKT ID or Telephone Number, Qwest trouble ticket number, CLEC trouble ticket number and date work was completed on all bill formats (as requested in SCR042902-01 and SCR060402-04).

If implemented, CR PC071202-1, would provide only the Qwest trouble ticket number, which is only one of the data elements Eschelon has specified as critical. With this CR, the Qwest trouble ticket number would appear on the Completion Report in lieu of the account information, e.g., AN, MAN or SBN, that appears today. The implementation of this CR would result in providing different information not more information.

Implementation of this Change Request would require scripting changes to populate the PON field with the Qwest trouble ticket number and, due to PON field character limitations, Qwest would no longer be able to populate the billing account information. Because this CR seeks to change a process changed at the CLECs’ request in February, 2002, Qwest would like to solicit feedback from the CMP Community at the September 18th Product & Process Monthly CMP Meeting before proceeding with this request.

Sincerely,

Alice Matthews Senior Process Analyst, Qwest

Cc: Sue Burson, Director Process Management, Qwest Alan Zimmerman, Manager Process Management, Qwest Craig Suellentrop, Staff Advocate Policy and Law, Qwest


Open Product/Process CR PC093002-06X Detail

 
Title: NPA NXX with corresponding CLLI and Rate Zone documentation somewhere on Qwest Wholesale web site (Cross over CR SCR093002 06X)
CR Number Current Status
Date
Area Impacted Products Impacted

PC093002-06X Denied
11/20/2002
Billing UNE, UNE-P, Loop
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Maynard, Elaine
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

Currently neither the Qwest paper bill nor the BillMate MONSERV (monthly service) file show an associated CLLI code for each UNE-P ANI or UNE Loop ANI. Since Qwest charges deaveraged zone rates it is essential that Eshelon know what zone each ANI is in. Eschelon has to look in the LERG using the NPA and NXX to find the CLLI for each ANI. Then Eschelon needs to look up the associated Rate Zone. This is an extra step and extremely time consumming. Eschelon asks Qwest to provide documentation, in Excel spreadsheet format, on its Wholesale web site which lists each NPA-NXX with its associated CLLI and Rate Zone. This is an alternative to a denied CR, SCR061902-01, which asked for this information on the BillMate MONSERV file.


Status History

09/30/02 - CR Submitted

10/01/02 - CR Acknowledged

10/04/02 - Clarification Meeting Scheduled

10/07/02 - Clarification Meeting Held

10/07/02 - Status changed to clarification

10/07/02 - Cross-over CR (PC093002-06X) Created

10/16/02 - October CMP Meeting - Minutes on this CR to be posted to the Project Meetings section. CR status updated to Presented.

11/13/02 - Issued Qwest draft response dated 11/5/02 to Kathy Stitcher at Eschelon

11/15/02 - Draft Response posted to the web site

11/20/02 - November CMP Meeting - Qwest presented draft response CR. CR status changed to Denied. Meeting minutes will be posted to this CR's Project Meetings section.

12/16/02 - Issued Qwest final response dated 11/5/02 to Kathy Stitcher at Eschelon


Project Meetings

11/20/02 November CMP Meeting Elaine Maynard with Qwest, reviewed the Qwest draft response and gave historical information regarding the Eschelon denied Systems Change Request, SCR061902-01. Elaine said that the IT representative had suggested that it would be possible to provide a downloadable spreadsheet with NPA/NXX CLLI and rate zone information. When this Product and Process CR was investigated, Qwest then determined that providing the NPA/NXX and CLLI in downloadable format would be a breech of the Telcordia contract. Kathy Stitcher with Eschelon asked if the CR was denied. Elaine said it is being denied due to contract and copyright restriction with Telcordia.

-- 10/16/02 October CMP Meeting Michael Buck gave historical information about previous system change request that was denied and said that Qwest had an alternative approach and Eschelon submitted the CR as Product and Process. There was agreement to cross-over the system CR and we will look to close the systems CR. Eschelon presented the CR to the CMP participants and explained that they need associated information to identify correct deaveraging. Qwest had proposed that the web site could have an Excel spreadsheet with the information needed. Dennis Martinez with Qwest asked if the spreadsheet would be static and contain only updates from the LERG. Kathy Stitcher with Eschelon agreed. Qwest understands the requested deliverables and the CR will be updated to Evaluation Status.

10/7/02 Clarification from Kathy Stichter

Kathy Stichter/Eschelon called to confirm that Eschelon did not want the interactive web site. They want the spreadsheet only.

10/7/02 - Clarification Meeting

Introduction of Attendees - Kathy Stichter - Eschelon, Bonnie Johnson, Eschelon, Ric Martin - Qwest, Beth Foster - Qwest, Dennis Martinez - Qwest, Lynn Stecklein - Qwest

Review Requested Change Lynn Stecklein - Qwest reviewed the request. Eschelon is requesting that Qwest provide documentation, in an Excel spreadsheet, on its Wholesale web site which lists each NPA NXX with its associated CLLI and Rate Zone. Currently, Eschelon is using the LERG to get the CLLI information and find it very time consuming.

Confirm Areas & Products Impacted This change request applies to UNE and UNE-P.

Confirm Right Personnel Involved The Product/Process CRPM (Ric Martin) attended the call because this CR will be handled as a crossover to Product/Process.

Identify/Confirm CLECs Expectation Dennis Martinez/Qwest confirmed that Eschelon was looking for Web functionality. Eschelon agreed. Dennis Martinez/Qwest also confirmed that Eschelon wanted the spreadsheet only and did not want interactive functionality. Kathy Stichter/Eschelon said that she would verify and get back to Lynn Stecklein/Qwest. Bonnie Johnson/Eschelon asked if this web site existed. Dennis Martinez/Qwest said that it does not exist today and that he website will most likely be added to the Wholesale web site. Dennis Martinez/Qwest also said that there might be a gap with number portability. Kathy Stichter/Eschelon said that did not appear to be a problem for Eschelon.

Identify any Dependent Systems Change Requests This will be handled as a Product/Process Crossover. This CR is an alternative to a denied CR, SCR061902-01.

Establish Action Plan Lynn Stecklein/Qwest will create the Crossover CR. The Crossover CR (PC093002-06X) will be presented in the October CMP Systems Meeting.


CenturyLink Response

November 5, 2002

Kathy Stitcher ILEC Relations Manager Eschelon

SUBJECT:Qwest’s Change Request Response - CR #PC093002-06X Request for NPA/NXX with corresponding CLLI and Rate Zone documentation on the Qwest Wholesale Web Site

This CR requests that Qwest provide documentation, in Excel spreadsheet format, on its Wholesale web site which lists each NPA-NXX with its associated CLLI and Rate Zone.

Qwest has investigated the creation of downloadable Excel Spreadsheets that would provide by State, all CLLIs within the state, all NPA/NXX combinations valid for each CLLI, and, the Geographic Deaveraging Zone that is applicable.

It is noted that this information is already currently available. The NPA/NXX can be used to perform a look up on the LERG to determine the associated CLLI or the CLLI can be used to perform a look up on the LERG to determine the NPA/NXXs associated with a particular CLLI. The Qwest web site for Geographic Deaveraging (http://www.qwest.com/wholesale/guides/geozone.html) can be used to view or download a spreadsheet that displays the associated CLLI code and zone.

As a result of this investigation, Qwest must respectfully deny this change request due to legal implications. By providing the information, we would breech our contract and copyright agreement with Telcordia. These restrictions prohibit Qwest from providing the information in the format requested or in any format beyond what is currently provided.

Sincerely,

Elaine Maynard Senior Process Analyst Qwest


Open Product/Process CR PC101402-1 Detail

 
Title: BillMate access and training for Qwest billing representatives, billing managers and service managers
CR Number Current Status
Date
Area Impacted Products Impacted

PC101402-1 Completed
10/14/2002
Billing
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Kriebel, Sue
Director:
CR PM: White, Matt

Description Of Change

Currently Eschelon uses BillMate files to validate charges, determine amounts to dispute and to determine amounts to submit for payment to Qwest. Qwest employees do not have access to or training for our BillMate files. The fact that Qwest employees can not see our BillMate files causes confusion between Eschelon and Qwest when trying to reconcile disputes. When Eschelon calls Qwest to question rates in anticipation of a potential dispute, or when there is a question as to the charges on the bill, Qwest continually asks for examples from Eschelon because the representatives do not see what we see. This creates significant work for Eschelon. Also Qwest figures never reconcile to Eschelon figures. Eschelon requests that Qwest provide access and training to its employees that interact with Eschelon.


Status History

10/14/02 - CR submitted

10/15/02 - CR acknowledged

10/21/02 - Clarification Meeting scheduled for 8:30-9:30 AM MT, 10/22/02

10/22/02 - Clarification Meeting held

11/20/02 - CR Presented at CMP Meeting

12/11/02 - Qwest response e-mailed to originator

12/11/02 - Qwest response inserted in the interactive report and posted to the Web site

12/18/02 - Qwest response presented at the CMP Meeting

01/15/03 - CR discussed at CMP Meeting

02/19/03 - CR discussed and Closed at CMP Meeting


Project Meetings

02-19-03 - CMP Meeting

White-Qwest described the CR and asked Eschelon if Qwest could close the CR. Stichter-Eschelon stated that, during the January CMP Meeting, she had asked if Service Managers would have access to the Billmate information. White-Qwest stated that he had phoned Stichter-Eschelon a week following the January meeting to discuss this issue. He stated that Qwest Service Managers would have access to Billmate information and that Qwest Billing Representatives could add Qwest Service Managers onto calls when CLECs were disputing bills. Masztaler-Qwest stated that Billing Representatives were the CLECs first contact with billing disputes and they would have access to Billmate. If requested, Qwest’s Service Management teams would partner with the Billing Representatives to resolve billing issues. Kriebel-Qwest agreed with this description. Stichter-Eschelon stated that the CR could be closed.

=====================================================

01-15-03 - CMP Meeting

White-Qwest asked Eschelon if they had had an opportunity to exercise the new process. Stichter-Eschelon asked if Service Managers had access to BillMate. White-Qwest stated that he would check to see if the Service Managers had access to the system and call Stichter off-line. Stichter-Eschelon stated that it was fine with Eschelon if only the Billing Representatives have access to BillMate. CR moved to CLEC Test.

========================================================

12/18/02 - CMP Monthly Product/Process Meeting

Kriebel-Qwest described the CR and presented Qwest’s response. White-Qwest proposed that the CR be placed into development status and the Qwest distribute a Level 1 notification to announce the change. The attendees agreed. The CR was moved into Development status.

========================================================

11/20/02 - CMP Monthly Product/Process Meeting

Stichter-Eschelon presented the CR. She stated that Eschelon uses Bilmate but the Qwest billing representatives do not, and cannot understand Eschelon’s concerns because they cannot look at the same screen Eschelon looks at. Sear-Qwest asked what Stichter meant by her statement in the CR about “blank spaces.” Stichter-Eschelon stated that this referred to columns in Billmate that were not populated. She stated that the billing representatives could not see these blank fields and Eschelon thought these columns ought to be populated. Schultz-Qwest asked if Eschelon had submitted CRs to address the issue of blank columns. Stichter-Eschelon stated that they had two active CRs out on this issue. Pardee-AT&T asked that this request be expanded to include CRIS and CABS/IABS billing. Burson-Qwest stated that this expansion would require a huge effort and asked Pardee-AT&T to clarify her request. Pardee-AT&T stated that she would like to leave the Eschelon CR as it was currently submitted. Johnson-Eschelon stated that she was concerned about Sear-Qwest’s comment that the Qwest representatives would be unable to assist Eschelon if there was missing information on the bill. Sear-Qwest stated that requests for additional information to be included on the bill should be sent through CMP. Schultz-Qwest stated that if there is additional information needed on the bill it should be requested with a systems CR. Stichter-Eschelon asked if she could ask the billing representatives for additional information in another form, like a spreadsheet. Burson-Qwest stated that she could. Stichter-Eschelon stated that the language in the description of change section the referenced blank or missing columns could be removed. The CR status was updated to Presented.

=========================================================

CLEC Change Request Clarification Meeting 8:30 AM (Mountain Time) / Tuesday October 22, 2002

1-877-550-8686 2213337# PC101402-1; BillMate access and training for Qwest billing representatives, billing managers and service managers

Attendees Matt White – CRPM Kathy Stichter – Eschelon Carl Sear – Qwest Mark Gonzales – Qwest Paul Diamond – Qwest

Introduction of Attendees White-Qwest welcomed all attendees and asked Stichter to review the request.

Review Requested (Description of) Change Stichter-Eschelon stated that Eschelon uses BillMate files to validate charges, determine amounts to dispute and to determine amounts to submit for payment to Qwest. She explained that Qwest employees do not have access to or training for our BillMate files and that causes confusion between Eschelon and Qwest when trying to reconcile disputes. She continued that when Eschelon calls Qwest asking to have all columns populated in BillMate, or when Eschelon questions rates in anticipation of a potential dispute, or when there is a question as to the charges on the bill, Qwest always asks for examples from Eschelon because the billing representatives can not see what Eschelon sees. She concluded that this creates significant work for Eschelon as Qwest billing figures never match Eschelon billing figures. Eschelon requests that Qwest provide access and training to its employees that interact with Eschelon.

Confirm Areas and Products Impacted White-Qwest asked meeting attendees if the Qwest Service, Account and Billing representatives were the only Qwest representatives impacted. The attendees agreed. Sear-Qwest clarified that there was no system involved and that the bill Stichter was referring to was a file sent to Eschelon.

Confirm Right Personnel Involved White-Qwest asked meeting attendees if the appropriate Qwest personnel were involved. Diamond-Qwest stated that Qwest may need to involve someone from billing after further review of the request and its impacts. Diamond-Qwest asked whom Stichter was dealing with within Qwest. Stichter-Eschelon stated that Eschelon dealt primarily with Terry Clooke, Vicky Keller and Scott Martin in regards to these issues.

Identify/Confirm CLEC’s Expectation White-Qwest asked Stichter if Eschelon's expectation was that all Qwest billing and service representatives who dealt with Eschelon would have access to and be trained on BillMate. Stichter-Eschelon agreed.

Identify and Dependant Systems Change Requests White-Qwest asked the attendees if they were aware of any other CRs related to this request. The attendees stated that there were none.

Establish Action Plan White-Qwest asked attendees if there were any further questions. There were none. White-Qwest stated that the next step was for Eschelon to present the CR at the November Monthly Product/Process Meeting and thanked all attendees for attending the meeting.


CenturyLink Response

December 6, 2002

RESPONSE For Review by CLEC Community and Discussion at the December 18, 2002, CMP Product/Process Meeting

Bonnie Johnson Eschelon Communications

SUBJECT: Qwest’s Change Request Response - CR #PC101402-1

This is a preliminary response regarding Eschelon CR PC101402-1.

Qwest will arrange for training and access to BillMate ASCII bill files by the Qwest Billing Centers upon request of individual CLEC’s, for the purpose of reconciling bills and disputes. CLEC’s can contact Carl Sear, 303-965-4465, to make the request, with an expected implementation time frame of 60-90 days.

If the volume of requests becomes such that technical restraints become an issue, Qwest will open a change request through CMP.

Qwest recommends this CR be updated to Development status.

Sincerely,

Carl Sear Process Specialist Qwest


Open Product/Process CR PC021502-1 Detail

 
Title: Collocation: Construction Process (in, near or affecting CLEC collocation space)
CR Number Current Status
Date
Area Impacted Products Impacted

PC021502-1 Completed
5/15/2002
Other: Collocation/construction Colocation
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Burke, Laurel
Director:
CR PM:

Description Of Change

Eschelon requests a written, trained, and adhered to nondiscriminatory process that addresses proper procedures when Qwest and/or its vendors perform construction activities in buildings that house CLEC collocations. Eschelon provides two examples demonstrating that Qwest’s current procedures are inadequate and discriminatory and in need of revision:

January 2002/Qwest’s Minneapolis Orchard Central Office: Qwest's Orchard Central Office is currently under construction for a new addition. That addition includes modification to the existing mechanical system, as well as additional floor space. Eschelon leases space, from Qwest, for a collocation in the Orchard Central Office. During a dispatch, in January 2002, Eschelon's technician discovered dirt, dust and metal shavings on its collocation equipment. Photographs showing the extent of the problem are attached. Qwest would not expose its own equipment to these conditions. Qwest had not notified Eschelon of this construction or the potential impact on Eschelon’s collocation space. When Eschelon discovered the problem, Eschelon immediately contacted Qwest to report the problem, request resolution, and obtain assurances that this serious problem would not be repeated. During later visits to this collocation site, Eschelon discovered excessive temperature levels that could also damage its equipment. Cleaning the equipment required 'powering down' the equipment, resulting in customer outages. Qwest removed all essential cooling to the area and replaced it with a fan, an inadequate solution. Qwest would not find that a fan would be adequate to cool its own equipment. The problem also required one of Eschelon's technicians to be available for the time period while a vendor was completing the clean up. This tied up a technician who should have been doing other work. This incident caused down time for our customers and forced Eschelon to incur unnecessary time and expense and could have caused major damage to our equipment. Eschelon believes that at least two other CLEC collocation spaces were adversely affected by the same construction. Qwest has an obligation to protect the CLEC collocation equipment with at least as much care, as it would use to protect its own equipment. Eschelon asks Qwest for an improved process to ensure that our collocations are protected during construction in any Qwest building that houses one of our collocations.

March 2001/Denver Main Central Office: On March 15, 2001, Eschelon conducted a site survey of its physical collocation located at the Denver Main Central Office. The conditions discovered at the site indicated a deliberate breach in security and potential damage to our equipment. Qwest had not notified Eschelon of this construction or the potential impact on Eschelon’s collocation space. When Eschelon discovered the problem, Eschelon contacted Qwest immediately asking for resolution of the following issues:

1. Eschelon's cage was accessed without Eschelon authorization or knowledge. A Qwest approved contractor removed the pins securing Eschelon's collocation cage to gain access and Qwest security failed to notify Eschelon of the intrusion. Eschelon pays security charges on a monthly basis and expects Qwest to provide and maintain a secure environment. Eschelon told Qwest that this matter is of utmost importance as the integrity of Eschelon's collocation equipment was jeopardized.

2. A 1 inch copper pipe running across the span of Eschelon's cage was installed. The location and height of the pipe severely restricted Eschelon's ability to expand the existing cable ladder racking for future growth. Additionally, the pipe was believed to be a water pipe, which if ruptured, had significant potential for causing damage to personnel and property.

3. There was a significant amount of dust within the cage and on the collocation equipment. This presented an operational issue with Eschelon's hardware and its ability to operate properly. Eschelon asked Qwest to thoroughly clean Eschelon's collocation cage and the surrounding area.

4. There were two additional 1/2 inch copper pipes running across the cage at ceiling height. These pipes also posed a significant problem, as they appeared to be water pipes serving the cooling unit adjacent to Eschelon's cage. The same potential for damage to personnel and property existed.

Both of these examples involved serious problems concerning the integrity of Eschelon's collocation cage. Eschelon had to escalate the issues within Qwest in an attempt to resolve them. An after-the-fact clean up, however, is not a satisfactory remedy. The breaches to security and integrity to the collocation cannot be undone. Eschelon also had to incur unnecessary time and expenses, in addition to its customers experiencing unjustified downtime.

Qwest would not expose its own equipment to such conditions or allow CLECs to treat Qwest’s space and equipment in this same manner. One can only imagine how Qwest would react if a CLEC removed the pins to a Qwest door to get around a lock securing access to the Qwest area of a building. On a much smaller scale, recently, a Vice President of Qwest in charge of Qwest’s network directly contacted Eschelon’s Executive Vice President of Operations and Engineering to allege that Eschelon’s equipment was causing a Qwest fire alarm near Eschelon’s cage to go off. Eschelon was able to show that was not the case. Nothing in Eschelon’s cage had caused the alarm to sound. Eschelon believes that the Qwest fire protection system in that building has had false alarms before, for reasons unrelated to collocation. The mere proximity of a CLEC collocation to a fire protection device that sounded a false alarm was sufficient to draw an immediate call from Qwest’s top management.

In contrast, Eschelon has had difficulty in getting appropriate attention to the very serious issues that have occurred with respect to violations of its collocation space. Eschelon had to expend substantial resources escalating these issues to obtain after-the-fact resolutions. Even after the first situation was resolved, and assurances were received that the problem would not occur again, serious problems occurred again, this time in the Orchard Central Office. In response to its escalation of the most recent situation (Orchard Central Office), Qwest provided Eschelon with a written response that said: “Throughout the life of this construction project, Qwest has insured that all methods of procedures (MOP’s) were followed and that dust protection was appropriate and in place.” Please review the enclosed photographs in light of this statement. Obviously, if following the current procedures at Qwest produces this result, the current procedures are inadequate.

Qwest needs to promptly establish an improved process. Eschelon requests that a solution be developed and implemented quickly to avoid further serious breaches.

The law and interconnection agreements provide support for Eschelon’s request. Examples include:

47 U.S.C. § 551(c)(6): Incumbent local exchange carrier has -- “The duty to provide, on rates, terms, and conditions that are just, reasonable, and nondiscriminatory, for physical collocation of equipment necessary for interconnection or access to unbundled network elements at the premises of the local exchange carrier, except that the carrier may provide for virtual collocation if the local exchange carrier demonstrates to the State commission that physical collocation is not practical for technical reasons or because of space limitations” (emphasis added).

Minnesota Qwest-Eschelon interconnection agreement, Second Amendment: “USW shall provide Collocation in a nondiscriminatory manner on rates, terms and conditions that are just, reasonable and nondiscriminatory.” § 2.1; see also Part A, § 4.


Status History

02/14/02 - CR Submitted by Eschelon.

02/15/02 - CR acknowledged by P/P CMP Manager.

02/19/02 - Contacted Kathy Stichter, Eschelon, to coordinate Clarification Meeting - Tentative date is Tuesday 2/26/02.

02/20/02 - CMP Meeting - Eschelon introduced its CR and routed documentation for review. Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package 03/20/02.

02/22/02 - Received e-mail from Eschelon with additional evaluation of Orchard site on 2/18/02.

02/26/02 - Conducted Clarification Meeting with Eschelon.

02/28/02 - Issued Clarification Meeting Minutes to Eschelon.

03/20/02 - CMP Meeting - Eschelon presented its CR. Qwest advised they are looking at gaps in their existing processes. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. It was agreed that the CR would move to Evaluation.

04/10/02 - Issued Qwest's Draft Response dated April 9, 2002 to Eschelon.

04/17/02 - CMP Meeting - Qwest presented its response. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. It was agreed that the CR would be status as CLEC Test.

04/19/02 - Formal response dated April 9, 2002 issued to CLECs. Notification CMPR.04.19.02.F.01258.Final_CR_Responses.

05/15/02 - CMP Meeting - Eschelon advised that the CR could be closed.


Project Meetings

CLEC Change Request Clarification Meeting

February 26, 2002, 12:00 (MT) Conference Call

877-564-8688 PC021502-1, Collocation: Construction Process (in, near or affecting CLEC collocation space)

Attendees: Ric Martin, Qwest Clyde Just, Qwest Laurel Burke, Qwest Chuck Frauenfeld, Qwest Paul Williams, Qwest Deb Heckart, Qwest Steve Sheahan, Qwest Kay Daugaard, Qwest Kathy Stichter, Eschelon Paul Hanser, Eschelon Bonnie Johnson, Eschelon

Introduction of Attendees Introduction of the participants on the Conference Call were made and the purpose of the call discussed Ric advised that there were two issues surrounding the Change Request. The first deals with the issues at the Orchard Central Office and the second deals with the process change requested in the Change Request. Ric advised that it would be best to discuss the first issue in a separate meeting and focus on the process in this meeting. Steve Sheahan would facilitate the meeting with Eschelon personnel with Kathy Stichter. Eschelon agreed with this path forward.

Review Requested (Description of) Change Kathy reviewed the requirements of their CR and their expected deliverable. Bonnie advised that Eschelon was aware that there is a documented process, but the concern is that it is not being followed 100%. Paul Hanser indicated that Eschelon would like to be involved in the planning process and be made aware of the construction activity. They want to know how the equipment is going to be protected and that it is kept cool and clean. Paul indicated that Eschelon would like to be involved in the project planning phase. Paul Williams asked if Eschelon would like to be notified on all construction activity. Paul Hanser indicated that they were more interested in the building construction activity rather than equipment installations. It was confirmed that Eschelon would prefer to be notified when there is facility construction as opposed to equipment installations. Paul clarified that some equipment installations could create a fair amount of dust (i.e. drilling through thick concrete) and they would want to be made aware of this type of installation. Ric confirmed that the process followed for construction activity is Technical Publication 77350. Clyde asked what name would Eschelon want Qwest to contact. Paul Hanser indicated that they would like the name on the emergency list provided to each Central Office, or the 800 number on their Collo cages contacted. This allows the call to go to operations that coordinate Eschelon’s activities. Clyde expressed concern that not all CLECs operate in the same manner. The only consistency is the name on the application. Paul Hanser advised that the person on the application and the associated number may change, but the posted 800 number remains the same. Qwest advised that this could be difficult to get a consistent approach from all CLECs. Ric asked Eschelon if discriminatory meant the same process for all parties involved. Kathy added that all equipment is treated the same for Qwest and CLECs.

Confirm Areas & Products Impacted It was confirmed that the CR addressed Collocation equipment. . Confirm Right Personnel Involved Ric advised that there are several SMEs that will be working on the CR. Laurel Burke will be the Owner identified on Qwest’s reports, but the other SMEs are Howard Cooper, Real Estate, Jerry Jenson, C.O. Staff, and Jeff Bostow, Technical Publications.

Identify/Confirm CLEC’s Expectation Eschelon confirmed that their expectation is their written statement under Expected Deliverable in the Change Request.

Identify any Dependent Systems Change Requests There is no corresponding System CR

Establish Action Plan (Resolution Time Frame) Qwest will facilitate a separate meeting to review the Orchard Construction activity. Ric advised that the CR will have the Community CLEC clarification and Qwest will present potential options at the March 20th CMP meeting.


CenturyLink Response

April 09, 2002

Kathy Stichter ILEC Relations Manager Eschelon Telecom, Inc.

SUBJECT: Qwest Change Request Response - CR PC021502-1 Collocation: Construction Process (in, near or affecting CLEC collocation space)

This letter responds to Change Request PC021502-1 requesting that Qwest develop a written, trained and adhered to nondiscriminatory process that addresses proper procedures when Qwest and/or its vendors perform construction activities in buildings that house CLEC collocations. Additionally, the two (2) examples described in your Change Request will be addressed in Attachment 1 to this letter.

Eschelon suggested that the process include the following:

1. Improved Qwest process for building construction activity in Central Offices that house CLEC collocations.

Qwest’s process for building construction utilizes a project management approach. Due to the nature of individual building construction activity, project design drawings and specifications documents embody the performance expectations associated with each construction project. The very specific nature of such projects and the quantity of detailed information associated with these projects prohibit Qwest from providing a detailed building construction process in this response. However, Qwest provides below a description of activities common across building construction projects.

Qwest Building Construction Project Management

When a project is initiated, Local Design Construction teams, coordinated by Real Estate Project Managers, develop project plans and specifications in conjunction with Registered Professional Consulting Architects/Engineers and selected Qwest General Contractors. Prior to entering into a contract with Qwest (Real Estate), these consultants and contractors must have a demonstrated track record of proficiency while working with electronic equipment environments. Methods used to demonstrate this include checking work references from other clients and reviewing the contractors project portfolio. Local teams may then choose projects small in scope to evaluate the contractor for larger projects such as Central Office building additions.

The Local Design Construction team assembles the project work scope and customizes it according to the specific project at hand. The documentation and scope of the project work utilizes engineering and operational elements from Qwest policy documents, engineering and operational standards, as well as engineering guideline documentation specifically applicable to Central Office projects. Building environment specifications, or operational standards, commonly contain aspects of several Qwest and industry standards. Examples of these standards include:

? Class 100,000 clean room requirements for airborne particulate control (reference Qwest Regional Policy REGN 000-010-019RG); ? Temperature control requirements meeting industry standards (reference Bellcore (Telcordia) Network Equipment Building Systems (NEBS) document NEBS GR-63-CORE, and REGN 000-010-019RG); ? Technical Publication 77350 for equipment isolation and protection; ? National Electrical Code (NEC) specifications; and ? Project specific Methods of Procedure ("MOP").

Real Estate Consultants and Contractors use Qwest policies and standards in project documents and are held accountable for performing and utilizing these policies and standards. Local Design Construction teams are reminded on each project about the consequences of not following and/or failing to perform to these policies and standards, including the potential for contract termination or probation. In fact, during 2001, Qwest terminated contracts with three (3) real estate contractors and placed two (2) others on probation for failing to adhere to documented policies and standards.

Additionally, before construction begins, an approved MOP document must be posted. The construction contractor must describe all tasks associated with a project that may represent a direct threat to service such as AC Power work affecting DC power and work generating airborne debris open to working equipment, in order to describe the method for protecting the equipment from the threat. The Local Network Central Office Manager and/or Supervisor reviews the MOP and approves the equipment protection strategies - validating that those strategies are present and to be utilized during the construction activity.

Finally, Qwest provides contractors with explicit expectations regarding adherence to standards and an audit mechanism for ensuring compliance. The Introduction to Qwest Technical Publication 77350 provides "the material and workmanship requirements for personnel working in Qwest Central Offices and provide the basis for audit and evaluation of a job." Contractors are individually responsible for adhering to Qwest standards as well as applicable law and industry standards. When work operations jeopardize the network or fail to comply with safety standards, Qwest employees may expel contractors from the facility. Qwest employees are encouraged to stop construction work in progress to question a threat to personnel safety or risk to working equipment. Also, when problems are identified with a specific Real Estate contractor, a thorough root cause analysis is completed and appropriate action taken up to and including termination of a contractor.

2. Provide Advance Notification to and coordination with affected CLECs of construction occurring in Qwest Central Offices containing CLEC collocations. The General Mailout notification process would not be adequate.

Qwest agrees to provide CLECs with an Advance Notification process providing notice of building construction in Qwest Central Offices containing CLEC collocations. Advance Notification will provide targeted email to CLECs collocated in the affected Central Office at the time the project is funded by Qwest. The email, provided by the Collocation Project Management Center ("CPMC") will include the Central Office affected, description of the construction activity, date construction is planned to begin, date construction is planned to complete, and a Qwest contact name and number for the project. The Qwest contact can be used by CLECs to identify environmental issues or concerns during the project. Qwest will also provide status updates in the event the project changes significantly, i.e. the start date is moved forward or the scope of the activity increases. This process will be implemented effective May 2002 or as soon thereafter as possible in compliance with the agreed upon notification schedule. The following real estate work will be the subject of CLEC notifications: ? Building Additions ? HVAC Infrastructure Modifications ? Electrical Infrastructure Modifications ? Building Work for Space Rearrangements or Compartmentation ? Roof Replacement ? Other Building work that could affect the equipment environment

3. Ensure measures are in place to protect the collocation equipment environment including but not limited to protection from:

? Dust ? Dirt ? Metal Shavings ? Adverse Temperature conditions

Qwest contractors performing building construction work within Qwest Central Offices are required to apply appropriate industry standards in an effort to limit and control dust, dirt, metal shavings and temperature variations. As stated earlier, prior to starting any work activity the work steps for protecting working equipment must be documented in a MOP, Method of Procedure. After construction starts and during Real Estate building construction activities, the real estate contractors apply specific environmental requirements as described in the project design and specifications documents.

Qwest requires its contractors to adhere to specific aspects of American Society of Heating, Refrigerating and Airconditioning Engineers (ASHRAE) industry standards as it relates to Class 100,000 clean room requirements (described in Qwest Regional Policy REGN 000-010-019RG). These requirements provide specific airborne particulate standards that in turn are used for isolating working equipment from construction zones. Typically project specifications state that all construction work shall comply with Class 100,000 clean room requirements and must maintain a Class 100,000 environment in the Central Office environment regardless of any activity construction or otherwise. This means that airborne particulates of 0.5 micron and larger cannot exceed a count of 100,000 in one cubic foot of air.

Qwest requires its contractors to meet ASHRAE Class 100,000 requirement by specifying two methods in its project specifications:

? Isolation/Vacuum: Isolate working equipment form the construction zone, pressurize and seal for migration of airborne construction debris; o If isolation is not possible, then directly extract dust dirt and debris by using a HEPA vacuum with the operation of cutting and drilling tools. ? Filtration: If filtration of airborne particulates is questionable then particulate monitoring with instrumentation is used. Particulate counting monitors the environment only at one point in the room environment and is not necessary if the construction zone is isolated.

In addition to ASHRAE requirements, Qwest contractors must adhere to Section 2 of Tech Pub 77350 that specifically addresses Qwest’s expectations of personnel including employees, contractors and suppliers, while performing construction activities within Central Office buildings:

2.3.6 The cutting, filing, drilling, and milling or painting of the Qwest approved auxilliary framing, cable rack, etc., shall be done outside of the equipment area. When drilling of equipment or structures, that can not be removed from the facility, proper protection, and the use of HEPA vacuum shall be required. 2.3.7 General cleaning of the equipment facility or storage area in which work is being done shall be performed by the Service Supplier during the entire installation or removal process. Care shall be taken to generate a minimal amount of airborne dust. 2.3.8 The Service Supplier shall use only a High Efficiency Particulate Arrestor (HEPA) vacuum, capable of filtering particles larger than .3 microns in size, and equipped with a static dissipative hose in QWEST facilities to capture dust and chips from the drilling of floors, walls, ceiling, ironwork, and equipment during the uncrating process, and while cleaning cable racks and equipment. 2.3.9 The Service Supplier shall be aware of conditions that may result in equipment thermal shock (failure or degraded service brought on by a rapid change in temperature) and take steps to prevent its occurrence.

4. Prohibit unauthorized entry into CLEC space and ensure that CLEC security is not breached.

Qwest has documented procedures regarding physical security associated with CLEC collocations. Refer to Qwest’s PCAT under heading Central Office Security.

Additionally, in order to provide more direction to Qwest suppliers performing duties in Central Offices with CLEC collocations, pursuant to the agreed upon notification process, Qwest proposes replacement of Section 16.1.6 of Tech Pub 77350 to read as:

Qwest requires emergency access to all cages for safety purposes. Combination locks (or combination lock-boxes, with a key inside to unlock a keyed padlock) must be provided by the CLEC and attached to each cage. This will provide the Qwest representative with emergency access into the cage when needed. Qwest also requires that the CLEC forward the combination code to its cage lock to the appropriate personnel, e.g., State Interconnect Collocation Manager (SICM). The CLEC’s representative (emergency contact phone number located on the CLEC cage placard) must also retain the combination.

Qwest reserves the right to access CLEC enclosure when work is required in the Qwest-owned space above the cage (this includes access to the overhead ironwork, cable racking, electrical conduit, etc.). CLEC enclosure space will not be entered by anyone, for any reason, without first contacting the CLEC representative and the Qwest State Interconnect Collocation Manager and obtaining the required approval(s).

Qwest is committed to protecting CLEC equipment collocated in Qwest premises when performing activities within a Qwest Central Office that may reasonably be foreseen or predicted to harm such equipment. While Qwest strives to provide an environment for equipment to operate throughout its expected life cycle, it is reasonable to expect that some failures from environmental support equipment or personnel cannot always be avoided. Qwest does require its suppliers (including Qwest personnel) to comply with all published Qwest standards, applicable laws as well as industry standards and disciplines noncompliance. However, since Qwest can not provide a 100% event free environment for its network facilities and equipment, it in turn cannot provide this to CLECs. Nonetheless, Qwest remains committed to protecting and responding to the needs of the CLEC equipment environment with timely responses to correct adverse environmental events.

In response to the two (2) incidents identified by Eschelon in the Change Request, Attachment 1 provides Qwest’s evaluation of the incidents and the corrective action initiated by Qwest.

Sincerely,

Laurel L. Burke Staff Advocate, Policy & Law Technical Regulatory Interconnection Planning Local Networks, Qwest Corporation

cc: Mary Retka, Director, Legal Issues Barry Orrel, Director, 271 Technical Regulatory Paul Williams, Jr, Manager, Real Estate Wolfgang Wiewel, Director, Real Estate

Attachment 1

Eschelon described two locations, Minneapolis Orchard and Denver Main, where they believe Qwest’s current procedures failed to protect Eschelon's equipment effectively resulting in discrimination. Qwest’s evaluation and response to the issues are set forth below.

January-February 2002/Qwest’s Minneapolis Orchard Central Office

? Eschelon’s technician discovered dirt, dust and metal shaving on its collocation equipment ? Qwest had not notified Eschelon of this construction or its potential impact on Eschelon’s collocation space. ? During later visits to the site, Eschelon discovered excessive temperature levels that could also damage its equipment ? Cleaning the equipment required “powering down” the equipment which in turn resulted in customer outages ? Qwest removed all essential cooling to the area and replaced it with a fan ? Eschelon provided a technician to be available for the time period while a vendor was completing the clean-up ? Eschelon believes that at least two other CLEC collocations spaces were adversely affected by the same construction ? Qwest has an obligation to protect the CLEC collocation equipment with at least as much care as it would use to protect its own equipment ? Dust problem continued after the professional cleaning of the equipment. ? The lack of environmental control at this Qwest C.O. disturbs Eschelon. Eschelon does not believe Qwest equipment is subjected to similar environmental conditions. ? Eschelon requires that Qwest take immediate action to have their equipment cleaned again by a professional service. ? Eschelon will be submit their internal cost to Qwest for our clean-up effort ? Dust was also observed on other CLEC’s equipment.

Qwest Response:

Qwest Real Estate completed a root cause investigation of the Orchard environmental event and discovered the following:

? Project documentation for the construction related activity conveyed the proper information about Class 100,000 clean room requirements and the proper environmental temperature control requirements to the supplier. ? An approved MOP was in place identifying the required protection for working equipment ? Contractor provided protection in the form of dust partition walls separating the construction zone from working equipment. ? Contractor provided supplemental cooling equipment with the proper high efficiency filtration for temperature and airborne particulate control. ? Contractor failed to achieve proper room pressurization to prevent particulate migration from the construction zone to working equipment. ? Contractor failed to recognize the lack of room pressurization after the first event and a repeat of the migration occurred within days after the first event. ? The lack of proper pressurization was caused by incorrect placement of temporary floor fans and created improper air-flow and pressurization in the working equipment area. Incorrect fan placement provided a recirculating air-flow which allowed transport of airborne and non-airborne construction debris to the working equipment area.

Qwest Real Estate completed a root cause investigation of the Orchard environmental event and concluded the following:

? Qwest Real Estate concluded the root cause was contractor error, meaning the contractor was provided with appropriate environment specifications to protect equipment but did not perform to those specifications. ? Qwest confirmed that air filtration and temperature control was adequately provided in all areas of the Central Office and that the same high efficiency filtration was provided to the CLEC area during construction activity. ? It was observed that Qwest equipment was also soiled due to particulate migration from construction activities. ? The contractor did provide proper pressurization and sealing procedures in the MOP but failed in the attempt to properly pressurize and seal the working equipment area from the construction zone. ? While it was observed that measures were in place and seemed to be properly applied, the contractor failed to identify the recirculating air flow/ negative pressurization that resulted in subsequent environmental problems a few days later.

Qwest action taken:

? Contractor has been placed on probation. ? Lack of information to the contractor was not an issue, but Qwest will verify going forward that all construction documents contain the Class 100,000 clean room requirement with improved awareness. ? Temporary air flow, pressurization and sealing of construction zones will be added as specific MOP check list items to address and will be standard for all projects requiring construction zone isolation. ? Placement of floor fans and other temporary cooling equipment will be secured to prevent tampering. ? Contractors will be reminded that they are responsible for placement and operation of all temporary air movement as well as pressurization equipment to achieve and maintain environmental conditions. ? The MOP will require contractors to observe particulate accumulation and soiling of equipment surfaces before and periodically during construction activity and will address reporting this information to the Central Office Manager and the Real Estate Project Manager. ? Advance Notification process will identify people to contact for concerns about construction debris, temperature control and other environmental issues. ? To prevent the potential for pressurization and/or construction zone seal failure, only Real Estate contractors/agents will be permitted to provide fans and/or other means of cooling during construction periods.

March 2001/Denver Main Central Office

? Eschelon’s collocation cage was accessed without Eschelon's authorization or knowledge. A Qwest approved contractor removed the pins securing Eschelon’s collocation cage to gain access and Qwest security failed to notify Eschelon of the intrusion. ? A 1-inch copper pipe running across the span of Eschelon’s cage was installed. The location and height of the pipe restricted Eschelon’s ability to expand the existing cable ladder racking for future growth. Additionally, the pipe was believed to be a water pipe, which, if ruptured, had significant potential for causing damage to personnel and property. ? There were two (2) additional ½-inch copper pipes running across the cage at ceiling height. These pipes appeared to be water pipes serving the cooling unit adjacent to Eschelon’s cage. ? There was a significant amount of dust within the cage and on the collocation equipment. Eschelon asked Qwest to thoroughly clean Eschelon’s collocation cage and the surrounding area.

Qwest response:

The Qwest State Interconnect Manager ("SICM") for Colorado arranged a meeting between himself, Eschelon representatives shortly after Eschelon notified Qwest of the problems in March 2001, the Qwest Real Estate Manager and the contractor performing work in the Qwest Central Office at the time Eschelon voiced their concern. The contractor was remodeling space in the west half of the 7th floor of Denver Main to support future equipment placement in that area.

? The meeting was held at Denver Main and the investigation resulted in the contractor being directed to perform several additional tasks: ? Remove copper pipes placed at the 8' level above the Eschelon cage; ? Place piping pans under the existing water pipes to ensure that no dripping water would fall into Eschelon's cage; ? Have Eschelon's space and equipment cleaned; ? Make arrangements with Eschelon PRIOR to entering their space to correct the pipe related issues; ? Take steps to ensure no further unauthorized entry would occur by adhering to the access guidelines and permissions required. ? The Central Office Supervisor indicated that he had not been contacted by the contractor for permission to enter the collocation cage; he also indicated that he had no way to access the cage as he did not have a combination or the key. Qwest action taken:

? The SICM and the Real Estate Manager reiterated to the contractor that they must have specific permission to enter CLEC space using first the number located on the cage. Product Catalog ("PCAT") language has been provided since this occurrence that clarifies Qwest personnel and vendor roles while working in CLEC physical collocations. Additionally, Qwest proposes to add additional clarity in its Technical Publication 77350 regarding contractor requirements relating to CLEC security while working in Qwest buildings. ? The SICM reviewed collocation access requirements with the Central Office supervisor. ? Qwest employees are now encouraged and expected to question any activity that does not comply with security guidelines. ? Eschelon provided the appropriate access information to the Central Office supervisor. ? Following the submittal of this change request, a Design Construction Director and Project Manager physically confirmed that leak protection had been installed and conforms to that for other equipment in Denver Main. ? The temporary applications of filters for all new ductwork grilles, registers and diffusers will be a MOP checklist item. o Qwest will reconfirm the application of temporary filtration on all new ductwork outlets is contained in construction documents.

Finally, upon acceptance of this response by the CLEC community, Qwest Real Estate will issue a document to alert Qwest Real Estate Design Construction Field Directors of all actions contained in this Change Request response. This alert will require confirmation that all construction documents contain the items specified herein.


Open Product/Process CR PC022802-1 Detail

 
Title: Qwest DSL services live until CLEC services installed
CR Number Current Status
Date
Area Impacted Products Impacted

PC022802-1 Completed
1/15/2003
Maintenance/Repair, Provisioning Resale, Unbundled Loop, UNE
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Bliss, Susan
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

When a customer has ancillary products, such as DSL, on one of their lines, it is Eschelon’s understanding that Qwest handles the provisioning of the DSL in a different department, within Qwest, than the normal line provisioning. It has been Eschelon’s experience that the department that handles the DSL does not recognize the FDT on an order and that it does not receive updates to orders as quickly. This will cause the DSL to go down before a scheduled time on a conversion and will also cause the DSL to go down when a supplement to the LSR is issued to change a DD.

Eschelon sent a request on 1/30/02 to convert service for a customer. The conversion to Eschelon Unbundled Loop service was due on 2/9/02. Although the line was equipped with DSL, Eschelon was not aware of the DSL because it was not reflected on the CSR. Eschelon did not find out that the line was equipped with DSL until the conversion had started. It became necessary to push-out the Due Date (DD) for the conversion of this service to a later date, because of the DSL. Eschelon followed a Qwest process by sending a supplement for a DD change and escalating with Qwest. Qwest took down the DSL service. Eschelon opened a repair ticket. Qwest gave a 24-hour commitment. This customer was without their DSL for 24 hours because Qwest had already removed it, not waiting for the conversion to complete. If Qwest had completed the order in the Service Order Processor, the customer could have been without DSL for up to 10 days because the customer would have had to place a new order.

On another LSR to convert both the customer’s voice lines and DSL, with an original DD of 2/20/02, Eschelon issued a supplement for a DD change. Following the Qwest process, Eschelon issued the supplement 2/19/02 at 3:31 PM and escalated with Qwest. The customer’s voice lines remained in service however Qwest took down the DSL service on 2/20/02.

Eschelon asks Qwest to develop, document and train an adhered to process to keep all ancillary services working, as is, until the conversion to the CLEC is complete, accepted and Qwest translations are completed. Eschelon also asks Qwest to include in the process a more ‘real time’ flow of order changes to the departments that provision the DSL services.

Expected Deliverable

A developed, documented, trained and adhered to process to ensure ancillary products, such as DSL, remain working with Qwest until the conversion to a CLEC is complete, the services are working with the CLEC and the conversion is accepted by the CLEC.


Status History

02/28/02 - CR Submitted by Eschelon.

02/28/02 - CR acknowledged by P/P CMP Manager.

03/06/02 - Eschelon contacted via phone and email to establish date and time for clarification call (call to be made 03/07/02 @ 10:00 a.m. MST)

03/07/02 - Clarification call held with Eschelon

03/08/02 - Clarification meeting minutes sent to all participants for review

03/12/02 - Clarification meeting minutes posted to database

03/20/02 - CMP Meeting - Eschelon introduced CR as Walk-on. CR status changed to Clarification. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

04/17/02 - CMP Meeting - Eschelon introduced CR. CR status changed to Evaluation. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

05/08/02 - Issued Qwest draft response dated May 8, 2002 to Eschelon and changed status to presented.

05/15/02 - CMP Meeting - CR status "Presented" unchanged. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

06/18/02 - Issued Revised Qwest response dated June 18 , 2002 to Eschelon

06/19/02 - CMP Meeting -- CR status changed to "Evaluation". Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

07/11/02 - Issued Revised Qwest response dated July 10, 2002 to Eschelon

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status "Evaluation" was not changed.

08/16/02 - Issued Revised Qwest response dated August 15, 2002 to Eschelon

08/21/02 - August CMP Meeting: CR was changed to CLEC Test. Minutes on this CR to be posted to the Project Meetings section.

09/09/02 - Posted e-mail from Bonnie Johnson dated 9/3/02

09/19/02 - September CMP Meeting: CR was changed to Development. Minutes on this CR to be posted to the Project Meetings section.

10/10/02 - Issued Revised Qwest response dated October 2 , 2002 to Eschelon

10/16/02 - October CMP Meeting - Minutes on this CR to be posted to the Project Meetings section.

11/13/02 - Issued Revised Qwest response dated November 7, 2002 to Eschelon

11/20/02 - November CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section.

12/10/02 - Issued Revised Qwest draft response dated 12/6/02 to Kathy Stitcher at Eschelon

12/11/02 - Revised Draft Response posted to the web site

12/16/02 - Issued Product Notification PROD.12.16.02F.00886.CR_Update_DSL Service

12/18/02 - December CMP Meeting - Qwest presented revised draft response to this CR. CR status changed to CLEC Test. Meeting minutes will be posted to this CR's Project Meetings section.

01/15/03 - January CMP Meeting - CR status changed to Completed. Meeting minutes will be posted to this CR's Project Meetings section.


Project Meetings

01/15/03 January CMP Meeting Bonnie Johnson with Eschelon suggested that this CR be moved to Completed status. This CR will move to Completed status.

12/18/02 December CMP Meeting Cindy Schwartze presented the Qwest updated response and said that Qwest had adjusted an internal DSL system to recognize normal processing when Frame Due Time is entered on an order. Frame Due Time (FDT) on orders accepted after 12/17/02 will be recognized in the Qwest internal DSL system. The level 1 notification of this Qwest internal system change was sent on Monday, December 16th and the change was implemented on December 17th. Eschelon suggested that this CR be moved to CLEC Test and the CLEC Community agreed.

11/20/02 November CMP Meeting Cindy Schwartze reviewed the Qwest updated response dated 11/7/02 and said Qwest expects to implement changes 12/15/02. The change will adjust an internal Qwest system to recognize and adjust normal processing when the Frame Due Time is populated and will keep Ancillary services, such as DSL up and working until the CLEC services are installed. This CR will remain in Development status.

- 10/16/02 October CMP Meeting Susie Bliss reviewed the revised response dated October 2, 2002 and said that she had not been made aware of any recent outages since the August 30th outage. Bonnie Johnson with Eschelon said that they are working around the problem. Susie said the technical team recommendations will be made by 10/18/02 and the implementation plan will be developed by 10/30/02. The CR will remain in Development status.

- 09/18/02 September CMP Meeting Qwest provided an update on this CR, which was put into CLEC test at the August CMP Meeting. There was one case where DSL went down in error. Qwest is having a technical meeting later this week to discuss work that needs to be done to resolve the problem and will provide a read-out at the October CMP meeting. Because there is further work required on this CR, Qwest and Eschelon agreed to move this CR to Development status.

-- From: Bonnie Johnson@eschelon.com on 9/3/02 4:48p To: "'ljsanch@qwest.com'" , jlnovak@qwest.com cc: "Clauson, Karen L." , "Knudson, Ronda K." , "Johnson, Bonnie J."

Hi Jean and Linda, I would like to provide you an example of DSL being taken down prior to cut. In this case, the customer was so upset Eschelon had to push the cut. If this customer cancels the conversion I will let you know. I am uncertain who will provide this example to Susie Bliss.

Please read below.

The Perfect Blend DD 8/30/02 @11:30 cst. At ~10:30am TNT was notified by Sales Rep the customer's DSL service was down. Because the customer was so upset about the DSL being disconnected the conversion was put on hold with the Qwest tester and the order was sup'd in IMA for new dd. Qwest DSL repair was contacted, An Eschelon tester stayed on line with repair for ~1 hr until service was re-established. The tester verified with the customer their service was up and running. Roughly 2 hours of downtime for the end user.

Thanks,

Bonnie

08/21/02 - August CMP Meeting Minutes: Qwest provided an update on the DSL SWAT team findings and the process improvements that have been put in place. Qwest requests feedback from the CLEC community on DSL orders disconnected in error. Eschelon said that migration orders were going well and that they have people watching conversion orders. This CR will be moved to CLEC test and Eschelon will let Qwest know of problems.

07/17/02 - July CMP Meeting Minutes: Eschelon stated there are multiple issues associated with DSL. There are weekly calls between Eschelon and their Qwest Service Managers to discuss DSL issues. Eschelon requested to keep this CR in Evaluation status. Qwest asked what it would take in Eschelon’s view to take this CR to completed status. Eschelon replied zero orders going down . Qwest stated that trials on DSL orders have been successfully performed. It was agreed to keep the Eschelon and Qwest teams working closely together on DSL issues. CR status remains evaluation.

Alignment/Clarification Meeting Time/Date:10:00 a.m. (MDT) / Thursday 7 March 2002 Place: Conference Call Conference Call-In No.: TEL: 877.564.8688 CODE: 6265401 PC022802-1 "Qwest services live until CLEC services installed"

Attendees: Kathleen Stichter, Eschelon Tina Schiller, Eschelon Jeffery B. Cook, Qwest Michael Keegan, Qwest Deni Toye, Qwest Russ Urevig, Qwest Brett Fesler, Qwest Michael Whitt, Qwest Cindy Buckmaster, Qwest

Introduction of Attendees Attendees introduced.

Review Requested (Description of) Change Description: When a customer has ancillary products, such as DSL, on one of their lines, it is Eschelon’s understanding that Qwest handles the provisioning of the DSL in a different department, within Qwest, than the normal line provisioning. It has been Eschelon’s experience that the department that handles the DSL does not recognize the FDT on an order and that it does not receive updates to orders as quickly. This will cause the DSL to go down before a scheduled time on a conversion and will also cause the DSL to go down when a supplement to the LSR is issued to change a DD. Eschelon sent a request on 1/30/02 to convert service for a customer. The conversion to Eschelon Unbundled Loop service was due on 2/9/02. Although the line was equipped with DSL, Eschelon was not aware of the DSL because it was not reflected on the CSR. Eschelon did not find out that the line was equipped with DSL until the conversion had started. It became necessary to push-out the Due Date (DD) for the conversion of this service to a later date, because of the DSL. Eschelon followed a Qwest process by sending a supplement for a DD change and escalating with Qwest. Qwest took down the DSL service. Eschelon opened a repair ticket. Qwest gave a 24-hour commitment. This customer was without their DSL for 24 hours because Qwest had already removed it, not waiting for the conversion to complete. If Qwest had completed the order in the Service Order Processor, the customer could have been without DSL for up to 10 days because the customer would have had to place a new order. On another LSR to convert both the customer’s voice lines and DSL, with an original DD of 2/20/02, Eschelon issued a supplement for a DD change. Following the Qwest process, Eschelon issued the supplement 2/19/02 at 3:31 PM and escalated with Qwest. The customer’s voice lines remained in service however Qwest took down the DSL service on 2/20/02. Eschelon asks Qwest to develop, document and train an adhered to process to keep all ancillary services working, as is, until the conversion to the CLEC is complete, accepted and Qwest translations are completed. Eschelon also asks Qwest to include in the process a more ‘real time’ flow of order changes to the departments that provision the DSL services.

Confirm Areas & Products Impacted Unbundled Loop UNE (Unbundled Network Elements) Resale

Confirm Right Personnel Cindy Buckmaster indicated her group will take responsibility for coordinating the response to this CR.

Identify/Confirm CLEC’s Expectation A developed, documented, trained and adhered to process to ensure ancillary products, such as DSL, remain working with Qwest until the conversion to a CLEC is complete, the services are working with the CLEC and the conversion is accepted by the CLEC.

Identify any Dependent Systems Change Requests None.

Establish Action Plan (Resolution Time Frame) Initial Qwest Response to Eschelon will be coordinated/delegated by Cindy Buckmaster. She will attempt to have the draft response issued by April 10.


CenturyLink Response

December 6, 2002

DRAFT REVISED RESPONSE For Review by CLEC Community and Discussion at December’s CMP Meeting

Kathy Stichter ILEC Relations Manager Eschelon

SUBJECT:Qwest’s Change Request Revised Response - CR PC022802-1 Qwest DSL services live until CLEC services installed.

On December 16, 2002 Qwest will send out a Level 1 notification to all CLECs regarding the implementation of this CR. The notification will remind CLECs that the internal DSL system change will be implemented on December 17, 2002. This change will adjust the internal system to recognize and adjust normal processing when Frame Due Time is present on the CLEC order. CLEC orders received after December 17, 2002 with a Frame Due Time will then be recognized by this system.

Sincerely,

Susie Bliss Director Process Management Qwest

- November 7, 2002

DRAFT REVISED RESPONSE For Review by CLEC Community and Discussion at November’s CMP Meeting

Kathy Stichter ILEC Relations Manager Eschelon

SUBJECT:Qwest’s Change Request Revised Response - CR PC022802-1 Qwest DSL services live until CLEC services installed.

As Qwest communicated during the October 16, 2002 CMP meeting, we were working with the DSL technical team to develop some options on how we could meet the requests of this CR. We also committed to having an implementation plan developed by 10/30/02.

We have researched our options, developed our implementation plan and are driving towards a solution. Our solution is targeted for implementation no later than December 15, 2002. This solution will adjust an internal DSL system to recognize and adjust normal processing when Frame Due Time is entered on an order. This internal system change will enable the process to keep ancillary services, like DSL, working as is, until the conversion to the CLEC is complete and accepted. This adjustment will also keep ancillary services, like DSL, working as is when supplementing or canceling a disconnect order.

Again, we are committed to identifying and implementing solutions so DSL is kept live during a conversion. We will continue to work with the technical team on this system enhancement through CLEC evaluation to ensure success.

Sincerely,

Susie Bliss Director Process Management Qwest

- October 2, 2002

DRAFT REVISED RESPONSE For Review by CLEC Community and Discussion at October’s CMP Meeting

Kathy Stichter ILEC Relations Manager Eschelon

SUBJECT:Qwest’s Change Request Revised Response - CR PC022802-1 Qwest DSL services live until CLEC services installed.

Qwest agreed at the September 18, 2002 CMP Meeting to provide an updated response to Eschelon’s Change Request PC022802-1, which requested the following:

-Qwest develop a process which keeps ancillary services like DSL working as is, until the conversion to the CLEC is complete and accepted. -Qwest develop a process which keeps ancillary services like DSL working as is, when supplementing or canceling a disconnect order.

First, Qwest understands the importance of keeping the DSL live during conversions and is committed to working with customers when outages occur. For the Retail/Resale to UNE-P orders, our July 11th process improvements are still working and 201 orders were processed successfully from July 26 - September 23.

Secondly, Qwest recently had an outage on August 30th. The SWAT team investigated the outage and it was an unbundled loop order with DSL. A Technical SWAT team was then pulled together. This team is identifying short and long term mechanical solutions and will have options and recommendations by October 18th, 2002. From there Qwest expects to have an implementation plan developed by October 30th.

Finally, we are committed to identifying and implementing solutions so that DSL is kept live during a conversion. We will continue to monitor and implement solutions when/if problems arise.

Sincerely,

Susie Bliss Director Process Management Qwest


Open Product/Process CR PC012902-2 Detail

 
Title: System Outage Notification
CR Number Current Status
Date
Area Impacted Products Impacted

PC012902-2 Completed
4/17/2002
Other: Qwest backend systems
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Ames, Tamara
Director:
CR PM: Thomte, Kit

Description Of Change

Currently when Qwest's backend systems experience problems or outages that affect CLECs, the CLECs are not notified. This can cause considerable time and energy. For example, sometime around 1/14/02, CARS was experiencing a problem so Service Orders would not post. Eschelon can not complete all of its tasks in its systems to bill a customer until the Qwest Service Order posts. Eschelon starts checking following the fifth business day after the DD and continues to check until the Qwest Service Order posts. This is very time consumming.


Status History

01/28/02 - CR Submitted by Eschelon.

01/29/02 - CR acknowledged by P/P CMP Manager.

02/01/02 - CLEC contacted to schedule clarification meeting; telephone message left to schedule meeting.

02/05/02 - Clarification Meeting conducted with submitting CLEC.

02/08/02 - Clarification Meeting minutes transmitted to submitting CLEC & posted in CMP data base.

02/20/02 - CMP Meeting - CLEC community clarification conducted. CR status changed to "Evaluation." Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package (03/20/02).

03/12/02 - Draft response dated 03/01/02 issued to Eschelon. CR Status changed to "Presented"

03/20/02 - March CMP Meeting: Qwest presented their response, CLECs agreed to change CR Status to "CLEC Test." Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site

03/21/02 - Formal response dated 03/01/02 posted to CMP database

03/22/02 - Formal response dated 03/01/02 issued to CLECs. Notification CMPR.03.22.02.F.01240.CR_Responses

04/09/02 - Update e-mail from Eschelon on System Outage Notification Process

04/09/02 - Reply e-mail from Qwest with modification proposal

04/09/02 - Return e-mail from Eschelon acknowledging modification

04/17/02 - April CMP Meeting: CLECs agreed to close CR. Status changed to "Completed." Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site


Project Meetings

04/09/02 - Return e-mail from Eschelon acknowledging modification

Subject: FW: PC012902-2 System Outage Notification Date: Tue, 9 Apr 2002 14:18:53 -0500 From: "Stichter, Kathleen L." To: tmead@qwest.com CC: "Johnson, Bonnie J."

Todd, If Qwest does not send an Initial Event Notification when it resolves the issue within an hour then I do believe that the Closure Notification should indicate that it is initial and closure. It would decrease confusion. Thanks for the proposal.

Kathy Stichter ILEC Relations Manager Eschelon Telecom, Inc 612-436-6022 klstichter@eschelon.com

--

04/09/02 - Reply e-mail from Qwest with modification proposal

Subject: Re: PC012902-2 System Outage Notification Date: Tue, 09 Apr 2002 11:42:43 -0600 From: Todd Mead Organization: Qwest Communications International, Inc. To: "Stichter, Kathleen L." Kathy, I have talked to the people here about this example and they told me the following:

"If an event occurs that is settled rather quickly (within 1 hour), we only send out a Closure Notification since the event has passed. No Initial Notification is required. To decrease confusion, I believe we could accommodate this request by simply checking both the Initial and Closure boxes, and putting the date and time in the Closure Box. But the name of the document and subject line will read Closure only."

Could you let me know if what they propose above will help you. If it does, they can implement immediately.

Thanks

Todd

--

04/09/02 - Update e-mail from Eschelon on System Outage Notification Process

Subject: RE: PC012902-2 System Outage Notification Date: Tue, 9 Apr 2002 10:08:56 -0500 From: "Stichter, Kathleen L." To: tmead@qwest.com

Todd, I am monitoring the process. Qwest sent one Event Notification, which dealt with SOPAD, it was a closure. We never did get the initial. I do not know why.

Kathy Stichter ILEC Relations Manager Eschelon Telecom, Inc 612-436-6022 klstichter@eschelon.com

--

02/05/02 - Clarification Meeting conducted with submitting CLEC.

11:30 a.m. (MDT) / Tuesday 05th February 2002 Conference Call TEL: 877.554.8688 CODE: 3269208 PC012902-2 "System Outage Notification"

Attendees: Kathleen Stichter, Eschelon Ken R. Olson, Qwest Stephen Sheahan, Qwest Monica Manning, Qwest Peter Wirth, Qwest

Introduction of Attendees: Attendees introduced.

Review Requested (Description of) Change: Currently when Qwest's backend systems experience problems or outages that affect CLECs, the CLECs are not notified. This can cause considerable time and energy. For example, sometime around 1/14/02, CARS was experiencing a problem so Service Orders would not post. Eschelon can not complete all of its tasks in its systems to bill a customer until the Qwest Service Order posts. Eschelon starts checking following the fifth business day after the DD and continues to check until the Qwest Service Order posts. This is very time consumming. Requested Deliverables: A process to notify CLECs when a Qwest backend system experiences problems or outages that directly or indirectly affect CLECs.

Kathy Stichter, Eschelon reviewed the CR description. Backend systems identified relating to the CR include CARS and BOSS, with potential others. Ken Olson addressed the Eschelon CARS example. He did provide notification to Eschelon, via e-mail of the outage (01/14/02). Qwest issues notifications to the CLECs for front-end systems when outages occur.

Confirm Areas & Products Impacted: Appropriate products & areas identified in CR.

Confirm Right Personnel Involved: Qwest & Eschelon confirmed appropriate personnel were in attendance; however the Qwest Systems representative did not attend.

Identify/Confirm CLEC’s Expectation: Qwest to evaluate CR. During the February 2002 Monthly P&P CMP Meeting, Qwest will either solicit input from CLEC community & provide potential solutions to the CR; or provide an expedited response to the CR.


CenturyLink Response

March 1, 2002

Ms. Kathy Stichter ILEC Relations Manager Eschelon Telecom, Inc.

SUBJECT: Qwest’s Change Request Response - CR #PC 012902-2 System Outage Notification

REQUEST: Currently when Qwest's backend systems experience problems or outages that affect CLECs, the CLECs are not notified. This can cause considerable time and energy. For example, sometime around 1/14/02, CARS was experiencing a problem so Service Orders would not post. Eschelon can not complete all of its tasks in its systems to bill a customer until the Qwest Service Order posts. Eschelon starts checking following the fifth business day after the DD and continues to check until the Qwest Service Order posts. This is very time consuming.

RESPONSE: Qwest has developed a new Unplanned Event Notification process that is based upon the newly approved Change Management Process (CMP) guidelines (See Production Support, Section 11.0). This process was launched on February 1, 2002.

Qwest is also completing the Unplanned Event Notification process document that will be available on the Wholesale Web site.

Qwest will continue to send Notifications that specifically correlate to the CMP approved systems.

Sincerely,

Tamara Ames IT 271 CLEC NOTIFICATION TEAM Qwest

cc: Barbara Spence, Director Information Technology, Qwest


Open Product/Process CR PC012902-1 Detail

 
Title: Deaveraged Rate Zones by Address
CR Number Current Status
Date
Area Impacted Products Impacted

PC012902-1 Completed
5/15/2002
Pre-Ordering, Ordering, Billing, Provisioning Unbundled Loop, Une
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Buckmaster, Cindy
Director:
CR PM: Thomte, Kit

Description Of Change

Loop rates are based upon geographically deaveraged rates, so the rates vary by zone. Eschelon needs to know what rate Qwest will bill for each Unbundled Loop we order. Qwest must have a means of determining the rate zone per address in order to bill the CLEC correctly. Eschelon asks Qwest for the documentation that allows Eschelon to determine where our existing lines and our future lines fall within the zones that have been established for geographically deaveraged loop rates. Such information should be posted on Qwest's Wholesale web page.


Status History

01/28/02 - CR Submitted by Eschelon.

01/29/02 - CR acknowledged by P/P CMP Manager.

02/01/02 - CLEC contacted to schedule clarification meeting; telephone message left to schedule meeting.

02/05/02 - Clarification Meeting conducted with submitting CLEC.

02/08/02 - Clarification Meeting minutes transmitted to submitting CLEC & posted in CMP data base.

02/20/02 - CMP Meeting - CLEC community clarification conducted. CR status changed to "Evaluation." Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package (03/20/02).

03/12/02 - Draft response dated 03/01/02 issued to Eschelon. CR Status changed to "Presented"

03/12/02 - CLEC Notification PROD.03.12.02.F.00733.UNE_C_&_P_Deaverage with PCAT updates concerning Geographic Deaveraging

03/20/02 - March CMP Meeting: Qwest presented their response, CLECs agreed to change CR Status to "CLEC Test." Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site

03/21/02 - Formal response dated 03/01/02 posted to CMP database

03/22/02 - Formal response dated 03/01/02 issued to CLECs. Notification CMPR.03.22.02.F.01240.CR_Responses

04/17/02 - April CMP Meeting: CLECs requested to keep CR open and provide a status update at May CMP meeting. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site

05/15/02 - May CMP Meeting: Eschelon agreed that the CR could be closed.


Project Meetings

03/12/02 - CLEC Notification PROD.03.12.02.F.00733.UNEC&PDeaverage with PCAT updates concerning Geographic Deaveraging

Announcement Date: March 12, 2002 Effective Date: April 11, 2002 Document Number: PROD.03.12.02.F.00733.UNEC&PDeaverage Notification Category: Product Notification Target Audience: CLECs, Resellers Subject: Updates for UNE-C, UNE-P ISDN BRI and Geographic Deaveraging Beginning April 11, 2002, Qwest will issue updates to its Wholesale Product Catalog that includes new/revised documentation for UNE-C, UNE-P ISDN BRI and Geographic Deaveraging.

The UNE-C PCAT will be modified to include links to the new Geographic Deaveraging PCAT and the CLEC Requested UNE Construction (CRUNEC) process. The UNE-P ISDN BRI PCAT will be updated to include USOCS UGUST, UGUFM on the downloadable USOCs table. The Geographic Deaveraging PCAT will provide general information on Geographic Deaveraging pricing for Unbundled Local Loop, Unbundled Network Elements-Platform (UNE-P) and Unbundled Network Element Combination (UNE-C) with state specific effective dates. Geographic Deaveraging zones may be applied based on distance from the Central Office (CO) or by the wire center.

You will find a summary of these updates on the attached Web Change Notification Form. Actual updates are found on the Qwest Wholesale Web site at these URLs:

UNE-C: http://www.qwest.com/wholesale/pcat/unec.html UNE-P ISDN BRI: http://www.qwest.com/wholesale/pcat/unepisdnbri.html Geographic Deaveraging: http://www.qwest.com/wholesale/clecs/geodeavg.html

You are encouraged to provide feedback to this notice through our web site. We provide an easy to use feedback form at http://www.qwest.com/wholesale/feedback.html. A Qwest representative will contact you shortly to discuss your suggestion.

--

02/05/02 - Clarification Meeting conducted with submitting CLEC.

11:00 a.m. (MDT) / Tuesday 05th February 2002 Conference Call TEL: 877.554.8688 CODE: 3269208 PC012902-1 "Deaveraged Rate Zones by Address"

Kathleen Stichter, Eschelon Bernadette Derlein, Qwest Stephen Sheahan, Qwest Craig Saunders, Qwest Peter Wirth, Qwest

1.0 Introduction of Attendees Attendees introduced.

2.0 Review Requested (Description of) Change {review long description from change request, confirm with all parties there is agreement on the change requested} Description: Loop rates are based upon geographically deaveraged rates, so the rates vary by zone. Eschelon needs to know what rate Qwest will bill for each Unbundled Loop we order. Qwest must have a means of determining the rate zone per address in ordeer to bill the CLEC correctly. Eschelon asks Qwest for the documentation that allows Eschelon to determine where our existing lines and our future lines fall within the zones that have been established for geographically deaveraged loop rates. Such information should be posted on Qwest's Wholesale web page. Requested Deliverables: Easily accessable, user friendly, current and accurate documentation used for billing deaveraged loop rates. This could be by address, wire center, CLLI, so long as it is clear which lines fall within which zones.

Kathy Stichter, Eschelon reviewed the CR description. Bernadette Derlein, qwest indicated that the requested information for AZ, CO, WY & MT may be extracted from IMA when using the "Address Validation" capability, and referencing the RTD fields for the appropriate zone. A cross-reference can then be made to the applicable SGAT, Exhibit A for rates. Spread sheets should have been distributed to the CLECs for the states in the Qwest region containing similar information (Qwest to verify). CLECs will need to otain zone maps from the commission to determine rates using the spreadsheets.

Issues identified in the meeting include: (1) spreadsheet availability [Qwest item] ; (2) zone map availability from commission [Qwest item]; and (3) availability of a web based system for Loop rates [Qwest item].

3.0 Confirm Areas & Products Impacted {read from change request, modify if needed} Appropriate products & areas identified in CR.

4.0 Confirm Right Personnel Involved {ensure the Qwest SME can fully answer the CLEC request. Confirm whether anyone else within Qwest has been involved with this issue, or whether we need to bring anyone else in} Qwest & Eshelon confirmed appropriate personnel were in attendance.

5.0 Identify/Confirm CLEC’s Expectation {Identify specific deliverables from CLEC – what does Qwest have to do in order to close this CR? (in measureable terms ie provide a documented process, change a process to include training etc)} Qwest to evaluate CR. During the February 2002 Monthly P&P CMP Meeting, Qwest will either solicit input from CLEC community & provide potential solutions to the CR; or provide an expedited response to the CR.


CenturyLink Response

March 1, 2002

Kathy Stichter ILEC Relations Manager Eschelon Telecom, Inc

SUBJECT: Qwest’s Change Request Response - CR # PC 012902-1: Deaveraged Rate Zones by Address

This letter is in response to your Change Request PC012902-1, requesting documentation to allow CLECs to determine where their existing and future lines fall within the zones that have been established for geographically deaveraged loop rates.

For the states of AZ, CO, WY and MT the zones are distance sensitive from the Central Office to end user premis. CLECs currently can input an end user address through IMA using “address validation”. The RTZ field will populate with the appropriate zone in relation to the address. The CLEC would then cross-reference the zone with the applicable rate either in their contract or SGAT Exhibit A.

For the remaining states (MN, IA, SD, ND, NE, OR, WA, NM and UT) the zones are based on wire center. As Cost Dockets were completed by state the CLEC community received CLEC Notifications in regards to the De-Averaging. In the CLEC Notification, a spreadsheet provided wire center in relation to the zone. The CLEC would then be able to cross-reference the zone with the applicable rate in their contract or SGAT. CLEC Notifications are provided with this response.

In response to this CR, Qwest will provide the CLECs with a spreadsheet that will reflect the zones based on wire center for MN, IA, SD, ND, NE, OR, WA, NM and UT. This information will be located on the Qwest Wholesale Website in April. The URL and the date to be published will be provided to the CLEC Community by March 25, 2002

Zone maps for distance sensitive states AZ, CO, MT, WY are available at the state commissions office. As these maps are not electronic, Qwest will not publish them on the Wholesale website at this time.

Sincerely,

Bernadette Derlein Unbundled Loop Product Manger Qwest

Cc: Cindy Buckmaster, Manager Product Management, Qwest Debra S Smith, Product Manager, Qwest Bill Campbell, Director Product Management, Qwest Todd Mead, Change Management, Qwest


Open Product/Process CR PC050902-1 Detail

 
Title: Offer expedites on Qwest resale DSL feature order
CR Number Current Status
Date
Area Impacted Products Impacted

PC050902-1 Completed
8/21/2002
Pre-Ordering, Ordering, Provisioning
Originator: Johnson, Bonnie
Originator Company Name: Eschelon
Owner: Schwartze, Cindy
Director:
CR PM: Thomte, Kit

Description Of Change

Currently Qwest policy does not allow a CLEC to expedite any request to add the DSL feature whether the DSL was disconnected in error by Qwest or the CLEC has a need to expedite the request due to customer needs. DSL is a specific service and not related to the dial tone itself. As a result, in some cases Eschelon customers are negativly impacted without the use of DSL even if they have dial tone. Eschelon requests that Qwest develop, train and adhere to a process to expedite the DSL feature order for Qwest resale DSL.


Status History

05/08/02 - CR Submitted by Eschelon

05/09/02 - CR acknowledged by P/P CMP Manager

05/10/02 - CR posted to Web

05/14/02 - Established Clarification meeting with Eschelon

05/15/02 - CMP Meeting: Eschelon introduced their CR.

05/20/02 - Held Clarification meeting with Eschelon.

05/24/02 - Distributed minutes from Clarification call to Eschelon

06/19/02 - June CMP Meeting: CR status changed to "Presented" Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

07/10/02 - Sent Qwest Initial Response to Eschelon

07-17-02 - July CMP Meeting: CR status changed to "CLEC Test". Meeting minutes posted to this CR's Project Meetings section

08/15/02 - Sent Qwest Revised Response to Eschelon

08-21-02 - August CMP Meeting: CR status changed to "Completed" Meeting minutes posted to this CR's Project Meetings section and the CMP Web site.


Project Meetings

August CMP Monthly Meeting Minutes

Qwest (Dinwiddie) indicated that the revised response discussed in the July Product and Process CMP meeting had been provided to the CLEC community. Eschelon (Johnson) indicated that the CR could move to “Completed” status

-

07/17/02 - July CMP Meeting Minutes: Qwest (Dinwiddie) provided an overview of the CR and the initial response that had been provided to Eschelon. Qwest indicated that it does not have a process available to install Retail DSL in a shorter than standard interval. Thus, no expedited process exists for the installation new Resale DSL. However, Qwest recently reduced the interval for both Retail and Resale DSL from 10 days to 5 days. Eschelon (Johnson) indicated that shortening the interval does help and is beneficial. Also inquired if Service Managers could assist with future expedites? Qwest indicated that the Service team had provided assistance in the past and would continue to do so. Qwest (Bliss) iterated that an MCC has been produced to assist SDCs in expediting the restoration of Resale DSL service that was disconnected in error by Qwest. She also indicated that a Swat Team has been established and meets daily to review DSL issues. Eschelon (Johnson) indicated its agreement with Qwest’s approach and requested that Qwest’s initial written response be modified to reflect (a) the process improvements for the expedited reconnection of Resale DSL disconnected in error by Qwest, and (b) the intent of the Service team to remain responsive to expedited installation requests for Resale DSL. Qwest (Dinwiddie) agreed to modify the initial written response. The CR will move to "CLEC Test" and Qwest will provide the revised written response in advance of the August CMP meeting.

Time/Date: 3:00 p.m. (MDT) May 20, 2002 Place: Conference Call-In No.: 1-877 550-868 1885858 CR No.:CLEC CR 050902-1 Change Request Clarification Meeting

Attendees Attended Conference Call Name/Company: Bonnie Johnson Eschelon Senior Manager ILEC Relations Neil Houston Qwest Network Regulatory Cindy Schwartze Qwest Wholesale Process Bob Shaheen Qwest Retail DSL Product Manager Kit Thomte Qwest Wholesale CRPM Linda Miles Qwest Wholesale Process

Meeting Agenda: Offer expedites on Qwest resale DSL feature order Action 1. Introduction of Attendees CRPM introduced all attendees and reviewed the agenda 2.0 Review Requested (Description of) Change The attendees reviewed the Change Request that was submitted by Eschelon.

3.0 Confirm Areas & Products Impacted The attendees agreed that the impacted products would be DSL resale as indicated on the CR.

4.0 Confirm Right Personnel Involved The attendees also agreed that the appropriate subject matter experts were on the call.

5.0 Identify/Confirm CLEC’s Expectation On occasion a DSL Resale is disconnected in error. This could occur for various reasons, such as the DSL being associated with the wrong line on the Customer Service Record. Or the customer makes a change and for some reason Qwest can change the voice order but the system associated with the DSL order aren’t updated in time. Also when requests are submitted to Qwest if the end customer or Eschelon is wanting the service earlier than the ten day interval, no process exists within Qwest to achieve an earlier due date.

The end result for Eschelon is they receive the same answer when they attempt to expedite a due date or disconnect in error.

Eschelons objective is to have a process that will allow CLECs to have an option to expedite when either a disconnect in error occurs or when the customer requires a shorter interval.

Bob Shaheen asked for a clarification regarding moves, is this a Qwest to Eschelon move? It would be the Eschelon customer moving to a new location.

Cindy Schwartze inquired about the types of requests that might be made.. Conversion Qwest to CLEC Disconnect in error New connect

6.0 Identify any Dependent Systems Change Requests Neil indicated that the closure of the other DSL CR 022802-1 might resolve at least one aspect of this CR. Bonnie indicated that a process still would need to be available for those times when a expedite is required.

7.0 Establish Action Plan (Resolution Time Frame) Qwest is prepared to review this CR in a collaborative clarification at the June Product and Process monthly meeting.


CenturyLink Response

August 14th, 2002

Bonnie Johnson Sr. Manager, ILEC Relations Eschelon Telecom 730 Second Avenue South, Suite 1200 Minneapolis, MN 55402

SUBJECT:Qwest’s Change Request Response - CR #PC050902-1 Offer Expedites on Qwest Resale DSL Feature Order

Eschelon’s Change Request petitioned for the following: *Currently Qwest policy does not allow a CLEC to expedite any request to add the DSL feature whether the DSL was disconnected in error by Qwest or the CLEC has a need to expedite the request due to customer needs. DSL is a specific service and not related to the dial tone itself. As a result, in some cases Eschelon customers are negativly impacted without the use of DSL even if they have dial tone. Eschelon requests that Qwest develop, train and adhere to a process to expedite the DSL feature order for Qwest resale DSL. *Qwest will develop and implement an expedite process for the feature order of Qwest resale DSL.

Qwest has documented and communicated several internal process improvements around the restoral of Resold DSL service when disconnected by Qwest in error. This was communicated to impacted Qwest organizations via a Multi-Channel Communicator (MCC) dated 07/16/02, Call Handling Procedures Supporting Resale/UNE P DSL Orders, issued by Michelle Thacker. CLECs should continue to utilize the Expedites & Escalations Overview business procedures document. This document can be accessed at the following link: http://www.qwest.com/wholesale/clecs/exescover.html

Additionally, effective June 21st, 2002, Qwest significantly reduced both the Retail and Resale Qwest DSL standard provisioning interval from 10 business days to 5 business days. This improvement is outlined in announcement PROS.06.26.02.F.00487.SIGUpdateDSL dated May 31st, 2002. The archived announcement can be accessed at the following link: http://www.qwest.com/wholesale/notices/cnla/bysubcat/1,1834,16,00.html

Qwest does not have a process available to install new Retail or Resale Qwest DSL within a shorter than standard interval; however, Qwest’s Wholesale Sales and Service Organization remains available to receive escalation requests on an individual case basis.

The following references are provided for your review:

Qwest Resale General Product Catalog, Located at the following link: http://www.qwest.com/wholesale/pcat/resalegeneral.html *Qwest's retail telecommunications products and services are available for resale by Competitive Local Exchange Carriers (CLECs) to their end-users. The term 'Resale' generally refers to the 'resale' of fully finished Residential, Business, Private Line and Integrated Services Digital Network (ISDN) services. This means that Qwest provides the end-to-end service all the way to the end-user, with your brand instead of Qwest

Template SGAT/Contract Language at 6.2.3: Qwest shall provide to CLEC Telecommunications Services for resale that are at least equal in quality and in substantially the same time and manner that Qwest provides these services to itself, its subsidiaries, its affiliates, other Resellers, and Qwest's retail end users. Qwest shall also provide resold services to CLEC in accordance with the Commission's retail service quality requirements, if any.

Qwest Business Procesures Product Catalog (PCAT) Expedites & Escalations Overview, Located at the following link: http://www.qwest.com/wholesale/clecs/exescover.html * If your service request was completed within the past 72 business hours, contact Qwest's Interconnect Service Center (ISC) at 888-796-9087 for assistance; otherwise utilize your normal trouble-reporting channel into the appropriate Center for repair call handling, trouble report creation, status updates, and escalation management. *Expedites: Requests for an improved standard interval, Individual Case Basis (ICB) or committed to ICB (Ready for Service (RFS) + Interval) date Escalations: Requests for status or intervention around a missed date. *Expedites - While Qwest standard intervals, defined in our Service Interval Guide (SIG) identify reasonable intervals, at times a valid expedite situation can occur such as: * Fire * Flood * National emergency * Conditions where your end-user is completely out of service (primary line) * Disconnect in error by Qwest * Requested service necessary for your end-user's grand opening event delayed for facilities or equipment reasons with a future RFS date * Delayed orders with a future RFS date that meet any of the above described conditions. * If an expedite situation occurs, call the assigned Qwest Wholesale Center Representative responsible for processing your service requests. All expedite requests require approval to ensure resource availability. The Qwest Wholesale Center Representative will coordinate with you and Qwest internal organizations to resolve. Expedite charges may apply. If your expedite request is denied, denial reason(s) will be provided. * The PCAT indicates that expedite/escalation requests can be directed to the Wholesale LSR Service Center at 888-796-9087.

Sincerely,

Cliff Dinwiddie Sr. Manager, Product Strategy & Regulatory Support Qwest

July 10th, 2002

Bonnie Johnson Sr. Manager, ILEC Relations Eschelon Telecom 730 Second Avenue South, Suite 1200 Minneapolis, MN 55402

SUBJECT:Qwest’s Change Request Response - CR #PC050902-1 Offer Expedites on Qwest Resale DSL Feature Order

Eschelon’s Change Request petitioned for the following: *Currently Qwest policy does not allow a CLEC to expedite any request to add the DSL feature whether the DSL was disconnected in error by Qwest or the CLEC has a need to expedite the request due to customer needs. DSL is a specific service and not related to the dial tone itself. As a result, in some cases Eschelon customers are negativly impacted without the use of DSL even if they have dial tone. Eschelon requests that Qwest develop, train and adhere to a process to expedite the DSL feature order for Qwest resale DSL. *Qwest will develop and implement an expedite process for the feature order of Qwest resale DSL.

Qwest has formed a DSL Swat team that is meeting daily to investigate root causes of DSL issues raised by customers. Currently, Qwest is reviewing and trialing some improved internal escalation processes around the restoral of Resold DSL service when disconnected by Qwest in error. As we learn more, Qwest will be advising the CLECs of any changes utilizing the existing CMP processes.

Effective June 21st, 2002, Qwest significantly reduced both the Retail and Resale Qwest DSL standard provisioning interval from 10 business days to 5 business days. This improvement is outlined in announcement PROS.06.26.02.F.00487.SIGUpdateDSL dated May 31st, 2002. The archived announcement can be accessed at the following link: http://www.qwest.com/wholesale/notices/cnla/bysubcat/1,1834,16,00.html Qwest does not have a process available to install new Retail or Resale Qwest DSL within a shorter than standard interval.

The following references are provided for your review:

Qwest Resale General Product Catalog, Located at the following link: http://www.qwest.com/wholesale/pcat/resalegeneral.html

Qwest's retail telecommunications products and services are available for resale by Competitive Local Exchange Carriers (CLECs) to their end-users. The term 'Resale' generally refers to the 'resale' of fully finished Residential, Business, Private Line and Integrated Services Digital Network (ISDN) services. This means that Qwest provides the end-to-end service all the way to the end-user, with your brand instead of Qwest.

Template SGAT/Contract Language at 6.2.3: “Qwest shall provide to CLEC Telecommunications Services for resale that are at least equal in quality and in substantially the same time and manner that Qwest provides these services to itself, its subsidiaries, its affiliates, other Resellers, and Qwest's retail end users. Qwest shall also provide resold services to CLEC in accordance with the Commission's retail service quality requirements, if any.

Sincerely,

Cliff Dinwiddie Sr. Manager, Product Strategy & Regulatory Support Qwest


Open Product/Process CR PC053002-1 Detail

 
Title: Real Time Dispute of TIC, Maintenance of Service Charges and Dispatch Charges.
CR Number Current Status
Date
Area Impacted Products Impacted

PC053002-1 Denied
9/18/2002
Billing, Maintenance / Repair Centrex, Resale, UNE Loop, UNE-P
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Suellentrop, Craig
Director:
CR PM:

Description Of Change

Currently a CLEC disputes a TIC, Maintenance of Service Charge or Dispatch Charge after the charge appears on the bill. Most of the time the CLEC knows before Qwest bills the charge, whether the charge is legitemate or not. Eschelon asks Qwest to develop, document, communicate and train a process to allow CLECs to dispute miscellaneous repair charges before Qwest bills them. This process would save Qwest the time and resources needed to issue an order to bill the charges and issue the paper work to adjust the charges billed in error. This process would also save research time needed to determine whether the charge is in error or not.


Status History

05/30/02 - CR Submitted by Eschelon

05/30/02 - CR acknowledged by P/P CMP Manager

05/31/02 - CR posted to Web

06/04/02 - Contacted Eschelon and scheduled Clarification Meeting for 06/05/02.

06/05/02 - Conducted Clarification Meeting conference call with Eschelon.

06/07/02 - Issued Clarification Meeting minutes to Eschelon.

06/19/02 - CMP Meeting - Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. CR status was changed to Presented.

07/10/02 - Initial response sent to Eschelon and posted to the Web

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status was changed to Evaluation.

08/08/02 - Issued Mailout Notification to CLECs advising that the CR will be reviewed with other similar CRs. Notification CMPR.08.08.02.F.01312.Mtg_Proposal.

08/14/02 - Issued Qwest's Supplemental Response dated August 13, 2002 to Eschelon.

08/19/02 - Issued Mailout Notification to CLECs confirming the Synergy Meeting for Multiple Trouble Ticket and Billing CRs scheduled for 8/27/02, 2:00 pm MT. Notification CMPR.08.19.02.F.01317.CMP_CR_Mtg.

08/21/02 - CMP Meeting - Qwest presented its Supplemental Response dated August 13, 2002. This CR to be included for discussion in the CLEC conference call scheduled for 8/27. Minutes on this CR to be posted to the Project Meetings section. Status was changed to Evaluation.

8/27/02 - CR included in the Synergy Meeting for Multiple Trouble Tickets & Billing CRs. See Meeting Notes in Attach O, Sept Systems CMP Package.

09/11/02 - Issued Qwest's revised response dated September 6, 2002 to Eschelon.

09/18/02 - CMP Meeting - Qwest presented its Revised Response dated September 6, 2002. Minutes on this CR to be posted to the Project Meetings section. Eschelon indicated that since a part of the respnse was denied the CR should be status as denied. Meeting participants agreed.


Project Meetings

09/18/02 September CMP Monthly Meeting Minutes

Qwest reviewed the draft response. Qwest advised that Designed Services currently accommodate Eschelon’s request. However, the only way to accommodate Non-Designed Services is to create an MCO, and, to do that is not economically feasible due to the volume of calls received. Qwest said that the system CRs assist the dispute process for Maintenance of Service charges and TIC charges. Eschelon said that for Designed Services the Qwest technician very seldom advises if there will be a charge for the trouble ticket, unless Eschelon specifically asks if there will be a charge. Qwest will open a Global Action Item and will evaluate the situation. Eschelon indicated that since a part of the CR was denied, the CR should be status as Denied. It was agreed that the status of this CR would be Denied.

--

08/21/02 August CMP Monthly Meeting Minutes

Qwest advised that the response remained the same as last month for Designed Services. The Non Designed Services will be reviewed in conjunction with other CRs related to trouble tickets, repair charges, etc. scheduled for August 27, 2002. The CLEC participants agreed to have this CR reviewed at that meeting. It was agreed that the CR status would be changed to Evaluation.

--

07/17/02 - July CMP Meeting Minutes: Qwest presented the initial response as follows: The current repair process for Designed Services Trouble Tickets supports this request by allowing CLECs to dispute charges before they are billed. For Designed Services Qwest uses a Maintenance Control Organization (MCO) to manage trouble tickets. Qwest’s process is to hold a Designed Services Trouble Ticket for two weeks after closure before sending the charges to billing. When Qwest is discussing the resolution of Designed Services Trouble Tickets with the CLEC, the MCO technician will advise the CLEC that charges will be applied. If the CLEC disputes the resolution of the ticket, the ticket will not be closed. If a CLEC was advised during a previous Trouble Ticket that charges would be applied and that ticket has not been sent to billing, the CLEC can dispute that with the MCO technician during a subsequent Trouble Ticket. After the charges have been sent to billing, the CLEC must contact their Billing Representative to dispute any charges.

Because Qwest does not use an MCO for Non-Designed Trouble Tickets, the above process cannot be applied to these tickets. Qwest will continue to investigate alternatives that meet the needs of both Qwest and the CLECs. Qwest intends to respond to this CR regarding Non-Designed Trouble Tickets at the August CMP meeting.

Eschelon asked how Qwest will confirm the CLEC was not charged for the initial trouble ticket when a second trouble ticket for the same problem has been issued. Qwest agreed to investigate. Eschelon stated that the Qwest stated policy of having a closed trouble ticket sit at the center for two weeks prior to it being sent to billing has not been their experience. Eschelon stated they are not allowed enough time to confirm with their customer the problem has been fixed prior to trouble ticket being closed. AT&T stated they are having the same problem. Eschelon would like the opportunity to test prior to trouble ticket being closed. Eschelon asked why can’t Non-Designed Trouble Tickets remain open for 24 hours. Qwest responded there is no place to hold them. Qwest stated the response will be revised in August to address the Non-Design Trouble Ticket portion of this CR. CR status was changed to evaluation.

CLEC Change Request Clarification Meeting

June 5, 2002, 9:00 a.m. (MT) Conference Call 877-564-8688 PC053002-1, Real Time Dispute of TIC, Maintenance of Service Charges and Dispatch Charges

Attendees: Ric Martin, Qwest Alice Matthews, Qwest Craig Suellentrop, Qwest Bob Mohr, Qwest Kathy Stichter, Eschelon

Introduction of Attendees Introductions of the participants on the Conference Call were made and the purpose of the call discussed

Review Requested (Description of) Change Kathy indicated that Eschelon was looking to be able to dispute TIC and MOS charges on a real time basis. They want a process to dispute charges they do not believe are legitimate before they get billed. She explained that she realized that repair personnel close the tickets which get forwarded to the center which in turn gets a service order issued that goes to billing. She also explained that she understood that TIC was for resale (non-design) and MOS was for Design services. She indicated that she realized that there would be two (2) processes involved and that it would be handled differently for each situation. Craig questioned how would they know if there was going to be a charge. Kathy indicated that per Eschelon’s ICA they are to be notified before the ticket is closed. She explained that CEMR provides them with an e-mail notification after a ticket is closed. Ric asked if this was the same for Design and Non-design. Kathy wasn’t sure, but Craig thought it was the same. Kathy was going to investigate. Kathy advised that Eschelon wants a dispute process before the charges are billed and believed it would be best if the process occurred before the ticket was closed. Craig indicated that for loops on the design side, they should be getting a coordinated closure and Eschelon’s Tech shouldn’t agree to close if they felt the charge wasn’t correct. Kathy advised that, for the most part, they are getting a call on design, but cannot get with the customer in a reasonable time that is within the required timeframe. Ric asked if Kathy had received the Question and Answers from the CLEC forums on Maintenance and Repair. In the May Mailout there was a dispute resolution matrix. It was agreed that the CR request was asking for more than what was on the matrix.

Confirm Areas & Products impacted It was confirmed that the products are those covered by Non-Design Services (Resale and Centrex) and Designed Services (UNEs)

Confirm Right Personnel Involved Qwest confirmed that Craig was the Lead SME for this CR. Qwest will need to bring some repair personnel into the evaluation.

Identify/Confirm CLEC’s Expectation It was confirmed that Eschelon was looking for a process to allow them to dispute charges before they get billed.

Identify any Dependent Systems Change Requests Eschelon submitted a Systems CR, SCR060402-04, which has to do with information being added to the bills. Kathy advised that per Alice’s comments at the CLEC forum, the information is not on the bills. Kathy to submit examples to Ric.

Establish Action Plan (Resolution Time Frame) Ric advised that the CR would have the CLEC Clarification at the CMP Meeting on June 19th. After the meeting Qwest will evaluate and present its response by the next CMP meeting.


CenturyLink Response

September 6, 2002

Kathleen Stichter Eschelon

SUBJECT: Qwest’s Revised Change Request Response - CR PC053002-1 “Real Time Dispute of TIC, Maintenance of Service and Dispatch Charges.”

This CR requests that Qwest develop “a process to allow CLECs to dispute miscellaneous repair charges before Qwest bills them.” During the clarification call with Eschelon and at the General Clarification at the June CMP meeting, the two repair processes (designed and non-designed) and the fact that the solution may be different for the different processes were discussed.

At the July CMP meeting Qwest responded that the current Designed Services process meets this request. Qwest uses a Maintenance Control Organization (MCO) to manage Designed Services trouble tickets. The process for Designed Services is to hold trouble tickets for two weeks after closure before sending charges to billing. When Qwest is discussing the resolution of Designed Services trouble tickets with the CLEC, the MCO technician will advise the CLEC that charges will be applied. If the CLEC disputes the resolution of the ticket, the ticket will not be closed. If a CLEC was advised during a previous trouble ticket that charges would be applied and that ticket has not been sent to billing, the CLEC can dispute that with the MCO technician during a subsequent trouble ticket. After the charges have been sent to billing, the CLEC must contact their Billing Representative to dispute any charges.

Because of the large number of Change Requests related to Maintenance and Repair a meeting was held on August 27, 2002 to discuss possible synergies between the various CRs. It was agreed at the August CMP meeting to defer the response regarding Non-Designed Services trouble tickets until after the August 27 meeting. At that meeting Eschelon agreed that the Designed Services process met their needs. It was also determined that this CR should have its own response to address the Non-Designed process. Qwest agreed to supply a revised response at the September CMP meeting. However, Qwest believes that the Systems CRs CRs SCR030702-1 – CLEC Trouble Ticket Cross Reference and SCR042902-01 – Use CLEC Internal Repair Ticket number on CLEC bill to identify maintenance and repair charges will aide CLECs in auditing their bills and address some of the CLECs underlying concerns.

Because Non-Designed trouble tickets are generally less complex and have much larger volumes, Qwest doesn’t use an MCO technician to manage their closure. For non-designed trouble tickets the technician that resolves the trouble closes the ticket. Any applicable charges are then automatically sent to billing for inclusion on the next bill. Waiting for a customer to clear voice mail and reply back to Qwest before closing a Non-Designed trouble ticket may result in increased resolution time, missed appointments, and technician idle time. It is not economically feasible for Qwest to create a new organization to manage non-designed trouble tickets, and at this time Qwest’s systems are not technically capable of holding non-designed trouble tickets before charges are sent to billing. Therefore, Qwest respectfully denies this request as it relates to the Non-Designed trouble ticket process.

Sincerely,

Craig Suellentrop Staff Advocate, Policy & Law Qwest

Cc: Mary Retka, Director-Legal Issues, Qwest Alice Matthews, Senior Process Analyst, Qwest Catherine R. Garcia, Lead Process Analyst, Qwest Don Tolman, Manager-Process Management, Qwest

--

August 13, 2002

Kathleen Stichter ILEC Relations Manager Eschelon

SUBJECT: Qwest’s Supplemental Change Request Response - CR PC053002-1 “Real Time Dispute of TIC, Maintenance of Service and Dispatch Charges.”

This CR requests that Qwest develop “a process to allow CLECs to dispute miscellaneous repair charges before Qwest bills them.” During the clarification call with Eschelon and at the General Clarification at the June CMP meeting, the two repair processes (designed and non-designed) and the fact that the solution may be different for the different processes was discussed.

At the July CMP meeting Qwest responded that the current Designed Services process meets this request. Qwest also said that investigation of alternatives for the Non-Designed Process would continue and further information would be available at the August CMP meeting. However, because of the large number of Charge Requests related to Maintenance and Repair billing, a meeting will be scheduled for late August to discuss all of these, including this CR. Further clarification and direction for this CR will be determined after this meeting.

Sincerely,

Craig Suellentrop Staff Advocate, Policy & Law Qwest

Cc: Mary Retka, Director-Legal Issues, Qwest

--

July 10, 2002

Kathleen Stichter ILEC Relations Manager Eschelon

SUBJECT: Qwest’s Change Request Response - CR PC053002-1 "Real Time Dispute of TIC, Maintenance of Service and Dispatch Charges."

This CR requests that Qwest develop "a process to allow CLECs to dispute miscellaneous repair charges before Qwest bills them." During the clarification call with Eschelon and at the General Clarification at the June CMP meeting, the two repair processes (designed and non-designed) and the fact that the solution may be different for the different processes was discussed.

The current repair process for Designed Services Trouble Tickets supports this request by allowing CLECs to dispute charges before they are billed. For Designed Services Qwest uses a Maintenance Control Organization (MCO) to manage trouble tickets. Qwest’s process is to hold a Designed Services Trouble Ticket for two weeks after closure before sending the charges to billing. When Qwest is discussing the resolution of Designed Services Trouble Tickets with the CLEC, the MCO technician will advise the CLEC that charges will be applied. If the CLEC disputes the resolution of the ticket, the ticket will not be closed. If a CLEC was advised during a previous Trouble Ticket that charges would be applied and that ticket has not been sent to billing, the CLEC can dispute that with the MCO technician during a subsequent Trouble Ticket. After the charges have been sent to billing, the CLEC must contact their Billing Representative to dispute any charges.

Because Qwest does not use an MCO for Non-Designed Trouble Tickets, the above process cannot be applied to these tickets. Qwest will continue to investigate alternatives that meet the needs of both Qwest and the CLECs. Qwest intends to respond to this CR regarding Non-Designed Trouble Tickets at the August CMP meeting.

Sincerely,

Craig Suellentrop Staff Advocate, Policy & Law Qwest

Cc: Mary Retka, Director-Legal Issues, Qwest Don Tolman, Manager-Process Management, Qwest Alice Matthews, Senior Process Analyst, Qwest


Open Product/Process CR PC053002-1X Detail

 
Title: Indicate which USOCs a CLEC is currently ordering to advise of rate changes (Crossover CR SCR053002 01)
CR Number Current Status
Date
Area Impacted Products Impacted

PC053002-1X Denied
7/18/2002
All
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Burson, Sue
Director:
CR PM: Thomte, Kit

Description Of Change

Currently when Qwest discovers an error in what it has billed a CLEC or when a rate is changing it sends a high level notification and then follows with a spreadsheet of the changes. Currently Qwest is populating the spreadsheet with all of the USOCs that a CLEC is allowed to order via its Interconnection Agreement. Eschelon wants to see somewhere on the spreadsheet which USOCs it is actually ordering. Qwest sent Eschelon a spreadsheet in February and Eschelon was currently only using 1 USOC out of over 3000 represented. The process took hours to look up each USOC to determine what Qwest was incorrectly billing and what would actually impact Eschelon's current invoices.

Expected Deliverables: Spreadsheets with rate changes should indicate which USOCs the CLEC is currently ordering. An alternative is that only USOCs that are currently or have been billed by Qwest to CLEC in the past is reflected on the rate notification rate sheet.


Status History

5/30/02 - CR Submitted by Eschelon

5/30/02 - CR acknowledged

5/31/02 - Requested Eschelon's availability for Clarification call

6/04/02 - Clarification Meeting scheduled

6/06/02 - Clarification Meeting held

6/06/02 - Status changed to clarification

6/06/02 - Cross-over CR created (Cross-over CR SCR053002-01)

6/19/02 - June CMP Meeting: CR status changed to "Presented". Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

7/10/02 - Sent initial response to Eschelon

7/18/02 - July CMP Meeting: CR status changed to "Denied". Meeting minutes posted to this CR's Project Meetings section.


Project Meetings

07/17/02 - July CMP Meeting Minutes: Qwest (Kriebel) reviewed the CR initial response. Qwest has determined that providing only the specific CLEC USOC that was ordered rather than what is available to them from the contract is cost prohibitive. The CR will carry a "Denied" status.

SCR053002-01 Clarification Meeting

2:00 p.m. (MDT) /Thursday June 6,2002

877 570-8688 Conference ID 7807739 SCR053002-01 Attendees Name/Company:

Kathy Stichter - Eschelon Michael Buck - Qwest Kit Thomte - Qwest Kristen Hathway - Qwest Lynn Stecklein - Qwest

Meeting Agenda: Introduction of Attendees Introductions of the participants on the conference call were made and the purpose of the call was discussed.

Review Requested (Description of) Change Kathy reviewed the change that Eschelon is requesting as follows: Qwest sends a high level notification and then follows with a spreadsheet of the rate change. Qwest is populating the spreadsheet with all of the USOCs that a CLEC is allowed to order via interconnection. Eschelon would like to see somewhere on the spreadsheet which USOCs they are actually ordering.

Confirm Areas & Products Impacted Eschelon verfied that all Products would be impacted with this change request

Confirm Right Personnel Involved All appropriate Personnel were involved

Identify/Confirm CLEC’s Expectation Eschelon would like to see somewhere on the spreadsheet which USOCs they are actually ordering.

Identify any Dependent Systems Change Requests

Michael Buck asked why Eschelon submitted this request as a system change. He explained that a change to a spreadsheet would be considered a process change. Kathy Stichter said that she was not aware that this would be considered a process change or else Eschelon would have submitted a Process CR. Michael Buck said that this change request would be handled as a Cross-over CR and Kathy Stichter said that was not a problem.

Establish Action Plan (Resolution Time Frame) A Cross-over CR will be created on behalf of Eschelon. The CR# will be PC053002-1X.


CenturyLink Response

July 8, 2002

Kathy Stichter ILEC Relations Manager Eschelon

SUBJECT: Qwest’s Change Request Response - CR #PC053002-1X Indicate which USOCs a CLEC is currently using somewhere on the spreadsheet sent to a CLEC to advise of rate changes

Qwest provides 10-day advance CLEC notification for any corrections to rates in a CLEC's contract. The notification is provided via an excel spreadsheet that enables the manipulation of the data by the CLEC to sort against their billing records. In order to provide the most comprehensive information regarding rate corrections, Qwest notifies CLECs of changes to any rates in their contract. This is due the fact that all contracted rates are loaded in the billing system and can be ordered at any time.

Providing only the specific CLEC USOCs that have been ordered would be cost prohibitive and could prevent Qwest from correcting rates in the billing system in a timely manner. Providing this additional information on the rate correction CLEC notification would require approximately 60 additional Qwest resources for the CLEC notification process to be completed in a timely manner.

Future rate validation efforts will result in a lesser number and size of notifications than CLEC’s may have received to this point, and thus will be smaller in size of impact to CLEC’s regarding comparing the data to their billing records.

Denied – Economically not feasible – low demand, cost prohibitive to implement the request, or both.

Sincerely,

Susan Burson Director Process Management Qwest

Cc: Christie Doherty, Judy Taylor, Toni Dubuque, Joan Masztaler


Open Product/Process CR PC053002-2X Detail

 
Title: Supply current rate, new rate and effective date when issuing rate changes (Cross over CR SCR053002 02)
CR Number Current Status
Date
Area Impacted Products Impacted

PC053002-2X Denied
7/18/2002
All
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Burson, Sue
Director:
CR PM: Thomte, Kit

Description Of Change

Currently when Qwest discovers an error in what it has billed a CLEC or changes a rate it sends a high level notification and then follows with a spreadsheet of the changes. Currently Qwest is populating the spreadsheet with 1minus discount, ending with a percentage or Qwest will provide a tariffed rate rather than the rate less the discount percent that shows up on the invoice. Eschelon asks Qwest to supply the actual incorrect rate (money amount) and the actual correct rate (money amount). Example, if Eschelon is billed $10.00 for a line and the $10.00 is the rate that shows on the bill, and that rate changes to $9.00, then on the notification, Eschelon should see $10.00 as existing rate and $9.00 as new rate. Also, the effective date of the corrected rate should be when the rate was first billed incorrectly. It should not be an effective date made up by Qwest.

Expected Deliverables: Spreadsheets with rate changes should show the actual rate (money amount) being billed incorrectly and not the percentage or tariffed rate. Spreadsheet should show the correct rate that will be billed going forward (money amount). Effective dates should be date when rate was first billed incorrectly.


Status History

5/30/02 - CR Submitted

5/30/02 - CR Acknowledged

5/31/02 - Requested Eschelon's availability for clarification call

6/04/02 - Clarification Meeting Scheduled

6/06/02 - Clarification Meeting Held

6/06/02 - Status changed to clarification

6/06/02 - Cross-over CR created (SCR053002-02)

6/19/02 - June CMP Meeting: CR status changed to "Presented". Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

07/10/02 - Sent Eschelon initial response

07/17/02 - July CMP Meeting: CR status changed to "Denied". Meeting minutes posted to this CR's Project Meetings section.


Project Meetings

07/17/02 - July CMP Meeting Minutes: Qwest (Kriebel) reviewed the response. Qwest has determined that providing the specific rate as opposed to the percentage as it appears in the contract is economically not feasible. Eschelon (Stichter) questioned why so many of the notifications carried the date of November 1. She also asked if the notification carried the date that the change will occur. This CR will carry a "Denied" status.

SCR053002-02 Clarification Meeting

2:00 p.m. (MDT) /Thursday June 6,2002

877 570-8688 Conference ID 7807739

Attendees Name/Company:

Kathy Stichter - Eschelon Michael Buck - Qwest Kit Thomte - Qwest Kristen Hathway Qwest Lynn Stecklein - Qwest

Meeting Agenda: Introduction of Attendees Introductions of the participants on the conference call were made and the purpose of the call was discussed.

Review Requested (Description of) Change Kathy Stichter reviewed the change that Eschelon is requesting as follows: When Qwest discovers an error in what they have billed, they populate the spreadsheet with a discount instead of the actual incorrect rate and correct rate. She also said that the effective date is a random date.

Confirm Areas & Products Impacted This request applies to all products.

Confirm Right Personnel Involved All appropriate personnel are involved in this change request.

Identify/Confirm CLEC’s Expectation Eschelon would like the spreadsheets to reflect the actual rate being billed incorrectly and not the percentage or tariffed rate. Kathy Stichter also said the Eschelon would like the date to reflect the actual effective date, not just any date.

Identify any Dependent Systems Change Requests Michael Buck asked why Eschelon submitted this request as a system change. He explained that a change to a spreadsheet would be considered a process change. Kathy Stichter said that she was not aware that this would be considered a process change or else Eschelon would have submitted a Process CR. Michael Buck said that this change request would be handled as a Cross-over CR and Kathy Stichter said that was not a problem.

Establish Action Plan (Resolution Time Frame) A Cross-over CR will be created (PC053002-2X)


CenturyLink Response

July 8, 2002

Kathy Stichter ILEC Relations Manager Eschelon

SUBJECT: Qwest’s Change Request Response - CR #PC053002-2X Supply current rate and new rate when issuing changes sent to CLECs via spreadsheet. Effective date of correction should go back to when the rate was first billed incorrectly, not an arbitrary date chosen by Qwest as to when the rate is effective.

When Qwest provides CLEC notification for any corrections to a CLEC's billing rates, Qwest provides the current and corrected rate in the manner that it appears in the contract. For UNE rates, facility based OS/DA usage rates and unbundled switching rates, the dollar amount is what is provided in the CLEC contract. So Qwest provides the dollar amount for the current rate and the corrected rate. For Resale (USOC and usage rates) and toll usage rates, the percent discount is the rate provided in the CLEC contract. So for Resale (USOC and usage) and toll usage rate corrections, Qwest provides the percent of Resale (1 minus the Resale percent discount). The CLEC can refer to the Retail Tariff (http://tariffs.uswest.com:8000/) to obtain the actual dollar amount against which the percent discount is applied.

Providing the actual resale (USOC and usage) and toll usage money amounts would be cost prohibitive and could prevent Qwest from correcting rates in the billing system in a timely manner. Providing this additional information on the rate correction CLEC notification would require approximately 50 additional Qwest resources for the CLEC notification process to be completed in a timely manner.

Future rate validation efforts will result in a lesser number and size of notifications than CLEC’s may have received to this point, and thus will be smaller in size of impact to CLEC’s regarding comparing the data to their billing records.

The effective date is provided on all CLEC rate correction notifications. The effective date is generally when the rate was first billed incorrectly (e.g. the contract or cost docket effective date).

If the CLEC has any specific questions regarding a CLEC notification for a rate correction (including the effective date for the rate correction), the CLEC can contact their Qwest Billing Representative.

Partially Denied - Economically not feasible – low demand, cost prohibitive to implement the request, or both.

Sincerely,

Susan Burson Director Process Management Qwest

Cc: Christie Doherty, Judy Taylor, Toni Dubuque, Joan Masztaler


Open Product/Process CR PC093002-05X Detail

 
Title: Revised Title: EDI documentation guidelines Original Title: Single Source Document for Implementing (Crossover CR SCR093002 05)
CR Number Current Status
Date
Area Impacted Products Impacted

PC093002-05X Crossover
7/29/2009
Pre-Ordering, Ordering All
Originator: Balvin, Liz
Originator Company Name: MCI
Owner: Schultz, Judy
Director:
CR PM: Stecklein, Lynn

Description Of Change

4/18/03 Revised Description: That Qwest personnel utilize the following guidelines when updating documentation, on a going forward basis:

1) Interface differences not clear (EDI or GUI). Functional differences should not exist.

2) Field level of detail for both inquiry and response transactions lacking (what special characters apply?)

3) ALL valid entries be provided for each transaction type

4) Acronyms must be defined

5) Usage rules must be defined

6) References must defined or have links provided

7) Complete and accurate business rules must be provided

8) Restrictions must be clearly defined

9) Lack of business rules to support usage cannot occur

10) Process established to sync up EDI documentation (disclosure documents and appendices)

NOTE: As originally intended, MCI considers this CR to be a process change request. The CMP document is specific:

Section 5.1 states "A CLEC or Qwest seeking to change an existing OSS Interface, (CR to establish a new OSS Interface, or to retire an existing OSS Interface must submit a Change Request)."

Section 5.3 states "If a CLEC wants Qwest to change a product/process, the CLEC e-mails a Change Request (CR) Form to the Qwest CMP Manager, cmpcr@qwest.com."

MCI's CRs, as with Qwest internal documentation enhancements, should not be subject to IMA resources.


Status History

4/18/03P/P CR submitted by WorldCom - See Project Meeting Minutes 4/17/03

5/6/03 - P/P Crossover CR created (See SCR093002-05 System CR)


Project Meetings

4/17/03 An agreement was reached with the CLEC Community in the April CMP Systems Meeting on SCR093002-05 (Single Source Document for Implementing EDI). This change request will be 'crossed over' to product and process and closed. Qwest agreed to 'cross over' this CR with the caveat that Qwest does not agree that this is Process work and believes it to be a system request.

4/17/03 CMP Systems Meeting Kit Thomte/Qwest stated that there is one more walk on to discuss regarding, from Liz Balvin. Liz Balvin/MCI stated that she was expecting a follow up call from Qwest last month and never got one. Kit Thomte/Qwest stated that nothing has changed in regard to this issue. Liz Balvin/MCI stated that WorldCom submitted process CRs and Qwest unilaterally processed them as systems CRs. Liz stated that if Qwest objected to MCI’s issuing these CRs as Process CRs, then Qwest needs to take this to the oversight committee. Kit Thomte/Qwest stated that Judy Schultz needs to address this issue and that Judy will be returning to the meeting after lunch. Liz Balvin/MCI stated that WorldCom wanted the CRs reverted back to Product/Process and sees that it was not done. Liz stated that she does not know if Judy is aware of that. Lynn Notarianni/Qwest stated that Judy is aware of your position on that. Lynn stated that from a standpoint of resolution, Qwest’s position is that we would not be escalating on ourselves on an issue that we feel that the decision was made congruent with how we’ve treated these types of issues in the past. Lynn stated that these CRs do need and take systems resources in order to do the work. Kit Thomte/Qwest recommended that we break for lunch and reconvene at 1:00 p.m. MT. Liz Balvin/MCI stated that WorldCom submitted 3 CRs as document changes and Qwest unilaterally changed them to systems CRs. Liz stated that this conversation has gone round and round. Liz stated that she tried to change the language back in December because she did not want these to impact IMA resources. Liz stated that the Qwest EDI implementation team changes documentation if Qwest finds a problem. Liz stated that if Qwest believes that WorldCom inappropriately sent these as Product/Process, Qwest needs to do something. Liz noted that any time there has been a cross over we’ve agreed to it in this forum and stated that she sees Qwest as out of process and doesn’t know how to better address that. Judy Schultz/Qwest stated that it is important to have this discussion and feels that we are at an impasse. Judy apologized if in the past Qwest has made unilateral decisions without communicating those decisions to change the CRs from Product/Process to Systems. Judy stated that Qwest is in the unique position of knowing which it should be and when there will be an impact to the systems. Judy stated that you might think it is just a process change, but we do know our internal systems and can say when a request would really impact a system. Judy noted that on the other hand, some changes come in as systems and we can look at it and determine that it would not require systems restraints and so we suggest crossing those CRs over to Product/Process. Judy stated that an email is sent to state if processed as a Product/Process or a Systems CR. Judy stated that the one issue that we are a little bit apart on is what to do with these systems documentation changes. Judy stated that in Section 8, which describes systems changes, the deliverables do include the system’s documentation, which is Sue’s (Stott) team. Liz Balvin/MCI stated that she agrees that the initial documentation to documented system enhancements per release should be included, but this is after it is implemented and a CLEC identifies a flaw with the documentation. Liz stated that in December, she said that the change was not intended to change existing documentation or previously existing versions, we just want issues addressed going forward. Liz stated that resources are required for new release documents, but once the document is used and a defect is identified, they should be corrected. Liz noted that the CLECs work with the EDI documentation team and when an issue is identified, that team fixes the problem. Sue Stott/Qwest stated that her team handles those in the same manner as a production support bug. Liz Balvin/MCI stated that these CR’s are for the issues that the EDI team said Qwest would not do as a bug fix. Wendy Green/Qwest stated that those were ones that Qwest viewed as enhancements rather than a bug in the documentation. Sharon Van Meter/AT&T asked if after a release is implemented and a bug is identified in the documentation, WorldCom sends an email to someone? Judy Schultz/Qwest stated that should go through production support. Liz Balvin/MCI stated that the production support help desk would not know this stuff. Liz Balvin/MCI stated that they do work with the EDI team and were told to issue these CRs. Wendy Green/Qwest stated that they are not a bug because the information is already there, it is an enhancement. Wendy noted that a lot of the time Qwest fixes issues that a CLEC brings forwards through that team but in this case you were requesting something a bit bigger than simply a clarification or a bug fix. Liz Balvin/MCI stated that it is not an enhancement because the documentation is incorrect. Lynn Notarianni/Qwest stated that we are disagreeing about a gray area, one side views as an enhancement and one side views as a bug. Donna Osborne-Miller/AT&T stated that her consumer team is finding this a challenge, they are trying to work with a manual and are feeling the same frustration. Liz Balvin/MCI stated that she understands Qwest’s position to not look at every data field so agreed to change the CR. Liz stated that the guidelines are for Qwest to focus on documentation going forward. Judy Schultz/Qwest stated that there is a process for documentation issues when Qwest and the CLECs believe that it is a bug. Liz Balvin/MCI stated is for when Qwest believes it to be a bug. Judy Schultz/Qwest asked when it happens that something in the documentation that a CLEC sees as a defect and Qwest doesn’t, would it satisfy the CLECs if going forward as fields are impacted in the course of a release, the documentation would be changed going forward to adhere to those expectations. Sue Stott/Qwest stated that this is currently occurring. Liz Balvin/MCI stated that in reference to this CR, they were told to issue a CR., as well as for the other 2 CRs. Sue Stott/Qwest stated that where it gets gray is when further clarification is needed for a field. Liz Balvin/MCI stated that these items are not gray, they are adding valid values or formats. Sue Stott/Qwest stated that the bigger issue for IT documentation is Qwest has people working on the releases and when they get a request for a documentation update, the people have to be diverted from the release in order to do the documentation updates. Sue stated that maybe the answer is less capacity for a release. Judy Schultz/Qwest stated that she wants to make sure that we’re clear. Judy noted that if there were 200 different fields to update, that would be a big effort. Judy stated that she thought she heard that IT was going forward in trying to follow the proposed guidelines. Sue Stott/Qwest stated that IT does that today and noted that her concern is, if you are an EDI user you are not going to pay close attention to the new release right away and that Qwest will not be made aware of issues until much later. Randy Owen/Qwest stated that Qwest needs to be careful because you cannot update for some products and not all, that would create other problems. Randy stated that we need to look at updates across the board, maybe a legend should be developed. Liz Balvin/MCI stated that the EDI documentation is going to come along because you now have users. Liz noted that consistency is an excellent point, if you only do that on one field then it could create inconsistency. Liz stated that she liked the idea of a legend but would need to check with her coders to see if one would work for them. Liz stated that she could possibly only be looking at a specific field and would need a guide to tell her what to look at first. Judy Schultz/Qwest asked what if we do a running cheat sheet. Randy Owen/Qwest stated that we saw that this CR might take us there and started down that path. Then heard that is not what was wanted. Sue Stott/Qwest stated that we have to carefully scrutinize to ensure that a documentation change doesn’t also mean a system change. It is so tightly related, the difference can be as subtle as an and/or difference. Sue stated that is another reason why system resources are needed. Judy Schultz/Qwest stated that she understands that it is the same resources and is just trying to explore if IT can do a piece at-a-time. Judy asked if there are ever any times when it would be logical do to this kind of work. Is there ever a time in development when we could spend time doing this? Sue Stott/Qwest stated that it would still take systems resources to do that and stated that the issue is if it affects the voting capacity for a release. Sue stated that in many cases the same resources are used for coding and documentation. Liz Balvin/MCI asked if she could update the single source CR with a title change to ‘Guiding Principals to Qwest Documentation on Going Forward Basis, When Documentation Happens’, and will list the 10-items that you say you are using. Liz stated that the CR would then be moved back to Process and the documentation would be done when the regular document comes out. Liz stated that when new documentation comes out in future releases and sees that the guidelines are not being adhered to, and when it severely impacts her ability to do business then she would bring it forward. Liz stated that she would be willing to do that in order to get these off the table. Liz stated that she understands where Qwest is coming from and that believes that Qwest understands where she is coming from. Kit Thomte/Qwest asked how the guidelines would be updated. Liz Balvin/MCI stated that they would be closed with this CR and for other items that come up, new CRs would be issued. Donna Osborne-Miller/AT&T asked if they are to call the Help Desk if problems after in production. Randy Owen/Qwest stated that the documentation team is to be contacted if prior to 30 days after production, after the 30 days, you contact the Help Desk. Wendy Green/Qwest stated that we took the principles and looked at redesigning to be 1 document for both EDI and GUI. Wendy stated that she did not know if that is still on the table. Liz Balvin/MCI stated that that was not the intent of the CR. Lynn Notarianni/Qwest asked if the guiding principles are separate from SBCs document. Wendy Green/Qwest stated that within the current format, will use the 10 guiding principles. Judy Schultz/Qwest asked if we should have a ‘guiding principles’ standing agenda item to identify what can be removed from the list. Wendy Green/Qwest stated that things would never be crossed off the list because they are principles and are there forever. Liz Balvin/MCI shared Judy’s concern and stated that they just came across a situation where they reserved TNs in the GUI and submitted the order in EDI. The reps populated the PON manually, typing them in lower case, but went out the door in upper case. Liz stated that it is not documented that they have to be in upper case. Liz stated that it would be helpful to have a tab for Documentation Experiences/Discussion. Lynn Notarianni/Qwest stated that there is a tab for design walkthrough’s and we can have one for documentation. Lynn noted that it could have something in it, or not. Liz Balvin/MCI stated that she understands Qwests position and stated that she did not know that she could call the Help Desk for documentation issues, that is a value add from this discussion. Sue Stott/Qwest asked that instead of a standing agenda item or separate tab, maybe we could add documentation issues to the SATE portion of the meeting. Wendy Green/Qwest stated that that would be fine. Liz Balvin/MCI stated that it could be EDI/SATE. Liz Balvin/MCI stated that she would review her 3 CRs to see if they are guiding principles. Judy Schultz/Qwest stated that if Liz wants to close as a process CR, is ok with that as long as it is noted that Qwest does not agree that this is Process work. Judy stated that Qwest truly believes them to be systems requests. Liz Balvin/MCI stated that she was not clear on closing the CR as a Process CR. Judy Schultz/Qwest responded that that is what Liz wanted. Randy Owen/Qwest stated that the guiding principles can be closed, Qwest has adopted them. Judy Schultz/Qwest stated that when a CLEC submits a CR, Qwest looks at it and determines if it is an impact for Product/Process or Systems. Judy stated that Qwest would email the CLEC if the category is different. Judy asked if that was an acceptable way to communicate. Liz Balvin/MCI stated that she did receive emails and that she responded that she did not agree with the assigned category. Judy Schultz/Qwest asked that when the email is sent, what happens if we cannot reach agreement, how do we break that stalemate? Lynn Notarianni/Qwest stated that in that case, if a CLEC says it is a Product/Process CR and Qwest says that it is not, it could result in a denial based on infeaseability. Judy Schultz/Qwest stated that it could result in a denial. Liz Balvin/MCI stated that she would not be unreasonable. Lynn Notarianni/Qwest stated that she is just stating that it could be a risk. Liz Balvin/MCI stated that the stalemate is due to the category of product/process or systems, and stated that she thinks that we have flushed out why each of us believes the way we do. Liz asked if these CRs are going to remain as Process CRs as they were originally intended? Judy Schultz/Qwest stated that she is ok with the change back to Process and closing it out, with Judy adding a note that Qwest believes the CR to be a Systems change. Judy stated that she has an obligation to represent Qwest’s position. Judy stated that in the future, as CRs come in the door, my team will send out an email with the category, and if you don’t agree you need to let us know and we will call a meeting to discuss. Judy asked if that was acceptable to the CLECs. Liz Balvin/MCI said yes. Lynn Stecklein/Qwest asked how the CRs that are marked as both Product/Process are to be handled. Judy Schultz/Qwest stated that in some instances the CR may be both, could be a systems CR and an MN. Judy stated that if the CR is for both P/P and Systems, the CRPM would ask that separate CRs be issued. Lynn Stecklein/Qwest clarified that all 3 CRs will be crossed-over to Product/Process and will be closed. There were no additional questions or comments.

4/18/03 Revised Description: That Qwest personnel utilize the following guidelines when updating documentation, on a going forward basis: 1) Interface differences not clear (EDI or GUI). Functional differences should not exist. 2) Field level of detail for both inquiry and response transactions lacking (what special characters apply?) 3) ALL valid entries be provided for each transaction type 4) Acronyms must be defined 5) Usage rules must be defined 6) References must defined or have links provided 7) Complete and accurate business rules must be provided 8) Restrictions must be clearly defined 9) Lack of business rules to support usage cannot occur 10) Process established to sync up EDI documentation (disclosure documents and appendices) NOTE: As originally intended, MCI considers this CR to be a process change request. The CMP document is specific:

Section 5.1 states "A CLEC or Qwest seeking to change an existing OSS Interface, (CR to establish a new OSS Interface, or to retire an existing OSS Interface must submit a Change Request)."

Section 5.3 states "If a CLEC wants Qwest to change a product/process, the CLEC e-mails a Change Request (CR) Form to the Qwest CMP Manager, cmpcr@qwest.com."

MCI's CRs, as with Qwest internal documentation enhancements, should not be subject to IMA resources.

--Original Message-- From: Elizabeth Balvin [mailto:liz.balvin@wcom.com] Sent: Monday, January 27, 2003 5:09 PM To: 'lsteckl@qwest.com' Cc: 'Johnson, Bonnie J.'; 'amaus@mainstreetcom.com'; 'arlen@contactcom.net'; 'Bart Atkinson (E-mail)'; 'byron.dowding@alltel.com'; 'Carla D NCAM Pardee (E-mail)'; 'chris@contactcom.net'; 'Dan Rosedahl (E-mail)'; 'David Hennes (E-mail)'; 'dosborne@att.com'; 'freddi@microtech-tel.com'; 'John Berard (E-mail)'; 'Karen Clauson'; 'Kimberly Isaacs'; 'Lea Barron (E-mail)'; 'Leilani Hines (E-mail)'; 'Linda Fowlkes (E-mail)'; 'Littler Bill (E-mail)'; 'Lori Mendoza (E-mail)'; 'lrucks@blackfoot.com'; 'Mark R. Powell (E-mail)'; 'mzulevic@covad.com'; 'Nancy Conant (E-mail)'; 'Peder Gunderson (E-mail)'; 'Sharon K NCAM Van Meter (E-mail)'; 'Sherry Lichtenberg (E-mail)'; 'Stephanie Prull (E-mail)'; 'Tom Hyde (E-mail)'; 'vicky@consolidatedtelcom.com' Subject: EDI Documentation Lynn, The following is a high level list of issues WCom has identified regarding Qwest's EDI documentation. While this list is not inclusive, per Qwest recommendation, WCom provides as a start at developing "guidelines" for Qwest documentation updates going forward: 1) Interface differences not clear (EDI or GUI), CLECs expect functionality would NEVER differ, need to confirm 2) Field level of detail for both inquiry and response transactions lacking (what special characters apply?) 3) ALL valid entries be provided for each transaction type 4) Acronyms must be defined 5) Usage rules must be defined 6) References must defined or have links provided 7) Complete and accurate business rules must provided 8) Restrictions must be clearly defined 9) Lack of business rules to support usage cannot occur 10) Process established to sync up EDI documentation (disclosure documents and appendices)

12/18/02 Email w/ Revised Description: --Original Message-- From: Elizabeth Balvin [mailto:liz.balvin@wcom.com] Sent: Wednesday, December 18, 2002 2:19 PM To: 'cmpcr@qwest.com' Cc: 'lsteckl@qwest.com' Subject: FW: SCR093002-05 Single Source Document for Implementing EDI

WCom is willing to change the language in the attached CR to better reflect the intended change. NOTE: The original request was submitted as a "process" CR which is still the intended CMP WCom wishes to follow. As such, the CR would not compete for IMA resources and impact prioritization. The new language should read:

This change request is not intended to modify in any way the current or planned Qwest applications or code to support these systems. In addition, this change request is not intended to be retroactive to current or previous OSS interface requirements. It is intended to be implemented on a going forward basis. The request seeks to require CLEC input such that Qwest understands from a "users perspective" what changes are need to provide "efficacy" as required by the FCC. WCom recommends working sessions with interested Parties as a means to establish ground rules for documentation.

An exception would not be necessary if Qwest agrees with following the Process CMP.

9/27/02 Original Description: At a minimum, the following documents are provided by Qwest for EDI Implementation: Product Catalog (PCAT) Qwest Preparation Guides EDI Disclosure Documentation LSR Developer Worksheets Premis Guide for City List EDI/SATE Error List and IMA User's Guide Sources are not always in sync and cross referencing causes delays


Open Product/Process CR PC121302-1 Detail

 
Title: Call Forwarding Simplification POTS resale and UNE P Pots
CR Number Current Status
Date
Area Impacted Products Impacted

PC121302-1 Denied
12/13/2002
Ordering, Billing, Maintenance/Repair, Billing UNE-P POTS, Resale POTS
Originator: Prull, Stephanie
Originator Company Name: McLeodUSA
Owner: Paxton, Mallory
Director:
CR PM: Harlan, Cindy

Description Of Change

McLeodUSA proposes the simplification of the Call Forward Busy and Don’t Answer USOC’s available for POTS resale and UNE-P Pots. McLeod would like to have one Call Forwarding USOC for Call Forward Busy, one for Call Forward Don’t Answer, and one for Call Forward Busy/Don’t Answer combo.

Currently there are multiple call forwarding USOC’s in each case. This causes confusion for order writers, line repair representatives, and causes end user pain if not ordered correctly as it can cause a loss of call forwarding service

Expected Deliverable:

McLeodUSA is expecting one call forwarding USOC in each instance labeled above that can work in any call forwarding situation (I.E intra-office, inter-office, overflow). This will eliminate training issues on both the CLEC and Qwest’s side by providing simplified training for order writing representatives for both companies. This will be more consistent with other products Qwest offers. And will allow for more accurate billing and data integrity.


Status History

12/13/02 - CR Submitted

12/13/02 - CR Acknowledged

01/06/03 - Conducted Clarification Meeting

01/15/03 - CR Presented at CMP Meeting

02/12/03 - Qwest response e-mailed to originator

02/19/03 - Qwest response presented at CMP Meeting

03/19/03 - Qwest update presented at CMP Meeting

04/09/03 - Qwest response sent

04/16/03 - Qwest response presented at CMP Meeting - CR Denied and Closed


Project Meetings

04-16-03 - CMP Meeting

Paxton-Qwest presented the denial response. Pardee-AT&T stated that AT&T was disappointed. She stated that the process was error prone and cumbersome. Powers-Tel West stated that Qwest is using “economically not feasible” as a reason for denial very frequently. She stated that CLECs submitted CRs because current Qwest processes were costing them money. She stated that she would begin submitting CRs with an estimate of how much the process was costing the CLEC. Johnson-Eschelon stated that Eschelon was disappointed by the denial of this CR. Balvin-WorldCom stated that the number of denials of economically infeasible also disappointed her. The CR was moved to Denied status.

======================================================

03-19-03 - CMP Meeting

Paxton-Qwest stated that Qwest was continuing to investigate this CR and would present a formal response at the April CMP Meeting. Pardee-AT&T stated that she supported this request as well. Johnson-Eschelon stated that Eschelon was also interested in this CR.

===================================================

02-19-03 - CMP Meeting

Paxton-Qwest presented the Qwest response. Prull-McLeod stated that she understood the response. White-Qwest stated that the CR would be moved to evaluation status.

==================================================

01-15-03 - CMP Meeting

Prull-McLeod presented the CR. Pardee-AT&T and Johnson-Eschelon stated that their companies were very interested in this change as well. The CR moves to Presented.

=================================================================

Clarification Meeting 2:00 PM (Mountain Time) / Monday, January 6, 2003

1-877-550-8686 2213337#

Attendees Matt White – CRPM Mallory Paxton – Qwest Stephanie Prull - McLeod

Introduction of Attendees White-Qwest welcomed all attendees and reviewed the request.

Review Requested (Description of) Change Prull-McLeod reviewed the CR. Paxton-Qwest stated that Qwest should grandfather interoffice and intraoffice call forwarding since they are priced the same way. This is important for repair and process clarity. Qwest recommended that McLeod submit this CR. Prull-McLeod stated that several other CLECs support this CR. Paxton-Qwest stated that this request is for all CLECs.

Confirm Areas and Products Impacted White-Qwest confirmed that the attendees were comfortable that the request appropriately identified all areas and products impacted. Confirm Right Personnel Involved White-Qwest confirmed with the attendees that the appropriate Qwest personnel were involved. Paxton-Qwest stated that the retail (Catherine Thompson) and wholesale (Janean Van Dusen and Michael Whitt) Product Managers need to be involved. Paxton-Qwest stated that this would be a lengthy CR. Prull-McLeod stated that she did not expect it to be a quick CR.

Identify/Confirm CLEC’s Expectation White-Qwest reviewed the request to confirm Allegiance’s expectation.

Identify and Dependant Systems Change Requests White-Qwest asked the attendees if they knew of any related change requests.

Establish Action Plan White-Qwest asked attendees if there were any further questions. There were none. White-Qwest stated that the next step was for Allegiance to present the CR at the January Monthly Product/Process Meeting and thanked all attendees for attending the meeting.


CenturyLink Response

April 9, 2003

REVISED RESPONSE For Review by CLEC Community and Discussion at the April 16th, 2003, CMP Product/Process Meeting Stephanie Prull OSS Manager McLeod Communications

SUBJECT: Qwest’s Change Request Response - CR #PC121302-1

This is Qwest’s Revised Response to McLeod’s request that Qwest reduce its number of call forwarding USOCs to three.

There are several applications for the many call forwarding USOCs Qwest uses today. These applications depend on the type of call forwarding requested, the product it will work with, and the state where the customer’s line is located.

This request is to make changes for POTS services. Since making these changes for POTS would impact other products, such as Voice Messaging and Centrex, which utilize call forwarding features and which use the same systems to provision them, Qwest’s evaluation of the request included the impact on those products.

Accommodating McLeod’s request would involve changes to Qwest’s ordering, provisioning, and billing processes and systems, including the Qwest Voice Messaging/Business Voice Messaging platform. These process changes would involve a very large financial commitment by Qwest. High level resource implications are outlined below:

- Addition of the following resources for a period of 12 months: - Five product management resources - Three process management resources (Centrex, Features and VMS/BVMS) - One Network Engineering resource - One Network Translations resource.

The economic magnitude of adding the indicated resources is too large for Qwest to implement this change. This request is denied because it is economically not feasible.

Qwest’s Product Management and Process Management, with our Network advisors, respectfully recommend that McLeod and other CLECs with questions concerning the use of these USOCs review the USOCs with their Qwest Service Management team to clarify the ordering process for these features. Ordering documentation, including the Resale and UNE-P feature PCATs and the USOC/FID Finder, is available on the Qwest Wholesale web site at http://www.qwest.com/wholesale/.

Sincerely,

Mallory Paxton Senior Process Analyst Qwest Services Corporation

Attachment 1 Call Forwarding USOCs

Call Forward Busy, Call Forward Don’t Answer, & Call Forward Busy/Don’t Answer are all features that utilize several USOCs and are ordered depending on the Call Forwarding Number (CFN) used on the order.

The options offered are:

Inter-office (Expanded): these USOCs are used to forward calls to a number outside of a customer’s Central Office switch in the various conditions described. FDJ – Call Forward Don’t Answer FBJ – Call Forward Busy Line FVJ – Call Forward Busy Line/Don’t Answer

Intra-office: These USOCs are used to forward calls to a number within the same Central Office switch in the various conditions described. For Residence customers: EVD – Call Forward Don’t Answer EVO – Call Forward Busy Line EVK – Call Forward Busy Line/Don’t Answer – All Qwest states except OR & WA EV2 – Call Forward Busy Line/Don’t Answer – OR & WA only

For Business customers: EVD - Call Forwarding Don't Answer EVB - Call Forwarding Busy Line External Intra-office - (Business Customers only USOC) EVO - Call Forwarding Busy Line Overflow - (Not available in NM to Bus Customers). EVF - Call Forwarding Busy Line External/Don'tAnswer - (Business Customers only USOC) EVK - Call Forwarding Busy Line Overflow/Don't Answer - ALL STATES EXCEPT OR, WA: (Not available in NM to Bus Customers) EV2 - Call Forwarding Busy Line Overflow/Don’t Answer Intraoffice - OR, WA ONLY.

Centrex 21 USOCs 69J – Call Forward Busy Line – Exceptions: In a DMS10 office the capability of forwarding outside the common block is not available. DMS-100 - Use 69J USOC followed by an 'HG' suffix, i.e. 69JHG 69H – Call Forward Don’t Answer – Exceptions: In a DMS-10 office the capability of forwarding outside the common block is not available. DMS-100 - Use 69H USOC followed by an 'HG' suffix, i.e. 69HHG. 69J & 69H – Call Forward Busy Line/Don’t Answer.

=====================================================

February 12, 2003

DRAFT RESPONSE For Review by CLEC Community and Discussion at the February 19, 2003, CMP Product/Process Meeting

Stephanie Prull OSS Manager McLeod Communications

SUBJECT: Qwest’s Change Request Response - CR #PC121302-1

This is Qwest’s Initial Response to McLeod’s request that Qwest reduce its many call forwarding USOCs to a total of three. Because of the complexity and effort necessary to appropriately evaluate this request, Qwest recommends moving this Change Request into Evaluation Status. Qwest will provide a status of Qwest’s research into a solution to the requested change in the March CMP meeting.

Sincerely,

Mallory Paxton Senior Process Analyst Qwest Services Corporation


Open Product/Process CR PC030102-1 Detail

 
Title: Trouble tickets for resale worked liked unbundled trouble tickets
CR Number Current Status
Date
Area Impacted Products Impacted

PC030102-1 Completed
6/19/2002
Maintenance/Repair Resale
Originator: Whitson, Carol
Originator Company Name: McLeodUSA
Owner: Suellentrop, Craig
Director:
CR PM: Thomte, Kit

Description Of Change

Work the trouble tickets for resale with a screener so they can schedule the tech and the tech calls the screener. After the tech has called the screener, they would call McLeod with the resolution of what was done and then close out the ticket.


Status History

03/01/02 - CR Submitted by McLeodUSA (03/01/02 reflects the date notification was sent advising the receipt of this CR at cmpcr@qwest.com and not the 02/27/02 submitted date shown on the CR.)

03/01/02 - CR acknowledged by P/P CMP Manager

03/01/02 - CR posted to the web in the Product & Process Interactive Report (http://qwest.com/wholesale/cmp/changerequest.html)

03/04/02 - McLeod contacted (by e-mail) to organize clarification meeting

03/05/02 - Clarification meeting conducted with McLeodUSA

03/06/02 - Clarification minutes issued to McLeodUSA and posted to CMP database

03/20/02 - March CMP Meeting: CR Status changed to "Clarification." Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site

04/17/02 - April CMP Meeting: CLECs agreed to change CR status to "Evaluation". Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site

05/08/02 - Issued Qwest's Draft Response dated April 29, 2002 to McLeodUSA.

05/15/02 - May CMP Meeting: Qwest presented its draft response dated April 29, 2002. McLeod identified examples where they were not getting call backs. Qwest agreed to open an action item. It was agreed that the CR would remain in a Presented status. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

06/19/02 - June CMP Product and Process meeting this CR was changed "Completed" Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site


Project Meetings

03/05/02 Clarification meeting conducted with McLeodUSA

Clarification Meeting 9:00 a.m. (MDT) / Tuesday 5th March 2002 1-877-564-8688 ID 626-5401 # PC030102-1 Trouble tickets for resale worked liked unbundled trouble tickets

Attendees: Carol Whitson / McLeod Mike Larson / McLeod Adam Schug / McLeod Scott Kendall / McLeod Jim Christner / McLeod Craig Suellentrop / Qwest Todd Mead / Qwest

Review Requested (Description of) Change: Carol read the Description of Change from the CR: "Work the trouble tickets for resale with a screener so they can schedule the tech and the tech calls the screener. After the tech has called the screener, they would call McLeod with the resolution of what was done and then close out the ticket." Craig asked for clarification that this request only covered resold POTs, not design services as design services already followed the same process as UBL. McLeod confirmed this request was for POTs. McLeod stated that with UBL there is a hold and then a call back to prevent multiple trouble tickets being opened. This is want they want with POTs. Craig reiterated that this request was clear. Currently Qwest Retail does not have this either, so this would be a completely new process. McLeod stated want they are really after here is to have a call back before the trouble ticket is closed. They have tried using 800 numbers etc to ensure this happens, but as yet they have not been successful in getting Qwest to call back prior to the ticket closing. This results in McLeod having to reopen multiple tickets for the same issue, which consequently results in escalation problems as the newly opened tickets do not qualify for the appropriate escalation. Qwest asked whether McLeod use CEMR or manual call in or both. McLeod replied they use a combination.

Confirm Areas & Products Impacted: Area: Maintenance/Repair Product: Resale Confirm Right Personnel Involved: Craig confirmed he is the right person within Qwest to take the lead on this CR. He will coordinate input from others within Qwest to develop the response to this CR.

Identify/Confirm CLEC’s Expectation: - Qwest would use screener to work trouble tickets and call McLeod instead of the tech. - McLeod want to have a process in place that will ensure they will receive a call from Qwest before the trouble ticket is closed

Identify any Dependent Systems Change Requests: None identified

Establish Action Plan: The General CLEC Clarification will be at the April CMP meeting (4/17/02). Qwest’s draft response to this will be presented at the May CMP meeting (5/15/02). The current CR status and respective documentation can be viewed in the Product & Process Interactive Report at: http://qwest.com/wholesale/cmp/changerequest.html


CenturyLink Response

“ April 29, 2002

Carol Whitson ILEC Relation Account Manager McLeod USA

SUBJECT: Qwest’s Change Request Response - CR PC030102-1 “Trouble tickets for resale worked like unbundled trouble tickets.”

This CR requests that Qwest “Work trouble tickets for resale with a screener so they can schedule the tech and the tech would call the screener when the trouble is resolved. After the tech has called the screener, they would call McLeod with the resolution and what was done and then close the ticket.” During the clarification call with McLeod and at the General Clarification at the April CMP meeting, McLeod indicated the primary concern is to receive a call before the ticket is closed.

As the title of this CR indicates, Qwest uses a Maintenance Control Organization (MCO) to manage all designed service trouble tickets (both wholesale and retail), including trouble tickets for unbundled network elements (excluding UNE-P POTS). The MCO technician manages the closure of these trouble tickets, including calling back the customer and waiting up to 24 hours to receive a call back to coordinate closure. The trouble ticket is placed in a “No Access” status while Qwest is waiting for a response from the customer. After 24 hours, the trouble ticket is closed if no response is received.

Because non-designed trouble tickets (both wholesale and retail) are generally less complex and have much larger volumes, Qwest doesn’t use an MCO technician to manage their closure. For non-designed trouble tickets (resale and UNE-P POTS) the technician that resolves the trouble closes the ticket. The technician attempts to contact the customer when closing the ticket. If the customer cannot be reached, the ticket is closed. In addition, for trouble tickets opened through the electronic interface (CEMR), notification is automatically sent (either through e-mail or fax) when the ticket is closed.

Qwest’s systems are unable to status non-designed trouble tickets as “No Access.” Waiting for a customer to clear voice mail and reply back to Qwest before closing a non-designed trouble ticket may result in increased trouble resolution time, missed appointments, and technician idle time. Therefore, Qwest respectfully denies this Change Request.

Sincerely,

Craig Suellentrop Staff Advocate, Policy & Law Qwest

Cc: Mary Retka, Director-Legal Issues, Qwest Catherine R. Garcia, Senior Process Analyst, Qwest Catherine Augustson, Senior Process Analyst, Qwest


Open Product/Process CR PC020602-1 Detail

 
Title: CLEC Trouble Ticket cross reference (Ref SCR030702 1)
CR Number Current Status
Date
Area Impacted Products Impacted

PC020602-1 Completed
3/20/2002
Maintenance/Repair Other: All products supported under the Repair platform.
Originator: Sprague, Michelle
Originator Company Name: McLeodUSA
Owner: McMahon, Cheryl
Director:
CR PM:

Description Of Change

McLeod would like to request that the CLEC repair trouble ticket number be added to the Qwest trouble ticket, each time a ticket is initiated with Qwest. This would allow for an efficient cross-reference for both McLeod and Qwest. The field chosen to house the CLEC trouble ticket number must be a searchable field, to allow for query capability. This change would save a great deal of time in locating tickets, assisting both McLeod and Qwest in efficiency.


Status History

02/06/02 - CR Submitted by McLeodUSA

02/06/02 - CR acknowledged by P/P CMP Manager.

02/12/02 - Submitting CLEC contacted to schedule clarificatiion meeting.

02/15/02 - Clarification Meeting conducted with McLeodUSA. Minutes transmitted to McLeodUSA and posted to CMP data base.

02/28/02 - Draft response dated 02/28/02 issued to McLeodUSA and posted to CMP database. CR status changed to "Presented"

03/01/02 - Draft response dated 02/28/02 posted to the web in the Product & Process Interactive report URL: http://qwest.com/wholesale/cmp/changerequest.html

03/01/02 - Notification issued to CLECs informing them draft response has been posted to the web

03/07/02 - Systems CR SCR030702-1 "CLEC Trouble Ticket Cross-Reference" opened to address this request

03/19/02 - E-mail from McLeod confirming closure of this CR - issue to be handled in Systems CMP

03/20/02 - March CMP Meeting: CLECs agreed to close CR. CR Status changed to "Completed." Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site

03/21/02 - Formal response dated 02/28/02 posted to CMP database

03/22/02 - Formal response dated 02/28/02 issued to CLECs. Notification CMPR.03.22.02.F.01240.CR_Responses

04/17/02 - CR Open/Closed status changed to closed and inactive and checked for Archive 2002


Project Meetings

03/19/02 E-mail from McLeod confirming closure of this CR - issue to be handled in Systems CMP

Subject: CR PC020602-1 Date: Tue, 19 Mar 2002 14:12:11 -0600 From: "Sprague, Michelle L." To: tmead@qwest.com, jxbeer2@qwest.com

I am OK with closing the CR McLeod has opened on the Product/Process side (PC020602-1) CLEC Trouble Ticket Cross-Reference and moving it to the system side. It defently has system impacts. I will be attending the Thursday meeting, to discuss the CR. Thanks for your help

--

9:30 a.m. (MDT) / Friday 15th February 2002 Conference Call TEL: 877.554.8688 CODE: 3269208 PC020602-1 "CLEC Trouble Ticket cross-reference"

Michelle Sprauge, McLeodUSA Cheryl McMahon, Qwest Craig Suellentrop, Qwest Dan Busetti, Qwest Catherine R. Garcia, Qwest Lynn Stecklein, Qwest Kerri L. Waldner, Qwest Peter Wirth, Qwest

1.0 Introduction of Attendees Attendees introduced.

2.0 Review Requested (Description of) Change {review long description from change request, confirm with all parties there is agreement on the change requested} Description: McLeod would like to request that the CLEC repair trouble ticket number be added to the Qwest trouble ticket, each time a ticket is initiated with Qwest. This would allow for an efficient cross-reference for both McLeod and Qwest. The field chosen to house the CLEC trouble ticket number must be a searchable field, to allow for query capability. This change would save a great deal of time in locating tickets, assisting both McLeod and Qwest in efficiency.

Expected Deliverables: For Qwest to communicate this new process to their service center and ensure that an applicable field for this new data to be stored, to allow for it to be searchable.

Michelle Sprauge discussed the CR. Additional clarification was provided regarding the following: 1) McLeodUSA format for trouble ticket number [McLeodUSA to provide] 2) Search capability for all Qwest trouble tickets requested by McLeodUSA 3) Electronic bonding may provide cross-referencing for electronic tickets. McLeodUSA to confirm. Manual ticketing will still require cross-referencing. 4) McLeodUSA ticket numbers are auto generated; thus preventing McLeodUSA from using the Qwest ticket number as their number.

3.0 Confirm Areas & Products Impacted {read from change request, modify if needed} Confirmed. Optional section: delete "SATE" reference.

4.0 Confirm Right Personnel Involved {ensure the Qwest SME can fully answer the CLEC request. Confirm whether anyone else within Qwest has been involved with this issue, or whether we need to bring anyone else in} Qwest & McLeodUSA confirmed appropriate personnel were in attendance.

5.0 Identify/Confirm CLEC’s Expectation {Identify specific deliverables from CLEC " what does Qwest have to do in order to close this CR? (in measureable terms ie provide a documented process, change a process to include training etc)"} Qwest to evaluate CR. During the March 2002 Monthly P&P CMP Meeting, Qwest will solicit input from CLEC community.


CenturyLink Response

February 28, 2002

Michelle Sprague OSS Manager McLeodUSA

SUBJECT: Change Request Response - CR # PC020602-1 "CLEC Trouble Ticket Cross-reference"

Qwest has reviewed the subject Change Request (CR) and has determined that the request should be re-classified as a 'Systems' CR. A process change would not satisfy the request for the trouble ticket cross-reference between Qwest and McLeodUSA. Qwest proposes to open a 'Systems' CR on behalf of McLeodUSA and process the request.

Sincerely,

Catherine Garcia Lead Process Analyst - Wholesale Repair Qwest Communications

Cc: Cheryl McMahon, Process Analyst Wholesale Repair, Qwest Sara Mendivil, Director Program/Project Management, Qwest


Open Product/Process CR PC031902-1 Detail

 
Title: Service Interval Guide (SIG) Updates (being executed under the exception process)
CR Number Current Status
Date
Area Impacted Products Impacted

PC031902-1 Completed
4/17/2002
Pre-Ordering, Ordering, Provisioning, Listings Resale, Collocation, UNE-P
Originator: Hooks, Perry
Originator Company Name: Qwest Corporation
Owner: Hooks, Perry
Director:
CR PM:

Description Of Change

This Change Reqest is to highlight, announce and clarify recent interval impacting changes/additions made to the Service Interval Guide which will be made available on 3/29/02 at the folowing URL: http://www.qwest.com/wholesale/guides/sig/index.html. All SIG changes to be posted on 3/29, including non interval impacting language calrifications and corrections, can be viewed by accessing the Red Lined Service Interval Guide posted for your review on the document review page of the CMP webs site (http://www.qwest.com/wholesale/cmp/review.html).

The following sections of the SIG have been updated with the following changes:

Unbundled Network Elements Platform - UNE-P

UNE-P POTS:

- Previous Interval for "Suspend" was changed to include Saturday as a possbile "next business day".

- New interval added for "Deny" to include "same business day if request is received before noon MT, otherwise

next business day (may be Saturday)"

UNE-P PBX:

- New intervals added for Zone 2 wire centers contingent on volume

UNE-P DSS:

- Updated interval from "Trunk Installation Services" from 9 business days to 12 business days

- Added "Designed Changes to T1 and Trunks" category with appropriate intervals

- Modified "Add/Change Trunks on existing facilities" to eliminate Zone differentiation resulting in a single

interval contingent on volume

UNE-P ISDN BRI:

- Changed "Conversion as Specified" interval for 1-10 Loops from ICB to 3 business days where a Loop change

is not involved.

- Added 11 or more Loops FOC of 192 hours and ICB Installation for all activities

UNE-P ISDN PRI:

- Modified "Add/Change Trunks on existing facilities" to eliminate Zone differentiation resulting in a single interval contingent on volume

UNE-P Centrex 21:

- Added "Non Designed Conversion As Is" with FOC and Installation Guidelines of 3 business days or 2 in CO

and MN.

- Clarified language on description of line and feature changes and added Colorado and Minnesota intervals.

- Added Non Designed with Dispatch intervals of next available due date by Appointment Scheduler with a

minimum of 3 business days. CO and MNdefault is 2 business days.

- "Deny/Restore" added with same business day if request is received before noon MT, otherwise next day

Installation Guideline.

UNE-P PAL:

- "Deny/Restore added with same business day if request is received before noon MT, otherwise next

business day (may be Saturday)

Resale

Resale POTS Business:

- Suspend/Restore Installation Guidelines interval - added "may be Saturday"

- New interval for "Deny" to include same business day if request is received before noon MT, otherwise next

business day (may be Saturday)

Resale PAL:

- Added "Deny/Restore" activity language and added FOC and Installation Guidlines

Resale Centrex 21:

- Added "Non Design Conversion As Is" with FOC and Installation of 3 business days or 2 business days in CO

and MN

- Added "Non Designed New Installs" section with appropriate intervals

- Added "Deny/Restore" activity with applicable intervals

Resale Centrex 21 - ISDN:

- Added "Conversion As Is" section with 3 Business Day Installation

- Clarified "Conversion As Specified" with appropriate intervals

- Separated "New Installs" with appropriate intervals

- Clarified "Line Feature" language and added "13 business day" interval if a Loop is added or changed.

- Added "Remove Loop or Completely Disconnect Service" with appropriate intervals

Resale ISDN PRI:

- Removed High and Low Density language and designations resulting in a single interval contingent on volume

Resale DSS:

- Changed "Trunks Installation Services Ordered" for 1-3 Facilities to 12 business days from 9 business days

- Added "Designed Changes to T1 and Trunks" category with appropriate intervals

Resale PBX DID:

- Changed Installation to include Zones 1 and 2 to bring intervals into parity with Retail High and Low Densitiy

intervals

Directory Listings:

- Added "Complex Listings" section to "Directory Listings" with appropriate intervals

Collocation

Caged Physical (unforecasted):

- For both "Timely Quote Acceptance" and "Late Quote Acceptance" interval was changed from 120 Calendar

Days from receipt of Complete Application to 90 Calendar Days from receipt of Complete Application, in

Montana only

Virtual Collocation (unforecasted):

- For "Timely Quote Acceptance/Equipment delivered prior to day 53" interval was changed from 120 Calendar

Days from receipt of Complete Application to 90 Calendar Days from receipt of Complete Application, in

Montana only

- For "Timely Quote Acceptance/Equipement Delivered after day 53" interval changed from 75 Calendar Days

from receipt of CLEC equipment to 45 Calendar Days from receipt of CLEC equipment, in Montana only

- For "Late Quote Acceptance/Equipment delivered before day 53" interval changed from 120 Calendar Days

from Quote Acceptance to 90 Calendar Days from Quote Acceptance, in Montana only

- For "Late Quote Acceptance/Equipment delivered after day 53" interval changed from 75 Calendar Days from

receipt of CLEC Equipment to 45 Calendar Days from receipt of CLEC Equipment, in Montana only

ICDF Collocation (unforecasted)

- For both "Timely Quote Acceptance" and "Late Quote Acceptance" interval was changed from 90 Calendar

Days from receipt of Complete Application to 45 Calendar Days from receipt of Complete Application, in

Montana only


Status History

03/17/02 - CR Submitted by Qwest

03/19/02 - CR acknowledged by P/P CMP Manager.

03/19/02 - Qwest Mailout, PROS.03.19.02.R.00402.SIG_DocReview, issued to CLECs.

03/20/02 - CMP Meeting - Qwest walked-on its CR and introduced it to the participants. Qwest requested and it was agreed that the CR would be executed under the Exception Process. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. CR will be moved to Evaluation.

03/20/02 - SIG document posted to CMP Document Review Web Page for comments by CLECs.

03/29/02 - Qwest Mailout, PROS.03.29.02.F.00413.SIG_Update, issued formal notification of SIG Updates effective March 29, 2002. Status changed to Presented.

04/17/02 - CMP Meeting - Qwest advised that the Final Notification was issued March 29th. It was agreed that the CR could be closed.


Project Meetings


Open Product/Process CR PC041202-1 Detail

 
Title: Service Interval Guide ("SIG") Updates
CR Number Current Status
Date
Area Impacted Products Impacted

PC041202-1 Completed
6/19/2002
Unbundled Loop, Transport, UNE-P
Originator: Dinwiddie, Cliff
Originator Company Name: Qwest Corporation
Owner: Dinwiddie, Cliff
Director:
CR PM:

Description Of Change

Qwest requests that this CR be re-categorized as a Level 2 change request as it consists only of language clarifications and interval improvements.

This Change Request is to highlight, announce and clarify proposed changes to the SIG that is currently available at the following URL: http://www.qwest.com/wholesale/guides/sig/index.html. Qwest is proposing these changes to the SIG to further clarify the state specific intervals driven by (a) state specific Wholesale Service Quality Rules and, (b) state specific US WEST/Qwest merger conditions that contain Wholesale minimum standards of performance, specifically:

- Utah Service Quality Guidelines, Rule R746-365-4. Intercarrier Service Quality.

- Colorado Service Quality Rules, Rule (4 CCR) 723-43-6. Minimum Performance Standards.

- Washington Merger Conditions. 05/24/00 Settlement Agreement. Wholesale Service Quality.

- Minnesota Merger Conditions. 04/14/00 Stipulation and Agreement. Wholesale Service Quality.

Qwest proposes that all documentation changes described herein become effective on 05/01/02.

The following sections of the SIG will be updated as indicated below:

Unbundled Network Elements Platform - UNE-P

UNE-P PBX Trunks:

- Page 13. While the standard interval remains ICB for New Install, Conversion As Specified, Changes (ex. PIC/LPIC or feature changes, etc.), and Suspend/Restore of 25 or more trunks, "Colorado Only: Twenty-Four (24) Business Days" will be added.

UNE-P ISDN BRI:

- Page 16. While the standard interval for Add or Change Feature(s), Add Primary Directory Number (PDN) to established Loop (N2Q), Add Call Appearance remains 3 business days, "Colorado Only: Two (2) Business Days" will be added.

Unbundled Services

2-Wire Voice Grade (VG) Analog Loop:

- Page 96, 97. The standard intervals remain 5, 6 and 7 business days for 1-8, 9-16 and 17-24 lines. Removed "Colorado Only: No Dispatch - 3 business days, With Dispatch - 4 business days" as this language was included in error and has never been implemented in practice. Added intervals to reflect required Minnesota intervals where facilities do not currently exist (i.e. obligation to build). Removed “Utah Only: Five (5) Business Days” for 1-8 Lines as this language is the standard interval and therefore Utah would not be unique. Changed "Utah Only; 3 Business Days" to "Utah Only: Five (5) Business Days" for 9-16 and 17-24 Lines as the 3 day interval information was included in error and has never been implemented in practice. Removed "Utah Only: 3 business days" from 25 or more lines as this information was included in error and has never been implemented in practice.

4-Wire Voice Grade (VG) Analog Loop:

- Page 99. The standard intervals remain 5, 6 and 7 business days for 1-8, 9-16 and 17-24 lines. Corrected the FOC Guidelines from 72 to 24 hours. Added intervals to reflect required Minnesota intervals where facilities do not currently exist (i.e. obligation to build). Added "Utah Only: Five (5) Business Days" for 9-16 and 17-24 line quantities.

2-Wire / 4-Wire Non Loaded Loop:

- Page100. The standard intervals remain 5, 6 and 7 business days for 1-8, 9-16 and 17-24 lines. Added intervals to reflect required Minnesota intervals where facilities do not currently exist (i.e. obligation to build). Added "Utah Only: Seven (7) Business Days" for 25 or more Lines.

Quick Loop:

- Page 102. The standard intervals remain 3 business days up to 24 lines. Added "(No Dispatch Required)" to clarify product offering. Added "Utah Only: Ten (10) Business Days" for 25 or more lines.

Quick Loop + LNP:

- Page 102. The standard intervals remain 3 and 4 business days for 1-8 and 9-24 lines. Added "(No Dispatch Required)" to clarify product offering.

DS1 Capable Loop:

- Page 103. The standard intervals remain 9 business days up to 24 lines. Added intervals to reflect required Minnesota intervals where facilities do not currently exist (i.e. obligation to build). Added "Utah Only: Five (5) Business Days" for all quantities. Removed the Colorado 5 day interval for 1-8 lines as it was included in error and replaced it with the Minnesota requirement.

DS3 Capable Loop:

- Page 105. The standard intervals remain 7 days up to 3 lines. Added intervals to reflect required Minnesota intervals where facilities do not currently exist (i.e. obligation to build). Added "Utah Only: Seven (7) Business Days" for 4 or more lines.

ADSL Compatible Loop:

- Page 106. The standard intervals remain 5, 6 and 7 business days for 1-8, 9-16 and 17-24 lines. Added intervals to reflect required Minnesota intervals where facilities do not currently exist (i.e. obligation to build). Added "Utah Only: Seven (7) Business Days" for 25 or more lines.

XDSL-I Capable Loop/ISDN-BRI Capable Loop:

- Page 108. The standard intervals remain 5, 6 and 7 business days for 1-8, 9-16 and 17-24 lines. Added intervals to reflect required Minnesota intervals where facilities do not currently exist (i.e. obligation to build). Added "Utah Only: Seven (7) Business Days" for 25 or more lines.

OCn Capable Unbundled Loops:

- Page 110. The standard intervals remain ICB. Added "Utah Only: OC3 - Fifteen (15) Business Days, OC12+ - ICB"

Unbundled Dedicated Interoffice Transport:

- Page 113-116. Added "Installation Guidelines apply where facilities/network capacity is in place. When UDIT Type or Dark Fiber facilities/network capacity is not in place, Qwest will not build facilities or hold orders to meet a request except where CLEC has implemented the CLEC Requested UNE Construction Process." Combined UDIT, UCCRE, E UDIT, and M UDIT into the same table to clarify that all intervals for these products are the same.


Status History

04/12/02 - CR Submitted by Qwest.

04/15/02 - CR acknowledged by P/P CMP Manager and posted to Web.

04/17/02 - CMP Meeting -Qwest introduced CR as Walk-on. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

04/18/02 - Called Qwest CR Originator and discussed CR and steps required for Level 4 change

04/30/02 - Notification sent to CLECs for meeting on May 8, 2002 to discuss Qwest responses to questions raised in April 17, 2002 CMP mtg (reference Notification Number CMPR.04.30.02.F.01262.SIG_CR_Meeting)

05/08/02 - Posted Qwest response to CLEC questions raised during the April 17, 2002 CMP meeting

05/08/02 - Held Input Cycle Meeting with CLECs for this Qwest Initiated CR

05/10/02 - Posted draft meeting minutes for 05/08/02 Input Cycle Meeting

05/10/02 - Draft meeting minutes of 05/08/02 Input Cycle Meeting sent to CLEC meeting participants for comment

05/10/02 - Initial Notification issued. CR status changed to "Presented"

05/15/02 - CMP Meeting - CR status "Presented" unchanged. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

05/30/02 - Final Notice issued that stated "No CLEC comments were received during the comment cycle, therefore, the proposed changes will become operational on June 13, 2002". Reference document number PROS.05.29.02.F.00458.Final_Notice_SIG

06/19/02 - CMP Meeting -- CR status changed to "Completed". Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.


Project Meetings

Input Cycle Meeting

Time/Date: 1:00 p.m. (MDT) / Wednesday 8 May 2002 Place: Conference Call-In No.: TEL: 877.521.8688 CODE: 7901848 CR No.:Qwest Change Request PC041202-1 Service Interval Guide ("SIG") Updates

Attendees/Company Cliff Dinwiddie, Qwest Judy Schultz,, Qwest Brenda Palmquist, Qwest Michael Keegan, Qwest Kathleen Stichter, Eschelon Jonathan Spangler, AT&T Terry Wicks, Allegiance Michael Zulevic, Covad Pamela Smith, Sprint Donna Osborne-Miller, AT&T

Description: 2.1 Mike Keegan stated the purpose of this call is to: 1. obtain CLEC input on this Qwest initiated CR (this meeting serves as the collaboration phase) and get agreement for the path forward 2. review proposed changes to the CR description detail 3. review Qwest responses to questions raised by CLECs when CR was presented during the April 17, 2002 Monthly CMP Meeting

2.2 Cliff Dinwiddie reviewed the proposed changes to the CR description detail. Michael Zulevic questioned the Qwest proposed effective date of May 1, 2002 for the changes. Cliff responded that this issue would be discussed later in the meeting. 2.3 Cliff Dinwiddie confirmed that the changes proposed for the CR description are being made to bring it into alignment with the red lined SIG. Corrections, not changes, to intervals are being presented. No changes to process are being made.

2.4 Michael Zulevic stated that Covad did not sign the Minnesota Merger Stipulation and Agreement and that Covad’s ICA should be the basis for intervals. Cliff Dinwiddie/Judy Schultz confirmed that the SIG is a reference guide for CLECs and that other, legally binding, agreements take precedence. Cliff agreed to modify the Qwest Response B1 to add the word “as” to the last sentence so that it will read: "However, the 04/14/00 Minnesota Merger Stipulation and Agreement in the Wholesale Service Quality section requires that any customer order submitted by a wholesale customer is subject to the Wholesale Service Quality as minimum standards of performance."

2.5 Jonathan Spangler asked if the changes to the SIG reflect Qwest current practice. He specifically referenced the Minnesota 45 day interval for 2-wire / 4-wire Non Loaded Loop where new facilities are required. Cliff confirmed the 45 day interval has been the practice and that the 15 day reference was an error in the SIG. Jonathan stated that if the proposed changes represent the current practice, he wondered why his people had not raised the issue about the discrepancy between the intervals shown in the existing SIG and the intervals as currently practiced. Cliff Dinwiddie said the Utah and Minnesota interval references have probably been in the SIG less than 60 days and any downloads of the SIG made over two months ago would not reflect the intervals.

2.6 Kathleen Stichter said Karen Clauson is on vacation this week and she would like Karen’s and Bonnie Johnson’s input. Judy Schultz said they could provide their comments during the 15 day period following initial notification which is the next step in the process. Cliff Dinwiddie said initial notification will be issued by close of business Friday, May 10, 2002.

2.7 Cliff Dinwiddie discussed the effective date of the CR. It is obviously not May 1, 2002 as originally proposed in the CR description. Judy Schultz described the process as follows: 1. Qwest obtains CLEC input into the proposed change (this conference call) 2. Notice of the planned change is issued to the CLECs (initial notification will be issued Friday, May 10, 2002) 3. CLECs have 15 calendar days following initial notification to provide written comments 4. Qwest has up to 15 calendar days following the CLEC cutoff for comments 5. Qwest will provide a second notification at least 15 days prior to implementation 6. Qwest will implement no sooner than 15 calendar days after providing the response to CLEC comments Cliff proposed a June 17, 2002 as the new proposed effective date of the CR which represents 38 calendar days from the initial notification date of May 10, 2002.

2.8 Michael Zulevic asked if the CR could move to a Level 2. Judy Schultz said any change in the Level would have to take place during the monthly CMP meeting per the Master Red-Lined CMP Re-Design document.

Cliff Dinwiddie stated that this CR would remain a Level 4 and that no exceptions to the process would be pursued

Terry Wicks said CLECs are not permitted to request an implementation date for their CRs so Qwest should not propose an effective date or the date derived from the maximum duration allowed by the process should be used.

Cliff Dinwiddie agreed no effective date would be included in the initial notification.

2.9 Terry Wicks asked what happened to the “not to exceed 24 days” language that the CLEC requested be added, during the April CMP meeting , to the Interval Case Basis. Cliff Dinwiddie replied that Qwest Response A addresses this question.

3.0 Cliff Dinwiddie summarized the following at meeting close: 1. initial notification will be issued Friday, May 10, 2002 2. initial notification will not include a proposed effective date 3. "as" will be added to Qwest response B1 as referenced in the notes above.


CenturyLink Response

The following is a summary of the discussion of this Qwest initiated CR in the 04/17/02 CMP meeting and includes CLEC comments resulting from the :Input Cycle Meeting held 05/10/02.

* CLECs did not agree to re-categorize this Qwest initiated CR as a Level 2 change request as CLECs do not agree that the CR consists only of language clarifications and interval improvements. CLECs requested that this CR remain at Level 4 and that the CR Originator respond to the following questions at the next CMP meeting (in May 2000):

CLEC Question/Concern A: There are a number of instances identified in this CR where Qwest wishes to reflect a specific interval where the standard interval is currently listed as "ICB". For instance, the standard Installation Guidelines for UNE-P PBX Trunks (New Install, Conversion As Specified, Changes, Suspend/Restore) for 25 or more trunks is reflected as "ICB". Qwest proposes including "Colorado Only: Twenty Four (24) Business Days" to care for the requirements in Colorado Service Quality Rule (4 CCR) 723-43-6. However, it is possible that in the past that Qwest installed that service in some interval less than 24 business days. Therefore, this is not necessarily an interval reduction. The updated language should instead read, "Colorado Only: Not To Exceed Twenty Four (24) Business Days." [Emphasis added.]

Qwest Response A: Qwest understands the CLEC’s proposal. The General Information section of the SIG on page 6 states, "This document sets forth performance guidelines, not guarantees of performance." [Emphasis added.] Further, on page 8, the SIG states, "Guidelines published in this document are for inward activity, i.e., new service, changes in service address, etc., where facilities and/or network capacity are in place. Facilities and/or network capacity not in place will be handled on an Individual Case Basis for the due date and the firm order confirmation." [Emphasis added.] For consistency sake, it is Qwest’s intent to add the state specific language as originally outlined in this CR to ensure that the SIG is the most comprehensive and efficient reference guide possible. In this example, Colorado Service Quality Rule (4 CCR) 723-43-6 requires that Qwest deliver 25 or more UNE-P PBX trunks within 24 business days. Qwest intends to represent this Colrado rule (and other rules where the standard guideline is ICB as originally outlined in this CR) as "Colorado Only: Twenty Four (24) Business Days". This is the way that all other interval guidelines in the SIG are represented.

It is important to note that this change in documentation only has no impact on Qwest’s processes. Therefore, the interval will still be handled the same way it was in the past and if the circuit can be turned up prior to it’s minimum interval, Qwest will deliver that circuit in the time-frame under which it is available.

CLEC Question/Concern B: There are a number of instances identified in this CR where Qwest wishes to reflect intervals specific to Minnesota where facilities do not exist. For instance, for 2-Wire Voice Grade (VG) Analog Loop (1-8 Lines), the standard interval is "Five (5) Business Days." In this CR, Qwest proposes that the following language be included "Minnesota Only: Where Facilities are not available, Fifteen (15) Business Days." The CLECs have a number of questions and concerns about Qwest’s proposal: 1. The 04/14/00 Minnesota Merger Stipulation and Agreement applies only to those CLECs who opted into that agreement. 2. In light of this standing rule, what has been Qwest’s practice in the provisioning of service in the state of Minnesota? Will that process change as a result of this SIG update? 3. In light of this standing rule, how is Qwest reporting provisioning performance in MN specifically and PIDs generally? Will that process change as a result of this SIG update? 4. In light of this standing rule, how are held order statistics calculated? Will that process change as a result of this SIG update?

Qwest Response B: Qwest reasserts that all proposed SIG updates in this CR, as indicated in the 04/17/02 CMP meeting, consist only of language clarifications and interval improvements. Thus, this language clarification has no impact to current provisioning, measurement or reporting processes or practices in Minnesota or other parts of the Qwest local service region. However, Qwest will briefly address each of the CLECs questions although they are not related to this CR. 1. CLECs communicated concern that the Minnesota Merger Stipulation and Agreement applies only to those CLECs who have opted into that agreement. However, the 04/14/00 Minnesota Merger Stipulation and Agreement in the Wholesale Service Quality section requires that any customer order submitted by a wholesale customer is subject to the Wholesale Service Quality as minimum standards of performance. 2. CLECs had questions about Qwest’s compliance with provisioning requirements in Minnesota and communicated concern that Qwest’s provisioning practice would change as a result of this SIG update. As indicated in the 04/17/02 CMP meeting, this language clarification will have no impact on Qwest’s provisioning practice. a. If facilities are available, Qwest will transmit a Firm Order Confirmation ("FOC") to the CLEC that reflects a due date that meets the customer’s request.. b. If facilities are not available, Qwest will transmit a FOC to the CLEC that reflects a due date that is in keeping with the requirements of the 04/14/00 Minnesota Merger Stipulation and Agreement. 3. CLECs had questions about how Qwest is measuring and reporting provisioning performance in Minnesota specifically and for PID requirements generally. Again, this minor language clarification has no impact on Qwest’s provisioning, measurement or reporting processes. Qwest remains consistent with PUC and PID reporting requirements. Data is provided pursuant to the requirements of the 04/14/00 Minnesota Merger Stipulation and Agreement. Measurement and reporting methodologies for the third party OSS testing effort are available in those forums. 4. CLECs expressed specific concerns regarding the impact of this language clarification on held order processes and reporting requirements. Again, this minor language clarification has no impact on Qwest’s provisioning, measurement or reporting processes. Qwest remains consistent with the provisions of the 04/14/00 Minnesota Merger Stipulation and Agreement.


Open Product/Process CR PC042902-1 Detail

 
Title: PDR Transfer of Responsibilty
CR Number Current Status
Date
Area Impacted Products Impacted

PC042902-1 Completed
10/16/2002
Other: Poles, Ducts and Rights of Way
Originator: Rossi, Matt
Originator Company Name: Qwest Corporation
Owner: Lacy, Jane
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

PDR Transfer of Responsibility refers to the transfer of your exising PDR agreement to occupy either aerial or underground facilities to an assuming CLEC or from a vacating CLEC to you.

CLEC requirements

- Assuming CLEC must have language supporting Poles, Ducts and Rights of Way in their ICA

- Both the Vacating and Assuming CLECs must sign the PDR Transfer of Responsibilty Contract Amendment

- Assuming and vacating CLECs must sign and submit the PDR Transfer Authorization Agreement (LOA)

- Assuming CLECmust complete and submit the PDR Transfer of Responsibility Application Form.

- Assuming CLEC must submit full payment of the PDR Transfer of Responsibility Transfer Charge. Requested transfer is irrevocable upon 100% payment of this charge.

Process and Procedures

- Once a complete and accurate PDR Tranfer of Responsibilty request is submitted, Qwest will complete the transfer within 15 business days unless otherwise negotiated.

- Once a complete and accurate request has been made, Qwest will issue a Tranfer of Responsbility Consent form which will acknowlege and grant the transfer effective on the date indicated . (see above)

- Qwest will send email notification to both Vacating and Assuming CLECs once transfer (billing) is made effective

- Effective date will designate date in which Assuming CLEC is responsible for all recurring payment for the trasfered occupancy of facilities.

Required Documentation

- PDR Transfer of Responsibility Application Form

- Qwest PDR Transfer Authorization Agreement

- PDR Transfer of Responsiblitly Contract Amendment

Web links

- PDR Product Catalog (PCAT) - www.qwest.com/wholesale/pcat/poleductrow.html

- PDR Contract Amendment - www.qwest.com/wholesale/clecs/negotiations.html

Qwest Point of Contact

Matthew Rossi - Collocation Product Manager

303 896-5432

mrossi@qwest.com

Proposed Implementation date: TBD with the CLECs on 5/15

Reason for change - due to current market conditions, will allow CLECs the ability to transfer occupancy of aerial or underground facilities to an assuming CLEC.

Why Level 4 - Because this is for the CLEC community, Qwest wishes to get CLEC input on this offering. This offering was taken from the same basic structure and concept as the Collocation Transfer of Responsibility that

was jointly defined and developed by the CLEC community and Qwest. Qwest wanted to present at the monthly CMP meeting to verify clarity and input from the CLEC community.


Status History

04/29/02 - CR Submitted by Qwest.

04/29/02 - CR acknowledged by P/P CMP Manager

05/01/02 - CR posted to Web

05/03/02 - Called Qwest CR Originator and discussed CR and steps required for Level 4 change

05/15/02 - CMP Meeting - CR status changed to Clarification. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

05/22/02 - Issued Mailout Notification, CMPR.05.22.02.F.01270.CMP_MTG_6_7_02, scheduling CLEC input conference call for June 7th, 01:00 am to 03:00 pm MT.

06/07/02 - Conducted CLEC input conference call. No CLECs joined the call. Qwest will issue its initial notification with documents for CLEC comment in accordance with the CMP procedures.

06/19/02 - CMP Meeting - CR status changed to "Development". Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status remains development.

07/19/02 - Issued Mailout Notification, PROD.07.19.02.F.00793.Poles_Ducts_ROW_V7, ? Which was an update that added the new product and process for Transfer of Responsibility, to the Poles, Ducts and Rights of Way documentation

08/15/02 - Issued Final Notification, PROD.08.15.02.F.00811.FinalNot_PDR. Process will become effective 8/30/02.

08/21/02 - August CMP Meeting - Qwest provided status on final notification issuance. Minutes on this CR will be posted to the project meetings section. Status will be changed to CLEC test on 8/30/02.

08/30/02 - Changed status to CLEC test in accordance to direction from CMP meeting.

09/18/02 - September CMP Meeting - CR will remain in CLEC test. Minutes on this CR will be posted to the project meetings section.

10/16/02 - October CMP Meeting - Minutes on this CR to be posted to the Project Meetings section. CR will be moved to Completed Status.


Project Meetings

10/16/02 October CMP Meeting Jane Lacy with Qwest said the product has been launched. There were no questions from CMP participants and the CR was updated to Completed status.

09/18/02 September CMP Meeting Qwest provided an update that on August 30, 2002, the proposed changes became operational and the contract amendment and PDR PCAT can be viewed on the website. This CR status will remain in CLEC Test until the October CMP when it is anticipated that it would update to Completed.

--

08/21/02 - August CMP Meeting Minutes: Qwest provided an update that no CLEC comments were received during the comment cycle, and the proposed changes will become operational on August 30, 2002. The CR status will remain in development until August 30, 2002 when it will move to CLEC test.

07/17/02 - July CMP Meeting Minutes: Qwest will add the new product and process for Transfer of Responsibility, to the Poles, Ducts and Rights of Way documentation by July 19, 2992. CR status remains development.


Open Product/Process CR PC043002-1 Detail

 
Title: Fiber Provider Point of Entry
CR Number Current Status
Date
Area Impacted Products Impacted

PC043002-1 Withdrawn
5/9/2002
Ordering, Billing, Maintenance/Repair, Provisionin Other: An Entrance Facility type product offering
Originator: Campbell, Ben
Originator Company Name: Qwest Corporation
Owner: Campbell, Ben
Director:
CR PM: Thomte, Kit

Description Of Change

This new product will be available to CFP and CLECs that provide backbone facilites. This product will allow them to place entrace facilites into the Qwest wire center for the purpose of connecting with a collocation. Qwest is developing this product as part of its response to the Petion from the Competitive Fiber Providers. This product development is currently scheduled to be completed by the end of May with the availability and notification taking place in June.


Status History

04/30/02 - CR Submitted by Qwest.

04/30/02 - CR acknowledged by P/P CMP Manager

05/01/02 - CR posted to Web

05/06/02 - Contacted originator of CR

05/09/02 - CR was withdrawn by originator


Project Meetings


Open Product/Process CR PC050102-1 Detail

 
Title: Available Inventory
CR Number Current Status
Date
Area Impacted Products Impacted

PC050102-1 Completed
4/15/2009
Collocation
Originator: Rossi, Matt
Originator Company Name: Qwest Corporation
Owner: Nelson, Steve
Director:
CR PM: Harlan, Cindy

Description Of Change

Available inventory refers to existing collocation sites and elements that have been returned to Qwest due to legal proceedings, abandonment, cancellation or decommission. Available Inventory gives CLECs the potential to assume these returned sites at a discounted rate, and gives the vacating CLEC an opportuntiy for a refund.

Reason for Change:

Due to recent market conditions, the number of vacated collocation sites has increased. This product offering is being developed to give CLECs the ability to purchase already existing collocation sites from other CLECs or Qwest and give vacating CLECs the potential to receive a percentage refund for those existing elements that are deemed reusable.

Qwest is presenting this product offering as a level 4 Qwest initiated Change in order to seek the input of the CLEC community in the final development of this offering. Proposed implementation date for this new product offering is August 1, 2002.

Terms and Conditions

Available sites will be listed on a web site called the "Collocation Classifieds", which will be released as part of this offering. Collocation sites available on this listing may be totally or partially completed before being returned to inventory. Both caged and cageless sites will be offered on the inventory list. Sites will be offered “AS IS, WHERE IS.” Additional elements may be ordered with the purchase of the available “AS IS WHERE IS” site, but CLECs can not reduce any elements until the Available Site order is complete. Refunds from any elements determined to be reusable under Qwest’s Collocation Decommissioning policy will be returned to the previous owner of the collocation space following a sale of such site from the "Collocation Classifieds". All services that were previously connected to the collocation (i.e. Unbundled Network Elements, CLEC to CLEC, administrative lines, finished services, line splitting and line sharing, etc.) will be disconnected before the site is listed on the "Collocation Classifieds".

Rate elements

Pricing for available sites on the "Collocation Classifieds" will be provided on a site-specific basis. Sites will be priced based on outstanding non-recurring charges from previous CLEC, amounts for reimbursable elements and transfer fees. These charges will be provided to a CLEC via a quote that requires their acceptance before work begins. Recurring charges for all elements will be charged at rates listed in the assuming CLECs interconnection Agreement and without a discount.

Ordering

CLECs wishing to purchase an existing site listed in the "Collo Classifieds" will do so by submitting a Qwest Collocation Application Form. Upon receipt of the complete application, Qwest will verify that the requested site is still available for acquisition and will return a feasibility study to CLEC within the timelines listed in the CLECs Interconnection Agreement (ICA).

Qwest Point of Contact

Matthew Rossi - Collocation Product Manager

303 896-5432

mrossi@qwest.com


Status History

05/01/02 - CR Submitted by Qwest.

05/01/02 - CR acknowledged by P/P CMP Manager

05/03/02 - CR posted to Web

05/06/02 - Reviewed with Qwest CR Originator to review CR.

05/15/02 - CMP Meeting - Qwest presented its CR and suggested the required input format. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

05/20/02 - Issued Mailout Notification, CMPR.05.20.02.F.01269.Collocation_Mtg, scheduling CLEC input conference calls for May 29th and June 12th, 10:00 am to 12:00 noon MT.

05/29/02 - Conducted CLEC input conference call. It was agreed by the participants that meeting minutes would not be issued; however, the revised process document would be issued through the mailout process and to each of the participants.

06/10/02 - Issued revised process description document to the CLEC participants at session 1 CLEC input conference call.

06/11/02 - Issued revised process description document to the CLEC community. Notification CMPR.06.11.02.F.01279.Collocation_Mtg.

06/12/02 - Conducted CLEC input conference call second session. It was agreed that a third session would be held June 26, 2002, 10:00 a.m. MT.

06/14/02 - Notified CLEC community of third session to review process documents. Notification CMPR.06.14.02.F.01280.Collocation_Mtg_3.

06/19/02 - CMP Meeting - Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. CR status was changed to Development.

06/24/02 - Issued additional documents to the CLEC community for review at third session on 6/26/02. Notification CMPR.06.24.02.F.01283.Collocation_Mtg.

07/17/02 - Qwest provided status update on development process. Meeting minutes posted to this CR's Project Meetings section

07/25/02 - Qwest issued initial notification on Collocation Classified which is associated with Available Inventory process. Notification Prod.07.25.02.F.00799.Collo_Classified.

08/21/02 - CMP Meeting - Qwest provided a status on issuance of the final notification. Minutes on this CR to be posted to the Project Meetings section. Status to remain in Development.

08/22/02 - Qwest issued the Final Notification. Notification PROD.08.22.02.F.00812.ColloClassifiedFinal.

09/09/09 - Changed CR Status to CLEC Test in accordance with August's CMP Meeting.

09/18/02 - CMP Meeting - Qwest advised that the product was effective on 09/16/02. Minutes on this CR to be posted to the Project Meetings section. CLECs requested that the CR remain in a CLEC Test status.

10/16/02 - CMP Meeting - Qwest advised that this product was effective on 09/16/02 and requested closure of CR. ATT requested to be left in CLEC Test one more month. Minutes on this CR to be posted to the Project Meetings section.

11/20/02 - November CMP Meeting Qwest clarified reusable and reimbursable and proposed closure of CR. ATT agreed to double check with Sharon V and advise.

11/22/02 - Email received from ATT authorizing closure effective 11/20/02.


Project Meetings

11/20/02 November CMP Monthly Meeting Minutes Qwest (Nelson) reported this process was implemented 9/16/02. Qwest clarified the difference between Reimbursable and Reusable. Qwest requested to close this CR. ATT (Spangler) advised they would verify with Sharon Van Meter that is is okay to close this CR. On 11/22/02 ATT provided authorization to close this CR effective 11/20/02.

10/16/02 October CMP Monthly Meeting Minutes Qwest reported this process was implemented 09/16/02 and requested to close this CR. World Comm clarified this process provides information about available inventory to CLECs. ATT requested to leave this CR in CLEC test until next month as they may have some items pending. This CR will remain in CLEC Test.

09/18/02 September CMP Monthly Meeting Minutes

Qwest advised that the Available Inventory product was effective on September 6th. The information is located in the Collocation PCAT and under optional features there is a link to the Collo Classified. Also the Contract Amendment is available in the Contract Negotiation Web page. This CR status will remain in “CLEC Test” until the October CMP when it is anticipated that it would update to “Completed.”

-

08/21/02 August CMP Monthly Meeting Minutes

Qwest advised that they received no comments on the initial notification. They plan to issue the final notification 8/22/02, the process will become effective 9/6/02 and amendments will be available at that time. Qwest advised that they continue to receive returned sites through bankruptcy proceedings. These sites will have a Qwest initiated Decommissioning which takes between 60 – 90 days. Qwest wants to make these sites known as soon as possible; therefore, the Collo Classifieds will have two lists – Verified and Unverified. The CLECs would be able to order from the Unverified list, but Qwest can’t guarantee complete availability until decommissioning is complete and the site verified. The participants agreed with this change. It was agreed that the CR would move to CLEC Test on 9/6/02.

--

07/17/02 - July CMP Meeting Minutes: Qwest will issue documentation July 26, 2002. CR status remains development.


Open Product/Process CR PC080602-1 Detail

 
Title: Obsolete Scan Alert in AZ, CO, IA, ID, MN, MT, NE, ND, NM, SD, UT, and WY
CR Number Current Status
Date
Area Impacted Products Impacted

PC080602-1 Completed
8/18/2004
Ordering Resale
Originator: Van Dusen, Janean
Originator Company Name: Qwest Corporation
Owner: Van Dusen, Janean
Director:
CR PM: Andreen, Doug

Description Of Change

Revised Description of Change 05-19-04

Obsolete Scan Alert in AZ, CO, IA, ID, MN, MT, NE, ND, NM, SD, UT, and WY

Because Qwest Retail does not offer Scan Alert in AZ, Qwest Resale will make Scan Alert in AZ obsolete on 11/6/02.


Status History

08/06/02 - CR Submitted by Qwest

08/06/02 - CR acknowledged by P/P CMP Manager.

08/07/02 - CR Posted to Web

08/07/02 - Contacted Qwest SME and discussed requirements of the CR.

08/21/02 - CMP Meeting - Qwest presented CR and CR will move into development status.

09/12/02 - Posted Qwest letter dated 9/11/02

09/18/02 - September CMP Meeting - Qwest presented CR and CR will move to Deferred. Meeting minutes will be posted to this CR's Project Meetings section.

05/19/04 - May CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section.

05/24/04 - Qwest issued PROD.05.24.04.F.01711.ScanAlertV4, proposed effective date 7/8/04

06/16/04 - June CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section.

06/23/04 - Qwest issued Product final notice PROD.06.23.04.F.01803.FNL_ScanAlertV4 effective date 7/25/04

7/21/04 -July CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section.

8/18/04 -August CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section.


Project Meetings

CMP Meeting 8/18/04 Doug Andreen reported the CR was effective July 25. The CR will move to Completed status.

-- 7/21/04 CMP Meeting Janean Van Dusen, Qwest said the effective date will be 7/25. The final notice was sent 7/8. The CR will move to Test status.

- 06/16/04 June CMP Meeting Janean Van Dusen with Qwest said this CR will be effective on 7/8/04 and final notice will be sent 6/23/04. This CR will remain in Development Status.

05/19/04 May CMP Meeting Janean Van Dusen with Qwest said this CR had been in deferred status and we have received FCC approval. We would like to revise the CR to include all states except WA and OR. There are no customers in other states and the effective date will be 7/8/04. Linda Sanchez-Steinke will update the CR to include all states except WA and OR. This CR will move to Development Status.

09/18/02 September CMP Meeting Qwest advised that after initial work to obsolete Scan Alert in Arizona, found that the FCC needs to approve the change, and Qwest would like to move this CR into a deferred status. Worldcom asked if Qwest would offer Scan Alert in Washington and Oregon. Qwest stated that Scan Alert would only be obsolete in Arizona. All agreed that this CR will be moved to Deferred status.

08/21/02 - August CMP Meeting Minutes: Qwest advised that Retail will no longer offer Scan Alert in Arizona effective November 6, 2002. Allegiance asked if the product will be removed from customers that currently have it and Qwest responded that there are no retail customers that have the product. It was agree that the CR will be moved to Evaluation status.


CenturyLink Response

September 11, 2002

For review by CLEC Community and discussion at September’s CMP Meeting

SUBJECT: Qwest’s Change Request – PC080602-1 “Obsolete Scan Alert in Arizona.”

This CR was issued to make the product “Scan Alert” obsolete in Arizona. Qwest issued this CR to make the resale of Scan Alert in Arizona obsolete on 11/6/02.

Since submission and presentation of this CR at the August Product & Process Monthly Meeting, Qwest has been made aware that the timeline for making Scan Alert obsolete in Arizona has been delayed and no new timeline is available.

At the September Monthly Product & Process CMP Meeting, Qwest will seek concurrence with CMP participants to update the status of this CR to "Deferred" status. Qwest will periodically review the status of this Change Request and, if conditions warrant, Qwest may explore other options for implementing this change.

Sincerely,

Janean Van Dusen Associate Product Manager, Qwest


Open Product/Process CR PC081302-1 Detail

 
Title: Qwest to establish a standard business day minimum DD on Port In to Resale/UNE P, 1 + Lines.
CR Number Current Status
Date
Area Impacted Products Impacted

PC081302-1 Completed
7/16/2003
Ordering, Provisioning LNP, Resale, UNE-P
Originator: Wells, Joan
Originator Company Name: Qwest Corporation
Owner: Wells, Joan
Director:
CR PM: Harlan, Cindy

Description Of Change

Revised 08-30-02

In an effort to improve the existing process associated with the Wholesale Resale/UNE Local Service Providers (LSP) Port In activity to the Qwest network, Qwest recommends and will implement changes to the current FOC and Due Date intervals.

Currently, upon receipt of the NLSP’s (New Local Service Provider’s) LSR, Qwest sends an LSR to the OSP (Old Service Provider) and waits to receive an FOC back, before issuing the internal Qwest order to complete the port in activity and confirm the port DD.

Delays in receiving timely FOC’s from the CLEC OSP, affect Qwest’s ability to FOC the NLSP in a timely manner and causes delays in installation.

Qwest recommends the following intervals:

Simple Service, 1FR/1FB service, 1-50 lines ported, minimum 6-business days

Complex Service (PBX, Trunks, ISDN, Centrex) 1-25 lines or trunks ported, minimum 6 business days

Simple Service, 1FR/1FB service, 51+ lines ported, minimum 10-business days

Complex Service (PBX, Trunks, ISDN, Centrex) 26 + lines or trunks ported, minimum 10 business days

Qwest will send the LSR to the OSP with nothing less that a 6 or 10-business day interval and issue our internal order. This allows Qwest to FOC the order to the NLSP upon issuance of the LSR to the CLEC OSP, based on FOC guidelines for the specific product ordered.

Qwest will then follow-up for receipt of the FOC from the OSP. On the 6th or 10th business day, if the FOC has been received from the OSP, no further action is needed and the port will proceed to activate as scheduled. If the FOC has not been received, Qwest will proceed with the port in activation and send a supplement to the CLEC OSP. Qwest will advise the OSP that the port is proceeding as scheduled and that they need to remove the TN(s) from their switch on the designated DD and FDT (Frame Due Time). No mechanized system changes are needed for this process.

Qwest currently has documented service intervals for LNP port out that are equal to or far less than the 6 or10-day proposed intervals and feels this proposal greatly improves the port in process for the Wholesale Resale and UNE Providers.

The complete detailed process, along with expectations of both the Wholesale Resale/UNE Provider NLSP and the CLEC OSP will be provided on the clarification call.

Expected Deliverable:

The expectation of this deliverable, once reviewed with the CLEC community, is that Qwest will be able to supply a timely FOC to the NLSP which allows greater planning for the NLSP, as a more definite defined due date is established. Qwest’s proposal is to implement this new process within 30.


Status History

08/12/02 - CR Submitted by Qwest

08/13/02 - CR acknowledged by P/P CMP Manager.

08/14/02 - CR Posted to Web

08/13/02 - Contacted Qwest SME and discussed requirements of the CR.

08/21/02 - CR not submitted by cut-off date. Additional work is needed prior to introduction at CMP Meeting.

08/30/02 - Received Revised CR from Qwest

09/18/02 - September CMP Meeting Joan Wells Qwest introduced CR. It was agreed that the CR could move into Evaluation. Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package 10/16/02.

10/03/02 - Mailout notification completed for schedule of meetings and Attachments A-C, CMPR.10.03.02.F.01336.Mtg_For_Resale_UNEP

10/07/02 - Mailout notification completed for Attachment D, CMPR.10.07.02.F.01337.Resale_UNEP_Document

10/10/02 - Held first Introductory CLEC meeting scheduled for 10/10/02 per mailout notification

10/15/02 - Held second Introductory CLEC meeting scheduled for 10/15/02 per mailout notification

10/16/02 - October CMP Meeting - Meeting discussions and minutes will be posted to the Project Meetings section

10/22/02 - Held first working session CLEC meeting scheduled for 10/22/02 per mailout notification

10/24/02 - Held second working session CLEC meeting scheduled for 10/24/02 per mailout notification

10/29/02 - Held third working session CLEC meeting scheduled for 10/29/02 per mailout notification. Agreed to update and distribute process document based on working sessions. Eschelon volunteered to trial this process approximately November 1-15. Qwest will schedule another meeting to review the results of the trial and any outstanding issues.

10/31/02 - Mailout notification distributed with updated process, industry flow attachments, and next meeting notification for November 19, 2002.

11/19/02 - Held CLEC meeting to review the results of the trial with Eschelon. ATT identified items to change in the process and Qwest agreed to incorporate the requested changes to the process. Agreement reached to share results at monthly CMP meeting and to extend the trial for all Port In to Resale/UNE-P 1+lines activity.

11/20/02 - November CMP Meeting Joan Wells shared results of trial and proposed to extend the trial to all Port In to Resale/UNE-P 1+ lines activity.

11/26/02 - Notification sent out offering 3 meeting options to review results of extended trial

11/27/02 - Notification sent out providing copy of updated process and advising the trial has been extened to all LNP Port In to Resale/UNE-P LSR activity

12/03/02 - Notification sent out advising meeting scheduled for December 11, 2002 12:00 - 1:00 pm mdt to review the results of the extended trial

12/11/02 - Held CLEC meeting to review the results of the Extended Trial for all LSR Port In to Resale/UNE-P activity. See meeting minutes for more details.

12/18/02 - December P/P CMP Meeting notes will be posted to the Project Meeting section. Process trial extended and still underway. An issue was identified by Allegiance and the team agreed to schedule another meeting to work on the identified issue. A meeting notification will be created and sent out. The team agreed to continue with the extended trial and process orders using the proposed process.

12/30/02 - Notification sent out Document Number: CMPR.12.30.02.F.01384.MtgTimes_CR081302-1, CMP Meeting Options Notification for LNP Port In to Qwest Resale/UNE-P

01/02/03 - Meeting day and time selected for LNP Port In to Qwest Resale/UNE-P 'Gap Review Meeting'. Thursday, January 9, 2003, Time: 9:00 am to 10:00 am (MST7MDT), Location: 1-877-572-8687 3393947#

01/09/03 - Held CLEC working session to review issue discussed at December CMP meeting. Notes are posted to the project meeting section of the database.

01/15/03 - CR discussed at CMP Meeting

1/24/03 - Notification of updated process sent out - updated process included agreements made at the Jan. 9 CLEC working session meeting

02/19/03 - February CMP Meeting Minutes will be posted to the Project Meeting section of the database.

03/19/03 - March CMP Meeting minutes will be posted to the Project Meeting section of the database.

4/16/03 - April CMP Meeting minutes will be posted to the database

5/21/03 - May CMP Meeting minutes will be posted to the database

6/18/03 - June CMP Meeting minutes will be posted to the database

7/16/03 - July CMP Meeting minutes will be posted to the database


Project Meetings

07/16/03 - July CMP Meeting Joan Wells – Qwest advised this process is published and working. Bonnie Johnson-Eschelon advised it is okay to close this CR. This CR will move to Completed status.

06/18/03 - June CMP Meeting Cindy – Qwest advised this CR is in the same status as Joan’s other two CRs and we should leave this in CLEC Test one more month.

05/21/03 - May CMP Meeting Joan Wells with Qwest said that documentation has been provided on the document review website and the comment cycle has been completed. The effective date is 5/13/03. This CR will move to CLEC Test status.

04/16/03 - April CMP Meeting PC081302-1: Standard Business Day Minimum DD on Port In to Resale/UNE-P, 1+Lines Joan Wells – Qwest reported the PCAT was released on target. This CR will stay in Development status.

03/19/03 - CMP Meeting Joan Wells – Qwest reported the PCAT is on target for release April 1, 2003. This CR will stay in Development status.

02/19/03 - CMP Meeting Cindy Macy–Qwest reported we are creating the PCAT documentation for this CR along with the other two open CRs that impact the Port In process. The target date for the CLECs to review the documentation is April 1, 2003.

01/15/03 - CMP Meeting

Wells-Qwest stated that Qwest and the CLECs had conducted a call in early January and that Qwest would make the process changes discussed in that meeting and distribute a notification announcing them. CR remains in Development.

Meeting Minutes for CLEC working session for CR PC081302-1 LNP Port In to Qwest Resale/UNE-P

January 9, 2003 9:00 – 10:00 a.m. MDT Conference number: 1-877-572-8687 3393947#

In Attendance: Steve Reynolds Ernest Communications Cindy Macy Qwest Scott Ellefson Qwest Jill Anderson Qwest Lori Mendoza Qwest Bill Markert Eschelon Jonathan Spangler ATT Lydell Peterson Qwest Joan Wells Qwest

The team met to review the issue identified by Allegiance during the December CMP Meeting. Cindy- Qwest shared Bonnie Johnson Eschelon’s concern and understanding of the issue. Eschelon’s concern is that if Qwest has contact with the old service provider via a reject we should not continue to port the service until we resolve the reject. In addition, Eschelon explained they believe the issue was caused by a difference in the standard intervals between this process and Allegiance and potentially other CLECs.

Joan Wells Qwest and Lori Mendoza Allegiance agreed this is their understanding of the issue also. Lori Mendoza-Allegiance explained their intervals are different than what Qwest has in the process. Allegiance has the following intervals: Less than 10 lines=5 bus days 11-20 =7 bus days 21-40 =10 bus days 40+ =negotiated

Joan advised Qwest would expect the CLEC to reject the request back to us within 48 hours and change the due date to meet their service interval. Qwest would then honor the FOC of the due date returned to us. Joan explained 2 options: 1st option: FOC back with date the service provider can support 2nd option: Reject LSR and advise the next available date that can be supported and Qwest would supp the LSR

Joan clarified in the issue Allegiance is sharing Qwest received the Reject on the due date. The CLECs agreed Qwest can not stop the Port on the due date as the port has potentially already occurred.

Joan agreed to change the process to prevent this from occurring again. The process will be updated so Qwest will notify the CLEC 1 day prior to the Due Date if we are going to port. Qwest will also recalculate the standard interval if we receive a reject or supp. We will start the calculation over.

Joan reviewed the escalation process.

Jonathan Spangler – ATT explained the requested due date is just a requested due date. It is not the FOC or committ date. The winning CLEC is requesting a due date but it is the commitment of the old CLEC to FOC back a committed due date. Joan Wells agreed.

Lori Mendoza- Allegiance advised if the above stated changes are made to the process it should alleviate her issues.

Next steps include for Joan to update the process based on the changes agreed to. Cindy will redistribute the process via a notification the week of January 20. Status will be provided by Joan Wells at the January CMP meeting. After the process is redistributed the PCAT will begin to be created/updated.

12/18/02 December CMP Monthly Meeting Qwest-Joan Wells reviewed the data that was gathered during the extended trial. Wells explained the process is working as developed. Allegiance-Mendoza described an issue that occurred when they were the old service provider. Allegiance rejected the LSR but the TNs were ported by Qwest anyway, based on the outlined trial process. Qwest contacted the Service Manager to help work the issue on the scheduled due date. The reject occurred on the scheduled due date. Allegiance advised their intervals may be longer than Qwest’s current intervals which could have impact on the process. The team agreed another working session would be scheduled to review the data to determine if this is an isolated incident or if a change should be made to the process to prevent this from occurring again. The meeting should be held before January 16, 2003 to accommodate Lori Mendoza’s schedule. The extended trial will continue and if other issues surface that data will be reviewed.

12/11/02 - Held CLEC meeting to review the results of the Extended Trial to all LSR activity for Port In to Resale/UNE-P. Qwest provided data on the LSRs that came in during the extended trial period (see below). No additional issues came about as a result of the extended trial. The team agreed we would continue with the trial until full implementation occurs. Next steps include sharing information at the December CMP Product Process meeting on 12/18/02. The process will be documented and follow Level 4 guidelines for implementation. If new issues arise after implementation they would be handled on an individual case basis utilizing your Service manager.

Out of 82 LSR's submitted for port in to Resale/UNE-P, 74% were FOC'd prior to the desired due date for that due date. 9% were rejected prior to the DDD 1% was ported without receiving an FOC 4% were cancelled by the NSP prior to the DD 12% with future due dates have not been FOC'd yet Average FOC interval was 4 days

11/20/02 November CMP Monthly Meeting Minutes - Qwest (Wells) reported three CLEC working sessions, a trial with Eschelon and a meeting to review the trial results are completed. Eschelon was happy with the results of the trial. Additional issues identified by ATT were addressed and the process will be updated to reflect the changes. Qwest advised they will extend the trial to all Port In to Resale / UNE-P activity. Qwest will create a Notification to advise the CLEC community the trial will be extedned to all Port In to Resale/UNE-P activity effective immediately. Qwest will attach the updated process document to the Notification. Qwest will schedule another review meeting in early December to gather any additional comments from the extended trial. Qwest will report trial status and findings at the December CMP Meeting. Qwest will then have the PCAT updated and made available for comments. This CR will remain in Development status.

11/19/02 - Held CLEC meeting to review the results of the trial with Eschelon. ATT identified items to change in the process and Qwest agreed to incorporate the requested changes to the process. Agreement reached to share results at monthly CMP meeting and to extend the trial for all Port In to Resale/UNE-P 1+lines LSRs.

10/29/02 - Held third working session CLEC meeting scheduled for 10/29/02 per mailout notification. Agreed to update and distribute process document based on working sessions. Eschelon volunteered to trial this process approximately November 1-15. Qwest will schedule another meeting to review the results of the trial and any outstanding issues.

10/24/02 - Held second working session with CLECs to review process, identify issues, and discuss potential trial.

10/22/02 - Held first working session with CLECs to review Industry flow documentation and identify and issues/action items related to implementing the Qwest proposed process.

10/16/02 - October CMP Monthly Meeting Minutes Qwest reported two introductory CLEC meetings have been held to discuss the CR and proposed process. Qwest requested the CLECS send to cmacy@qwest.com their Port Out interval information. Qwest verified the first working session is scheduled for October 22, 2002. This CR will remain in Development status.

10/15/02 - Held second Introductory Meeting with CLECs to share information about the CR and Qwest's Proposed Process.

10/10/02 - Held first Introductory Meeting with CLECs to share information about the CR and Qwest's Proposed Process.

09/24/02 - September CMP Meeting Minutes Qwest explained this CR would establish a standard 6 & 10 day business day minimum DD on Port In to Resale/UNE P, 1+lines. Currently the process is not working well as installation gets delayed for the NSP. The CLECs supported the CR and agreed on the Level 4 classification. The CLECs explained their interval process would have to change so there will be impact to the CLECs. We need to encourage as many CLECs as possible to attend the meetings. The team determined a series of meetings would be held to discuss the CR. Two introduction meeetings would be scheduled a few days apart to allow multiple times for CLECs to attend. Additional 1 1/2 hour working sessions would be scheduled to allow for comparison of intervals and discussion of issues and drive towards a standard interval that all CLECs can support. The CLECs should send their current intervals to Cindy Macy - Qwest to include in the meeting documentation. Meeting notifcation will be posted on the web.

08/21/02 - August CMP Meetig Minutes CR not submitted by cut-off date. Additional work is needed prior to introduction at CMP Meeting.


CenturyLink Response

09/18/02 Qwest Response: Provided status update at September CMP meeting. Qwest explained this CR would establish a standard 6 & 10 day business day minimum DD on Port In to Resale/UNE P, 1+lines. Currently the process is not working well as installation gets delayed for the NSP. The CLECs supported the CR and agreed on the Level 4 classification. The CLECs explained their interval process would have to change so there will be impact to the CLECs. We need to encourage as many CLECs as possible to attend the meetings. The team determined a series of meetings would be held to discuss the CR. Two introduction meeetings would be scheduled a few days apart to allow multiple times for CLECs to attend. Additional 1 1/2 hour working sessions would be scheduled to allow for comparison of intervals and discussion of issues and drive towards a standard interval that all CLECs can support. The CLECs should send their current intervals to Cindy Macy - Qwest to include in the meeting documentation. Meeting notifcation will be posted on the web.


Open Product/Process CR PC120402-1 Detail

 
Title: Modification of the Service Interval Guide (SIG) for clarity.
CR Number Current Status
Date
Area Impacted Products Impacted

PC120402-1 Completed
4/16/2003
Clarification to Documentation Collocation, Resale, Unbundled Loop, UNE, LIS / Interconnect
Originator: Petrollini, Anitra
Originator Company Name: Qwest Corporation
Owner: Petrollini, Anitra
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

Rearrangement of the SIG. See attached documentation for more information

Expected Deliverable

Clarification and improvement of docs. Modified all references to "Qwest Communications" from All-Caps to Title Case. Added the word UNE to the footer for clarity. Added the Qwest Trademark for consistency. For clarity, re-ordered existing information for better organization and a more logical flow.


Status History

12/04/02 - CR Submitted

12/05/02 - CR Acknowledged

12/12/02 - Held Clarification Meeting

12/18/02 - December CMP Meeting - Qwest presented CR to CLEC Community. CR status changed to Presented. Meeting minutes will be posted to this CR's Project Meetings section.

12/20/02 - Notification sent for Potential times to scheduled Ad Hoc Meeting, CMPR.12.20.02.F.01380.MtgTimes_CR120402-1

12/31/02 - Notification sent for scheduled Ad Hoc Meeting, CMPR.12.31.02.F.01386.MtgDetailsCR120402-1

01/08/03 - Draft Response posted to the web site

01/10/03 - Held Ad Hoc Meeting

01/15/03 - January CMP Meeting - Qwest presented draft response. Meeting minutes will be posted to this CR's Project Meetings section.

01/27/03 - Held second Ad Hoc Meeting

02/19/03 - February CMP Meeting - Status of CR was discussed. Meeting minutes will be posted to this CR's Project Meetings section.

03/07/03 - Qwest sent notification PROS.03.07.03.F.01022.SIG_V11, CMP Service Interval Guide For Resale and Interconnection Services (SIG) (V11.0)

03/19/03 - March CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section.

03/28/03 - PROS.03.07.03.F.01022.SIG_V11, effective

04/16/03 - April CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section.


Project Meetings

04/16/03 April CMP Meeting Linda Sanchez-Steinke reviewed this CR and said that SIG Version 11 was available for review on 3/7/03 and became effective 3/28/03. At the March CMP meeting, Bonnie Johnson and Liz Balvin thought that Qwest was having another meeting to discuss the revisions. Bonnie said that the issue not resolved is related to Conversions as Specified. Linda said that Qwest had answered an e-mail received from Carla Pardee asking about the wording for Conversions as Specified and that the changes had been in the SIG and were not part of the changes made in Version 11. There will be an action item opened and Liz Balvin will send specific questions about Conversions as Specified to Linda Sanchez-Steinke. Qwest and the CLEC community agree that this CR would move to Completed status.

03/19/03 March CMP Meeting SIG Version 11 was available for review on 3/7/03. Bonnie Johnson and Liz Balvin thought that Qwest was having another meeting to discuss the revisions. CR is in Development status.

02/19/03 February CMP Meeting Anitra Petrollini with Qwest provided an update on the SIG revisions and said that questions and comments received from the CLECs have been answered and the SIG is targeted to be available for review in late February. Liz Balvin with Worldcom said that she had received the answers to questions on Monday and will forward those to the CLEC Community. This CR will be moved to Development status.

2/17/03 3:22 p.m. From Linda Sanchez-Steinke To "Pardee, Carla D, CSLSM" cc Anitra Petrollini/GROUPWARE/USWEST/US@USWEST

Subject Re: Clarification on SIG

Carla -

The following is in response to your questions about the SIG:

The SIG note is somewhat ambiguous, but has to be because it captures primarily 2 different activities that are both categorized as 'Conversions as Specified'. CLECs submit these types of orders to do a lot of different things, but the 2 most common are to 1)convert an existing resale/retail line to UNE-P with changes, and 2) to request an additional line. Number 1 is easy enough - it follows the change order intervals (3 days in most states, 2 in CO & MN). Number 2 is the reason for the note. Occassionally, CLECs request that we add a new line on a Conversion as Specified order 9a 2nd line or something). The interval for this activity is the new install. If we have to dispatch the interval is determined by Appt Scheduler.

Please let me know if you have any questions.

Thank you

Linda Sanchez-Steinke Change Request Project Manager Qwest 303-965-0972

2/17/03 3:13 p.m. From: Linda Sanchez-Steinke To: liz.balvin@wcom.com cc: nitra Petrollini/GROUPWARE/USWEST/US@USWEST

Subject Re: SIG Notes

Liz -

Attached are responses to questions regarding the SIG Updates.

1) Regardless of the number of Access Service Requests (ASRs) or Local Service Requests (LSRs) submitted, the quantity used for determining the appropriate standard interval will be the sum of the quantities of requests for like service at the same location requested for turn-up on the same day.

CLEC Comment: Per Qwest, this language is an attempt to restrict CLECs from "getting around" standard interval by breaking up orders on separate LSRs. NEED TO BE SPECIFIC...CLECs cannot bypass "project totals" by submitting separate LSRs that require provisioning at the same location. Specifically, Qwest cannot change standard interval unless multiple ASR/LSRs reflects the same customer name at the same location and requesting to provision the same products on the exact due date.

We will be removing the footnote on this eliminating the question.

2) The Application Date (APP) is the day Qwest receives a complete and accurate request. The Application Date is the start of the Firm Order Confirmation (FOC), installation and disconnection due date calculation.

CLEC Comment: Request language change..."The App Date is the start of any interval associated with an ASR/LSR." Customer's that request a Due Date change to an earlier date would utilize the normal Expedite channels.

CLEC Comment: Only if less than Standard Interval.

This is fine.

3) Change Due Date on order delayed due to facility reasons. / Change all Critical Dates from Records Issue Date (RID) forward. RID will be Request For Service (RFS)+1..

CLEC Comment: Language should not be included in this table...Qwest to provide justification.

Qwest Action Item: Link that defines "special conditioning" requested from CLECs.

This section was removed from the table.

Please let me know if you have any questions.

Thank you

Linda Sanchez-Steinke Change Request Project Manager Qwest 303-965-0972

Meeting Minutes

Modification of the Service Interval Guide (SIG) for clarity CMP Product & Process January 27, 2003 1-877-572-8687, Conference ID 3393947# 10:00 a.m.- 10:30 a.m. Mountain Time

List of Attendees Carla Dickinson Pardee, AT&T Bonnie Johnson, Eschelon Anitra Petrollini, Qwest Wayne McCarthy, Qwest Linda Sanchez-Steinke, Qwest

PURPOSE

At the December CMP Meeting, participants agreed to hold a conference call for CLEC participation and provide an overview of changes made to the SIG, and a time for questions and answers to be addressed. The following is the write-up of the discussions and action items from the working session. This meeting was a continuation of the meeting held on January 10, 2003.

MEETING MINUTES

The meeting began with Qwest making introductions and welcoming all attendees.

Overview of Changes to the SIG

Anitra Petrollini with Qwest provided an overview of the changes that have been made to the Service Interval Guide. The Service Interval Guide redlined document can be reviewed at http://www.qwest.com/wholesale/cmp/teammeetings.html under Team Meeting Distribution Packages, PC120402-1 SIG for Resale, UNE, & Interconnection Services. The change request and detailed document can be viewed using the "Product Process Interactive Reports" link on the Wholesale web site, located at http://qwest.com/wholesale/cmp/changerequest.html. Within the Interactive Report do a find on "PC120402-1"..

Anitra Petrollini with Qwest said the changes made to the SIG do not include any product or process changes and the changes made were made to improve the document and to provide clarity to the document. The document being reviewed will be merged into Version 7 of the SIG and will be posted on the website for review. The following lists the section reviewed, the questions, and action items:

Questions and Answers by Section

The meeting began by reviewing the LIS Trunking section. LIS Trunking - Wayne McCarthy with Qwest reviewed changes in this section which were made for clarity. Bonnie Johnson asked if the ICB interval applies regardless of forecasting and Wayne McCarthy said that the necessity of joint forecasting has been softened as requested at the 271 workshops.

MSA document information has been removed from the SIG and will be placed on a separate web site. Bonnie Johnson with Eschelon suggested that in the SIG there be a link included which will direct the reader to the URL for the MSAs. Anitra will provide the URL in the meeting minutes. (URL here).

Carla Pardee will e-mail Anitra Petrollini a question on UNE P intervals, page 16 of the SIG.

The meeting was concluded. Qwest advised that the minutes would be posted to CR PC120402-1 on the CMP Web site.

From: Carla Pardee at AT&T Sent: 1/28/03 2:52 p.m. To: ljsanch@qwest.com>, , Sorry I didn't get this out to all of you yesterday. AT&T requests clarification of the following, which is found on page 16 of the SIG. This information has been in the SIG for sometime, and is not part of the new changes to the SIG.

On UNE-P POTS Activity" Conversion As Specified Retail, Resale to UNE-P Pots to UNE-P, the installation guidelines state "Depends on changes requested. For instance, addition of another line would follow New Installs guidelines."

The statement "Depends on changes requested is somewhat ambiguous". Can you clarify what types of what types of changes are dependent, and what the dependency would be? Thank you.

Carla Dickinson Pardee AT&T Local Services & Access Management 1875 Lawrence Street, Suite 8-38 Denver, Colorado 80202 Phone: 303-298-6101

From: Liz Balvin at Worldcom Sent: 1/27/03 11:33 a.m. To: ljsanch@qwest.com Subject: SIG Notes

Linda,

Please forgive me, I thought I sent this to you on the 15th. Here are the notes I took from the last SIG meeting.

Sorry again,

1) Regardless of the number of Access Service Requests (ASRs) or Local Service Requests (LSRs) submitted, the quantity used for determining the appropriate standard interval will be the sum of the quantities of requests for like service at the same location1 requested for turn-up on the same day.

CLEC Comment: Per Qwest, this language is an attempt to restrict CLECs from "getting around" standard interval by breaking up orders on separate LSRs. NEED TO BE SPECIFIC...CLECs cannot bypass "project totals" by submitting separate LSRs that require provisioning at the same location. Specifically, Qwest cannot change standard interval unless multiple ASR/LSRs reflects the same customer name at the same location and requesting to provision the same products on the exact due date.

2) The Application Date (APP) is the day Qwest receives a complete and accurate request. The Application Date is the start of the Firm Order Confirmation (FOC), installation and disconnection due date calculation.

CLEC Comment: Request language change..."The App Date is the start of any interval associated with an ASR/LSR." Customer's that request a Due Date change to an earlier date would utilize the normal Expedite channels.

CLEC Comment: Only if less than Standard Interval.

3) Change Due Date on order delayed due to facility reasons. / Change all Critical Dates from Records Issue Date (RID) forward. RID will be Request For Service (RFS)+1..

CLEC Comment: Language should not be included in this table...Qwest to provide justification.

Qwest Action Item: Link that defines "special conditioning" requested from CLECs.

Liz Balvin

WorldCom Carrier Management - Qwest Internal Line - V625-7305 External Line - 303-217-7305 Pager (888) 900-7221

01/15/03 January CMP Meeting Anitra Petrollini reviewed the Qwest draft response and said that Qwest held the ad hoc meeting on 1/10/03 and there will be a follow up meeting scheduled to finish the review of the SIG. Liz Balvin will compile suggested SIG revisions discussed by the CLECs in their meeting, and Liz will e-mail suggestions to Linda Sanchez-Steinke, ljsanch@qwest.com.

Meeting Minutes Modification of the Service Interval Guide (SIG) for clarity CMP Product & Process January 10, 2003 1-877-572-8687, Conference ID 3393947# 9:00 a.m. - 11:00 a.m. Mountain Time

List of Attendees Carla Dickinson Pardee, AT&T Jonathan Spangler, AT&T Donna Osborne-Miller, AT&T Liz Balvin, Worldcom Bonnie Johnson, Eschelon Kim Isaacs, Eschelon Lori Mendoza, Allegiance Anitra Petrollini, Qwest Cliff Dinwiddie, Qwest Janean Van Dusen, Qwest Gary Berroa, Qwest Barb Carlson, Qwest Pat Finley, Qwest Jane Lacy, Qwest Wayne McCarthy, Qwest Linda Sanchez-Steinke, Qwest

PURPOSE

At the December CMP Meeting, participants agreed to hold a conference call with CLEC participation and provide an overview of changes made to the SIG and address questions. The following is the write-up of the discussions, action items, and decisions made in the working session.

MEETING MINUTES The meeting began with Qwest making introductions and welcoming all attendees.

Overview of Changes to the SIG

Anitra Petrollini with Qwest provided an overview of the changes that have been made to the Service Interval Guide. The Service Interval Guide redlined document can be reviewed at http://www.qwest.com/wholesale/cmp/teammeetings.html under Team Meeting Distribution Packages, PC120402-1 SIG for Resale, UNE, & Interconnection Services. The change request and detailed document can be viewed using the "Product Process Interactive Reports" link on the Wholesale web site, located at http://qwest.com/wholesale/cmp/changerequest.html. Within the Interactive Report do a find on "PC120402-1".

Anitra said that the changes that have been made were made to improve the document and to provide clarity to the document. Each section of the SIG was reviewed and was opened up for discussion and questions. The following lists each section reviewed, the questions, and action items:

Questions and Answers by Section

Global Changes: Anitra explained that there were changes made to the SIG in all sections of the document changing capitalization of Qwest, changing references to "Service Interval Guide for Resale, UNE, and Interconnection Services", adding UNE to the footer for clarity and changing Co-Provider to CLEC, adding the Qwest Trademark and changing the standard format for intervals.

General Information Introduction: Anitra explained that this section contains no new information and that the information has been re-ordered to provide clarity.

General Information Due Date Calculation: Anitra reviewed this section. Several CLECs agreed to provide suggested language to Linda Sanchez-Steinke, ljsanch@qwest.com.

General Information Disconnect Information: Cliff Dinwiddie with Qwest provided an overview of this section. Barb Carlson with Qwest reviewed the detailed changes in this section. Bonnie Johnson with Eschelon requested that there be clear documentation in the SIG when changing a due date that have to re-negotiate the critical dates. At the follow up call, Cliff will answer Bonnie’s question about changing the due date to request a less than standard interval. Barb Carlson with Qwest will provide additional information explaining why the last row of matrix on page 8 is there or remove. The matrix is pertaining to supps to LSR in delayed order situation.

Liz Balvin with Worldcom commented that the interval for LSRs received manually add additional 24 hours, reference page 9. Liz also said that she liked the old language better because the old FOC let them know facilities are available, reference page 12.

General Information Definitions: Anitra reviewed this section.

All Product Specific Sections: Anitra gave an overview of changes made to these sections.

Unbundled Network Elements Platform (UNE-P): Janean Van Dusen with Qwest reviewed changes in this section.

Enhanced Extended Loop: Anitra provided an overview of the changes in this section.

Resale: Janean Van Dusen with Qwest reviewed changes in this section. Bonnie Johnson suggested that in the SIG it may be helpful to have a link added, which would take the reader to AIN features. Bonnie also asked why removed where ICB facilities not available. Janean answered that the language was redundant.

Directory Listings: Anitra provided an overview of changes in this section.

Interconnection Other Services: Pat Finley, Jane Lacy and Anitra Petrollini reviewed this section. Bonnie Johnson suggested that there be a special conditioning link in the SIG document.

Liz Balvin with Worldcom had a question about what interval they should follow if in their interconnection agreement does not have forecasting. Qwest SME was not available to answer the question during the meeting and Qwest will send e-mail to Liz Balvin.

Unbundled Services: Anitra and Cliff provided an overview of this section.

The meeting was concluded and all participants agreed to continue meeting to review the remainder of the SIG; LIS Trunking and Network Identified Wire Center / MSA/ Zone 1/ Zone 2 Lists and definitions. There will be a notification sent to CLECs asking for available meeting times.

Questions and suggestions for wording can be e-mailed to Linda Sanchez-Steinke, ljsanch@qwest.com. Qwest advised that the minutes would be posted to CR PC120402-1 on the CMP Web site.

12/18/02 December CMP Meeting - Anitra Petrollini and Cliff Dinwiddie with Qwest presented this CR. Anitra explained that Qwest submitted this CR because there are many changes to the Service Interval Guide and although there are no process or product changes, there are changes on nearly every page of the SIG. A summary of the changes is included with the change request and the entire Red-lined SIG document will be placed on the CMP site for review. Qwest would like to hold a meeting with CLEC particiption to explain the changes to the SIG. A notification will be sent to CLECs asking for preference of either January 8th or January 10th and please e-mail to Linda Sanchez-Steinke, ljsanch@qwest.com your preference for the date of the meeting. Terry Bahner with AT&T asked if there would be changes to LNP. Cliff Dinwiddie said there are changes to the SIG header and footer and changes on every page for document clarity, but there is no impact to LNP. This CR will be moved to Presented status.


CenturyLink Response

February 6, 2003

DRAFT RESPONSE For Review by CLEC Community and Discussion at February’s CMP Meeting

SUBJECT: Qwest’s Change Request Response - CR # PC120402-1 Modification of the Service Interval Guide (SIG) for Clarity

At the December 18, 2002 CMP Meeting, Qwest introduced Change Request PC120402 – 1, Modification of the Service Interval Guide (SIG) for Clarity. Qwest has modified the SIG to improve document consistency and clarity. Ad hoc meetings occurred on January 10 and January 27, 2003 and all interested parties participated in a dialog regarding the document changes.

Comments were made in the General Section of the document. The CLEC community will provide a language modification for that section to clarify the issues that we brought to the table during the ad-hoc meeting. The SIG document will be available for review in late February 2003.

Sincerely,

Anitra M. Petrollini Wholesale Product Strategy & Financial Support Qwest Corporation

Cc: Clifford Dinwiddie, Wholesale Product Strategy & Financial Support

January 6, 2003

DRAFT RESPONSE For Review by CLEC Community and Discussion at January’s CMP Meeting

SUBJECT:Qwest’s Change Request Response - CR # PC120402-1 Modification of the Service Interval Guide (SIG) for Clarity

At the December 18, 2002 CMP Meeting, Qwest introduced Change Request PC120402 – 1, Modification of the Service Interval Guide (SIG) for Clarity. Qwest has modified the SIG to improve document consistency and clarity. An ad-hoc meeting has been set up for January 10, 2003 for all interested CLEC’s to allow comments and feedback of those changes.

Although these changes do not affect products or processes, due to the magnitude of the changes, this Change Request will be treated as a Level 4 change.

Sincerely,

Anitra M. Petrollini Wholesale Product Strategy & Financial Support Qwest Corporation

Cc: Clifford Dinwiddie, Wholesale Product Strategy & Financial Support


Open Product/Process CR PC100202-1 Detail

 
Title: Synchronization ("Router") Testing for Line Sharing
CR Number Current Status
Date
Area Impacted Products Impacted

PC100202-1 Completed
4/16/2003
Provisioning, Testing Line sharing, line splitting
Originator: Burke, Laurel
Originator Company Name: Qwest Corporation
Owner: Boudhaouia, Jamal
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

Overview:

Qwest will begin offering data synchronization testing (aka, router testing) as an option for CLECs submitting line sharing orders in Central Offices where Qwest DSL has been deployed. Qwest commits to performing the same physical layer "router" testing for line shared loop provisioning that it provides to itself with data synchronization testing in those central offices in which Qwest currently deploys and those where it plans to deploy Qwest DSL.

Qwest does not propose a separate recurring or non-recurring charge for Data Synchronization/"router" testing at this time, but does reserve the right to propose alternate rate structures for line sharing in future rate proceedings.

Qwest commits to implement router testing for line shared loop provisioning as soon as practical but no later than the end of first quarter 2003.

Required Information:

In order to be eligible for data synchronization testing on line sharing orders, Qwest must know what type of DSL technology the CLEC is utilizing in itsDigital Subscriber Access Multiplexer (DSLAM). Thus, if a CLEC wishes to take advantage of this testing option and to ensure the correct test is performed, specific DSL technology type information to must be provided to Qwest. When performing data synchronization testing, Qwest DSL test equipment can support the following DSL technologies: DMT, CAP, G.lite,T1.413.

Special considerations: If a CLEC uses more than one technology in a given Central Office location, the specific technology for each splitter shelf must be identified separately. If a CLEC would like to designate a desired technology on a regional or state wide basis, it may do so; however, APOTs for each location must still be submitted. MVL technology is not supported by the DSL test set and if a CLEC utilizes this type of technology, when provisioning the line sharing order, the Qwest personnel will revert to the LSVT test. In cases where line sharing orders are submitted for Central Offices where Qwest DSL is not provided, no data synchronization testing will occur, however, Qwest will continue to perform continuity testing utilizing LSVT test sets. That is, there will be no change to the line shared loop provisioning process. The following website contains central office locations where Qwest is currently providing DSL and therefore will be available for synchronization testing: http://www.qwest.com/disclosures/netdisclosure459/index.html

For each Central Office location in which a CLEC would like to obtain data synchronization testing, the following needs to be provided:

- The completed final APOT (this was provided by Qwest to the CLEC when the splitter was installed).

- For each APOT indicate the type of technology being used for each splitter shelf. Any of the following technologies may be indicated: DMT, CAP, G.lite, T1.413

NOTE: If information is not received about the type of technology in conjunction with a specific APOT the CO tech will continue to perform the LSVT for your new line sharing/shared loop orders.

***To include sites already provisioned with splitters in the initial deployment of data synchronization testing for newly installed line sharing/shared loop orders, this information must be provided to the CPMC, via email to rfsmet@qwest.com with the subject line of synch test, no later than 4pm MST November 1, 2002.

All questions should be addressed to your Wholesale Collocation

Project Manager.

Expected Deliverable: Qwest will begin offering data synchronization testing as an option for CLECs submitting line sharing orders in Central offices where Qwest DSL has been deployed.


Status History

10/02/02 - CR Submitted

10/04/02 - CR Acknowledged

10/04/02 - Clarification Meeting Scheduled

10/04/02 - Conducted clarification meeting with SME

10/16/02 - October CMP Meeting - Qwest clarified this CR. Meeting minutes are posted to this CR's Project Meetings section.

10/16/02 - CR moved to Evaluation status.

10/22/02 - E-mail from Covad regarding data needed for synchronization testing

10/23/02 - E-mail from Qwest to Mike Zulevic at Covad regarding data needed for synchronization testing

10/24/02 - E-mail from Qwest to Beckie Neesen at Covad regarding data needed for synchronization testing

10/27/02 - E-mail from Covad regarding timeframe to provide Qwest with data for synchronization testing

10/28/02 - CLEC Community Meeting held. Meeting minutes are posted to this CR's Project Meetings section.

10/28/02 - E-mail from New Edge Networks attachment, APOTS

10/29/02 - E-mail from Qwest to New Edge Networks asking for Technology used at APOTS

11/01/02 - E-mail from Qwest to Tina Thompson at New Edge Networks regarding locations where Qwest DSL not deployed

11/01/02 - E-mail from Covad regarding timeframe to send Qwest final APOT and technology information

11/15/02 - Initial Response posted to web site

11/20/02 - November CMP Meeting - Qwest presented initial response. Meeting minutes will be posted to this CR's Project Meetings section.

12/11/02 - Qwest Draft Response dated 12/5/02 posted to the web site

12/18/02 - December CMP Meeting - Qwest presented revised draft response to this CR. Meeting minutes will be posted to this CR's Project Meetings section.

12/23/02 - Qwest issued IMA 11.01 Draft Release Notes, IMA User's Guide 11.01 SYST.12.20.02.F.04223.GUI28DySysDocRev1

12/30/03 - Qwest issued IMA 11.01 Final Release NotesSYST.12.27.02.D.04230.21DyIMAFinalDocRel

01/06/03 - Product Notification sent, PROD.01.06.03.F.00893.ColloProdupdates, PCAT updates

01/15/03 - January CMP Meeting - Qwest presented updated response. Meeting minutes will be posted to this CR's Project Meetings section.

01/27/03 - Qwest issued Final Notification. Notification PROD.01.27.03.F.03300.FNL_Collo_Pro_Updates. Effective date of change is 2/11/03.

02/19/03 - February CMP Meeting - Status of CR was discussed. Meeting minutes will be posted to this CR's Project Meetings section.

03/19/03 - March CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section.

04/16/03 - April CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section.


Project Meetings

04/16/03 April CMP Meeting Jamal Boudhaouia with Qwest provided an overview of the synchronization testing process when CLEC submits a line share order with synchronization testing requested. The COT tests for load coil and if there is load coil detected, the order is placed in jeopardy. If no load coil is detected, the tech will place OE and facility and draw dial tone at ANI. If the assignment is correct, the tech will verify the line is not busy. If the line is busy, the tech will place on hold and check every 30 minutes. After the line is no longer busy, the tech will terminate the new jumper to the line splitter and ANI line circuit. If failed, trouble shoot at ICDF. Then test LSVT and get remark from FOM order if sync test has passed sync is completed. If test has not passed, then test DSLAM on 410 block. If there is a problem, resolve the problem and if fails because of splitter issues, use S1 jep code. If problem is in the first port on splitter, the tech will attempt to change the card.

Mike Zulevic with Covad asked if the 350 test set is used at the 410 block and Jamal said yes. Mike asked if there is a problem at the splitter where Qwest provides maintenance, how will that be handled. Jamal said if there is more than one customer, will not take a customer out of service. Mike asked if Qwest will strap around the ICDF and jep the order S1 and Jamal said yes. Mike asked how would Qwest jep the order before sync testing if there was a problem in the splitter and need to get clearance. Jamal said that the S1 jep is for the data stream from DSLAM and the A8 jep code would be used if the splitter has an issue. Mike said that Covad is looking for something to help both Qwest and CLEC techs understand how sync testing is performed. When Covad techs are dispatched they need to have testing information available in the central office. Mike would like to close this CR on the condition the synchronization testing process documentation is posted in the central offices. This CR was moved to Completed status.

03/19/03 March CMP Meeting Heidi Moreland with Qwest provided an update on the change request and said that Synchronization Testing has been implemented and all is running smoothly. There were no questions and Qwest had anticipated that Covad would ask for information regarding Qwest process for Synchronization testing. The following is an outline of steps performed by Qwest Central Office technicians for Synchronization Testing:

Heat coils are removed from protector at the MDF and TPI 350+ test set is connected to binding posts to test. Synch test with Acturna TPI 350+ test set is performed and test is run until green light verifies test is completed. If the synch test fails, technician will verify that all terminations and jumpers are correct. If trouble is isolated to the DEMARC 410 block the tech will jep the order. If splitter problems are discovered, CO Tech will jumper around the splitter to maintain voice service and place the order in jeopardy.

This CR was moved to Completed status. It has been reopened since the initiating CLEC was off line during a portion of the 3/19 CMP meeting. Qwest will keep the CR open for one more session to give the CLEC another opportunity to bring forth any comments.

02/19/03 February CMP Meeting Jamal Boudhaouia with Qwest provided an update and said that systems have been tested, are working, and Qwest has been receiving orders from the CLECs. Mike Zulevic with Covad asked for the jeopardy code and Jamal said it is S1, and was provided in IMA 11.01 User’s Guide. This CR will be moved to CLEC test.

01/15/03 January CMP Meeting Jamal Boudhaouia with Qwest reviewed the updated response. Jamal said that documentation of the PCAT is available on the web for review. Mike Zulevic with Covad asked if Qwest had deployed in any central offices and if the jep codes will be provided. Jamal responded that Qwest will deploy in central offices on 3/1/03 and the jep codes will be provided. This CR will remain in Evaluation status.

12/18/02 December CMP Meeting Jamal Boudhaouia presented the Qwest update on this CR and said that documentation updates will be made to include Synchronization Testing will soon be available for CLEC review. Mike Zulevic with Covad asked about the jeopardy code from Telecordia and if implementation is on track for completion by end of 1Q03. Jamal said that Qwest is on track for implementation during 1Q03. This CR will remain in Evaluation status

11/20/02 November CMP Meeting Laurel Burke reviewed the Qwest draft response dated 11/4/02. Laurel said that we are on track for implementation in the first quarter of 2003. There is Telcordia software that will be loaded and tested 12/19/02. Mike Zulevic with Covad asked if Qwest expected to deploy by the end of year and Laurel said that the systems concerns were larger than anticipated and Qwest does not expect to trial before the end of the year. Barry Orrel explained that Qwest is using an off the shelf expansion for jeopardy codes and have found some bugs that will not be fixed until December. Mike Zulevic with Covad asked if customer not ready jeopardy code could be used and Barry said that we are using a new jeopardy code specific to synchronization testing. Mike asked about deployment of Qwest DSL in offices currently not available. Barry Orrel said that the Qwest process isn’t quite worked out and we expect it will be similar to the joint planning process. John Berard with Covad asked how many jep codes there would be and Laurel Burke replied there will be one new jep code. Mike Zulevic asked if synchronization testing would be used in trouble isolation and if similar testing would be done on UNE and second lines. Barry Orrel responded that Qwest wants to understand the value added, if any, on the provisioning side after deployment for line sharing.

From: Linda Sanchez-Steinke Sent: Friday, November 01, 2002 2:50 PM To: ththompson@newedgenetworks.com Cc: lburke@uswest.com Subject: Sync Testing - New Edge offices not eligible Tina -

Please see attached e-mail from Laurel Burke regarding Change Request PC100202-1, Synchronization "Router" Testing for Line Sharing.

Thank you Linda Sanchez-Steinke Change Request Project Manager Wholesale Markets Qwest 303 965-0972 Forwarded by Linda Sanchez-Steinke/GROUPWARE/USWEST/US on 11/01/2002 03:44 PM lburke@qwest.com on 10/31/2002 12:12:21 PM

To: Linda Sanchez-Steinke cc: Charlis Miller , Kristin Provost , Barry Orrel Subject: Sync Testing - New Edge offices not eligible Linda - Please share with New Edge the attached spreadsheet of the locations where New Edge submitted APOTs but where Qwest DSL has not been deployed. Since Qwest DSL has not been deployed, these offices will not be included in the initial sync testing development/deployment. If Qwest DSL becomes available in any of these offices in the future, Qwest stands ready to accommodate a subsequent New Edge request according to the process identified during development, at the time Qwest DSL is deployed.

Thank you and please feel free to call me with any questions, Laurel Burke 303-707-7014

11/1/02 12:36p From: Mike Zulevic To:"'Laurel Burke'" cc:Linda Sanchez-Steinke , "Neesen, Beckie" , Barry Orrel , "Caron, Sandra"

Subject:RE: router test information requirements Laurel,

Thanks for the update. We will do our best to meet this time frame.

Mike Z.

From Laurel Burke @qwest.com 10/29/02 11:07 a.m. To:Tina Thompson cc:Linda Sanchez-Steinke , "Rinehart, Rock" , Barry Orrel

Subject:Sync Test

Tina - Thank you for your very timely response to our information request related to synchronization testing. One question remains open though, from my brief review, I don't see in the APOTs you provided yesterday the type of technology New Edge will use. From the information you provided in the conference call yesterday 10/28, I understand that DMT is the only technology that New Edge utilizes for line sharing/shared loop applications. Is that correct? If so, do you want the APOTs you provided yesterday associated with DMT technology?

Thank you for your assistance, Laurel Burke

From: Tina Thompson @newedgenetworks.com 10/28/02 1:53 p.m. To:"'ljsanch@qwest.com'" , "'frsmet@qwest.com'" cc:"Benton, Jerome" , TAC Leads , "Rinehart, Rock"

Subject:Synch Test

- C.htm - New Edge LS APOTs.zip

From:Laurel Burke 10/29/02 at 5:37 p.m. To:"Zulevic, Michael" cc:Linda Sanchez-Steinke , "Neesen, Beckie" , Barry Orrel , scaron@covad.com

SubjectRe: router test information requirements

Mike - Thank you for the feedback; in lieu of requiring the final APOT and the technology for each location, Qwest has agreed to accept a spreadsheet with the necessary information. Since we too have an interest in testing beginning sooner rather than later, in the interest of time, we can accept Covad's information in "chunks" - i.e. a state at a time. To stay on track, we would like to complete entry your information into our systems before the end of November. Beckie, before her vacation, indicated that the week of Thanksgiving was feasible to complete the data transfer to us. Although I was unable to touch base with Sandra Caron again today, I spoke with her yesterday after the call and she indicated that Covad could provide a proposed schedule of states.

Thanks, Laurel

Meeting Minutes Synchronization ("Router") Testing for Line Sharing October 28, 2002, 1-877-572-8687, Conference ID 3393947# 10:00 a.m. - 11:30 a.m. Mountain Time

List of Attendees Chuck Browitt, Covad Tina Thompson, New Edge Networks Rocky Rinehart, New Edge Networks Carla Pardee, AT&T Sandy Blake, Covad Sandy Caron, Covad Jonathan Spangler, AT&T Laurel Burke, Qwest Susan Earley, Qwest Deb Smith, Qwest Charliss Miller, Qwest Kristin Provost, Qwest Brad Hoffner, Qwest Barry Orrel, Qwest Linda Sanchez-Steinke, Qwest

PURPOSE At the October CMP Meeting, participants agreed to hold a conference call and include CLEC technical experts for an overview of proposed Synchronization Testing and a time for questions and answers to be addressed. The following is the write-up of the discussions, action items, and decisions made in the working session.

MEETING MINUTES The meeting began with Qwest making introductions and welcoming all attendees.

Overview of Synchronization Testing Laurel Burke with Qwest provided an overview of Data Synchronization "Router" Testing as a provisioning option for CLECs on Line Shared Loops in Central Offices where Qwest has deployed Qwest DSL. She further indicated that this option will also be available in those Central Office where Qwest deploys Qwest DSL in the future. Qwest will continue to perform LSVT testing for CLECs that don’t want the Synchronization Testing option as well as in those offices where Qwest DSL has not been deployed. Qwest does not propose a separate or incremental recurring or non-recurring charge for Synchronization Testing at this time, but does reserve the right to propose alternate rate structures for line sharing in future rate proceedings. Qwest provided an overview of the testing procedures that are performed between the protector /MDF and the CLEC provided DSLAM. Laurel said that by offering this option, Qwest wants to meet CLEC needs and then opened up the discussion for questions.

Questions and Answers Rocky Rinehart with New Edge Networks asked how testing was performed using the router. Laurel Burke said that Qwest utilizes a vendor provided test set to test the physical layer of the data signal from the protector/MDF to the CLEC DSLAM. The technician plugs the test set in and if test set shows that the data syncs up, then Qwest will complete the order; if data fails to sync up according to the test set reading, then a jeopardy code will be assigned on the order.

Tina Thompson with New Edge asked if the test at the MDF will be extended to the loop. Laurel stated that because Qwest does not use the DSL test set to test its own loop, the proposed router test will not test CLEC loops as well..

Jonathan Spangler with AT&T asked if the test will be requested on the order and if they will need to do re-applications for existing collocations. Laurel Burke said that on new collocations, the application form will ask for a technology to be designated (if synchronization testing is desired). If Synchronization Testing is desired for existing collocations (sites that have already been pre-provisioned for line sharing) to be included in the initial deployment, send Qwest an e-mail now as directed by the notification for this meeting.

Chuck Browitt with Covad asked if on MDF sync, if there is no sync, if Qwest tests at the cable head. Barry Orrel indicated that if it won’t train we check for wiring problems and we isolate the problem to the DMARC. Chuck also asked if the testing will give a margin rate. Laurel said no it will train or not train. Barry added that router testing for line shared loop provisioning will be performed only at the physical layer to ensure data connectivity.

Chuck Browitt asked if the router testing will be used for maintenance issues. Barry Orrel said that we use LSVT to the demarc for maintenance purposes.

Sandy Caron with Covad asked if there would be a charge for Synchronization Testing. Laurel Burke said Qwest does not propose a recurring or non-recurring charge for Synchronization at this time, and Barry Orrel added that we don’t see any additional charge now, but if additional costs are identified may seek recovery of those costs in state by state filings.

Laurel Burke said that she had heard that one CLEC was interested in Synchronization Testing and asked if other CLECs would be interested that she was hoping to have necessary information (final APOT and technology identified) by November 1, 2002. Susan Early with Qwest inquired into the type of information needed and Laurel indicated that the information on the final APOT is needed - more specifically, in addition to the splitter circuit count and location, Qwest needs CLEC CLLI, Job Identification/BAN, Wire Center code, Entity Code and ZCID. Qwest further indicated that if there were concerns with providing the information on a speadsheet or faxed APOTs including the information would likely be workable. Laurel Burked asked that CLECs let Qwest know and work with her if they are unable to get the information needed in the timeframe requested. Laurel Burke further asked that Sandy Blake of Covad contact her and said that Becky Niessen had been working with her last week.

Carla Pardee with AT&T said she had no specific information about interest in this option and while Tina Thompson with New Edge Networks indicated they are very interested. Questions about Synchronization Testing can be e-mailed to Linda Sanchez-Steinke, ljsanch@qwest.com and will be forwarded to Laurel Burke.

Qwest advised that the minutes will be posted to CR PC100202-1 on the CMP Web site. Qwest asked if there were any additional comments. No comments were made.

From: Michael Zuleviz@covad.com 10/27/02 5:15 p.m. To:"'ljsanch@qwest.com'" cc:"Laurel Burke (E-mail)" , "Neesen, Beckie" , "Barry Orrel (E-mail)"

Subject: router test information requirements Linda,

Beckie has been working with Laurel to try and find a way to get the data Qwest is requesting we provide prior to beginning the router, or "synch" testing. It still appears to me that Qwest should have this information available already, but we will attempt to comply with your request as quickly as we can. I have been informed that much of this data must be manually compiled which may take about 3 weeks. It would be unfortunate if this results in a delay in beginning the router, or "synch" testing of our line sharing orders. I would appreciate it if Qwest would take one more look at whether providing this information is really necessary prior to implementation of testing.

Thanks, Mike Z.

From: Laurel Burke 10/24/02 5:11 p.m. To:"Neesen, Beckie" cc"Zulevic, Michael" , Linda Sanchez-Steinke

Subject:Re: Sample APOT Data - DNVRCODC 10-23-02.xls

Beckie - Just to confirm our conversation, the info in the spreadsheet you provided is not enough. In addition to your technology selection(s), from the final APOT, we need: the WC code, Entity code, ZCid, Splitter location, Splitter Circuit count, CLEC CLLI and Job#/BAN.

If we have this information, we can work from either a spreadsheet or the APOTs themselves. Since the required information means more time (due to manual handling) needed from your perspective and an inability to meet the 11/1/02 timeframe outlined in the notice, we would prefer to receive your information in batches to minimize the potential effect on the deployment cycle.

As an aside, we will address this data/timeline modification with the CLECs who participate in the Monday call as well.

Please continue to keep in touch about the projected time required to complete your data gathering.

Thank you, Laurel Burke 303-707-7014

10/23/02 at 8:05 a.m From: Linda Sanchez-Steinke . To: Mike Zulevic @covad.com Mike -

Please see attached response from Laurel Burke.

Thank you

Linda Sanchez-Steinke CRPM 303-965-0972 Forwarded by Linda Sanchez-Steinke/GROUPWARE/USWEST/US on 10/23/2002 08:04 AM To:Linda Sanchez-Steinke cc:Barry Orrel

Subject: Re: router test data

Linda - I just spoke with the SWITCH guru and confirmed that Qwest needs to have the final APOT for each location. We want to ensure that we all are working from the same information as we update the records to include the specific technology. A spreadsheet such as the one Mike describes could be included but would not be enough in and of itself.

Thanks. Laurel Burke

"Zulevic, Michael" on 10/22/2002 12:48:11 PM To: "'ljsanch@qwest.com'" cc: "Neesen, Beckie" Linda,

Beckie has been working with Laurel to try and find a way to get the data Qwest is requesting we provide prior to beginning the router, or "synch" testing. It still appears to me that Qwest should have this information available already, but we will attempt to comply with your request as quickly as we can. I have been informed that much of this data must be manually compiled which may take about 3 weeks. It would be unfortunate if this results in a delay in beginning the router, or "synch" testing of our line sharing orders. I would appreciate it if Qwest would take one more look at whether providing this information is really necessary prior to implementation of testing.

Thanks,

Mike Z.

10/16/02 October CMP Meeting Barry Orrel with Qwest provided an overview of this CR and explained that the CR was initiated to offer Data Synchronization "Router" Testing as a provisioning option for CLECs on Line Shared Loops in Central Offices where Qwest has deployed Qwest DSL. Qwest also committed to expanding this option to newly deployed Central Offices. Qwest will continue to perform LSVT testing for CLECs that don’t want the Synchronization Testing option. Qwest will also continue to perform LSVT testing in those Central Offices that Qwest does not provision Qwest DSL. Qwest provided an overview of the testing procedures that are performed between the MDF and CLEC provided DSLAM. Router testing for line shared loop provisioning will be performed only at the physical layer to ensure data connectivity. The outcomes of the Synchronization Test are 1) data syncs up, then Qwest will complete the order, 2) if data does not sync up, then a jeopardy code will be assigned on the order. At this time Qwest does not propose a separate or incremental recurring or non-recurring charge for Synchronization at this time, but does reserve the right to propose alternate rate structures for line sharing in future rate proceedings. Sharon Van Meter with AT&T pointed out that the CR does not reference the disclaimer about reserving the right to propose rate structure changes. Barry Orrel agreed and the CR will be updated and include the information. Qwest explained that we would like to move forward and implement in 1Q03 or sooner and do have dependencies with delivery of vendor provided software and CMP. Laurel Burke with Qwest asked that CLECs interested in Synchronization provide DSLAM and Splitter APOT information, and the technology they are using. This information should be e-mailed to the CPMC by November 1, 2002. AT&T asked if a conference call could be held to include their technical experts. A notification of proposed meetings, either next Thursday or Friday will be sent to the CLEC community and a date for Overview and Question and Answer will be selected and final notification provided. Michael Buck with Qwest discussed the CMP process, Section 5.4.5.1.and the participants agreed that it would be a Level 4 Change and will follow the process for Level 4 Change. The next step is to send out a notification of possible meeting times today, at the latest tomorrow. Jamal Boudhaouia with Qwest asked that with the final meeting time notification if CLEC participants would send back any questions that may be asked during the meeting so questions can be researched ahead of time. The participants agreed to send questions and preference for meeting time to Linda Sanchez-Steinke, ljsanch@qwest.com. Sharon Van Meter asked that the CR more fully describe how Synchronization testing will work technically. Michael Buck said that the CR would be updated with meeting minutes from today’s discussion and further describe Synchronization testing.


CenturyLink Response

January 8, 2003

DRAFT RESPONSE For Review by CLEC Community and Discussion at January’s CMP Meeting

SUBJECT: Qwest’s Change Request Response - PC100202-1 Synchronization ("Router") Testing for Line Sharing

The following is a progress update on the Synchronization Test project:

Qwest has reviewed and updated the following PCATs to include Synchronization Testing:

- Collocation - General PCAT - Adjacent Collocation - Facility Connected Collocation - Line Sharing/Shared Loop - Common Area Splitter Collocation

The Collocation Application and APOT forms have also been updated to include this new testing. These documents were distributed to the CLEC community for comments on January 7th per the CMP guidelines.

Sincerely,

Jamal Boudhaouia, Heidi Moreland Staff Adovcate, Policy & Law Local Network Technical Regulatory Qwest Corporation

cc: Barry Orrel, Director Local Network Technical Regulatory, Qwest Corporation Mary Retka, Director Local Network Technical Regulatory, Qwest Corporation

December 5, 2002

DRAFT RESPONSE For Review by CLEC Community and Discussion at November’s CMP Meeting

SUBJECT:Qwest’s Change Request Response - PC100202-1 Synchronization ("Router") Testing for Line Sharing

As Qwest has informed the CLEC community at the October 16, 2002 and the November 20, 2002 CMP meetings, the following is a progress update on the Synchronization Test project:

Qwest is currently reviewing the following PCATs for the purpose of including the Synchronization Testing:

- Collocation - General PCAT - Adjacent Collocation - Facility Connected Collocation - Line Sharing/Shared Loop - Common Area Splitter Collocation

Qwest is also reviewing the Collocation Application and APOT forms to include this new testing. Once these documents are updated, they will be distributed to the CLEC community for comments per the CMP guidelines.

Sincerely,

Jamal Boudhaouia Staff Adovcate, Policy & Law Local Network Technical Regulatory Qwest Corporation

cc: Barry Orrel, Director Local Network Technical Regulatory, Qwest Corporation Mary Retka, Director Local Network Technical Regulatory, Qwest Corporation

- November 5, 2002

DRAFT RESPONSE For Review by CLEC Community and Discussion at November’s CMP Meeting

SUBJECT:Qwest’s Change Request Response - PC100202-1 Synchronization ("Router") Testing for Line Sharing

At the October 16, 2002 CMP Meeting, Qwest introduced Change Request PC100202-1, Synchronization ("Router") Testing, as an option for Line Sharing in central offices where Qwest has deployed Qwest DSL. The synchronization test checks for physical layer continuity between the protector and the Digital Subscriber Line Access Multiplexer (DSLAM). To provide the testing for interested CLECs, Qwest must know what technology is in use at the CLEC DSLAM for each splitter shelf in central offices where Qwest currently provides DSL. Qwest requested that interested CLECs submit information identifying the type of DSL technology by November 1, 2002. To further clarify and explain the technical parameters of the test, Qwest also conducted an overview, question and answer session with the CLEC community on October 28, 2002 in which three CLECs and Qwest representatives participated. Following that meeting, two CLECs expressed an interest in the testing and Qwest is moving forward with the necessary updates to reflect their technology choices. We hope to complete the systems entry of CLEC provided information during 4th Quarter 2002.

Once the CLEC technology information has been entered into the appropriate systems, modifications made to process and methods documents, and all system upgrades from Telcordia implemented effectively, Qwest will be able to deploy synchronization testing for line sharing in those offices where Qwest DSL has been deployed. We anticipate being able to begin synchronization testing in those offices with Qwest DSL no later than the end of 1st Quarter 2003, and, as Qwest DSL becomes available in additional offices, synchronization testing will be offered in those offices.

As agreed to at the October CMP Meeting, this Change Request will be treated as a Level 4 change and Qwest will propose changes to the CLEC Community as required in the CMP process.

Sincerely,

Laurel Burke Staff Adovcate, Policy & Law Local Network Technical Regulatory Qwest Corporation

cc: Barry Orrel, Director Local Network Technical Regulatory, Qwest Corporation Mary Retka, Director Local Network Technical Regulatory, Qwest Corporation


Open Product/Process CR PC102502-1CM Detail

 
Title: Change to the CMP Document Section 12.0 "Date TBD" Trouble Tickets
CR Number Current Status
Date
Area Impacted Products Impacted

PC102502-1CM Completed
10/25/2002
CMP Document Production Support Process
Originator: Notarianni, Lynn
Originator Company Name: Qwest Corporation
Owner: Notarianni, Lynn
Director:
CR PM: White, Matt

Description Of Change

Currently, Section 12.3 of the Qwest Wholesale Change Management Process Document has an IT Trouble Ticket closure disposition code of ‘Date TBD’ for IT Trouble Tickets that are not scheduled to be resolved in a patch, change or otherwise. Once the trouble ticket is closed in this manner, CLECs are provided status of the ticket at the Monthly Systems CMP Meetings, even if a date for resolution has been determined. Qwest would like to propose a change to the language to have “Date TBD” reflect a hold status to end the need for Event Notifications but not actually close the IT Trouble Ticket. Once the fix has been scheduled, Qwest can then provide an update to the IT Trouble Ticket, close the ticket with one of the four closure disposition codes, and only bring forward those tickets remaining in a hold status (‘Date TBD’) to the Monthly Systems CMP Meeting.

The proposed update to Section 12 is available in Supplemental Information.

Expected Deliverable

Change Sectoin 12


Status History

10/25/02 - CR Submitted

10/25/02 - CR Acknowledged

10/31/02 - Clarification Meeting Scheduled for 11/4/02

11/4/02 - Clarification Meeting held

11/20/02 - Presented at the Monthly CMP Product/Process Meeting

11/21/02 - Vote Notification distributed

12/18/02 - CR voted on at the CMP Meeting. Approved by unanimous vote.


Project Meetings

12/18/02 - CMP Monthly Product/Process Meeting

White-Qwest described the voting process. Van Meter–AT&T asked that Qwest recap the issue because she had missed the November CMP Meeting. Notarianni-Qwest described the change. Van Meter-AT&T asked if this would change the date the ticket was closed to when the patch was successfully implemented. White-Qwest and Zulevic-Covad stated that this change was only to remove “Date TBD” as a valid closure status for a trouble ticket. There were no further questions. White-Qwest conducted the vote. The change passed by unanimous vote 7 "Yes" and 0 "No." White-Qwest proposed that the change to the CMP Document be made in combination with the change from CR PC100201-1CM in a January 6, 2002, Level 1 notification. The attendees agreed. The CR status was updated to Completed.

==================================================================

11/20/02 - CMP Monthly Product/Process Meeting

Notarianni-Qwest presented the CR. White-Qwest reviewed the process to change the CMP Document. He asked the participants if anyone wished to have any meetings before the vote to discuss the proposed change. No participants asked for input meetings. White-Qwest asked if the participants could agree that the vote be held at the December 2002 Monthly CMP Product/Process Meeting. The attendees agreed. White-Qwest stated that Qwest would distribute a vote notification. The CR status was updated to Presented.

==================================================================

CLEC Change Request – PC102502-1CM Clarification Meeting 2:00 PM (Mountain Time) / Monday, November 4, 2002

1-877-550-8686 2213337#

Attendees Matt White – CRPM Lynn Natorianni - Qwest Jeff Thompson - Qwest Beth Foster - Qwest

Introduction of Attendees White-Qwest welcomed all attendees and reviewed the request.

Review Requested (Description of) Change Natorianni-Qwest reviewed the CR.

Confirm Areas and Products Impacted White-Qwest confirmed that the attendees were comfortable that the request appropriately identified all areas and products impacted. Confirm Right Personnel Involved White-Qwest confirmed with the attendees that the appropriate Qwest personnel were involved.

Identify/Confirm CLEC’s Expectation White-Qwest reviewed the request to confirm Qwest's expectation.

Identify and Dependant Systems Change Requests White-Qwest asked the attendees if they knew of any related change requests.

Establish Action Plan White-Qwest asked attendees if there were any further questions. There were none. White-Qwest stated that the next step was for Qwest to present the CR at the November Monthly Product/Process Meeting and thanked all attendees for attending the meeting.


Open Product/Process CR PC101802-2IGX Detail

 
Title: Implement new Industry Dispute form (Crossover CR SCR090402 01IG)
CR Number Current Status
Date
Area Impacted Products Impacted

PC101802-2IGX Completed
10/17/2002
All
Originator: Kriebel, Sue
Originator Company Name: Qwest Corporation
Owner: Kriebel, Sue
Director:
CR PM: White, Matt

Description Of Change

Requesting CLECs use the new revised Dispute Format developed at the OBF. We would like to receive our disputes in the format agreed to at the Industry for OBF issues 2002, 2307, & 2348. This form provides for disputes to be detailed at the Bill/Summary Bill/Ban level. Also to be provided will be the reason code for charges in dispute. See attached dispute template in word format. It can also be submitted in the excel format developed.

On August 10, 1999 OBF issue 2002 - Standard Dispute Template- was opened and stated: Several providers have started sending out Dispute Templates to be followed by customers when they send disputes to the provider. In an effort to eliminate multiple dispute formats a Standard Dispute Format should be created for use by all providers and customers.

The issue was closed on November 11, 2000 with the following resolution: The Dispute File Specifications document has been created which establishes the record layout and requirements associated with the process to be followed for disputes other than PICC disputes. This document will be owned and maintained by the OBF Billing Committee and available on the ATIS Web Site.

It is expected that all customers and providers will follow the guidelines in the Dispute File Specifications document when filing and receiving disputes.

Then it was determined at the OBF billing committee that the template format created could be more user friendly and may need some additonal fields added. So, 2 additional OBF issues were opened to address these concerns. OBF issue 2307 and 2348 were opened. These issues addressed template additions and further definition on fields required for investigation on dipsutes submitted. As of August 21, 2002 (OBF 79) these issues are in Initial Closure.


Status History

9/4/02 - CR submitted

9/4/02 - CR acknowledged

9/9/02 - Clarification meeting held

9/9/02 - Status changed to clarification

10/10/02 - Communicator issued - CMPR.09.26.02.F.0133.Dispute_Form_CR

10/10/02 - Discussed at Monthly CMP Meeting - Please see Systems CMP Distribution Package Order CMP - Att D

10/17/02 - Status change to presented

10/18/02 - Created crossover PC101802-2IGX from SCR090402-1IGX

11/20/02 - Response presented at CMP Meeting. CR Closed.


Project Meetings

11/20/02 - CMP Monthly Product/Process Meeting

Kriebel-Qwest described the change and presented her response. Stichter-Eschelon asked if the notification would include language indicating that the change was optional. Kriebel-Qwest stated that she would put that language in the notification. Schultz-Qwest asked if there was any objection to moving this change to Level 1. Bahner-AT&T stated that there was none from AT&T. There were no other comments or questions. The CR status was updated to Completed.

===============================================================================

10/18/02 CMP Systems Meeting

Michael Buck/Qwest stated that process document calls for Industry Guidelines to be brought though the systems meeting. That applies even in the case where we know that it is a product/process request. Michael noted that a notice was sent and that as a result, Eschelon did submit a question; it was not an objection. There were no objections received to proceed with this request as an Industry Guideline CR. Michael Buck/Qwest-so after we finish discussing it, the appropriate thing will be to cross it over and continue talking about it in the Product/Process CMP Meetings going forward. Sue Kriebel/Qwest presented the CR and provided background and issue being discussed at OBF. The issue for enhancing the template was reviewed and put in initial closure in the August OBF. Will look to the November OBF for it to go into final closure. Sue stated that at OBF, the billing customer’s stated that as they file disputes, each provider had a different form. A lot of CLECs stated that it was difficult to manage. Issue 2002 was opened, for a template. The issue was resolved and documented. It was a Word document, an EXCEL document, and a comma delimited file. This worked for several companies but it was not user friendly. Issues 2307 and 2308 were for additional information, as applicable, and to make the format friendlier. The Word, EXCEL, and comma delimited file documentation was updated with the OBF issues. Qwest would like to implement the guideline form so Qwest can be provided the information needed for research and resolution of disputes. Sue asked if there were any questions. Carla Pardee/AT&T asked if the web site provides the location as to where to send the forms. Sue Kriebel/Qwest stated that the ATIS web site has the form that can be downloaded. That download can be used with the existing communication process. Carla Pardee/AT&T asked if the OBF had a guideline as to when disputes are to be done. Sue Kriebel/Qwest stated that no, those are policy issues and advised of the AT&T contact name. Bill Markert/Eschelon stated that Eschelon receives 80% of their bills via BillMate files. Eschelon sends disputes using the EXCEL spreadsheet. Is concerned about filling out 79 fields when giving Qwest all the information that Qwest needs. Bill stated that Eschelon currently provides Qwest with all the information that Qwest needs. Sue Kriebel/Qwest stated that she agreed with Bill (Eschelon) and that Qwest will still accept the spreadsheet that Eschelon is sending today (provided all information needed for a dispute is present). Qwest would like the face page information such as the bill date, dollar amount, total, etc. Sue stated that this is not a guideline that Qwest is imposing, Qwest is responding to the request for 1 format. Bill Markert/Eschelon stated that Eschelon already provides the BAN and information so why the need to fill out another page. Sue Kriebel/Qwest stated that you will not be providing all 79 fields, if you are currently providing all the necessary information. Sue reiterated that Qwest is not imposing this. The guideline is for the information that is needed be provided for the dispute. Sue stated that as long as Qwest is given what is needed, Qwest will not make you fill out another piece of paper. Qwest is responding to a request for 1 format. This is not a forced thing. Bill Markert/Eschelon asked for confirmation that this is optional and that disputes would not be denied. Sue Kriebel/Qwest stated that that was a true statement. Bonnie Johnson/Eschelon thanked Qwest for the clarification and stated that Eschelon’s questions were based on the understanding that this was going to be mandated. Sue Kriebel/Qwest stated that no, it’s not forced. Michael Buck/Qwest asked if there were any other questions on the CR or the process? There were no other questions or comments brought forward. Michael Buck/Qwest stated that the CR status would be updated to Presented and that the CR will be crossed over to product/process.

APPENDIX B PAPER DISPUTE TEMPLATE (draft until final closure at OBF) Billing Company Contact Information Section: 1. Billing Company Name: 2. Billing Contact Name: 3. Billing Contact Address: 4. Billing Contact Phone: 5. Billing Contact Fax #: 6. Billing Contact Email: Disputing Company Contact Information Section: 7. Disputing Company Name: 8. Disputing Contact Name: 9. Disputing Contact Address: 10. Disputing Contact Phone: 11. Disputing Contact Fax #: 12. Disputing Contact Email: General Dispute Section: 13. Date of Claim: (yyyy-mm-dd): 14. Status: 15. Claim/Audit Number: 16. Service Type:

17. ACNA: 18. OCN: 19. CIC: 20. BAN: 21. Invoice Number(s): 22. Bill Date: 23. Billed Amount: $24. Dispute Reason Code: 25. Dispute Desc: 26. Disputed Amount: $ 27. Disputed Amount Withheld: $ 28. Disputed Amount Paid: $ 29. Dispute Bill Date From: Dispute Bill Date Thru: Dispute Information Section: 30. Rate Element/USOC: 31. Rate: Billed Correct Factor Information: 32. PIU: Billed Correct 33. PLU: Billed Correct 34. BIP: Billed Correct 35. Other Factors: Billed Correct 36: Jurisdiction 0Non Jurisdictional 0Inter/Interstate 0Intra/Interstate 0Intra/Intrastate 0Inter/Intrastate 0 Local37. Mileage: Billed Correct 38. Contract Name/#: 39. Business/Residence Indicator: 40: State: 41: LATA:

Facilities/Dedicated Circuit Dispute Information Section: 42. PON: 43 SON: 44. EC Circuit ID: 45 Circuit Location: 46. IC Circuit ID: 47. CFA : 48. TN/All: 49. Point Code: 50. USOC Quantity: 51. Two-Six Code:

52. Facilities From Date: Thru Date:

Usage Dispute Information Section:

53. End Office CLLI: 54. TN/All: 55. Usage Billed Units/Quantity: 56. Usage Billed Units/Quantity Disputed: 57. Directionality: 0 N/A 0 Orig. 0 Term. 0 Combination 58. Query: 59. Query Type: 60. OC&C SON: 61 OC&C PON: 62. Usage From Date: Thru Date: Information Section:

63. Tax Dispute Amount: 64. Tax exemption form attached : 0 65. Invoice(s) LPC billed: 66. LPC paid, date of payment:

OTHER 67. Other remarks

Resolution Information Section: 68. Resolution Date:

69. Resolution Amount: $ 70. Resolution Reason: 71. Adjustment Bill Date: 72. Adjustment Invoice Number: 73. Adjustment Phrase Code(s): 74. Adjustment BAN/ 75. Adjustment SON: 76. Disputed Amount: $ 77. Amount Credited: $ 78. Bill Section Adjustment will appear on: OC&C Adjustment 79. Resolution remarks:

Bill Dispute Form - Overview Draft until final closure at OBF

Date of Claim:Claim/Audit Number: Billing Account Number:Service Type: ACNA:OCN: CIC:Status:

Billing Company Contact Information Section

Billing Company Name: Billing Contact Address: Billing Contact Name: Billing Contact Phone # :Billing Contact Fax # : Billing Contact Email:

Disputing Company Contact Information Section

Disputing Company Name: Disputing Contact Address: Disputing Contact Name: Disputing Contact PhoneDisputing Contact Fax # : Disputing Contact Email:

Disputed Amount Section

Summary Disputed Amount: Summary Disputed Amount Withheld: Summary Disputed Amount Paid: Dispute Bill Date From: Dispute Bill Date Thru:

Other Section

Other Remarks:

Information Section

Tax Dispute Amount: Tax Exemption Form Attached: Invoice(s) LPC Billed: LPC Paid, date of payment:

Resolution Information Section

Resolution Date: Summary Resolution Amount: Resolution Reason: Adjustment Bill Date: Adjustment Invoice Number: Adjustment Phrase Code: Adjustment Bill Account Number: Adjustment Service Order Number: Amount Credited: Bill Section Adjustment Will Appear On: Resolution Remarks:

9/9/02 - Clarification Meeting

Qwest understands this change request and there were no questions. Sue Kriebel/Qwest provided example of dispute template.(See above) and history of the dispute issue at OBF.

On August 10, 1999 OBF issue 2002 - Standard Dispute Template- was opened and stated: Several providers have started sending out Dispute Templates to be followed by customers when they send disputes to the provider. In an effort to eliminate multiple dispute formats a Standard Dispute Format should be created for use by all providers and customers. The issue was closed on November 11, 2000 with the following resolution: The Dispute File Specifications document has been created which establishes the record layout and requirements associated with the process to be followed for disputes other than PICC disputes. This document will be owned and maintained by the OBF Billing Committee and available on the ATIS Web Site.

Then it was determined at the OBF billing committee that the template format created could be more user friendly and may need some additonal fields added. So, 2 additional OBF issues were opened to address these concerns. OBF issue 2307 and 2348 were opened. These issues addressed template additions and further definition on fields required for investigation on dipsutes submitted. As of August 21, 2002 (OBF 79) these issues are in Initial Closure.


CenturyLink Response

November 13, 2002

DRAFT RESPONSE For Review by CLEC Community and Discussion at the November 20, 2002, CMP Product/Process Meeting

Sue Kriebel Process Manager Qwest

SUBJECT:Qwest’s Change Request Response - CR #PC101802-2IGX

This is a preliminary response regarding Qwest CR PC101802-2IGX (Implement new industry dispute form (from SCR090402-01IG)).

This change represents an optional format for CLECs to submit their billing disputes to Qwest.

When Qwest originated this CR (09/04/02), the Change Management Process required all industry guideline changes to be initiated as Systems CMP CRs. Qwest believes that if this change were originated today, Qwest would do so by distributing a Level 1 change notification (Process options with no mandatory deadline that do not supercede the existing process and that do not impose charges, regardless of whether the CLEC exercises the option. The current process for CLECs to submit their billing disputes to Qwest is documented on the Qwest Web site at http://www.qwest.com/wholesale/clecs/cris.html in the “Disputes and Claims” section.)

Qwest recommends that this change be implemented as a Level 1, with a notification date of 02/28/03. Qwest will seek concurrence with this approach at the November 20, 2002, Product/Process Monthly CMP Meeting.

Sincerely,

Sue Kriebel Process Manager Qwest


Open Product/Process CR PC111102-1EX Detail

 
Title: Extended Wholesale Customer Service Hours for Call Handling Centers
CR Number Current Status
Date
Area Impacted Products Impacted

PC111102-1EX Completed
11/11/2002
Call Center Hours
Originator: Thacker, Michelle
Originator Company Name: Qwest Corporation
Owner: Thacker, Michelle
Director:
CR PM: White, Matt

Description Of Change

Qwest will change the current weekday hours of operation from 6:00am - 7:00pm Mountain Time to 6:00am - 10:00pm Mountain time for the following Wholesale Call Handling Centers:

Tier 0 - ISC (Interconnect Service Center)

Tier 1 - CSIE (Customer Service Inquiry and Education)

Tier 2 - CSIE Subject Matter Experts

During these extended hours, Qwest's Centers will perform all of the same functions and services that they performed during the previous hours of operation.

In the spirit of service, Qwest is extending business hours to provide more flexibility and options to our customers.


Status History

11/11/02 - CR Submitted by Qwest

11/11/02 - CR acknowledged by P/P CMP Manager

11/11/02 - Exception Notification distributed CMPR.11.11.02.F.01355.CMP_ExceptionNotice

11/13/02 - Exception Pre-Meeting Held

11/15/02 - Vote Notificaiton distributed CMPR.11.15.02.F.01357.CMP_PreMeeting_Vote

11/20/02 - CR Presented, voted on, and unanimously approved at CMP Meeting


Project Meetings

11/20/02 - CMP Monthly Product/Process Meeting

White-Qwest described the CR, the Exception Process, the notifications Qwest had distributed, the voting options, and the voting standard. There were no questions. Thomte-Qwest stated that quorum of 7 carriers was achieved. White-Qwest distributed the ballots and asked if there were any voters on the line. There were none. White-Qwest concluded the vote and collected and verified all ballots. The Exception Request was approved by a unanimous vote. The CR status was updated to Completed.

Exception Request Pre-Meeting Minutes – PC111102-1EX Wednesday, November 13, 2002 4:00 PM MT

Attendees: Matt White – Qwest Judy Schultz – Qwest Kit Thomte – Qwest Michelle Thacker – Qwest Pat Bratetic – Qwest Carolyn Brown – Qwest Donna Osborne-Miller – AT&T Terry Bahner - AT&T Esther Scherer - AT&T Jonathan Spangler – AT&T Carla Pardee – AT&T Mike Zulevic – Covad Bonnie Johnson – Eschelon Liz Balvin – WorldCom Wayne Hart – Idaho PUC

Conduct of Meeting:

White-Qwest opened the conference line and introduced attendees. He stated that there were six items on the agenda for this meeting: ? Review the Exception Process and the purpose of the Pre-Meeting ? Present Exception Request ? Propose Clear Statement for delineating what “Yes” and “No” votes will mean. ? Determine appropriate voting standard ? Propose a Clear Statement outlining a course of action parties will follow if the Exception Request is granted. ? Establish logistics for the meeting at which the vote will be held.

Review the Exception Process and the purpose of the Pre-Meeting

White-Qwest reviewed the Exception Process and the Pre-Meeting Process (Sections 16.2 and 16.2.1).

Present Exception Request

Thacker-Qwest presented the Exception Request. She also stated that she would like to modify the request to implement the change on December 2, 2002. Johnson-Eschelon asked if the retail hours of operation were the same. Thacker-Qwest stated that they were. Bahner-AT&T asked if LSR acceptance times would be extended as well. Thacker Qwest stated that at this time Qwest was not extending LSR acceptance times, and if AT&T wanted to extend them then AT&T should submit a CR. Bahner-AT&T asked if the personnel who normally handled LSR would be a the centers until 10. Thacker-Qwest stated that only the center personnel would be staffing the centers and that this was a limited group of personnel. She continued that these personnel could assist with all customer service issues. White-Qwest asked if there were any additional questions about the request. There were none.

Propose Clear Statement for delineating what “Yes” and “No” votes will mean

White-Qwest read Qwest’s proposed language for delineating what “Yes” and “No” votes will mean. He asked if there were any comments or additions to the Qwest proposed language. There were none.

Determine appropriate voting standard

White-Qwest stated that Section 16.4 states that “If the Exception Request is for a general change to the established CMP timelines for Product/Process changes, a two-thirds majority will be required.” He continued that Qwest proposes that this vote be held to a two-thirds majority vote because the request seeks a change to the established CMP timelines for a Qwest originated process change (Level 3 – Customer-facing Center hours and holiday schedule changes). Osborne-Miller-AT&T agreed. White asked if there were any other comments, concerns or questions about the voting standard. There were none.

Propose a Clear Statement outlining a course of action parties will follow if the Exception Request is granted

White-Qwest presented Qwest’s proposed language: “If this Exception Request is granted, Qwest will implement a change to the weekday hours of operation for the Wholesale Call Handling Centers with a single notification on December 2, 2002.” White-Qwest asked if there were any comments, concerns or questions about the course of action. Balvin-WorldCom and Osborne-Miller-AT&T stated that they agreed that that was an appropriate course of action if the request was granted.

Establish logistics for the meeting at which the vote will be held

White-Qwest stated that the timing of the Exception Process allowed the vote for this Exception Request to be held at the November 20, 2002, Monthly CMP Product/Process Meeting. He asked if anyone had any concerns about this vote schedule. There were no concerns expressed.

White-Qwest stated that Qwest would issue a notification (Voting Instructions Notification) documenting the agreements reached at this meeting and thanked all attendees for participating.


Open Product/Process CR PC112202-1 Detail

 
Title: Held Order Processes when Qwest does not have Facilities
CR Number Current Status
Date
Area Impacted Products Impacted

PC112202-1 Completed
7/16/2003
Ordering Lines / Loops
Originator: Lorence, Susan
Originator Company Name: Qwest Corporation
Owner: Carlson, Barbara
Director:
CR PM: Harlan, Cindy

Description Of Change

When a Local Service Request (LSR) is submitted for multiple lines/loops and Qwest cannot provision all of the lines/loops due to lack of facilities, the are several Held Order processes that may be invoked. However, there have been some gaps identified in these processes that need to be resolved. These are:

-Qwest does not consistently apply the Held Order process for Non-Designed orders which results in:

-IMA then does not reflect the correct status of the LSR

-CLECs are unaware of subsequent orders issued to their LSR by Qwest

-CLEC notification does not necessarily occur prior to Due Date

-What is the appropriate timing and notification process back to CLECs to make provisioning decisions; Input is needed from CLECs as to

-Which TN(s) does the CLEC want to move forward with

-Different decision criteria in handling conversion activity versus end-user moves

-CLEC input vs. end-user input when Qwest Tech is on-site

Qwest and the CLEC community will work together to resolve the gaps and modify the existing Held Order Processes when Qwest does not have facilities.

Expected Deliverable

Updated Held Order Process for Designed and Non-Designed when Qwest does not have Facilities


Status History

11/18/02 - Qwest issued a notification identifying this CR would be issued and it normally would be a Level 3 CR but Qwest believes the change would actually be best represented as a Level 4.

11/20/02 - November CMP Monthly Meeting - Qwest introduced this project as a walk on and advised an AdHoc meeting was held on October 29 to review the existing LSR processes when Qwest doesn't have facilities. During the October 29 meeting the team agreed this project should be handled utilizing the CMP Process. The CLEC community agreed during the November 20 CMP meeting that a CR should be issued and handled as Level 4.

11/22/02 - CR Submitted by Qwest

11/25/02 - CR acknowledged by P/P CMP Manager

11/27/02 - Contacted Susan Lorence to discuss CR. Clarification Meeting scheduled for 12/03/02.

12/03/02 - Held meeting with CLEC community to discuss the issues identified during previous working sessions. Qwest shared two options which would address the issues identified. The team discussed the pros/cons of each option. Agreement was reached that meeting minutes would be produced, the CR would be presented at the December CMP meeting and additional working sessions would be scheduled to discuss the options in more detail.

12/17/02 - Meeting Notification sent out to offer 2 meeting options for 1/7/02 from 8:30 - 930 and 11:30 - 12:30.

12/18/02 - December P/P CMP Meeting Minutes will be posted to the Project Meeting Section. Changed status to Presented.

12/18/02 - Qwest-Urevig explained a meeting was held with the CLEC community to review two options. Both options were determined to have areas that still didn’t meet everyone’s needs. Qwest requested additional CLECs participate in the next meeting to help develop the solution. Two meeting times have been proposed via a Notification. The selected meeting will be scheduled and the team will continue brainstorming ways to improve this process. This CR will move to Presented status.

12/18/02 - Document Number: CMPR.12.18.02.F.01377.HeldOrderMtgOptions sent out to offer meeting options

12/30/02 - Document Number: CMPR.12.30.02.F.01383.HeldOrderProcessMtg sent out to schedule meeting for CLEC Meeting CR PC112202-1, Tuesday, January 7, 2003

Time: 8:30 am to 9:30 am (MST7MDT), Location: 877-572-8687 3393947#

01/07/03 - CLEC meeting held to further discuss process, gaps, options. Qwest agreed to hold internal meeting and fine tune the options and document them so they can be reviewed again with the CLECs in a working session, with target recommendation made by Qwest at the February CMP meeting. Changed status to Development.

01/09/03 - Entered meeting minutes in database

01/15/03 - January CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section.

01/21/03 - Notification sent offering 3 meeting times to discuss CLEC submitted Option C (Jan31, Feb3)

01/24/03 - Notification sent advising meeting time selected is Monday February 3 12:00 - 1:00 mdt.

1/31/03 - Notification sent distributing additional attachments for Monday Meeting. Attachments are flow charts depicting Option A and B.

2/3/03 - Held CLEC Community meeting and reviewed Option C details as presented by the CLEC Community and reviewed Option A/B flow charts. Agreed next steps are to incorporate additional discussions into the flow charts/process and CLEC Community will review the options internally and advise Qwest of their preferred Option. Additional working session meeting will be scheduled.

2/13/03 - Notification sent out offering 3 meeting options for CLEC Community meeting to discuss CLEC's preferred option. Meeting option are 2-28 9:00-10 and 1:00-2, and 3-3 12:00-1.

2/19/03 - February CMP Meeting Minutes will be posted to the Project Meeting section of the database

2/28/03 - Met with the CLEC Community to gather their preferrences and review any additional comments. Option A was the option most CLECs preferred.

3/11/03 - Posted Response to database

3/19/03 - March CMP Meeting minutes posted to the database

4/16/03 - April CMP Meeting minutes will be posted to the database

5/21/03 - May CMP Meeting minutes will be posted to the database

6/18/03 - June CMP Meeting minutes will be posted to the database

7/16/03 - July CMP Meeting minutes will be posted to the database


Project Meetings

07/16/03 July CMP Meeting Cindy Macy-Qwest advised this process was implemented last month. Bonnie Johnson – Eschelon checked with her organization and the process is in place and working. Bonnie advised it is okay to close this CR. This CR will move to Completed status.

06/18/03 June CMP Meeting Cindy Macy – Qwest advised the comment cycle for this CR ended May 9, and implemented June 8. The CLECs would like to leave this CR open one more month.

05/21/03 May CMP Meeting Cindy Macy – Qwest reported this PCAT will be published this week as a Level 3 Notification. This CR will move to CLEC Test Status.

4/16/03 April CMP Meeting PC112202-1: Held Order Processes when Qwest does not have Facilities Barb Carlson – Qwest reported the PCAT is under internal review and will be released for CLEC review by the end of the month. This CR will stay in Development status.

3/19/03 March CMP Meeting Barb Carlson – Qwest reviewed the process that was developed by Qwest and the CLEC Community. Mitch Menendez – ATT asked some clarifying questions about the process. Mitch asked if the C order was created by Qwest, and if the CLEC has to submit another LSR or sup. Barb advised Qwest creates the C order and the CLEC does not have to submit another LSR or sup. Sheila US Link asked if Qwest sends the new C order number and Barb advised Qwest sends a new FOC, PSON, jep and order number. This CR will stay in Development status.

2/19/03 February CMP Meeting

Barbara Carlson–Qwest reported we are still working internally on our recommendation. The CLEC Community will determine which option they prefer and share that with Qwest during the meeting scheduled for February 28, 2003. Bonnie Johnson–Eschelon stated the purpose of the meeting on the 28th is for the CLECs to be prepared to provide which option they would like implemented. Cindy Macy–Qwest shared that only Eschelon responded with a preferred meeting time so hopefully the other CLECs will be able to attend the meeting and provide their preferences. Sharon–ATT advised Carl from ATT will attend. Liz–World Comm advised they are planning on attending.

CLEC Meeting Minutes for Qwest Initiated CR PC112202-1 Held Order Process when Qwest does not have Facilities February 3, 2003 12:00 – 1:00 MDT

In attendance: Valerie Estorga – Qwest Denny Graham – Qwest Monica Avila – Var Tech Terri Kilker – Qwest Lori Langston – Qwest Sharon Van Meter – ATT Bonnie Johnson – Eschelon Vivian Vigil – Qwest Dave Hahn – Qwest Kim Issacs – Eschelon Russ Urevig – Qwest Mallory Paxton – Qwest Barbara Carlson – Qwest Stephanie Prull – McLeod Carla Pardee – ATT

The team got together to review the Option C details that the CLEC Community provided to Qwest. In addition the team reviewed the Option A/B flow charts.

Bonnie Johnson-Eschelon discussed Option C. Bonnie asked if Qwest would incorporate some of Option C key points into Option A or B. Qwest advised they would see if this is possible. Key points regarding Option C include: *CLECs request to have two processes. One for held order conditions found before due date and one for held order conditions found on due date. * CLECs want to be able to prioritize lines to be installed on held order conditions found before due date. * CLECs wanted to know if Qwest could quantify how many held order conditions are determined before the due date? Mallory-Qwest replied that we do not track this data today. Qwest’s position is that we try to determine if there are facilities available or not as early in the process as possible. As soon as Qwest determines there are no facilities the order is jeopardized and the CLEC is advised via the jep process.

Russ – Qwest explained what may be missing is the reason why the order is jeopardy condition. This information may be helpful for the CLECs and help them prioritize the lines to install or split off the LSR or cancel, etc.

Bonnie-Eschelon advised if we find out the order is held before the due date the CLECs could prioritize the lines, if the order is held on/after the due date the CLECs understand that Qwest should decide and install the lines that are available.

Barbara – Qwest reviewed Option A. Bonnie – Eschelon clarified a Service Order completion notice would happen when one or more lines were completed, but a LSR completion would only occur when all lines were completed. Russ- Qwest confirmed that when any portion of the LSR has a complete status it can no longer be supp’d.

Barbara-Qwest reviewed Option B. Bonnie-Eschelon asked if CLEC sups LSR and splits the orders what due date would the CLEC get? Mallory-Qwest advised what should happen is Qwest should create a second LSR with the same DDD (desired due date). The actual due date would be based on available facilities. Qwest would take a hit on missed facilities. The CLEC may have to escalate on this situation as the center would probably assign the Standard Interval due date as they wouldn’t know the actual circumstances.

Russ – Qwest asked CLECs what time frame before we cancel / archive LSR should we use if facilities are held? Macy – Qwest asked if 30 days was the time frame for other processes. Qwest advised we would like to cancel and archive the LSR after 30 days held. The CLEC would issue a 2nd LSR for the remaining lines after 30 days instead of leaving the LSR that can’t be sup’d out there indefinitely.

Russ-Qwest stressed the original issue that this CR is addressing is regarding Completion Notification in IMA and providing a way for the CLECs to know what lines completed and what lines didn’t. Both Option A and B address this issue. The other changes extend beyond the main issue as the team is trying to improve the process.

Current condition: When the N order is completed and C order is not associated to the LSR the LSR Completion Notice happens automatically and in error.

With Option A: When the N order is completed and the C order is associated to the LSR the Order Completion occurs and CLEC receives a 2nd FOC/PSON for the order that is split off. The LSR Completion Notice will not show complete.

With Option B: The order/LSR do not complete so there is not a LSR or Order Completion Notice created.

Next Steps: * The CLEC Community will go back to their company and determine their preference between Option A/B. * Qwest will review additional comments from this working session and update flow charts if appropriate * Qwest will schedule another working session for CLEC Community so they can share their preferences with Qwest and further discussion can take place * Qwest will make recommendation

01/15/03 CMP Monthly Meeting: Barb Carlson with Qwest gave an update on this CR and said that on 1/7/03 Qwestheld a discussion meeting with CLECs about the process, gaps and options. Cindy Macy will schedule another meeting with CLECs before the 2/19/03 CMP Meeting. Bonnie Johnson said that the CLECs were encouraged to provide input, and she will email this input, option C, to Linda Sanchez-Steinke, ljsanch@qwest.com. This CR will remain in Development status.

CLEC Meeting Minutes for Qwest Initiated CR PC112202-1 Held Order Processes when Qwest does not have Facilities January 7, 2003 8:30 – 9:30 a.m. MDT

In Attendance: Mallory Paxton Qwest Barbara Carlson Qwest Wendy Northcutt McLeod Mona Fielder McLeod Adam Schug McLeod Russ Urevig Qwest Beth Foster Qwest Carla Pardee Qwest Lori Mendoza Allegiance Sheila Hoffman Covad Bonnie Johnson Eschelon Vivian Vigil Qwest Jennifer Fischer Qwest John Beard Covad Kim Issacs Eschelon Denny Graham Qwest

This meeting was held to discuss and review the current process and notes from the December 3, 2002 meeting. The team wanted to gather input from additional CLECs and clarify the gaps and possible solutions.

Russ Urevig – Qwest reviewed Option A and Option B. These options were discussed at a detail level and also summarized by key differences.

Key Differences are: Option A: Allows due date to stay in tact for lines that Qwest can install Qwest determines what lines to install Qwest handles the supp in most cases LSR would stay open in most cases and new order would be issued for held lines (split the LSR) *this causes a problem per Jill as LSRs traditionally have one DD* New FOC and PSON would be generated for the new order

Option B: CLEC would have control over which lines completed Installation of all lines would be stopped until we received direction to proceed from CLEC CLEC would supp the LSR to advise which lines to complete New FOC and PSON would be generated for the new order

Specific questions and discussions are: Mona – McLeod advised they use option B today except Qwest handles the supp. Vivian – Qwest advised we handle the supp if facilities are not available before the DD, but not on the DD.

Vivian – Qwest advised for Option A Qwest would generally convert the TNs on the order in sequence as they are listed on the order. Mallory – Qwest advised if the correct telephone numbers are not converted this can be escalated and depending on the circumstances we can perform a number change.

Bonnie – Eschelon advised in the case of a conversion the CLEC needs to advise Qwest and it would be ALL or Nothing on the lines. Qwest can not split the order on conversions.

Bonnie - Eschelon advised they prefer Option B

Discussion occurred around what products were included in this CR. Qwest replied it was Non Design, Resale/UNE P / ISDN, trunks that are not UBL, non-Private Line Line activity.

Russ – Qwest advised volumes of held orders are low, but the impact to CLEC is high when Billing does not occur correctly.

Cindy – Qwest asked about Jill's concerns: 1. Traditionally, LSRs have only one due date. Option A will require a manual override on the FOC and this will cause a miss match between what is shown on the FOC and the service order. How will we handle this? Russ – Qwest advised we would have to complete the LSR and move the held lines to another LSR

2. What if the LSR goes into a CNR condition later for those orders once they have been released from a delayed order status. How will they supp the LSR to show the newly requested due date? Vivian – Qwest replies we would have to take a verbal approval and perform a manual work around The team agreed there are individual case situations that would need to be handled uniquely. In those cases the LSR would not stay open. We would complete the LSR and issue a new one for the held lines.

Next Steps: The team agreed the next steps would be for Qwest to fine tune the process and document it as a flow or multiple scenarios. Qwest will schedule internal sessions to fine-tune and document the process. Qwest will them schedule another CLEC working session to share the process and obtain additional input. After that the PCAT would be updated and follow the normal review cycle.

12/18/02 CMP Monthly Meeting: Qwest Urevig explained a meeting was held with the CLEC community to review two options. Both options were determined to have areas that still didn’t meet everyone’s needs. Qwest requested additional CLECs participate in the next meeting to help develop the solution. Two meeting times have been proposed via a Notification. The selected meeting will be scheduled and the team will continue brainstorming ways to improve this process. This CR will move to Presented status.

Meeting Minutes -CLEC Meeting on Qwest Initiated CR PC112202-1 Held Order Processes when Qwest does not have Facilities December 3, 2002, 2:00 – 3:30 p.m. MDT

In Attendance: Mallory Paxton –Qwest Bonnie Johnson – Eschelon Russ Urevig – Qwest Kim Isaac – Eschelon Barb Carlson – Qwest Denny Graham - Qwest Vivian Vigil – Qwest Wayne Hart – Idaho PUC Terry Kilker – Qwest LeiLani Hines – World Comm Cindy Macy – Qwest Phyliss Sunnins - Qwest Susan Lorence – Qwest

The team came together to continue to work on issues and gaps identified with the Held Order Process. The previous meeting was reviewed. Susan Lorence advised a CR was issued and Cindy Macy – CRPM, will manage this CR. This project will now be managed using the CMP guidelines. This project will be managed as a Level 4 CR, as agreed to during the November CMP meeting. This CR will be presented at the December CMP meeting. This meeting can be considered as a Clarification meeting.

The current process was reviewed. Barb Carlson advised the orders today are split ‘on site’ by the tech. A new order is generated for the lines that go held. The customer doesn’t always get notified of this and billing can happen in error.

Qwest and the CLECs discussed two options and the pros/cons to each option. The issues and gaps were also mapped to the options so we know which option would address each issue. See the below matrix for these details.

The team agreed the discussion today was focused on Non Design, as that is the process that is causing the most issues. The team agreed the Design process should also be reviewed after we have decided upon the Non Design process.

Susan Lorence – Qwest asked if the volumes were high or low for this process and set of issues. Bonnie – Eschelon advised the volume is fairly low but the impact is high when it occurs.

The team agreed this process should be consistent within itself and not allow different processes for different situations, i.e. if the held order condition is found before the tech goes out or if the held condition is determined during provisioning. Another example is new install versus conversion.

Option A – Non Design Pro/Con Continue to keep 1 LSR – split the order into what can be completed and the lines/loops that can’t

Both the original LSR and the outstanding orders would be in Jeopardy status.

Qwest would need to attach the 2nd order to the LSR to prevent the LSR from completing.

Qwest would need to move ahead on the 2nd order ASAP to keep the LSR from completing.

The CLECs would NOT have input into which lines completed

Billing is based on the SOP and IMA completion report

Qwest would complete the lines available, usually in sequence as they are identified on the order. The tech may not completed one voice line and one fax line- lines would probably be completed based on the sequence on the order

Option B – Non Design Pro/Con CLEC will split the LSR into what can/cannot be completed Original modified LSR and related orders would be completed. CLEC would create a new LSR/orders with only the lines that cannot be completed on it which would go into Jeopardy status.

CLEC would have control over which lines Qwest completed

Completions and notifications would be correct and the CLEC would be aware of what lines completed

All lines may go into Jeopardy if CLEC is not able to decide which lines to complete when the tech is on site.

The Jeopardy in this case would be a JEP to the customer if the customer were not able to advise us which lines to complete.

Tech would contact the center to contact the CLEC. The IMPCON would be contacted 1st then the Initiator if the impcon were not available.

Option B may have IMA impacts that we need to investigate. Kim-Eschelon brought up impacts to the Reserve # function in IMA. Numbers are reserved based on the PON. Option B would have a different PON on the 2nd LSR/order and the TNs would be reserved under the 1st LSR/order.

Issue / Gap Which Options addresses this Issue / Gap Qwest does not consistently apply the Held Order process for Non-Design orders which result in the following issues: IMA then does not reflect the correct status of the LSR Option A and B will address this issue. Option A would require Qwest to make sure the LSR does not complete and the 2nd order is associated to the LSR. Option B would ensure the LSR shows the correct status, as the CLEC would issue the 2nd LSR for the held lines. CLECs are unaware of subsequent orders issued to their LSR by Qwest Option A and B will address this issue. Option A would require Qwest to make sure the LSR does not complete and the 2nd order is associated to the LSR. Option B would provide more clarity for the CLECs, as they would be making the decisions of what lines to complete and what lines to issue subsequent orders on. CLEC notification does not necessarily occur prior to Due Date Option A or B would NOT address this issue. Qwest generally does not know before the due date that the order is held. Qwest would know ON the due date. Option B would provide clearer notification as the CLEC would be making the decisions on what to do with the held lines. What is appropriate timing and notification process back to CLECs to make provisioning decisions; Input is needed from CLECs as to the following: Which TNs does the CLEC want to move forward with Option B would address this issue. Option B gives the CLECs control over which TNs to complete and which ones to put on the 2nd LSR/order Option A would NOT address this issue as the technician would decide which lines to complete, unless the end user is there to advise. Different decision criteria in handling conversion activity versus end – user moves Option A would address conversion activity better Option B would address end user moves better CLEC input vs. end user input when Qwest Tech is on site The Technician should really be taking input from the CLEC not the end user. Ultimately we both want to do what the end user requests. Option B would allow for CLEC input as the CLEC would have control over which lines complete Option A (may) allow for end user input if they are on site and advise the technician. Action Item Assign to What form of Notification will CLECs get when the order is split?

Bonnie advised she would think she would get an additional FOC and PSON for the 2nd order. She would expect to get the 1st FOC/PSON on the order, then when it goes held and if we split the order by creating a second order and /or LSR she would expect another FOC/PSON Barbara Carlson Determine IMA impacts to the ‘Reserve TN# function’ – Option B may have IMA impacts that we need to investigate. Kim-Eschelon brought up impacts to the Reserve # function in IMA. Numbers are reserved based on the PON. Option B would have a different PON on the 2nd LSR/order and the TNs would be reserved under the 1st LSR/order. Cindy Macy Determine internal impacts to LSR/SO process for Option A and B- contact Char Mahs to discuss in more detail Barbara Carlson


CenturyLink Response

For Review by CLEC Community and Discussion at the March 19, 2003 CMP Meeting

March 11, 2003

CMP Community

SUBJECT: Qwest’s Change Request Response - CR # PC112202-1 Held Order Processes when Qwest does not have Facilities

The original request of the CR is to provide a way for the CLECs to know what lines completed and what lines did not complete when a Local Service Request (LSR) is submitted for multiple lines/loops and Qwest cannot provision all of the lines/loops due to lack of facilities.

Several meetings were held with the CLEC Community and Qwest between November 2002 and February 2003, to develop an acceptable delayed order process. During the meetings multiple options were developed, presented and discussed.

The option selected by the participants where Qwest will install the lines available on the due date and establish a second order on the same LSR for those lines in a delayed order condition address the CR because: ? It provides a way for the CLECs to know what lines completed and what lines did not complete ? Allows the CLEC to provide partial service to their customer ? Provides parity with Retail ? Enables Qwest to begin working on the facility issues

The option provides three processes when the outside technician is on site to install: 1. If all lines can be provisioned, they are installed and the order and LSR are completed 2. If no lines can be provisioned, the order is placed into the delayed order process 3. If some lines can be provisioned, those that can be are installed. Those that are delayed for facility reasons are split off the original order and placed on a new “C” order and the new “C” order is attached to the LSR. New FOC and PSON notices along with a Jeopardy notice on the new “C” order are sent to the CLEC. The original order is completed and the new “C” order is placed in the delayed order process. The LSR and the new “C” order remain in a jeopardy status.

The next steps are to update the PCAT Ordering and Provisioning section and provide PCAT status at the April CMP meeting.

Sincerely,

Barbara Carlson SR Process Analyst Wholesale Service Delivery

- 12/18/02 Initial Response: Held meeting on 12/3/02 with CLEC community to discuss the issues identified during previous working sessions. Qwest shared two options which would address the issues identified. The team discussed the pros/cons of each option. Agreement was reached that meeting minutes would be produced, the CR would be presented at the December CMP meeting and additional working sessions would be scheduled to discuss the options in more detail. Documenting or updating the agreed upon process will be the actual response to this CR.


Open Product/Process CR PC052202-1X Detail

 
Title: Getting scheduled cut times for Resale and UNEP DID's moving from one trunk to another. (Cross over CR SCR052202 01X)
CR Number Current Status
Date
Area Impacted Products Impacted

PC052202-1X Completed
7/17/2002
Originator: Thompson, Jody
Originator Company Name: TDS Metrocom/USLink
Owner: Neher, Laurel
Director:
CR PM:

Description Of Change

Example: When porting Resale or UNEP DID's over to new T1 and Trunks the customers vendor needs to be on site and we are not given a time when these DID's will be cutting over. This causes inconveniences and extra charges for the customer. Currently customer is having to keep vendor at location all day waiting for cut to happen


Status History

05/22/02 - CR Submitted by USLink

05/22/02 - CR acknowledged by P/P CMP Manager

05/24/02 - CR posted to Web

05/28/02 - Contacted Jody Thompson @ USLink and tentatively scheduled the clarification call for Thursday, 5/30/02 at 2:00p.m. MST

05/30/02 - Clarification call held with USLink

06/05/02 - Clarification call meeting minutes sent to USLink and posted to the database

06/19/02 - CMP Meeting - CR status changed to "Presented". Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

07/10/02 - Qwest initial response sent to USLink and posted to the Web

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status was changed to Completed.

07/29/02 - Final Response sent to CLEC community (no changes were made to the initial response)


Project Meetings

07/17/02 - July CMP Meeting Minutes: Qwest presented the initial response which included the following discussion: Qwest’s current mechanized process allows simple line translations changes to be delivered to the switch and worked without manual intervention using switch-specific default Frame Due Times (FDTs). For most DID order activity, Qwest believes that the default FDTs should meet the needs of the CLEC community.

To enable CLECs to request specific translations and/or switch work timeframes, Qwest proposes to open the Desired Frame Due Time (DFDT) field on LSRs for UNE-P DSS and UNE-P ISDN-BRI and PRI when ordered with DID trunks and Resale ISDN-BRI and PRI .

Because enabling the DFDT field in IMA will require IT development and implementation, Qwest has created cross-over CR SCR052202-1X on behalf of USLink. This IMA CR is eligible for CMP prioritization in IMA 12.0. The IMA 12.0 prioritization process will take place immediately following the July Monthly Systems CMP Meeting. All prioritization eligible CRs will be reviewed and discussed at the July Monthly Systems CMP Meeting to be held on July 18, 2002.

Currently, while in most instances the translations work will be initiated within a two-hour window of the DFDT, the following situations may delay translation activity: *Another large project is underway. *Many separate orders are contending for the same FDT in a switch. * Qwest translation system or the switch itself is experiencing an outage or technical difficulty . For example, if the link from the MARCH system, the system that holds the order information until FDT and then downloads it to the switch, were to go down, orders could not be completed until the problem is fixed. * MARCH system maintenance window is being employed.

In all these instances, RCMAC would also be "locked out" and even manually-handled order processing could be delayed for more than two hours.

In order to maximize the potential for UNE-P and Resale DID orders to be processed as requested, a new process will be put into place. For all UNE-P and Resale DID orders requesting a DFDT, the SDC will contact the RCMAC manager to verify that the requested FDT is available.

To minimize the possibility of switch contention and order delays, Qwest recommends that CLECs populate the DFDT field only when translations activity must be performed within a specific timeframe.

The next step to go forward with this proposal will be for the CLEC community to vote for or against supporting this proposal at the CMP meeting and, if in support, prioritize the IT development.

Eschelon asked if a trial is required to see if it works. Qwest responded that it already exists for some products and a trial is not required. Allegiance asked is the SBC can give an alternative time if the requested time is not available. Qwest responded that this will be investigated. CR status changed to completed.

Time, Date: 2:00 p.m. (MDT) , Thursday 30 May 2002 Conference Call Call-In No: 877.521.8688 Call-In Code: 7901848

Attendee Name, Company,Title: Jody Thompson, USLink , Sr. Provisioning Rep. Julie Pickar, USLink, Provisioning Manager Marnie Meyer, USLink, Provisioning Rep Teresa Rynchek. USLink, T1 Network Coordinator Jennifer Arnold, USLink, Carrier Relations Rep

Ed Perini, Qwest, 271 Network Technical Regulatory Laurel Neher, Qwest, 271 Network Technical Regulatory Joan Wells, Qwest, Process Manager, Local Number Portability Michael Keegan, Qwest, CMP Manager

Introduction of Attendees Attendees introduced.

Review Requested (Description of) Change Description: The following is extracted from the CR submitted by USLink: Example: When porting Resale or UNE-P DID's over to new T1 and Trunks the customers vendor needs to be on site and we are not given a time when these DID's will be cutting over. This causes inconveniences and extra charges for the customer. Currently customer is having to keep vendor at location all day waiting for cut to happen.

The following points were discussed during the clarification call: 1) New DIDs are not an issue 2) USLink stated problem is associated with Qwest identifying only the day the translations will be made and not a smaller time window (they are requesting a two hour window). USLink does not know the translations have been completed until a disconnect recording is heard. This problem is associated the following scenarios: a) Porting DIDs to another CLEC (LNP) b) Moving all DIDs from analog to new digital facilities c) Moving Non sequential DIDs from analog to digital facilities

Confirm Right Personnel Qwest confirmed the correct personnel were on the call.

Identify/Confirm CLEC’s Expectation USLink expects a two hour window for cut times.

Identify any Dependent Systems Change Requests To address LNP-related Issue: Systems change request SCR100401-1X (Allow for Coordinated Hot Cuts on CLEC UBL to CLEC Resale (Cross-over CR PC100401-1)) was discussed and it was determined that it does not impact this USLink Change Request. There is a Product/Process Global Action Item , AI051502-2, which was opened during the May 15, 2002 CMP meeting which is a request for Qwest to report progress on Retail's Coordinated Hot Cut Process Development.

Establish Action Plan (Resolution Time Frame) USLink can present this Change Request to the CLEC community at the June Product/Process CMP meeting scheduled for June 19 Qwest will issue draft response to this Change Request by July 10 (one week prior to the July 19 CMP meeting). Qwest will discuss the draft response at the July 19 CMP meeting.


CenturyLink Response

July 10, 2002

Jody Thompson Senior Provisioning Representative USLink

SUBJECT: Qwest’s Change Request Response - CR # PC052202-1 Getting scheduled cut times for Resale and UNE-P DID’s moving from one trunk to another

Dear Ms. Thompson:

The following proposal is in response to your Customer Request, CR PC052202-1. In your CR, you explained that “[when porting Resale or UNE-P DID’s [Direct Inward Dial Numbers] over to new T1 and Trunks the customers vendor needs to be on site and we [USLink] are not given a time when these DID’s will be cutting over. This causes inconveniences and extra charges of the customer. Currently customer is having to keep vendor at location all day waiting for cut to happen.”

Qwest’s current mechanized process allows simple line translations changes to be delivered to the switch and worked without manual intervention using switch-specific default Frame Due Times (FDTs). For most DID order activity, Qwest believes that the default FDTs should meet the needs of the CLEC community.

To enable CLECs to request specific translations and/or switch work timeframes, Qwest proposes to open the Desired Frame Due Time (DFDT) field on LSRs for UNE-P DSS and UNE-P ISDN-BRI and PRI when ordered with DID trunks and Resale ISDN-BRI and PRI .

Because enabling the DFDT field in IMA will require IT development and implementation, Qwest has created cross-over CR SCR052202-1X on behalf of USLink. This IMA CR is eligible for CMP prioritization in IMA 12.0. The IMA 12.0 prioritization process will take place immediately following the July Monthly Systems CMP Meeting. All prioritization eligible CRs will be reviewed and discussed at the July Monthly Systems CMP Meeting to be held on July 18, 2002.

Currently, while in most instances the translations work will be initiated within a two-hour window of the DFDT, the following situations may delay translation activity: * Another large project is underway. *Many separate orders are contending for the same FDT in a switch. *Qwest translation system or the switch itself is experiencing an outage or technical difficulty . For example, if the link from the MARCH system, the system that holds the order information until FDT and then downloads it to the switch, were to go down, orders could not be completed until the problem is fixed. * MARCH system maintenance window is being employed. In all these instances, RCMAC would also be "locked out" and even manually-handled order processing could be delayed for more than two hours.

In order to maximize the potential for UNE-P and Resale DID orders to be processed as requested, a new process will be put into place. For all UNE-P and Resale DID orders requesting a DFDT, the SDC will contact the RCMAC manager to verify that the requested FDT is available.

To minimize the possibility of switch contention and order delays, Qwest recommends that CLECs populate the DFDT field only when translations activity must be performed within a specific timeframe.

The next step to go forward with this proposal will be for the CLEC community to vote for or against supporting this proposal at the CMP meeting and, if in support, prioritize the IT development.

Qwest looks forward to working with you further on this project.

Sincerely,

Laurel A. Neher Staff Advocate, Policy and Law Local Networks Group


Open Product/Process CR PC010202-1 Detail

 
Title: Removal of UDC
CR Number Current Status
Date
Area Impacted Products Impacted

PC010202-1 Denied
4/19/2002
Ordering Other: Shared Loop
Originator: Hundertmark, Kirk
Originator Company Name: Twin Rivers Valley Telephone
Owner: Houston, Neil
Director:
CR PM:

Description Of Change

Process to remove UDC off line to provide DSL to Qwest Customers


Status History

12/28/01 - CR received from Twin Rivers Valley Telephone.

01/03/02 - E-Mail Acknowledgement issued to Twin Rivers Valley Telephone.

01/07/02 - Twin Rivers Valley Telephone contacted (via telephone) to set up clarification meeting.

01/11/02 - Clarification Meeting conducted with Twin Rivers Valley Telephone.

01/17/02 - Draft clarification meeting minutes transmitted to sbmitting CLEC.

02/20/02 - CMP Meeting - CLEC community clarification conducted. CR status changed to "Evaluation." Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package (03/20/02).

03/13/02 - Qwest draft response posted to database

03/13/02 - Qwest draft response posted to Web and sent to submitting CLEC

03/20/02 - CMP Meeting - Qwest presented its Draft Response dated March 12, 2002. Twin Rivers Valley Telephone was not present at meeting. CR status as Presented unchanged. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

04/12/02 - Revised response sent to CLEC and posted to the CMP database and the Interactive Report

04/17/02 - CMP Meeting - Twin Rivers Valley Telephone was not present at meeting. CR status as Presented unchanged. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

04/19/02 - Twin Rivers Valley contacted by Qwest to confirm that the Qwest response dated April 11, 2002 was received and understood. CR status changed to "Denied".

04/19/02 - Formal response dated April 11, 2002 issued to CLECs. Notification CMPR.04.19.02.F.01258.Final_CR_Responses.


Project Meetings

1:00 p.m. (MDT) / Friday 11th January 2002 Conference Call TEL: 877.554.8688 CODE: 3269208 PC010202-1 "Removal of UDC"

Kirk Hundertmark, Twin Rivers Valley Telephone Cindy Buckmaster, Qwest Brett Fesler, Qwest Neil Houston, Qwest Crystal Soderlund, Qwest Clifford Dinwiddie, Qwest Bernadette Derlein, Qwest Peter Wirth, Qwest

1.0 Introduction of Attendees Attendees introduced.

2.0 Review Requested (Description of) Change: Twin Rivers Valley Telephone (TRV) is a re-seller of Qwest dial-up services in Iowa. TRV does not maintain a co-location presence in any Qwest Central Office (CO). TRV is requesting Qwest to remove UDC’s from residential lines for TRV DSL orders.

3.0 Confirm Areas & Products Impacted {read from change request, modify if needed} Appropriate products & areas identified in CR.

4.0 Confirm Right Personnel Involved {ensure the Qwest SME can fully answer the CLEC request. Confirm whether anyone else within Qwest has been involved with this issue, or whether we need to bring anyone else in} Qwest & TRV confirmed appropriate personnel were in attendance.

5.0 Identify/Confirm CLEC’s Expectation {Identify specific deliverables from CLEC – what does Qwest have to do in order to close this CR? (in measureable terms ie provide a documented process, change a process to include training etc)} TRV is requesting Qwest to remove UDC’s from residential lines for TRV DSL orders. TRV is receptive to a reasonable fee for this activity. Qwest to evaluate CR. During the February 2002 Monthly P&P CMP Meeting, Qwest will either solicit input from CLEC community & provide potential solutions to the CR; or provide an expedited response to the CR.


CenturyLink Response

April 11, 2002

Twin Rivers Valley Telephone Kirk Hundertmark

SUBJECT: Qwest’s Change Request Response - CR # PC010202-1 Process to remove UDC off line to provide DSL to Qwest Customers

This letter is in response to Twin Rivers Valley Telephone Change Request (CR) PC010202-1. This CR requests that Qwest create a process to remove UDCs off of working residential lines, to enable Twin Rivers to provide DSL data service to Qwest’s voice customers.

Qwest uses many different technologies to provision voice services to its end user customers. UDCs are one of these technologies. UDCs are deployed throughout the Network to meet growth and service demands for POTS (voice) service. The voice paths that are constructed by use of the UDCs are local loops and the UDC is an essential element of such loops. In addition to customer requests for POTS voice service, loops derived from UDCs can be used to provision resold and UNE-P services to CLECS. Removing UDCs would equate to de-constructing the loop, thus taking the voice out of service. Qwest does not have a policy to remove UDCs on a repair call other than when it is determined that the apparatus is degrading the voice service.

Qwest has no requirement under the Telecommunications Act of 1996 to de-construct the loop. Therefore, Qwest respectfully denies Twin Rivers Valley Telephone request to remove UDCs.

Sincerely,

Neil Houston Staff Advocate Policy & Law

Cc: Mary Retka


Open Product/Process CR PC010202-2X Detail

 
Title: Shared loop on resold lines. (Cross over CR SCR010202 02X)
CR Number Current Status
Date
Area Impacted Products Impacted

PC010202-2X Completed
7/17/2002
Ordering, Provisioning Other: Shared Loop for Resold Customers
Originator: Hundertmark, Kirk
Originator Company Name: Twin Rivers Valley Telephone
Owner: Fesler, Bret
Director:
CR PM:

Description Of Change

Process to provide DSL to TRV Telephone resold Qwest Customers


Status History

12/28/01 - CR received from Twin Rivers Valley Telephone.

01/03/02 - E-Mail Acknowledgement issued to Twin Rivers Valley Telephone

01/07/02 - Twin Rivers Valley Telephone contacted (via telephone) to set up clarification meeting.

01/11/02 - Clarification Meeting conducted with Twin Rivers Valley Telephone.

01/17/02 - Draft clarification meeting minutes transmitted to submitting CLEC.

02/20/02 - CMP Meeting - CLEC community clarification conducted. CR status changed to "Evaluation." Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package (03/20/02).

03/12/02 - Qwest draft response posted to database and sent to submitting CLEC

03/13/02 - Qwest draft response posted to Web

03/20/02 - CMP Meeting - Qwest presented its Draft Response dated March 4, 2002. Line Partitioning will be deployed by Qwest during late 2nd quarter 2002. Twin Rivers Valley Telephone was not at meeting. CR status changed to Development . Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

03/22/02 - Formal response dated 03/04/02 issued to CLECs. Notification CMPR.03.22.02.F.01240.CR_Responses

04/17/02 - CMP Meeting - Twin Rivers Valley Telephone was not present at meeting. CR status "Development" unchanged. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

05/15/02 - CMP Meeting -- Twin Rivers Valley Telephone was not present at meeting. CR status "Development" unchanged. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

05/15/02- Action Item opened at CMP meeting to determine if amendment to Interconnect Agreement is required in order to do Covad line partition.

06/19/02 - CMP Meeting -- Twin Rivers Valley Telephone was not present at meeting. CR status changed to "Evaluation". Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site.

06/27/02 - Update to Qwest Response Dated March 4, 2002 sent to CLEC and posted to CMP database. Response included in Mailout CMPR.06.27.02.F.01286.Supp_CR_Responses

07/17/02 - CMP Meeting - Meeting minutes posted to this CR's Project Meetings section. CR status was changed to Completed.


Project Meetings

07/17/02 - July CMP Meeting Minutes: Twin Rivers Valley Telephone was not at the meeting. Qwest, at the June 19, 2002 CMP Meeting, requested CLECs to provide anticipated volumes for this product. Qwest, to date, has not received any volume estimates. Qwest explained a Cross-over Systems Change Request SCR010202-02X has been opened to enable the scope of this CR to be included in the voting for IMA 12.0. The CLECs attending the meeting agreed the Change Request can be closed if Qwest contacts Twin Rivers Valley Telephone and they agree it can be closed.

1:30 p.m. (MDT) / Friday 11th January 2002 Conference Call TEL: 877.554.8688 CODE: 3269208 PC010202-1 "Shared loop on resold lines"

Kirk Hundertmark, Twin Rivers Valley Telephone Cindy Buckmaster, Qwest Brett Fesler, Qwest Neil Houston, Qwest Crystal Soderlund, Qwest Clifford Dinwiddie, Qwest Bernadette Derlein, Qwest Peter Wirth, Qwest

1.0 Introduction of Attendees Attendees introduced.

2.0 Review Requested (Description of) Change: Twin Rivers Valley Telephone (TRV) is a re-seller of Qwest dial-up services in Iowa. TRV does not maintain a co-location presence in any Qwest Central Office (CO). TRV is requesting a process from Qwest; whereby TRV can provide DSL to TRV telephone Resold Customers.

3.0 Confirm Areas & Products Impacted {read from change request, modify if needed} Appropriate products & areas identified in CR.

4.0 Confirm Right Personnel Involved {ensure the Qwest SME can fully answer the CLEC request. Confirm whether anyone else within Qwest has been involved with this issue, or whether we need to bring anyone else in} Qwest & TRV confirmed appropriate personnel were in attendance.

5.0 Identify/Confirm CLEC’s Expectation {Identify specific deliverables from CLEC – what does Qwest have to do in order to close this CR? (in measureable terms ie provide a documented process, change a process to include training etc)} TRV is requesting Qwest to allow TRV to provide DSL (shared loop) to it’s telephone Resold Customers. Qwest to evaluate CR. During the February 2002 Monthly P&P CMP Meeting, Qwest will either solicit input from CLEC community & provide potential solutions to the CR; or provide an expedited response to the CR.


CenturyLink Response

June 27, 2002

Kirk Hundertmark Twin Rivers Valley Telephone

SUBJECT:Qwest’s Change Request Response - CR # PC010202-2 Update to Qwest Response Dated March 4, 2002

In an effort to formally update our response to the Twin Rivers initiated CR #PC010202-2, Qwest respectfully submits the following information as provided in the CMP meeting of June 19th, 2002.

As indicated in those meeting minutes, Qwest stated that Line Partitioning is not yet available. When a test order for the product was generated, a coding systemization issue emerged (i.e., the co-existence of the RSID and ZCID on the same order). Due to this issue, Qwest is re-evaluating its ability to deliver this product. As a critical element to that evaluation, Qwest asked the CLECs to provide an estimate of their anticipated volumes for this product before Qwest moves forward with development. CLEC input should be sent to the CRPM, Mike Keegan.

At this time we cannot accept or process an order manually or mechanically. Qwest will receive the declarations of volume from the CLEC’s based on the June 19th CMP meeting. At that point Qwest will re-evaluate its ability to provide this product.

Sincerely,

Brett Fesler Line Sharing Product Manager Qwest

Cc: Michael Buck, Qwest CMP Manager Michael Keegan, Qwest CRPM Cindy Buckmaster, Product Manager

March 4, 2002

Kirk Hundertmark Twin Rivers Valley Telephone

CC: Cliff Dinwiddie Peter Wirth

This letter is in response to CLEC Change Request Form #PC010202-02 dated December 19, 2001 - "Line Sharing on Resold Lines."

Qwest has received the request to provide "Line Sharing on Resold Lines." In the Ordering and Billing Forum ("OBF"), the industry has agreed to refer to this arrangement as "Line Partitioning."

After reviewing the request, Qwest has determined that it is able to support the request for Line Partitioning. Further, Qwest has initiated the product ideation and development process to prepare to deploy Line Partitioning during the 2nd quarter of 2002. Qwest will distribute the official Line Partitioning product announcement via this communications channel and in keeping with all Change Management requirements.

Sincerely,

Brett Fesler Product Manager


Open Product/Process CR PC062802-1CM Detail

 
Title: Modify Prioritization Process for SATE Production Mirroring
CR Number Current Status
Date
Area Impacted Products Impacted

PC062802-1CM Withdrawn
7/18/2002
Other: CMP/SATE
Originator: Hines, LeiLani
Originator Company Name: WorldCom
Owner: Maher, Jim
Director:
CR PM: Thomte, Kit

Description Of Change

Per Qwest direction resulting from an AZ TAG Meeting discussion on the Draft PO-19B, this CR is being submitted to request a change in the execution of the CMP CR Prioritization and Ranking processes as Qwest has explained them to exist. Section 10.2 "Prioritization" of the redlined CMP Redesign document states that the prioritization and ranking process is applied to change requests for OSS interfaces as well as change requests for the test environment. Section 10.2 further explains how a voting and ranking process follows a Prioritization Review held during a CMP meeting to produce an Initial Prioritization List. Qwest has verbally represented in the AZ TAG, that this voting and ranking process (of proposed OSS system changes and test environment changes) would also be carried out in the SATE Users Group forum. Qwest has recently explained that, consequently, the prioritization process in the CMP and SATE Users Group forums could produce different outcomes which would cause not all functionality planned for implementation in production (as determined by the prioritized CRs selected for the future IMA release) to be, likewise, implemented in the test environment.

Therefore this CR requests that the CMP Prioritization process for an IMA release not include proposed test environment changes; so that the CR prioritization for an IMA release in production is what's used for implementing that IMA release in the test environment-SATE. Additionally, this CR requests that proposed test environment changes be managed separately from OSS interface changes ensuring that test environment specific changes do not prevent the implementation of IMA Release CRs in the SATE.


Status History

06/27/02 - CR Submitted by WorldCom

06/28/02 - CR acknowledged by P/P CMP Manager.

07/01/02 - CR Posted to Web

07/01/02 - Qwest requested Worlcoms proposed language

07/17/02 - CR was "Withdrawn" based on discussion that took place in the July Product and Process CMP monthly meeting further information is available ath the CMP web site in the meeting minutes


Project Meetings

Qwest CMP -- Additional Information Required for Change to CMP Framework PC062802-1CM

LeiLani,

As indicated in the acknowledgement sent on Friday, June 28, Qwest has received your proposed modification to the CMP framework (PC062802-1CM).

In accordance with "Managing the Change Management Process Document" (section 2.1 of the Qwest Wholesale Change Management Process Document) Qwest is requesting that WorldCom provide specifics on the proposed modification to the Qwest Wholesale Change Management Process Document. Specifically, what section (or sections) of the document are to be changed and what is the proposed language to be added or altered. If you could please provide the proposed redlined language Qwest can ensure that complete information is included in the Distribution Package for the July Monthly Product & Product CMP Meeting.

If you should have any questions, please don't hesitate to contact me or the CRPM assigned to this proposed modification to the CMP framework.

Sincerely,

Michael Buck Qwest Communications, Inc. CMP Manager


Information Current as of 1/11/2021