Open System CR SCR050819-2IG Detail

 
Title: ASOG 59 changes for the EASE ordering system
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR050819-2IG Completed
6/5/2019
-   28/7 ATIS-OBF
Originator: Walker, Letty
Originator Company Name: CenturyLink
Owner: Walker, Letty
Director:
CR PM: Lorence, Susan

Description Of Change

CenturyLink will implement the ATIS /OBF modifications associated with ASOG 59 effective September 21, 2019. Included in that release are the following issues:

Issue 3619 – Modify SALI (015) practice to update existing fields (LAT/LONG) to clarify existing assumptions

Issue 3620 – Update CNR (010) practice to modify the existing usage for the field CNT to clarify existing assumptions

Issue 3623 – Modification of LREF field for ‘R’ activity

Issue 3624 – Modify Transport (005) practice to clarify existing LATENCY field

Issue 3626 – Expand use of FDT field on the ASR Form

CenturyLink will begin the implementation of these modifications on Friday September 20, 2019. All systems will resume availability on Monday, September 23, 2019.

Status History

Date Action Description

Project Meetings

7/17/19 System CMP Meeting Mark Coyne (CenturyLink) Notice went out on 6/21/19 and no comments were received. This will go into effect on 7/22/19 and we will look to close in August. Reminder: the 1st time you sign in, after the 22nd, you will need to put in your reset information. Andrea Smith Comcast) likes the additional security.

6/19/19 System CMP Meeting Mark Coyne – CenturyLink stated this CR was presented last month by Letty Walker. The CR is scheduled for an effective date of sept 23rd . There is a scheduling attachment under calendar that speaks to ASOG 59. Tech specs will go out July 12th and we will set up a walk through and the notice will go out around July 30th. This CR is scheduled for EASE Release 7.0 with dates according to OSS calendar in attachment M.

5/15/19 System CMP Meeting Letty Walker – CenturyLink presented this new CR associated with the ASOG 59 release from ATIS. Letty reviewed the five ASOG Issues that are included in the EASE release as listed in the CR Description. This will be EASE ASR Release 7.0 that will be effective Monday, September 23, 2019. CenturyLink will begin the implementation of these modifications on Friday, September 20, 2019. Letty said she did not think there would be an update to the User Guides since the work is background work in the system. Letty asked if there were any questions. There were none.

CenturyLink Response