All System CMP's in One File

Open System CR SCR011413-2 Detail

 
Title: Enable late Ebonding for POTS TNs in the MTG platform
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR011413-2 Deferred
9/25/2013
5000 - 8300  15/ Maintenance and Repair
Originator: Van de Water, Mark
Originator Company Name: AT&T
Owner: Walker, Letty
Director:
CR PM: Lorence, Susan

Description Of Change

Currently MEDIACC does not support late Ebonding.

AT&T is requesting CenturyLink to enable late Ebonding for POTS TNs in their MTG platform, which is currently not available.

Status History

Date Action Description
1/14/2013 CR Submitted CR Submitted. NOTE: This CR was originally combined with SCR011413-3 but was split in to two CRs after confirmation from Originator. 
1/15/2013 CR Acknowledged CR Acknowledged. 
1/16/2013 Discussed at Monthly CMP Meeting Discussed at the January System CMP Meeting - See Attachment F in the Distribution Package 
1/16/2013 Status Changed Status changed to Presented. 
1/18/2013 Clarification Meeting Held Clarification meeting was originally scheduled for this date. Originator was not able to attend so call was rescheduled for 1/21/13. 
1/21/2013 Clarification Meeting Held Clarification meeting conducted. 
2/14/2013 Status Changed Status changed to Evaluation. 
2/20/2013 Discussed at Monthly CMP Meeting Discussed at the February Systems CMP Meeting - See Attachment J in the Distribution Package. 
3/20/2013 Discussed at Monthly CMP Meeting Discussed at the March Systems CMP Meeting - See Attachment I in the Distribution Package. 
4/17/2013 Discussed at Monthly CMP Meeting Discussed at the April Systems CMP Meeting - See Attachment I in the Distribution Package. 
5/8/2013 Info Sent to CLEC Status sent to AT&T that CR is still under evaluation. 
5/15/2013 Discussed at Monthly CMP Meeting Discussed at the May Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/13/2013 Draft Response Issued Draft response issued to accept CR 
6/19/2013 Discussed at Monthly CMP Meeting Discussed at the June Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/19/2013 LOE Issued LOE provided as part of CenturyLink Draft Response. LOE is 5000-8300 hours.. 
9/25/2013 Status Changed Status changed to Deferred at the request of AT&T. 
9/25/2013 Record Update AT&T Point of Contact for this CR changed to Mary Mullen. 
10/16/2013 Discussed at Monthly CMP Meeting Discussed at the October Systems CMP Meeting - See Attachment I in the Distribution Package. 
2/21/2018 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment J in the Distribution Package. 
10/1/2018 Record Update CenturyLink CR owner changed from Denise Martinez to Letty Walker. 

Project Meetings

2/21/18 System Monthly Meeting Mark Coyne – CenturyLink said as an FYI, we are starting to look at these two MTG Deferred CRs to consider some next steps.

10/16/13 System Monthly Meeting Mark Coyne – CenturyLink said this Change Request was moved to a Deferred at the request of AT&T.

6/19/13 System Monthly Meeting Mark Coyne – CenturyLink said the draft response had been sent to AT&T on June 13, 2013. Mark reviewed the draft response that was included in the CMP package which indicates the CR is accepted and the high level of effort (LOE) is 5000-8300 hours but there is no remaining OSS Repair release capacity hours for 2013. The response also indicates that if AT&T wants this CR as a priority, the CMP document includes a process called Special Change Request Process (SCRP) which ATT can also utilize. Otherwise, CenturyLink will reconsider the CR in the late 4th quarter timeframe when the OSS release capacity for 2014 has been established.

5/15/13 System Monthly Meeting Susan Lorence – CenturyLink said these CRs are still under review. Susan asked if there were any questions. There were none.

4/17/13 System Monthly Meeting Mark Coyne – CenturyLink said these CRs are still under review.

3/20/13 System Monthly Meeting Mark Coyne – CenturyLink said these two CRs are still in the Evaluation stage. The CRs have not been Accepted at this point so there are no LOEs.

2/20/13 System Monthly Meeting Mark Coyne – CenturyLink said these three CRs were presented by AT&T last month and are under evaluation.

1/21/13 Clarification Meeting Attendees: Susan Lorence – CenturyLink, Mark Van de Water – AT&T, Doris Luttrell – CenturyLink, Lori Burchett – CenturyLink, Cecilia Tank – CenturyLink, Kyle Kirves – CenturyLink, John Hansen – CenturyLink, Mark Coyne – CenturyLink, Carrie Bousfield – CenturyLink, Vinesh Vijayan Leela – CenturyLink

Susan Lorence – CenturyLink asked Mark to present SCR011413-2 - Enable late Ebonding for POTS TNs in the MTG platform.

Mark Van de Water – AT&T stated that the title of the change request was fairly self-explanatory in regards to the request.

Carrie Bousfield – CenturyLink stated that the functionality was not currently available and asked how AT&T worked around the issue while using MEDIACC.

Mark Van de Water – AT&T replied that when unable to create a ticket electronically, they had to call it in resulting in future calls if additional tracking of the ticket was necessary and wanted to be able to continue working the ticket electronically even if it had been created manually, especially with the current Create problem.

Carrie Bousfield – CenturyLink asked if AT&T considered this issue important specifically because of the TrackID issue.

Mark Van de Water – AT&T stated that they could currently do late Ebonding for access services but not for POTS.

Carrie Bousfield – CenturyLink asked for volume so that CenturyLink could consider when evaluating.

Mark Van de Water – AT&T stated that he would get that information.

1/16/13 System Monthly Meeting Mark Van de Water - AT&T presented the CR and said the capability is for POTS and the functionality being requested was not currently in MEDIACC.

CenturyLink Response

June 13, 2013

Mark Van de Water AT&T

This letter is in response to CLEC Change Request number SCR011413-2, entitled “Enable late Ebonding for POTS TNs in the MTG platform”.

CR Description: Currently MEDIACC does not support late Ebonding. AT&T is requesting CenturyLink to enable late Ebonding for POTS TNs in their MTG platform, which is currently not available.

History: A clarification meeting was held on Monday, January 21, 2013 with AT&T and CenturyLink representatives present. The CenturyLink SME team completed a high level of analysis of the work that would be required to enhance the Maintenance Ticketing Gateway (MTG) with the requested functionality.

CenturyLink Response: CenturyLink is accepting this CR to enhance MTG to enable Ebonding for POTS TNs in the MTG platform. The early estimate of the work effort to complete the project places it in a range of 5000 to 8300 hours. The available hours allotted for the 2013 calendar year for Repair Releases was 800 hours. (The estimates for each Wholesale functional area was established in December 2012 and was shared with the customer community via notice number CMPR.CMPP.12.12.12.F.10740.2013SystemReleaseCapacity.)

With the Repair work that has been completed and the projected remaining work activities for 2013, there is no remaining capacity for 2013. CenturyLink is proposing that we review this CR in the late 4th quarter timeframe when the OSS release capacity for 2014 has been established.

Alternately, if AT&T prefers that CenturyLink continue to consider this enhancement to MTG in 2013/2014, AT&T may choose to pursue the Special Change Request Process (SCRP) available through the Wholesale Change Management Process (CMP). SCRP allows a CLEC or Resale customer to pursue CenturyLink system changes through their own funding of CenturyLink development and testing costs. For additional information on the CMP SCRP, refer to Section 10.3 of the CMP document available at http://www.centurylink.com/wholesale/cmp/index.html.

Should AT&T chose to not pursue the SCRP, as stated above, CenturyLink will review the requested enhancement included in this CR in late 4th quarter to determine if development and implementation in 2014 is possible pending determination of 2014 release capacity.

Sincerely,

Susan Lorence CenturyLink CR Project Manager

Open System CR SCR011413-3 Detail

 
Title: Enable electronic escalations for POTS (TNs) services in the MTG platform
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR011413-3 Deferred
9/25/2013
-   15/ Maintenance and Repair
Originator: Van de Water, Mark
Originator Company Name: AT&T
Owner: Walker, Letty
Director:
CR PM: Lorence, Susan

Description Of Change

Currently MEDIACC does not support electronic escalations for POTS (TNs) services.

AT&T is requesting CenturyLink to enable electronic escalations for POTS (TNs) services in their MTG platform, which is currently not available.

Status History

Date Action Description
1/14/2013 CR Submitted CR Submitted. NOTE: This CR was originally combined with SCR011413-2 but was split in to two CRs after confirmation from Originator. 
1/15/2013 CR Acknowledged CR Acknowledged. 
1/16/2013 Discussed at Monthly CMP Meeting Discussed at the January System CMP Meeting - See Attachment F in the Distribution Package. 
1/16/2013 Status Changed Status changed to Presented. 
1/18/2013 Clarification Meeting Held Clarification Meeting was originally scheduled for this date. Originator was not able to attend so call was rescheduled for 1/21/13. 
1/21/2013 Clarification Meeting Held Clarification meeting conducted. 
2/14/2013 Status Changed Status changed to Evaluation. 
2/20/2013 Discussed at Monthly CMP Meeting Discussed at the February Systems CMP Meeting - See Attachment J in the Distribution Package. 
3/20/2013 Discussed at Monthly CMP Meeting Discussed at the March Systems CMP Meeting - See Attachment I in the Distribution Package. 
4/17/2013 Discussed at Monthly CMP Meeting Discussed at the April Systems CMP Meeting - See Attachment I in the Distribution Package. 
5/8/2013 Info Sent to CLEC Status sent to AT&T that CR is still under evaluation. 
5/15/2013 Discussed at Monthly CMP Meeting Discussed at the May Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/13/2013 Draft Response Issued Draft response issued to accept CR. 
6/19/2013 Discussed at Monthly CMP Meeting Discussed at the June Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/19/2013 LOE Issued LOE provided of 7500 to 8500 hours. 
9/25/2013 Status Changed Status changed to Deferred at the request of AT&T. 
9/25/2013 Record Update AT&T Point of Contact for this CR changed to Mary Mullen. 
10/16/2013 Discussed at Monthly CMP Meeting Discussed in the October System CMP Meeting - See Attachment I in the Distribution Package. 
2/21/2018 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment I in the Distribution Package. 
10/1/2018 Record Update CenturyLink CR owner changed from Denise Martinez to Letty Walker. 

Project Meetings

2/21/18 System Monthly Meeting Mark Coyne – CenturyLink said as an FYI, we are starting to look at these two MTG Deferred CRs to consider some next steps.

10/16/13 System Monthly Meeting Mark Coyne – CenturyLink said this Change Request was moved to a Deferred at the request of AT&T.

6/19/13 System Monthly Meeting Mark Coyne – CenturyLink said the CenturyLink draft response for this CR is very similar to the response on the previous Ebonding CR. This second CR is accepted but due to the understood priority of the Ebonding CR, CenturyLink recommends this CR be placed in a Deferred status.

Mark Van de Water – AT&T said he received the CenturyLink responses but has not reviewed them. He asked that CenturyLink review the LOE at the end of the year since he felt 5000 was high.

Tracy Strombotne - CenturyLink indicated she was happy to have IT review the LOE and they would walk through the impacted systems but said the team has typically not come in under budget.

Mark Coyne – CenturyLink asked if there were any other questions. There were none.

5/15/13 System Monthly Meeting Susan Lorence – CenturyLink said these CRs are still under review. Susan asked if there were any questions. There were none.

4/17/13 System Monthly Meeting Mark Coyne – CenturyLink said these CRs are still under review.

3/20/13 System Monthly Meeting Mark Coyne – CenturyLink said these two CRs are still in the Evaluation stage. The CRs have not been Accepted at this point so there are no LOEs.

2/20/13 System Monthly Meeting Mark Coyne – CenturyLink said these three CRs were presented by AT&T last month and are under evaluation.

1/21/13 Clarification Meeting Attendees: Susan Lorence – CenturyLink, Mark Van de Water – AT&T, Doris Luttrell – CenturyLink, Lori Burchett – CenturyLink, Cecilia Tank – CenturyLink, Kyle Kirves – CenturyLink, John Hansen – CenturyLink, Mark Coyne – CenturyLink, Carrie Bousfield – CenturyLink, Vinesh Vijayan Leela – CenturyLink

Susan Lorence – CenturyLink asked Mark to present SCR011413-3 - Enable electronic escalations for POTS (TNs) services in the MTG platform.

Mark Van de Water – AT&T stated that the title of the change request was fairly self-explanatory in regards to the request. He said that it was currently do this for access services, but not for POTS and wanted CenturyLink to consider offering this option.

Carrie Bousfield – CenturyLink stated that it wasn’t currently available in MEDIACC and asked why AT&T felt that it was critical as part of MTG.

Mark Van de Water – AT&T stated that it was to save time by not having to call in each escalation request.

Susan Lorence – CenturyLink asked if there were more than one level of escalation.

Mark Van de Water – AT&T stated that there were multiple levels.

Carrie Bousfield – CenturyLink asked for volume so that CenturyLink could consider when evaluating.

Mark Van de Water – AT&T stated that he would get that information.

Carrie Bousfield – CenturyLink asked another question about the first change request – would AT&T be attempting to use the same TrackID that had been used for an MLT transaction to Create a ticket?

Mark Van de Water – AT&T didn’t know.

Carrie Bousfield – CenturyLink stated that CenturyLink would need to know.

Mark Van de Water – AT&T asked if MTG allowed a Create function based on the results of the MTG test or if they had to do that separately.

Vinesh Vijayan Leela – CenturyLink explained that it would be a separate transaction and that the customer would include the MLT test results in the newly created ticket.

Mark Van de Water – AT&T stated they would use the scenario in testing.

Carrie Bousfield – CenturyLink asked for specific examples regarding the escalation request.

Mark Van de Water – AT&T agreed that he could provide that information. He then recapped the issues he needed to investigate.

Susan Lorence – CenturyLink relayed the next steps for CenturyLink and concluded the call.

1/16/13 System Monthly Meeting Mark Van de Water - AT&T presented the CR and said the capability is for POTS and the functionality being requested was not currently in MEDIACC. Mark asked if there were any questions.

Mark Coyne - CenturyLink asked if there were any questions. There were no additional questions. Mark reiterated there was a clarification call on Friday, January 18, 2013.

CenturyLink Response

June 13, 2013

Mark Van de Water AT&T

This letter is in response to CLEC Change Request number SCR011413-3, entitled “Enable electronic escalations for POTS (TNs) services in the MTG platform”.

CR Description: Currently MEDIACC does not support electronic escalations for POTS (TNs) services. AT&T is requesting CenturyLink to enable electronic escalations for POTS (TNs) services in their MTG platform, which is currently not available.

History: A clarification meeting was held on Monday, January 21, 2013 with AT&T and CenturyLink representatives present. The CenturyLink SME team completed a high level of analysis of the work that would be required to enhance the Maintenance Ticketing Gateway (MTG) with the requested functionality.

CenturyLink Response: CenturyLink is accepting this CR to enhance MTG to enable electronic escalations for POTS (TNs) services in the MTG platform. The early estimate of the work effort to complete the project places it in a range of 7500 to 8500 hours. The available hours allotted for the 2013 calendar year for Repair Releases was 800 hours. (The estimates for each Wholesale functional area was established in December 2012 and was shared with the customer community via notice number CMPR.CMPP.12.12.12.F.10740.2013SystemReleaseCapacity.)

With the Repair work that has been completed and the projected remaining work activities for 2013, there is no remaining capacity for 2013. With the current understanding that the preference of AT&T is for CenturyLink to focus the priority on CR SCR011413-2 related to ebonding of POTS in MTG, CenturyLink is proposing that this CR be placed in a Deferred status at this time. CenturyLink will then consider this CR again at the end of each calendar year when the OSS release capacity for the upcoming year has been established.

Alternately, if AT&T prefers that CenturyLink continue to consider this enhancement to MTG in 2013/2014, AT&T may choose to pursue the Special Change Request Process (SCRP) available through the Wholesale Change Management Process (CMP). SCRP allows a CLEC or Resale customer to pursue CenturyLink system changes through their own funding of CenturyLink development and testing costs. For additional information on the CMP SCRP, refer to Section 10.3 of the CMP document available at http://www.centurylink.com/wholesale/cmp/index.html.

Should AT&T chose to not pursue the SCRP for this CR, CenturyLink accepts the CR as stated above but proposes the CR be placed in Deferred at this time.

Sincerely,

Susan Lorence CenturyLink CR Project Manager

Open System CR SCR110415-1 Detail

 
Title: Implement Ensemble to provide a single application to bill Wholesale customers for their Local Service Requests (LSR)
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR110415-1 Deferred
2/15/2017
-   11/ Billing Centrex, Private Line, Resale , UDIT, Unbundled Loop, UNE - All types, Directory Listings
Originator: Strombotne, Tracy
Originator Company Name: CenturyLink
Owner: Coyne, Mark
Director:
CR PM: Lorence, Susan

Description Of Change

CenturyLink is introducing Ensemble as a replacement for CRIS billing. This will provide CenturyLink and customers alike with a single application and a single invoice format for all LSR services billing.

Ensemble is a proven, flexible, table driven system which provides electronic bills and CSRs to be generated in industry compliant BOS format for electronic media billing and customer service records (CSR). Ensemble also provides paper invoice outputs.

Existing services being billed in CRIS will be converted and all bills from that point forward will be generated from Ensemble. New billing account numbers will be assigned and communicated to customers.

This CR is part of a system consolidation project for ordering and billing LSRs. While the end goal of this consolidation is to provide a streamlined service platform for current and future product delivery, there are differences in both appearance and functionality between the target state and retiring applications. Where there are differences, CenturyLink will provide equivalent functionality.

CenturyLink will implement Ensemble in a phased process beginning with the CenturyLink QC Eastern region which has a planned effective date in December 2016. The Western region of CenturyLink QC will follow with a planned effective date mid year 2017. The Central region of CenturyLink QC will be last with a planned effective date in late 2017.

Expected Deliverables/Proposed Implementation Date: The first proposed implementation is expected to be December 2016 for Eastern.

Status History

Date Action Description
11/4/2015 CR Submitted CR Submitted. 
11/6/2015 CR Acknowledged CR Acknowledged. 
11/18/2015 Status Changed Status changed to Presented. 
11/18/2015 Discussed at Monthly CMP Meeting Discussed in the November Systems CMP Meeting - See Attachment C in the Distribution Package. 
11/23/2015 Communicator Issued See Notification number CMPR.MEET.11.23.15.F.14096.AdHocMtgLSR_CnsolidatnCRs. 
12/1/2015 General Meeting Held Ad hoc meeting held to discuss four new system consolidation CenturyLink Change Requests. 
12/16/2015 Status Changed Status changed to Development. 
12/16/2015 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment I in the Distribution Package. 
1/4/2016 Communicator Issued See notification number SYST.OTHR.01.04.16.F.14175.PrelimPlanLSR_SysConsldtn. Initial Release notice and Preliminary Interface Implementation Plan provided with Review meeting scheduled for January 18, 2016. 
1/12/2016 Communicator Issued See notification number SYST.OTHR.01.12.16.F.14205.LSR_ConsldtnCALL_RESCHED. Preliminary Interface Plan Review meeting rescheduled to January 19, 2016. 
1/14/2016 Communicator Issued See notification number SYST.OTHR.01.14.16.F.14209.LSR_CnsldtnCALL2ndRESCHED. Preliminary Interface Plan Review meeting now scheduled for January 27, 2016.  
1/20/2016 Discussed at Monthly CMP Meeting Discussed in the January Systems CMP Meeting - See Attachment H in the Distribution Package. 
1/27/2016 General Meeting Held Preliminary Interface Implementation Plan Review Meeting conducted. Meeting minutes available 2-3-16. 
1/28/2016 Communicator Issued See notice number CMPR.CMPP.01.28.16.F.14250.RFP_ThrdPrtyFacilitatrLSR. 
2/2/2016 Communicator Issued Customer Comment cycle extended. See Notice number SYST.OTHR.02.02.16.F.14265.LSR_SysCnsldtnCmtsExtnded. 
2/16/2016 Communicator Issued See Notification number CMPR.CMPP.02.16.16.F.14317.RFP_ThrdPrtyFcilitatr_FNL. 
2/17/2016 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment I in the Distribution Package. 
2/23/2016 Communicator Issued See Notification number SYST.OTHR.02.23.16.F.14333.LSR_ConsolPln_DelayedResp. 
3/7/2016 Communicator Issued See Notification number SYST.OTHR.03.07.16.F.14377.CommentRespLSR_SysCnsldtn. 
3/14/2016 Communicator Issued See notification number SYST.OTHR.03.14.16.F.14401.LocalServPrjTechSpecDELAY. 
3/16/2016 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment I in the Distribution Package. 
4/14/2016 Communicator Issued See notification number SYST.OTHR.04.14.16.F.14479.LocalServProj_NewEffDate. New Release to Production effective date for Eastern established as no earlier than April 10, 2017. 
4/20/2016 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment I in the Distribution Package. 
5/18/2016 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/15/2016 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/30/2016 Communicator Issued See notification number WEBS.ANNC.06.30.16.F.14752.OSS_Consolidation_Pages. 
7/7/2016 Communicator Issued See notification number SYST.OTHR.07.07.16.F.14766.LocServProjREVTechSpcDate. 
7/11/2016 Communicator Issued See Notification number CMPR.CMPP.07.11.16.F.14775.LSR_ProjctCustomerTesting. 
7/20/2016 Discussed at Monthly CMP Meeting Discussed in the July System CMP Meeting - See Attachment I in the Distribution Package. 
8/12/2016 Communicator Issued See notification number SYST.BILL.08.12.16.F.14863.EnsmblRel1.0DrftTechSpecs. NOTE: This notice relayed a change to the Release to Production date for Eastern to be no earlier than June 2017. 
8/17/2016 Discussed at Monthly CMP Meeting Discussed in the August System CMP Meeting - See Attachment I in the Distribution Package. 
8/22/2016 Communicator Issued See notification number SYST.OTHR.08.22.16.F.14883.LoclSerCnsldtnDrftTestPln. 
8/26/2016 Communicator Issued See notification number SYST.OTHR.08.26.16.F.14904.DraftTchSpcExtendCmtCycle. 
9/21/2016 Discussed at Monthly CMP Meeting Discussed in the September System CMP Meeting - See Attachment I in the Distribution Package. 
9/30/2016 Communicator Issued See notification number SYST.BILL.09.30.16.F.14997.EnsmblRel1.0FNL_TechSpecs. 
10/6/2016 Communicator Issued See notification number SYST.OTHR.10.06.16.F.14986.LSRCnsldtnPROJ_DELAY. 
10/19/2016 Discussed at Monthly CMP Meeting Discussed in the October Systems CMP Meeting - See Attachment I in the Distribution Package. 
10/31/2016 Communicator Issued See notification number SYST.OTHR.10.31.16.F.15087.LoclServR1.0ResptoCommUPD. 
11/16/2016 Discussed at Monthly CMP Meeting Discussed in the November Systems CMP Meeting - See Attachment I in the Distribution Package. 
12/13/2016 Communicator Issued See notification number SYST.BILL.12.13.16.F.15124.EnsmblR1.0FNLTechSpecsUPD. 
12/14/2016 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment I in the Distribution Package. 
1/18/2017 Discussed at Monthly CMP Meeting Discussed in the January Systems CMP Meeting - See Attachment I in the Distribution Package. 
2/13/2017 Communicator Issued See notification number GENL.ANNC.02.13.17.F.15335.LSR_Consol_ProjSTATUS_UPD. 
2/15/2017 Status Changed Status changed to Deferred. 
2/15/2017 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment I in the Distribution Package. 
3/15/2017 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment J in the Distribution Package.  
9/20/2017 Discussed at Monthly CMP Meeting Discussed in the September Systems CMP Meeting - See Attachment I in the Distribution Package. 
10/18/2017 Discussed at Monthly CMP Meeting Discussed in the October Systems CMP Meeting - See Attachment I in the Distribution Package. 
7/10/2018 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment J in the Distribution Package. 

Project Meetings

6/20/18 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink advised the above CRs (SCR110415 1-4) remain in Deferred status. CenturyLink will soon be updating the Consolidation Plan to include the most recently known dates for the project which is NO EARLIER THAN FIRST QUARTER 2020 and adding some wording about the Retail Trial.

10/18/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink said these four CMP CRs are in a Deferred status and we plan to keep them in that status for now. Mark said that last month he had relayed that the first planned migration would likely be 4th quarter 2019. The date in the package is now showing 1st quarter 2020. He said the Project team is still working toward some portion of the migration to begin late 2019. When Version 3 of the Consolidation Plan is provided later this year, the best estimate of planned migration dates will be provided at that time. The updated document will also include some information about the interim phase that will be occurring with retail customers that is associated with the IMA CR SCR101217-1. Mark then turned the call over to Mike Norton – CenturyLink to provide an update on planned system enhancements being made to Legacy CenturyLink (L-C) EASE for LSR processing.

Mike Norton – CenturyLink said there is considerable development in EASE LSR that is occurring in preparation for the Local Service Consolidation project. Mike talked about the development occurring in the L-C systems to meet the functional requirements that already exist in IMA. He said the intent is to reduce overall risk and to prove in some of the equivalent functionality before the first L-Q migrations begin in early 2020. Mike said the first major release for L-C systems will be in February 2018. One of the biggest changes is to upgrade EASE LSR to LSOG 14Q2 which is the last version of the Ordering and Billing Forum (OBF) LSOG standards that was released 2nd quarter 2014. L-C customers have already been notified of these Technical Specification changes. Mike said some customization is occurring with the L-C release to match some of the customization that occurs in IMA today but these fields will not likely be utilized until the first migration. The following EASE enhancements are being made associated with Pre-Order functionality: Address validation, Customer Service Information, Loop Qualification, Raw Loop Data, TN Reservation. Mike said these functions are not all of the enhancements that will be made to Pre-Order; more will be added at a later date. Other functions to be added in February are associated with the Exchange Carrier Version (EC VER) and some gap closure on some of the auto-population of some fields. With these enhancements, CenturyLink will be able to get some customer feedback on these functions prior to the first migration. Mike asked if there were any questions. There were none.

9/20/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink provided some information about the four CMP CRs that were moved to a Deferred status in February 2017. Mark relayed the Local Service Consolidation Project Web page has a statement that indicates more information will be provided late 2017. The website currently has Version 2 of the Consolidation Plan which includes out-dated planned effective dates. The LSR Consolidation team plans to post a Version 3 by end of year that relays the first planned migration date is likely to be 4th Quarter 2019. The team also plans a Version 4 of the Consolidation Plan that will provide more information about dates and migration approach; the document will likely be issued mid 2018. Mark said there are enhancements being made to the Legacy C EASE LSR system that will add additional functionality to process Legacy Qwest accounts. The Legacy C Release is planned for 1st Quarter 2018. Mike Norton – CenturyLink will likely attend CMP in the coming months to review the planned Legacy C EASE LSR enhancements. Mark asked if there were any questions. There were none.

3/15/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink reminded those on the call that on last month’s call, the above fours CRs have been moved into a Deferred status.

2/15/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink reminded those on the call that the LSR Consolidation Project had been delayed and that there will be no testing or conversion activity in 2017 while the SME team continues to re-evaluate the timing and conversion approach. Mark said a General notification had been sent on February 13, 2017 to relay this status to all Wholesale Customers and said the notice was posted to the Wholesale calendar. He then reviewed some of the key points in the notice:

- CenturyLink will be working on enhancements to EASE and Ensemble to incorporate changes that will be required for processing of Legacy Qwest accounts. - CenturyLink will be placing the CRs in a DEFERRED status likely until the end of 2017. - By the end of 2017, CenturyLink will update the Local Service Ordering and Billing Systems Consolidation Plan with more information about the conversion strategy and timeline. - The LSR Consolidation web site will be updated with a NOTE at the top of the page to relay there will be more information provided late 2017 around the migration approach, testing and planned system consolidation dates. Armando Fimbres – Oregon PUC asked about the first paragraph in the General notice and what the phrase “during the eventual consolidation” meant. NOTE: The full sentence from the notice is “During the eventual Local Service Systems Consolidation, CenturyLink will move all Local Service Request ordering to Electronic Administration & Service Order Exchange (EASE) from Interconnect Mediated Access (IMA). “

Mark Coyne – CenturyLink said that customer accounts will be moved once the consolidation begins on the conversion weekend. He asked if there were any other questions. There were none.

1/18/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink said these are the Local Service System Consolidation CRs where CenturyLink has previously communicated a project delay while the timing and conversion approach are being re-evaluated. On December 13, 2016, CenturyLink distributed notifications associated with updates to the EASE and Ensemble Final Technical Specifications which also included updates to the CenturyLink responses to customer comments. There are several customer comments that show CenturyLink responses are still being determined. Mark said because of the project delay, CenturyLink is considering whether to move these CRs into a Deferred status for a period of time. Mark asked if there were any questions.

Frank Behnke – AT&T asked with this information about the project delay, could he tell his management that there will be no action until 2018. He said they have a lot of work to do and need to plan work for the year.

Mark Coyne – CenturyLink said that statement was safe; there will be no testing or conversion activity in 2017. Mark said in the coming months, CenturyLink will hopefully have more info high level information to share.

Lisa Lynn – Granite asked if that was why CenturyLink was implementing an IMA Release 40.0.

Mark Coyne – CenturyLink said yes. As discussed in December as part of 2017 OSS capacity planning, there would be a Release 40.0 for IMA.

12/14/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink reminded those on the call that this Project has been delayed while the SME team is re-evaluating timing and conversion approach. No testing or conversion activity is planned for 2017. Two system notifications were distributed on December 13, 2016 to provide updated Final Technical Specifications for EASE and updated CenturyLink responses to customer comments for both EASE and Ensemble. Mark asked if there were any questions. There were none.

11/16/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink reminded those on the call that this project has been delayed. The CenturyLink SME team is currently re-evaluating the timing and conversion approach and, as discussed last month, there will be no testing or conversion activity planned in 2017. Mark then referred to the System notification SYST.OTHR.10.31.16.F.15087.LoclServR1.0ResptoCommUPD sent on October 31, 2016 (included in the package) to relay the updated CenturyLink response to customer’s comments was still pending for some questions still under investigation. He said the CenturyLink SME team planned to send the updated response to comments and final technical specifications on November 18, 2016. The Local Service Ordering and Billing System Consolidation Plan (Version 3) updates are also still pending.

NOTE: The EASE and Ensemble final technical specification notices were not sent as planned on November 18, 2016 due to some .xsd files still pending.

10/19/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink provided an update on the status of these Local Service System Consolidation CRs. He said the Final Technical Specifications and CenturyLink Response to Comments for EASE and Ensemble were sent September 30, 2016. The SME teams are working on providing an updated CenturyLink Response to Comments by the end of October for the remaining customer questions that are listed as “still under investigation” on the CenturyLink Response to Comments. Mark said a System Notification SYST.OTHR.10.06.16.F.14986.LSRCnsldtnPROJDELAY was distributed on October 6, 2016 to relay a Project delay. In conjunction with the project delay, CenturyLink cancelled the Joint Test Planning/Testing Walkthrough that had been scheduled for October 18, 2016. Mark said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan and the updates to the remainder of the Milestone dates for the Project Timeline are PENDING. Mark said it is well known that this system project is large and complex. The CenturyLink project team is reviewing the approach and timelines and is considering some other phased implementation alternatives. He said it has become fairly clear that there will be no Wholesale customer impacts that will occur in 2017. Mark said the project team will be making some further decisions over the coming months and will communicate the information when available.

Mike Norton – CenturyLink said he wanted to clarify that there will be no customer testing in 2017.

Rob Garth – DishNET asked if that meant there was no environment for customer testing.

Mike Norton – CenturyLink said that the customer testing that was to begin in 1st quarter as required by CMP and merger agreements would not occur in 2017. It would begin beyond that date. Mike said no conversion within wholesale would be occurring either.

Rob Garth – DishNET asked what the biggest factor was in the project delay.

Mike Norton – CenturyLink said it was the project complexity and feedback from internal and external customers. The Project team is looking at the approach to determine if it can be simplified.

Rob Garth – DishNET asked if this meant CenturyLink was back to the drawing board. Rob asked if the project technical specifications that had been made available to customers are still valid?

Mike Norton – CenturyLink said the technical specifications were not 100% locked down but that he did not think a change in the approach would significantly impact them. He said the LSOG is based on Issue 2Q14 and those requirements to IT are not changing. CenturyLink would continue to refine the tech specs as testing occurs and as feedback is received from customers similar to the feedback provided during the formal comment cycle. Mike said the major issue now is the timing.

Mark Coyne – CenturyLink said it sounds like it is safe to say the requirements and tech specs are still valid and will continue to be used going forward.

Mike Norton – CenturyLink said absolutely. Mike said the system development will impact Legacy CenturyLink customers as well as Legacy Qwest customers as the current system is upgraded with Legacy Qwest requirements. Mike said CenturyLink is also anxious to firm up the revised approach and dates. The plans are still to do an automated migration by region.

9/21/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said the EASE and Ensemble Draft Technical Specification walkthroughs had been held August 25, 2016 and an additional Walkthough-Q/A was scheduled and held on September 7, 2016. Mark said the meeting minutes and draft responses to Customer comments are available on Wholesale calendar. The formal comment cycle on Draft Technical Specifications for EASE and Ensemble was extended through September 16, 2016. The Final Technical Specifications and CenturyLink Response to Comments are now scheduled for September 30, 2016. (The various notices are included in the system distribution package.) Mark said we have received a significant amount of additional comments so we may send a first set of responses on September 30, 2016 and follow-up with the remainder of CenturyLink responses a couple weeks later. CenturyLink has a Testing Walkthrough scheduled for October 18, 2016; related documents are on the Wholesale calendar. Mark relayed an additional Self Nomination was received for Customer Testing; the Testing companies now include Electric Light Wave/Integra, XO, Mobius, Charter/Accenture, dishNET, TDS Metro. Mark asked if there were any questions. There were none.

8/17/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said the biggest update here is the change to the Release to Production for Eastern Region to be no earlier than June 2017. On August 12, 2016, CenturyLink issued two notifications associated with posting the Draft Technical Specifications for EASE and Ensemble and Mark referred to the notices in the System package. He relayed that the Walkthroughs are scheduled for August 25, 2016 and are available on Wholesale calendar: EASE August 25, 2016 9:30 AM MT - 11:30 AM MT Ensemble August 25, 2016 1:30 PM MT - 3:00 PM MT

Kim Isaacs - Electric Lightwave said she wanted to provide some early questions to allow CenturyLink to prepare. There are whole product groups that CenturyLink still offers that are not available in the Draft Tech Specs, e.g., UNE-P, DSS, Trunking, etc. Kim said some of the CenturyLink specific fields are also not addressed, e.g., manual reject override. Kim said it would be valuable to have SMEs relay which fields would be used in those instances.

Mark Coyne – CenturyLink said we would provide those questions to the SME team to allow them to prepare.

Susan Lorence - CenturyLink said if customers can submit any additional questions to CMPCOMM prior to the walkthrough that would be helpful.

Armando Fimbres – Oregon PUC asked if the change to the Eastern Release to Production date would impact the other regions effective dates.

Mark Coyne – CenturyLink said he could not answer that question at this time. He thought the SME team would be sharing the Project timeline as it becomes available.

Mark Coyne – CenturyLink said the Self Nominations for Customer Testing had been requested by August 1, 2016 and there were five companies that self nominated: Electric Lightwave, XO Communications, dishNET Wireline, Charter, and Mobius. Mark said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan and the remainder of Milestone dates for the Local Service Consolidaton Project Timeline were being updated for the change in date for Eastern and would likely be available before the September CMP meeting.

Michelle Ewton – XO Communications said they currently do not have connectivity with the Legacy CenturyLink systems and asked how far in advance that effort will need to begin.

Mike Norton – CenturyLink said if it is a brand new connection, the timeline is approximately 90 days.

Michelle Ewton – XO Communications said they would be getting with CenturyLink in the 4th quarter of this year to begin the process.

Mark Coyne – CenturyLink said the current timeline shows that customer testing would begin no earlier than January 2017 so the test planning would likely begin in October 2016.

Kim Isaacs - Electric Lightwave said in regard to the XO question about connectivity, customers will need to keep both connections up and will need to figure out what CenturyLink system to send orders to.

Mark Coyne – CenturyLink said that was true and it would be to everyone’s benefit to get through the remaining consolidation phases quickly. He asked if there were any other questions. There were none.

7/20/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said CenturyLink had issued a notification on July 7, 2016 to relay the issuance of Draft Interface Technical Specifications will be August 12, 2016 instead of July 18, 2016. Mark said a notification had been sent on July 11, 2016 requesting that any customers that are interested in participating in testing for this project should send a self nomination to cmpcomm@centurylink.com. The email should be sent by August 1, 2016 and should include the person who will be the point of contact for that company. Mark said that, so far, there have been five companies that have requested to test with CenturyLink for this project: Integra, XO, dishNET, Charter, and Mobius Communications. Mark said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan should be forthcoming. CenturyLink was working on the remainder of the Milestone dates for the LSR Project Timeline, testing dates, etc. The document should be available no later than the August CMP meeting. Mark relayed that CenturyLink had implemented a new Local Service Consolidation Web page as of July 1, 2016 that will be similar in content as the Access Systems Consolidation Project. Mark asked if there were any questions. There were none.

6/15/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan should be available by the end of the month including an updated LSR Project Timeline. CenturyLink will be establishing a new Local Service Consolidation web page that is similar to the Access Consolidation web page that will house documentation and information about the Local Service system consolidation. The Statement of Work for the Third Party Facilitator is still underway. Mark said we will likely be sending a notification prior to the July CMP meeting asking for customers to self nominate for Customer testing for the Local Access project. The next Milestone Date for the project is the issuance of the Draft Interface Technical Specifications on July 18, 2016. Mark asked if there were any questions. There were none.

5/18/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink said that on April 14, 2016, CenturyLink issued a notification to relay the new delivery date of July 18, 2016 to provide the Draft Technical Specifications for EASE and Ensemble. The notice also indicated that the Release to Production date for the Eastern Region will be no earlier than April 10, 2017. CenturyLink is still working on the other Milestone dates in between and should provide them soon along with an updated Local Service Ordering and Billing System Consolidation Plan. Mark then relayed that in regard to the Third Party Facilitator, CenturyLink had shared the decision to go with Wicresoft but that the finalized dates for testing were being determined so the dates could be included in the Statement of Work. Mark asked if there were any questions. There were none.

4/20/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink advised that on March 14, 2016, CenturyLink issued a notification to delay the delivery of the Draft Technical Specifications for EASE and Ensemble. On April 14, 2016, CenturyLink issued a notification to advise the new delivery date for Draft Technical Specifications will be July 18, 2016. Mark said that associated with the new Draft Tech Spec date, the new Project Release to Production date for the Eastern Region will be no earlier than April 10, 2017. Mark asked if there were any questions. There were none.

Mark Coyne – CenturyLink then provided an update on the Third Party Facilitator and said as discussed in the March meeting, the RFP was sent to suppliers to secure a Third Party Facilitator. Only the vendor Wicresoft responded. Following an interview with Wicresoft and based on the criteria of cost, knowledge, availability and our experience so far with them on the Access Consolidation project, CenturyLink recommended that Wicresoft be selected as the Third Party Facilitator for the project. Mark said CenturyLink had asked for customers to provide any feedback or concerns to the CMP mailbox by March 31, 2016. No feedback was received. CenturyLink is proceeding with Wicresoft but is still reviewing the Project timeline to determine the Wicresoft start date. CenturyLink will be providing Version 3 of the Local Service Ordering and Billing System Consolidation Plan to communicate the new timeline and any additional information to Wholesale customers. Mark asked if there were any questions. There were none.

3/16/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs.

Mark Coyne – CenturyLink said a notification was distributed on Monday, March 14, 2016 to relay that the Draft Technical Specifications for the Local Service Ordering System Consolidation Project are being delayed. Mark relayed that as stated in the notification, the delay is a result of CenturyLink's consideration of customer requests and our ongoing internal reviews to ensure the delivery of a high quality systems product to customers. On April 14, 2016, CenturyLink will provide an update on the status of the delivery date of the Draft Technical Specifications and will send the appropriate notifications to communicate any required revisions to the Local Service Ordering and Billing System Consolidation timeline. Mark said a revised version of the OSS Interface Calendar is included in the Package but we have also since posted a revised version to today’s meeting. Armando Fimbres - Oregon Public Utility Commission asked if the official schedule has been updated and asked if the Oregon docket would be updated. Mark Coyne – CenturyLink said we know the LSR Production effective date for Eastern will change but that new date has not yet been determined. We will provide a status on April 14, 2016 and once the revised schedule is determined, the appropriate updates would be made with the states. Mark then provided a status on the Request for Proposal (RFP) that had been sent to suppliers to secure a Third Party Facilitator for the project. He said only one vendor responded which was Wicresoft. CenturyLink did conduct an interview with Wicresoft and based on the criteria of cost, knowledge, availability and our experience so far with them on the Access Consolidation project, CenturyLink is recommending that Wicresoft be selected as the Third Party Facilitator for the project. Mark asked if there were any concerns. He said customers could provide feedback on this recommendation on the call or via the CMPCOMM mailbox but unless there is feedback, CenturyLink will be proceeding with this selection. CenturyLink will likely not engage Wicresoft until the new effective date is determined. Kim Isaacs – Integra said she would like to have time to consider this selection within Integra and asked if anything had yet been formalized with Wicresoft. Mark Coyne – CenturyLink said this is the CenturyLink recommendation based on merger agreements. He said CenturyLink would like to have any CLEC comments sent to the CMPCOMM mailbox by March 31, 2016. If there are any comments, they would be considered in the April CMP meeting. Mark asked if there were any other questions. There were none.

2/17/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink provided an update on the Local Service Consolidation project relaying that the Preliminary Implementation Plan Review meeting was held on January 27, 2016 and those meeting minutes are available. There was a request by the CLEC community to extend the formal Comment cycle. CenturyLink sent a notification to extend the comment cycle through February 11, 2016 thus providing an additional week. Mark said the response to comments and final version of the Local Service Consolidation Plan is due February 25, 2016. In regard to the Request for Proposal (RFP) for a Third Party Facilitator, Mark said the CLEC Notification with the redlined RFP was sent for review on January 28, 2016 with CLEC feedback due February 11, 2016. CenturyLink sent a notification that included the Response to CLEC comments and the Final version of the RFP on February 16, 2016. CenturyLink is distributing the RFP to potential vendors. Mark asked if there were any questions. There were none.

01/27/16 Preliminary Interface Implementation Plan Review Meeting FINAL Local Service Ordering and Billing System Consolidation Plan Meeting minutes SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs.

Attendees: Troy Peters – Alliance Connect (Iowa Network Services) Donna Barfield – Birch Katherine Merschat – Birch Mary Taylor – Birch Tiffany Kidd – Birch Dennis Molner – Charter Communications Linda McDonald – Charter Communications Tam Doan – Comcast Jason Renander – Comcast Andrea Smith - Comcast Kasha Fauscett – Comcast Lynn Notarianni – Colorado PUC Susan Travis – Colorado PUC Shannon Bishop – Consolidated fka Inventive Christy Kennedy – CTC Communications Rob Garth - DishNET George Devargis - DishNET Graham Northcutt- DishNET Joel Mitchell- DishNET Melat Lewis- DishNET Shawn Stickle- DishNET Josh Santos – Douglas FastNet JoAnn Norton – Gervais Telephone Co. Brendan Hamel – Granite Adam DeFeo – Granite Judy O’Day – Granite Budd Shearing – Granite Nancy Hansen – Granite Lisa Lynn – Granite Edie Wallace – Granite Kim Isaacs - Integra Laurie Roberson – Integra Nancy Taylor – Integra Julie Pickar – Integra Jamie Shay - Integra Carmen Painter – LS Networks Valerie Starr - LS Networks Emily Davis – Midcontinent Karen Viste - Midcontinent Mary Lohnes - Midcontinent Bonnie Johnson - Minnesota Department of Commerce Lan Nguyen - Neustar Armando Fimbres – Oregon PUC Pam Popp – Popp Communications LoriAnn Kuhn – Quantum Communications Jeff Hocker - – Quantum Communications Kurt Boucher - Southwest Cyberport Rick Heck - Spectrotel Jeanne Kulesa – Synchronoss John Zhan – Synchronoss Manjunath Gowda – Synchronoss Jackie Diebold - TDS Telecom Marnie Silvernail - TDS Telecom Victor Gaither - Time Warner Cable Ed Keefer – Value Telecommunications Tim Zawislak – Washington Commission (Staff) Lynn Denton – Windstream Don Lemke – Windstream Mary Conquest – XO Communications Mark Coyne - CenturyLink John Hansen - CenturyLink Denise Martinez - CenturyLink Sandy Nelson - CenturyLink Mike Laughman - CenturyLink Shawn Simpson - CenturyLink Sue Kriebel - CenturyLink Lee Gomez - CenturyLink Renee Albersheim - CenturyLink Marty Wilson - CenturyLink Rusty Burdette - CenturyLink Rick Breitenbach - CenturyLink Mike Norton - CenturyLink Susan Lorence - CenturyLink

Mark Coyne - CenturyLink defined the purpose of the call which is to review the CenturyLink Local Service Ordering and Billing System Consolidation Plan which combines the requirement of the Detail Plan as specified by Merger requirements and the Preliminary Interface Implementation Plan as required by CMP. The plan is to cover at a high level each section of the Consolidation Plan. Mark said Ordering and Billing SMEs are on the call to answer any customer questions. For any questions that cannot be answered on the call, CenturyLink will take an action item for follow-up. The CenturyLink response will be covered either in the meeting minutes or will be covered in a subsequent CMP meeting. Any technical questions will be addressed as part of the Draft Technical Specifications planned for April 8, 2016. Mark asked if that process would work for those on the call. There were no objections. Mark began the review of Consolidation Plan. The following questions were asked as the high points of each section were covered.

Section 1.0 Executive Summary Kim Isaacs - Integra said it was too early to use the term Benefits for customers. At best, any OSS transition can be difficult; it is important for discussion to occur early. Kim said there is a lot of work that has to be done in EASE for it to be equivalent to IMA and that execution will determine the benefits. Mark Coyne - CenturyLink said the updates to EASE are addressed later in the document. Section 1.2 - Assumptions Joel Mitchell - DishNET asked about availability of completed orders for 24 months and whether that history would be kept in IMA.

Mike Norton - CenturyLink said the Completed orders would remain available in a view only mode in IMA and that following conversion, the same archive requirements as exist today would remain in the new system. Kim Isaacs - Integra said her assumption is that not only would CMP be followed for the consolidation itself but that CMP would be followed to address future system updates. Mark Coyne - CenturyLink said that was correct as it pertains to the products/services governed by CMP today. Rob Garth - DishNET asked if BillMate would be retained as one of the existing output choices for billing media. Sue Kriebel - CenturyLink said that CenturyLink is still analyzing the best option and it was only the ASCII BillMate format that was undecided. Joel Mitchell - DishNET asked whether the billing account number structure in EASE would be used or whether the structure in IMA would be retained. Mike Norton - CenturyLink said an account hierarchy will be set up in EASE based on RSID/ZCID. He said CenturyLink plans to hold a Customer Brown Bag on account hierarchy options and then have Service Managers work with customers to determine how their accounts should be set up. In regard to account numbers in Ensemble, they are set up based on Product ID which is typically the telephone number. Joel Mitchell - DishNET asked if the WTN structure (NPA NXX and Cus Code) would be used. Sue Kriebel - CenturyLink said the invoice in Ensemble will not be in NPA NXX Cus Code format but will be a nine digit number. Mike Norton - CenturyLink said BAN mapping changes will be communicated well in advance of the conversion. Kim Isaacs - Integra asked if the BANs for unbundled loops will change formats and no longer use the NPA NXX format. Kim asked if circuit ids will change. Sean Simpson – CenturyLink said CenturyLink will try not to change those account number in Ensemble unless there is already a product id in existence with that same number. CenturyLink will analyze each account number from CRIS to determine whether it can be reused. Sean said circuit ids themselves will not change. Joel Mitchell - DishNET asked if the consolidation was only for ordering or if there were support system changes also, e.g., NEAC vs. CSIE or modem activation. Mark Coyne - CenturyLink each area will be looked at individually. Kim Isaacs - Integra said that in regard to any support system changes, the merger conditions require adequately trained staff. Mike Norton - CenturyLink said the back end dispatch, design and provisioning processes are not changing with this project. There have already been some consolidations where legacy CenturyLink has consolidated into Legacy Qwest systems. Section 2.1 Current State System View Lynn Notarianni – Colorado PUC said there are inconsistencies on how the terms LSR orders, Local Service Requests, orders, etc., are used in the Consolidation Plan and thought they may have different meanings. Lynn suggested it would be helpful to figure out the right term to use. Mark Coyne - CenturyLink said we will take that action item back to the document owner to review and be more consistent. Section 2.2 End State System View Kim Isaacs - Integra asked whether CenturyLink retail was going to use EASE as the ordering platform for residential services.

Mike Norton - CenturyLink said CenturyLink Retail only uses EASE for the one process of Loss notification otherwise Retail works directly in Ensemble and other platforms.

Kim Isaacs - Integra said then Retail ordering cannot see what Wholesale is doing.

Mike Norton - CenturyLink said that is correct that Retail cannot see what is in EASE for Wholesale and that for Ensemble, he is working with CenturyLink Regulatory to assess if any enhancements are required for CPNI for Legacy Qwest.

Kim Isaacs - Integra asked if there will be the capability that a CLEC can view the CSR of another resale account like what occurs in IMA today?

Mike Norton - CenturyLink said that will be the same.

Kim Isaacs - Integra said Integra has had a problem with another company that uses a Synchronoss application and asked if CenturyLink was going to lock down Wholesale BANs so Retail cannot add to them.

Mike Norton - CenturyLink said those details are still being worked out with Regulatory.

Section 2.3.1 Service Ordering Comparison – IMA to EASE Rob Garth – DishNetwork asked whether there would be improvement in the process to “Manage Users” and whether a certificate was required. Rob asked if the process would utilize a GUI or an API.

Mike Norton - CenturyLink said EASE does not generally require a certificate but said there may be a requirements for one if there is electronic bonding. Mike said there are different user administration requirements. A technical call will be conducted with IT personnel on both sides to review the certificate requirements, XML tech specs, testing, etc.

Adam DeFeo – Granite asked how to get on the distribution list for the technical calls.

Mark Coyne - CenturyLink said systems notifications will be sent for the technical reviews so customers should be sure they are signed up to receive notifications or they can send an email to cmpcomm@centurylink.com for assistance.

Rob Garth - DishNET asked if there would be a GUI or API to assist with user management.

Mike Norton - CenturyLink said there is a GUI based user management capability for customers. Mike said he did not think APIs are available in EASE nor are they available today in IMA.

Mark Coyne - CenturyLink referenced the matrices in Section 2.3.1 and said the asterisk indicates there will be development required in EASE to provide those functions.

Joel Mitchell - DishNET asked if the functions that are to be added to EASE will be placed in production prior to conversion.

Mike Norton - CenturyLink said the EASE enhancements may go in for Legacy CenturyLink and Embarq customers prior to the LSR account consolidation which will help test the system updates and will introduce the new capability to the current EASE customers. He said appropriate system notification would be sent. Josh Santos – Douglas FastNet asked if both IMA and EASE will be active in tandem while customers get used to the new system. Mike Norton - CenturyLink said no, IMA and EASE will not be available in tandem for the same states. He said the system implementation will be phased by region so once Eastern is converted, IMA will only be available to review the 2 year old order history. For Western and Central, IMA and CRIS will be business as usual Joel Mitchell - DishNET asked if the “Manage Users” functionality in EASE will allow more control of user access and gave the example of whether some order functions could be limited for one person vs. another.

Mike Norton - CenturyLink said if that capability exists today in IMA, then the capability would have to be looked at for EASE.

Joel Mitchell - DishNET asked about recapping from Pre-order to order. Joel said they have a lot more questions about how functions will be provided but would hold off until the draft tech specs are available.

Mike Norton - CenturyLink said discussion is underway as to how to provide information that will aid customers in the transition, likely it will be some combination of tech specs, PCATs, developer worksheets, etc. He said the PCATs are probably the most descriptive of the changes.

Kim Isaacs - Integra said under the matrix for Ordering Functionality, there are lot of functions not listed and wanted to insure those are being addressed.

Mike Norton - CenturyLink said the SME team is currently going through user stories and that there are high level functions as well as specific functions that they are capturing. He said the matrix would be very extensive to add them to this document but said he thought they would be delineated in the Tech Specs.

Lynn Notarianni – Colorado PUC asked if part of the concern is that this Consolidation Plan is preliminary and asked if a statement should be added that the document is not intended to represent the full capability that will be provided.

Mark Coyne - CenturyLink said this document is preliminary and pointed to the Scope. He said it is not intended to go into great detail.

Kim Isaacs - Integra said she knows this is a high level but like the ASR project, there were some differences in how customers and CenturyLink define functionality. Kim said she is concerned that there is no asterisk by the EASE functions since she knows there are some specific capabilities, requested thru CMP by both CLECs and Qwest, that need to be added to EASE.

Mark Coyne - CenturyLink said that though this Consolidation Plan is not intended to be very detailed, there will likely be updates made to it as more is known. The SME team now knows more than they did when the document was released in early January.

Joel Mitchell - DishNET asked if the Consolidation Plan would be updated monthly.

Mark Coyne - CenturyLink said not necessarily monthly but it will definitely be updated when CenturyLink responds to CLEC comments on February 25, 2016.

Joel Mitchell - DishNET asked if it was possible to extend the February 4, 2016 comment cycle due date since this session had been pushed out a week.

Mark Coyne - CenturyLink said he would look at whether the date could be pushed a week and would include that in the meeting minutes. [NOTE: On February 2, 2016, CenturyLink sent out notifications to extend the formal comment period by one week. The original comment cycle was to end on February 4, 2016 but was extended through February 11, 2016. See notice numbers SYST.OTHR.02.02.16.F.14265.LSRSysCnsldtnCmtsExtnded and GENL.ANNC.02.02.16.F.14266.LSRSysCnsldtnCmtCycExtnd.]

Mike Norton - CenturyLink said the SME team will add a lot more asterisks on the various matrices after continued requirement meetings over the last month. Lynn Notarianni – Colorado PUC said because of the complexity of the LSR transition and potential for Commission complaints, she thinks it would be appropriate to add a disclaimer that this is a preliminary document and is not intended to represent the final project functionality. Lynn said that will help insure that all understand the intent of this document.

Joel Mitchell - DishNET asked if there would be a distinction between Legacy Qwest and Legacy CenturyLink/Embarq territory. He said there will be a need to know which support group to call depending on the region and then gave the example of CEMR-MTG and asked if it applied to Legacy Qwest and Legacy CenturyLink/Embarq territory.

Mike Norton - CenturyLink said the goal is to minimize functional or product differences across CenturyLink. He said because there are some backend systems that are region specific, there will be a requirement to provide some indication of differences should they occur. Mike said there are two primary systems in the CenturyLink suite that are not common – Address Management and the Copper inventory for assignment. Other than that, the main functional applications are the same.

Lynn Notarianni – Colorado PUC asked if the Consolidation Plan identifies what is to be done with the various PID/PAP measures. Lynn said she assumes since the applications are changing the measures will need to be updated.

Mike Norton - CenturyLink said we will add a paragraph in the document for that and there is a SME team already working on that.

Section 2.4 Billing System Differences between CRIS to Ensemble Tam Dohn – Comcast asked about the BAN changes and said they use a third party to set up new accounts which can take some time. She asked if a report can be received in advance.

Sue Kriebel – CenturyLink said yes we will provide that cross reference a couple months in advance and that for those customers that are testing with us, it would be provided sooner. Sue said we are working thru that process now on the ASR side.

Kim Isaacs - Integra said as Integra went through a system transition with another company, the BAN change was a big issue. She said if there any deviations to the plan, they will need to be communicated ASAP. If a customer cannot audit the bill, that stops payment and said CenturyLink may need to consider stopping LPCs for a period of time.

Section 3 Consolidation Plan Implementation Troy Peters - Alliance Connect asked how customer support will work when this is occurring by region.

Mark Coyne - CenturyLink said the CenturyLink customer support will be scheduled to support all customers regardless of their location.

Kim Isaacs - Integra said Integra has already expressed concern that this is an aggressive schedule. Kim said there is an LNP administrator change that overlaps with this schedule and asked how it will impact the EASE implementation. She said there is no implementation date yet but thought it could impact resources for companies.

Mike Norton - CenturyLink said EASE does not interact with NPAC but said the SOAs would be impacted with that NPAC change.

Mark Coyne - CenturyLink said any scheduling concerns will likely be part of the formal comments that the SME team will then address. Section 3.2 3rd Party Facilitator Lynn Notarianni – Colorado PUC asked about the 3rd Party Facilitator and how that process will work.

Mark Coyne - CenturyLink relayed that there will be a notification sent on January 28, 2016 about the 3rd Party Facilitator selection process that will also provide the proposed RFP updates and planned schedule. Mark said the 3rd Party Facilitator may not come on board until the 2nd quarter timeframe. NOTE: For details of this timeline and process, refer to notification CMPR.CMPP.01.28.16.F.14250.RFPThrdPrtyFacilitatrLSR.

Section 3.3.2 Training and Process Plan Kim Isaacs - Integra asked what the training will encompass and whether it will cover the business rules. Kim said it is the understanding of the business rules that is most important.

Mark Coyne - CenturyLink said he thought training would cover screen navigation but would relay that information back to the Training team.

Mike Norton - CenturyLink said IMA is on LSOG 6 and EASE is on LSOG 10, CenturyLink will be moving to a current version of the LSOG.

Kim Isaacs - Integra said Qwest made the business decision as to what LSOG that IMA is based on. Going from LSOG 6 to 10 and the related update to so many business rules is a big concern and will need to be made clear to those writing the order.

Mike Norton - CenturyLink said he thinks EASE will be moving to LSOG 14.2 (numbering is now year and quarter) with customization. The tech specs and PCATs would be updated accordingly. Mike said that upgrade will occur in EASE first so it will not be part of the actual conversion.

Rob Garth - DishNET asked the timeframe for the LSOG version upgrade to EASE.

Mike Norton - CenturyLink said it will likely be about 90 days before the planned conversion. By doing this, the current EASE customers will have time to implement the changes. The benefit is that it allows the focus at conversion to be on that vs. an additional system change. Mike said that will increase the quality of the initial implementation.

Kim Isaacs - Integra said another big problem that Integra experienced during a recent system consolidation with another company was that flowthrough was significantly impacted and caused an impact to center staff that had to process the orders manually. Kim said CenturyLink should plan on an increase in manual orders and that training on the CenturyLink side needs to prepare for that.

Jackie Diebold - TDS Telecom asked if the training would be instructor led or web based.

Mark Coyne - CenturyLink said he does not think that has been determined yet but that it will follow CMP requirements which provides for instructor led, web based or a combination. Mark said training is scheduled to begin July 15, 2016.

Lynn Notarianni – Colorado PUC asked if CenturyLink is planning for an interim process for escalations during the conversion.

Mark Coyne - CenturyLink said there will be an interim process for escalations during the conversion.

Section 3.3.3 Customer Testing Rob Garth - DishNET asked if there are plans to enhance the current EASE testing, for example, availability, test cases, etc.

Mike Norton - CenturyLink said there will be a dedicated environment for CLEC testing which will interface with downstream systems, such as address validation, inventory systems, CFA queries. Mike said there will be a “full suite” of applications to support testing.

Rob Garth - DishNET asked how defect classification, reporting and resolution would be addressed - including SLAs for resolution. Rob said he wants to work with CenturyLink to determine this prior to production and asked if there will be a severity rating for defects and asked if CLECs will have a voice in that.

Mike Norton - CenturyLink said that UAT will be where this process is developed. Mike said the 3rd party facilitator will play a key part to developing the defect process also. He said it is difficult to have an SLA tied to problem resolution since there are so many variables that could impact that. Mike asked if it was reasonable to wait until the 3rd party facilitator is available.

Rob Garth - DishNET said he thought it was reasonable but did not want to get too much farther before it is determined.

Mike Norton - CenturyLink said it will be resolved well ahead of UAT beginning. There is already protection in the Testing process with the Go/No Go decision that is part of the merger agreement. He said the 3rd party facilitator should be involved in the negotiation which benefits both sides.

Mark Coyne - CenturyLink said he thought defining those processes will be part of the Test Planning in preparation for UAT.

Section 3.3.4 Load and Performance Testing Rob Garth - DishNET asked if CenturyLink will include customers in Load and Performance testing to test capacity.

Mike Norton - CenturyLink said CenturyLink will share the Load and Performance volumes and results.

Rob Garth - DishNET said Dish has had to temper some large volume queries in IMA in the past and would like to test using some real world data. Rob asked if CenturyLink is still tied to the same back end systems which have certain volume limitations.

Mike Norton - CenturyLink said EASE is tied to the same back end systems and said any performance changes to those systems are out of scope for this project. He used the example of the Loop Qual volumes in TIRKs.

Rob Garth - DishNET asked if there will be a simplified process for Loop Qual.

Mike Norton - CenturyLink said CenturyLink will provide the same information that IMA provides but it may be presented differently.

Rob Garth - DishNET asked if system availability will be the same as today or would there be an increase in hours.

Mike Norton - CenturyLink said there are “guaranteed hours” of availability in EASE however the system is not taken down if no system maintenance is required; this may result in an increase in availability but it is not guaranteed. At a minimum, CenturyLink will meet the available hours that exist in IMA today.

Rob Garth - DishNET asked if supporting infrastructure systems will remain as today by territory, e.g., SAGA or FAM.

Mike Norton - CenturyLink said that consolidating infrastructure is not part of this project but gave the example that address validation may eventually go to a data warehouse solution.

Mark Coyne - CenturyLink said the call was nearing the planned timeline and reminded customers their comments can be sent to cmpcomm@centurylink.com. He said the comment cycle will be extended through February 11. Depending on the extent of the questions, another call might be scheduled to allow more discussion. Mark asked if there were any final questions.

Rob Garth - DishNET asked when the minutes from the call would be available.

Mark Coyne - CenturyLink said the draft meeting minutes will be available in a week on the wholesale calendar.

Susan Lorence - CenturyLink said the draft minutes will also be distributed to participants on the call but we may need to use a point of contact per company if an email address is not available.

Mark Coyne - CenturyLink thanked everyone for participating on the call today and said he appreciated the discussion.

The meeting was adjourned at 11:00 AM Mountain Time.

01/20/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink provided an update on the LSR Consolidation project relaying that the CMP Initial Release Notification and the Initial Retirement Notifications were distributed on January 4, 2016 with an extended formal Comment cycle. As of that date, the Preliminary Interface Implementation Plan was available for review. The Preliminary Interface Implementation Plan Review Meeting is now scheduled for January 27, 2016 from 9:00 -11:00 AM MT. Mark said CenturyLink is working on updating the RFP for the 3rd Party Facilitator for this project. The Release Milestones are now included in the OSS Calendar. Mark asked if there were any questions. There were none.

12/1615 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said these four CRs associated with the LSR Consolidation Project were presented by Tracy Strombotne – CenturyLink in the November 2015 monthly meeting. Mark said an Ad hoc meeting was held with the customer community on December 1, 2015. The Powerpoint presentation that was reviewed on that call is posted to the Wholesale calendar along with the final version of the meeting minutes from that call. Mark said the CMP notice and Preliminary Interface Implementation Plan will be available in early January 2016 and the notice will include a 30 day customer review cycle. An ad hoc call will be established for mid January for CenturyLink to review the plan with customers. Mark said work is beginning around developing the RFP for the 3rd Party Facilitator. He said a notice will be sent in early January to ask for customers to identify themselves if they would like to be involved in developing the RFP for the LSR project. It is likely that we will be able to use some of the work that occurred for the ASR Project. Mark asked if there were any questions. There were none.

LSR Consolidation Project Ad hoc meeting minutes FINAL December 1, 2015 SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs.

Attendees: Tywanda Bloodworth - Access Point Deborah Pasquale - Access Point Patrick Hall - Access Point Katherine Merschat - Birch Chris Garrison - Central Scott Telephone Renee Albersheim - CenturyLink Susan Lorence - CenturyLink John Hansen - CenturyLink Lee Gomez - CenturyLink Mark Coyne - CenturyLink Tracy Strombotne - CenturyLink Mike Norton - CenturyLink Paul Dunphy - Charter Linda Birchem - Comcast Randee Ryan - Comcast Andrea Smith - Comcast Kasha Fauscett - Comcast Roger Delgrosso - Custom Call Jay Bobacaci - Custom Call Kim Isaacs - Integra Laurie Roberson - Integra Becky Chandler – Integra Rhonda Otto – Integra Steve Schmidt - Iowa Network Services Mary Lohnes - Midcontinent Bonnie Johnson - Minnesota Department of Commerce Lan Nguyen - Neustar Amber Taylor - Nex-Tech Missy McMullan - Nex-Tech Jackie Diebold - TDS Telecom Mark Andersen - TDS Telecom Denise Boe - Tekstar Victor Gaither - Time Warner Cable Jamie Wright – Valley Telecom

Mark Coyne – CenturyLink defined the purpose of the call which is to share information about the LSR system integration work associated with four CenturyLink Change Requests that were presented in the November 2015 Monthly CMP meeting. Mark said the call would be reviewing the “CenturyLink LSR System Ordering and Billing Consolidation” document that is posted on the Wholesale calendar and that attendees could ask questions at any time during the call. If the question could not be readily answered, CenturyLink would take an Action item to follow up after the call. Mark said there would be more meetings on this topic through the life of the project.

Renee Albersheim – CenturyLink then reviewed the Agenda located on page 3 of the PowerPoint presentation. Renee then presented history regarding the Merger Commitments and steps that lead up to this conversion project. She then covered the systems that will be addressed during the LSR system consolidation project: IMA to EASE for Ordering and CRIS to Ensemble for Billing. The benefits of the LSR system consolidation project were then presented. Renee asked if there were any questions.

Kim Isaacs - Integra asked what the impacts to CenturyLink residential customer will be.

Renee Albersheim - CenturyLink explained that the CenturyLink Residential group did not use the systems in the same manner as the CLEC, but that systems are used for CenturyLink Residential accounts.

Kim Isaacs - Integra said she had experience with previous conversions to Synchronoss products and asked about the significant volume increase [12/11/15 Updates received from Integra in CAPS] ASSOCIATED WITH CENTURYLINK RESIDENTIAL ACCOUNTS and the POSSIBLE impact to system stability and system response times. Mike Norton - CenturyLink responded that the internal CenturyLink systems interface directly with call center sub-applications that interface with Ensemble and there are volume implications that will be accounted for. The only CenturyLink retail use of EASE is invoked during the port-out process, otherwise, internal CenturyLink users do not use EASE.

Renee Albersheim - CenturyLink continued by describing the benefits of both EASE and Ensemble as per slide 6 of the presentation.

Kim Isaacs - Integra asked when it would be appropriate to present concerns.

Mark Coyne - CenturyLink replied if there were concern with a specific slide, they could be addressed at that time otherwise, they can be addressed at the end.

Kim Isaacs - Integra stated that for LSR GUI users, the documentation, especially regarding the Business Rules, a more user friendly document would be needed more like the IMA LSOR rules than just the technical specifications. [12/11/15 Updates received from Integra in CAPS] THIS IS AN EARLY REQUEST FOR THE LSR CONSOLIDATION PROJECT BECAUSE THE DOCUMENTATION FOR THE ASR CONSOLIDATION PROJECT WAS NOT USER FRIENDLY FOR A GUI USER.

Renee Albersheim - CenturyLink continued by explaining that with the new LSR system, there would only need to be one order for both provisioning and billing, whereas with IMA, it required two orders that CenturyLink had to synch up. She then turned the presentation over to Mike Norton – CenturyLink.

Becky Chandler – Integra asked if the back-up Billmate files would be required after the conversion and if the Ensemble bill was in CABS format.

Kim Isaacs – Integra said if the Billmate file goes away, the information that was on the Billmate file would still need to be available on the Ensemble bill.

Mike Norton - CenturyLink clarified that there are several bill media formats within Ensemble, but the BOS format was not one of them. CenturyLink is researching a BOS standard output for appropriate Design services when USOCs and FIDs are normally provided. Mike said the bulk of the services are non-design and will not have a BOS standard format. He confirmed the Billmate files are going away but the information would be on the Ensemble bills. Mike continued with slide 7 of the presentation that provided some history around the company that developed Ensemble and a description of the application.

Kim Isaacs - Integra asked about the PID/PAP performance metrics and if that would remain intact.

Mike Norton - CenturyLink confirmed that was true that equivalent data measurement points were currently being determined and fed into the reporting system.

Kim Isaacs – Integra said that was very good and asked if reports would remain available

Mike Norton - CenturyLink confirmed that they would be available.

Kim Isaacs - Integra asked if there would be testing available for the performance metrics.

Mike Norton - CenturyLink confirmed that there would be and mentioned a past conversion between Embarq and CenturyTel and that we would be utilizing lessons learned during that conversion to make this conversion better. He continued with the description of EASE as defined on slide 8.

Kim Isaacs - Integra said since CenturyLink is required by CMP to provide the release capacity for the following year, Kim asked if CenturyLink had negotiated an annual release capacity with Synchronoss.

Mike Norton - CenturyLink said that 95% of the EASE [12/11/15 Updates received from Integra in CAPS] [delete UPGRADES WERE IMPLEMENTED] DEVELOPMENT CAN BE MADE without Synchronoss support. The tool is an off-the-shelf tool but is very configurable. Most of the business rules are controlled by CenturyLink IT. From the GUI perspective, CenturyLink tries to remain complaint with the Synchronoss tool while utilizing the internal development function as needed. He added that during the conversion, CenturyLink would work closely with Synchronoss because there would be substantial development necessary in the initial stages.

Kim Isaacs - Integra asked Mark Coyne - CenturyLink if he thought there would be a similar level of hours available for EASE that currently exists for IMA.

Mark Coyne - CenturyLink responded that the CenturyLink IT folks are aware that CenturyLink is required to provide a certain annual capacity as required by CMP. He said we will have to wait and see how things progress. Mark said development has been tapering off with respect to IMA changes in recent years.

Mike Norton - CenturyLink discussed customer impacts as indicated on slide 9. He then described some of the key differences as listed on slide 10. CenturyLink has a team of system and business analysts that are working to determine differences between the functionalities of IMA and EASE and to determine if there are gaps that need to be closed.

Becky Chandler – Integra asked if the differences in the existing three Qwest billing systems was being addressed.

Mike Norton - CenturyLink stated that there are two SME/analyst teams that are performing detailed reviews of ordering and billing.

Kim Isaacs - Integra asked what “equivalent functionality” means to CenturyLink and stated that she did not believe that it meant the same to CenturyLink as it does to CLECs.

Mark Coyne - CenturyLink asked if Kim was looking for a definition.

Kim Isaacs - Integra offered the email status notification as an example and described her concerns comparing the functionality differences in the ASR conversion. She also mentioned IMA availability to pull CFA information in a range of 100 at a time and asked if EASE did the same. Kim said though CenturyLink identifies that both systems provide some capability does not necessarily mean they have equivalent functionality.

Mark Coyne – CenturyLink said he did not think anyone on the call could provide a solid definition. He said that CenturyLink was taking each capability and reviewing it in detail to determine if the functions would be considered equivalent between the two systems - which was being done on the ASR project.

Mike Norton - CenturyLink stated in general, when the systems are compared, the data and appearance may be different. He mentioned that Loop Qual as in IMA is not yet available in EASE and that would be defined as a gap and CenturyLink will need to build one. He also gave a few more examples of potential gaps that CenturyLink was addressing the equivalent functionality.

Kim Isaacs - Integra said that she had a concern and had asked the question during the initial ASR conversion walkthrough about ASR email status. Kim said she was still waiting for a response. She stated that equivalent functionality needed to be defined and that the differences between the systems needed to be addressed.

Tracy Strombotne – CenturyLink stated that we were looking into specifics on the ASR email status and should have a response from IT shortly.

Mark Coyne – CenturyLink said he thought the CenturyLink response to the ASR email status concern is part of the Delayed response to CLEC comments due December 9. If the CenturyLink response did not answer all of the questions, more discussion could occur.

Kim Isaacs - Integra reiterated that this is a big concern about equivalency that she has brought up multiple times on the ASR project. She said for the LSR project, Loop qualification and Raw Loop data will be a big focus to review equivalent functionality since today EASE is not where it will need to be. Kim said if there is not equivalent functionality it would be a No Go for the project vote.

Tracy Strombotne – CenturyLink said that CenturyLink could not possibly know how Integra uses all of the available functions of IMA and that she appreciates hearing the various examples that are important to CLECs.

Kim Isaacs - Integra stated that she wanted to be up front with the fact that these issues could affect CenturyLink’s ability to meet its timeline on the conversion.

Mark Coyne – CenturyLink said he appreciated Kim bringing it up early and that it is a lessons learned from the ASR project.

Renee Albersheim - CenturyLink added that CenturyLink recognized that Integra had done a lot of integration between its system and IMA which is why CenturyLink is trying to set up a visit so that we can see first-hand how the two systems work together.

Mark Coyne - CenturyLink added that this walkthrough is high level and that there are SME teams in both provisioning and billing that continue to work on these issues so that the final consolidation plan can be developed.

Mike Norton - CenturyLink continued the overview with slide 10 – Key Differences and said CenturyLink is working extensively to develop requirements to bridge each of the various gaps. Mike asked if there were any questions about this high level review of the key differences.

Kim Isaacs - Integra asked when the greater level of detail will be available to the CLECs.

Mike Norton - CenturyLink responded that the draft Tech Specs should be in April 2016. There will also be more information available with detailed implementation plan in early January 2016.

Kim Isaacs - Integra said that CenturyLink has identified that there has been quite a bit of work done to date and asked if those specific differences could be shared now.

Mike Norton - CenturyLink said he would work with the IT and CMP regarding that request and get back with her.

Mark Coyne - CenturyLink said most of that information would be included in the detailed consolidation plan and that CenturyLink will set up time to discuss the plan and differences.

Kim Isaacs - Integra asked when that would be done.

Mark Coyne - CenturyLink replied that it would be early January 2016 and that the timeline would be covered as part of the presentation.

Mike Norton - CenturyLink continued with his review of information in slide 11 – Conversion Strategy.

Mark Coyne - CenturyLink acknowledged that the call had gone over the scheduled hour and that if anyone needed to drop, CenturyLink would provide a summary of this call on the Wholesale Calendar. Mark then reviewed the Timelines on slides 12-14. He said the information above the timeline represents Merger related activities while the information below the timeline relates to CMP activities. Mark said the original approach as reflected on the slides was to issue the Implementation plan for the project in early December but that has been pushed out to early January. He said this information will be addressed in more detail in that Implementation Plan. Mark said if anyone had questions on the presentation after the call, those questions could be submitted through the CMP mailbox at cmpcomm@centurylink.com and we will respond. He next reviewed slide 15 – Next steps. Mark said the key purpose of the call is for customers to begin to understand the project so they can also begin to prepare for this significant project that will bring challenges to both CenturyLink and customers. CenturyLink wants the project to be a success for all parties. Mark asked if there were any questions. There were none.

The meeting was adjourned at approximately 10:45 AM Mountain Time.

11/18/15 Monthly Systems CMP Meeting Tracy Strombotne – CenturyLink presented this new CenturyLink CR as listed in the CR Description. Tracy said the implementation will occur in a phased approach beginning with the CenturyLink QC Eastern region which has a planned effective date in December 2016. The Western region implementation has a planned effective date midyear 2017 while the Central region has a planned effective date in late 2017. Tracy asked if there were any questions.

Kim Isaacs – Integra said Integra had a concern associated with the first planned migration date of December 2016. Kim said the Integra IT budget for 2016 has been established and the 2016 date for this project presented a resource issue. Integra had submitted a request to move the Eastern date to later in 2017 and would like to discuss that. Kim said [12/1/15 Updates received from Integra in CAPS] CENTURYLINK’S RESPONSE TO INTEGRA REQUEST TO MOVE THE EASTERN IMPLEMENTATION DATE INDICATED CENTURYLINK WAS LOOKING FOR other CLECs TO [delete CUSTOMERS WILL] provide feedback [delete ALSO].

Mark Coyne – CenturyLink said CenturyLink had received the request and responded that CenturyLink understood the Integra’s concerns but CenturyLink had demonstrated our adherence to the merger agreement and had provided extended lead time in most instances. Mark said CenturyLink is currently working on the detail planning and will be holding walkthroughs in the coming weeks to get into the details to review the milestones and how those line up with dates.

Kim Isaacs – Integra said she thought quite a few enhancements need to be made to EASE to be equivalent to IMA functionality and that may take some time.

Mark Coyne – CenturyLink said the important thing is to get started toward a date. Mark said he will provide the Integra feedback to the Project team who will take it to CenturyLink leadership.

Kim Isaacs – Integra asked if the walkthroughs mentioned were internal.

Mark Coyne – CenturyLink proposed that after the CRs are presented, he will cover the next steps that are planned for the project.

CenturyLink Response

Open System CR SCR110415-2 Detail

 
Title: Implement EASE to provide a centralized platform for LSR processing
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR110415-2 Deferred
2/15/2017
-   3/ Pre-ordering and Ordering Centrex, Private Line, Resale , UDIT, Unbundled Loop, UNE - All types, Directory Listings
Originator: Strombotne, Tracy
Originator Company Name: CenturyLink
Owner: Coyne, Mark
Director:
CR PM: Lorence, Susan

Description Of Change

CenturyLink is introducing the Electronic Administration & Service Order Exchange (EASE) application to provide a single, centralized platform for all LSR processing. The EASE application is a proven, industry compliant order entry system which gives customers an end-to-end view of LSR orders. It is a robust, table driven application with extensive business rule capabilities.

The system consists of a GUI and UOM/XML application to application (e-bonding) ordering capability.

EASE follows the LSOG/LSR industry standards.

EASE will replace the existing IMA application. All customer processing of LSRs will be required to move to EASE.

This CR is part of a system consolidation project for ordering and billing LSRs. While the end goal of this consolidation is to provide a streamlined service platform for current and future product delivery, there are differences in both appearance and functionality between the target state and retiring applications. Where there are differences, CenturyLink will provide equivalent functionality.

CenturyLink will implement EASE in a phased process beginning with the CenturyLink QC Eastern region which has a planned effective date in December 2016. The Western region of CenturyLink QC will follow with a planned effective date mid year 2017. The Central region of CenturyLink QC will be last with a planned effective date in late 2017.

Expected Deliverables/Proposed Implementation Date: The first proposed implementation is expected to be in December 2016 for Eastern.

Status History

Date Action Description
11/4/2015 CR Submitted CR Submitted. 
11/6/2015 CR Acknowledged CR Acknowledged. 
11/18/2015 Status Changed Status changed to Presented. 
11/18/2015 Discussed at Monthly CMP Meeting Discussed in the November Systems CMP Meeting - See Attachment C in the Distribution Package. 
11/23/2015 Communicator Issued See Notification number CMPR.MEET.11.23.15.F.14096.AdHocMtgLSR_CnsolidatnCRs. 
12/1/2015 General Meeting Held Ad hoc meeting to discuss four new system consolidation CenturyLink Change Requests. 
12/16/2015 Status Changed Status changed to Development. 
12/16/2015 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment I in the Distribution Package. 
1/4/2016 Communicator Issued See notification number SYST.OTHR.01.04.16.F.14175.PrelimPlanLSR_SysConsldtn. Initial Release notice and Preliminary Interface Implementation Plan provided with Review meeting scheduled for January 18, 2016. 
1/12/2016 Communicator Issued 1/12/16 See notification number SYST.OTHR.01.12.16.F.14205.LSR_ConsldtnCALL_RESCHED. Preliminary Interface Plan Review meeting rescheduled to January 19, 2016. 
1/14/2016 Communicator Issued See notification number SYST.OTHR.01.14.16.F.14209.LSR_CnsldtnCALL2ndRESCHED. Preliminary Interface Plan Review meeting now scheduled for January 27, 2016. 
1/20/2016 Discussed at Monthly CMP Meeting Discussed in the January Systems CMP Meeting - See Attachment H in the Distribution Package. 
1/27/2016 General Meeting Held Preliminary Interface Implementation Plan Review Meeting conducted. Meeting minutes available 2-3-16. 
1/28/2016 Communicator Issued See notice number CMPR.CMPP.01.28.16.F.14250.RFP_ThrdPrtyFacilitatrLSR. 
2/2/2016 Communicator Issued Customer Comment cycle extended. See Notice number SYST.OTHR.02.02.16.F.14265.LSR_SysCnsldtnCmtsExtnded. 
2/16/2016 Communicator Issued See Notification number CMPR.CMPP.02.16.16.F.14317.RFP_ThrdPrtyFcilitatr_FNL. 
2/17/2016 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment I in the Distribution Package. 
2/23/2016 Communicator Issued See Notification number SYST.OTHR.02.23.16.F.14333.LSR_ConsolPln_DelayedResp. 
3/7/2016 Communicator Issued See Notification number SYST.OTHR.03.07.16.F.14377.CommentRespLSR_SysCnsldtn. 
3/14/2016 Communicator Issued See notification number SYST.OTHR.03.14.16.F.14401.LocalServPrjTechSpecDELAY. 
3/16/2016 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment I in the Distribution Package. 
4/14/2016 Communicator Issued See notification number SYST.OTHR.04.14.16.F.14479.LocalServProj_NewEffDate. New Release to Production effective date for Eastern established as no earlier than April 10, 2017. 
4/20/2016 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment I in the Distribution Package. 
5/18/2016 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/15/2016 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/30/2016 Communicator Issued See notification number WEBS.ANNC.06.30.16.F.14752.OSS_Consolidation_Pages. 
7/7/2016 Communicator Issued See notification number SYST.OTHR.07.07.16.F.14766.LocServProjREVTechSpcDate. 
7/11/2016 Communicator Issued See notification number CMPR.CMPP.07.11.16.F.14775.LSR_ProjctCustomerTesting. 
7/20/2016 Discussed at Monthly CMP Meeting Discussed in the July System CMP Meeting - See Attachment I in the Distribution Package. 
8/12/2016 Communicator Issued See notification number SYST.EASE.08.12.16.F.14862.EASE_LSR1.0DraftTechSpecs. NOTE: This notice relayed a change to the Release to Production date for Eastern to be no earlier than June 2017. 
8/17/2016 Discussed at Monthly CMP Meeting Discussed in the August System CMP Meeting - See Attachment I in the Distribution Package. 
8/22/2016 Communicator Issued See notification number SYST.OTHR.08.22.16.F.14883.LoclSerCnsldtnDrftTestPln. 
8/26/2016 Communicator Issued See notification number SYST.OTHR.08.26.16.F.14904.DraftTchSpcExtendCmtCycle. 
9/21/2016 Discussed at Monthly CMP Meeting Discussed in the September System CMP Meeting - See Attachment I in the Distribution Package. 
9/30/2016 Communicator Issued See notification number SYST.EASE.09.30.16.F.14995.EASE_LSR1.0_FNL_TechSpecs. 
10/6/2016 Communicator Issued See notification number SYST.OTHR.10.06.16.F.14986.LSRCnsldtnPROJ_DELAY. 
10/19/2016 Discussed at Monthly CMP Meeting Discussed in the October Systems CMP Meeting - See Attachment I in the Distribution Package. 
10/31/2016 Communicator Issued See notification number SYST.OTHR.10.31.16.F.15087.LoclServR1.0ResptoCommUPD. 
11/16/2016 Discussed at Monthly CMP Meeting Discussed in the November Systems CMP Meeting - See Attachment I in the Distribution Package. 
12/13/2016 Communicator Issued See notification number SYST.EASE.12.13.16.F.15117.EASE_LSR1.0FNLTechSpcsUPD. 
12/14/2016 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment I in the Distribution Package. 
1/18/2017 Discussed at Monthly CMP Meeting Discussed in the January Systems CMP Meeting - See Attachment I in the Distribution Package. 
2/13/2017 Communicator Issued See notification number GENL.ANNC.02.13.17.F.15335.LSR_Consol_ProjSTATUS_UPD. 
2/15/2017 Status Changed Status changed to Deferred. 
2/15/2017 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment I in the Distribution Package. 
3/15/2017 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment J in the Distribution Package. 
9/20/2017 Discussed at Monthly CMP Meeting Discussed in the September Systems CMP Meeting - See Attachment I in the Distribution Package. 
10/18/2017 Discussed at Monthly CMP Meeting Discussed in the October Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/20/2018 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment J in the Distribution Package. 

Project Meetings

6/20/18 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink advised the above CRs (SCR110415 1-4) remain in Deferred status. CenturyLink will soon be updating the Consolidation Plan to include the most recently known dates for the project which is NO EARLIER THAN FIRST QUARTER 2020 and adding some wording about the Retail Trial.

10/18/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink said these four CMP CRs are in a Deferred status and we plan to keep them in that status for now. Mark said that last month he had relayed that the first planned migration would likely be 4th quarter 2019. The date in the package is now showing 1st quarter 2020. He said the Project team is still working toward some portion of the migration to begin late 2019. When Version 3 of the Consolidation Plan is provided later this year, the best estimate of planned migration dates will be provided at that time. The updated document will also include some information about the interim phase that will be occurring with retail customers that is associated with the IMA CR SCR101217-1. Mark then turned the call over to Mike Norton – CenturyLink to provide an update on planned system enhancements being made to Legacy CenturyLink (L-C) EASE for LSR processing.

Mike Norton – CenturyLink said there is considerable development in EASE LSR that is occurring in preparation for the Local Service Consolidation project. Mike talked about the development occurring in the L-C systems to meet the functional requirements that already exist in IMA. He said the intent is to reduce overall risk and to prove in some of the equivalent functionality before the first L-Q migrations begin in early 2020. Mike said the first major release for L-C systems will be in February 2018. One of the biggest changes is to upgrade EASE LSR to LSOG 14Q2 which is the last version of the Ordering and Billing Forum (OBF) LSOG standards that was released 2nd quarter 2014. L-C customers have already been notified of these Technical Specification changes. Mike said some customization is occurring with the L-C release to match some of the customization that occurs in IMA today but these fields will not likely be utilized until the first migration. The following EASE enhancements are being made associated with Pre-Order functionality: Address validation, Customer Service Information, Loop Qualification, Raw Loop Data, TN Reservation. Mike said these functions are not all of the enhancements that will be made to Pre-Order; more will be added at a later date. Other functions to be added in February are associated with the Exchange Carrier Version (EC VER) and some gap closure on some of the auto-population of some fields. With these enhancements, CenturyLink will be able to get some customer feedback on these functions prior to the first migration. Mike asked if there were any questions. There were none.

9/20/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink provided some information about the four CMP CRs that were moved to a Deferred status in February 2017. Mark relayed the Local Service Consolidation Project Web page has a statement that indicates more information will be provided late 2017. The website currently has Version 2 of the Consolidation Plan which includes out-dated planned effective dates. The LSR Consolidation team plans to post a Version 3 by end of year that relays the first planned migration date is likely to be 4th Quarter 2019. The team also plans a Version 4 of the Consolidation Plan that will provide more information about dates and migration approach; the document will likely be issued mid 2018. Mark said there are enhancements being made to the Legacy C EASE LSR system that will add additional functionality to process Legacy Qwest accounts. The Legacy C Release is planned for 1st Quarter 2018. Mike Norton – CenturyLink will likely attend CMP in the coming months to review the planned Legacy C EASE LSR enhancements. Mark asked if there were any questions. There were none.

3/15/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink reminded those on the call that on last month’s call, the above fours CRs have been moved into a Deferred status.

2/15/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink reminded those on the call that the LSR Consolidation Project had been delayed and that there will be no testing or conversion activity in 2017 while the SME team continues to re-evaluate the timing and conversion approach. Mark said a General notification had been sent on February 13, 2017 to relay this status to all Wholesale Customers and said the notice was posted to the Wholesale calendar. He then reviewed some of the key points in the notice: - CenturyLink will be working on enhancements to EASE and Ensemble to incorporate changes that will be required for processing of Legacy Qwest accounts. - CenturyLink will be placing the CRs in a DEFERRED status likely until the end of 2017. - By the end of 2017, CenturyLink will update the Local Service Ordering and Billing Systems Consolidation Plan with more information about the conversion strategy and timeline. - The LSR Consolidation web site will be updated with a NOTE at the top of the page to relay there will be more information provided late 2017 around the migration approach, testing and planned system consolidation dates. Armando Fimbres – Oregon PUC asked about the first paragraph in the General notice and what the phrase “during the eventual consolidation” meant. NOTE: The full sentence from the notice is “During the eventual Local Service Systems Consolidation, CenturyLink will move all Local Service Request ordering to Electronic Administration & Service Order Exchange (EASE) from Interconnect Mediated Access (IMA). “

Mark Coyne – CenturyLink said that customer accounts will be moved once the consolidation begins on the conversion weekend. He asked if there were any other questions. There were none.

1/18/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink said these are the Local Service System Consolidation CRs where CenturyLink has previously communicated a project delay while the timing and conversion approach are being re-evaluated. On December 13, 2016, CenturyLink distributed notifications associated with updates to the EASE and Ensemble Final Technical Specifications which also included updates to the CenturyLink responses to customer comments. There are several customer comments that show CenturyLink responses are still being determined. Mark said because of the project delay, CenturyLink is considering whether to move these CRs into a Deferred status for a period of time. Mark asked if there were any questions.

Frank Behnke – AT&T asked with this information about the project delay, could he tell his management that there will be no action until 2018. He said they have a lot of work to do and need to plan work for the year.

Mark Coyne – CenturyLink said that statement was safe; there will be no testing or conversion activity in 2017. Mark said in the coming months, CenturyLink will hopefully have more info high level information to share.

Lisa Lynn – Granite asked if that was why CenturyLink was implementing an IMA Release 40.0.

Mark Coyne – CenturyLink said yes. As discussed in December as part of 2017 OSS capacity planning, there would be a Release 40.0 for IMA.

12/14/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink reminded those on the call that this Project has been delayed while the SME team is re-evaluating timing and conversion approach. No testing or conversion activity is planned for 2017. Two system notifications were distributed on December 13, 2016 to provide updated Final Technical Specifications for EASE and updated CenturyLink responses to customer comments for both EASE and Ensemble. Mark asked if there were any questions. There were none.

11/16/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink reminded those on the call that this project has been delayed. The CenturyLink SME team is currently re-evaluating the timing and conversion approach and, as discussed last month, there will be no testing or conversion activity planned in 2017. Mark then referred to the System notification SYST.OTHR.10.31.16.F.15087.LoclServR1.0ResptoCommUPD sent on October 31, 2016 (included in the package) to relay the updated CenturyLink response to customer’s comments was still pending for some questions still under investigation. He said the CenturyLink SME team planned to send the updated response to comments and final technical specifications on November 18, 2016. The Local Service Ordering and Billing System Consolidation Plan (Version 3) updates are also still pending.

NOTE: The EASE and Ensemble final technical specification notices were not sent as planned on November 18, 2016 due to some .xsd files still pending.

10/19/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink provided an update on the status of these Local Service System Consolidation CRs. He said the Final Technical Specifications and CenturyLink Response to Comments for EASE and Ensemble were sent September 30, 2016. The SME teams are working on providing an updated CenturyLink Response to Comments by the end of October for the remaining customer questions that are listed as “still under investigation” on the CenturyLink Response to Comments. Mark said a System Notification SYST.OTHR.10.06.16.F.14986.LSRCnsldtnPROJDELAY was distributed on October 6, 2016 to relay a Project delay. In conjunction with the project delay, CenturyLink cancelled the Joint Test Planning/Testing Walkthrough that had been scheduled for October 18, 2016. Mark said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan and the updates to the remainder of the Milestone dates for the Project Timeline are PENDING. Mark said it is well known that this system project is large and complex. The CenturyLink project team is reviewing the approach and timelines and is considering some other phased implementation alternatives. He said it has become fairly clear that there will be no Wholesale customer impacts that will occur in 2017. Mark said the project team will be making some further decisions over the coming months and will communicate the information when available.

Mike Norton – CenturyLink said he wanted to clarify that there will be no customer testing in 2017.

Rob Garth – DishNET asked if that meant there was no environment for customer testing.

Mike Norton – CenturyLink said that the customer testing that was to begin in 1st quarter as required by CMP and merger agreements would not occur in 2017. It would begin beyond that date. Mike said no conversion within wholesale would be occurring either.

Rob Garth – DishNET asked what the biggest factor was in the project delay.

Mike Norton – CenturyLink said it was the project complexity and feedback from internal and external customers. The Project team is looking at the approach to determine if it can be simplified.

Rob Garth – DishNET asked if this meant CenturyLink was back to the drawing board. Rob asked if the project technical specifications that had been made available to customers are still valid?

Mike Norton – CenturyLink said the technical specifications were not 100% locked down but that he did not think a change in the approach would significantly impact them. He said the LSOG is based on Issue 2Q14 and those requirements to IT are not changing. CenturyLink would continue to refine the tech specs as testing occurs and as feedback is received from customers similar to the feedback provided during the formal comment cycle. Mike said the major issue now is the timing.

Mark Coyne – CenturyLink said it sounds like it is safe to say the requirements and tech specs are still valid and will continue to be used going forward.

Mike Norton – CenturyLink said absolutely. Mike said the system development will impact Legacy CenturyLink customers as well as Legacy Qwest customers as the current system is upgraded with Legacy Qwest requirements. Mike said CenturyLink is also anxious to firm up the revised approach and dates. The plans are still to do an automated migration by region.

9/21/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said the EASE and Ensemble Draft Technical Specification walkthroughs had been held August 25, 2016 and an additional Walkthough-Q/A was scheduled and held on September 7, 2016. Mark said the meeting minutes and draft responses to Customer comments are available on Wholesale calendar. The formal comment cycle on Draft Technical Specifications for EASE and Ensemble was extended through September 16, 2016. The Final Technical Specifications and CenturyLink Response to Comments are now scheduled for September 30, 2016. (The various notices are included in the system distribution package.) Mark said we have received a significant amount of additional comments so we may send a first set of responses on September 30, 2016 and follow-up with the remainder of CenturyLink responses a couple weeks later. CenturyLink has a Testing Walkthrough scheduled for October 18, 2016; related documents are on the Wholesale calendar. Mark relayed an additional Self Nomination was received for Customer Testing; the Testing companies now include Electric Light Wave/Integra, XO, Mobius, Charter/Accenture, dishNET, TDS Metro. Mark asked if there were any questions. There were none.

8/17/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said the biggest update here is the change to the Release to Production for Eastern Region to be no earlier than June 2017. On August 12, 2016, CenturyLink issued two notifications associated with posting the Draft Technical Specifications for EASE and Ensemble and Mark referred to the notices in the System package. He relayed that the Walkthroughs are scheduled for August 25, 2016 and are available on Wholesale calendar: EASE August 25, 2016 9:30 AM MT - 11:30 AM MT Ensemble August 25, 2016 1:30 PM MT - 3:00 PM MT

Kim Isaacs - Electric Lightwave said she wanted to provide some early questions to allow CenturyLink to prepare. There are whole product groups that CenturyLink still offers that are not available in the Draft Tech Specs, e.g., UNE-P, DSS, Trunking, etc. Kim said some of the CenturyLink specific fields are also not addressed, e.g., manual reject override. Kim said it would be valuable to have SMEs relay which fields would be used in those instances.

Mark Coyne – CenturyLink said we would provide those questions to the SME team to allow them to prepare.

Susan Lorence - CenturyLink said if customers can submit any additional questions to CMPCOMM prior to the walkthrough that would be helpful.

Armando Fimbres – Oregon PUC asked if the change to the Eastern Release to Production date would impact the other regions effective dates.

Mark Coyne – CenturyLink said he could not answer that question at this time. He thought the SME team would be sharing the Project timeline as it becomes available.

Mark Coyne – CenturyLink said the Self Nominations for Customer Testing had been requested by August 1, 2016 and there were five companies that self nominated: Electric Lightwave, XO Communications, dishNET Wireline, Charter, and Mobius. Mark said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan and the remainder of Milestone dates for the Local Service Consolidaton Project Timeline were being updated for the change in date for Eastern and would likely be available before the September CMP meeting.

Michelle Ewton – XO Communications said they currently do not have connectivity with the Legacy CenturyLink systems and asked how far in advance that effort will need to begin.

Mike Norton – CenturyLink said if it is a brand new connection, the timeline is approximately 90 days.

Michelle Ewton – XO Communications said they would be getting with CenturyLink in the 4th quarter of this year to begin the process.

Mark Coyne – CenturyLink said the current timeline shows that customer testing would begin no earlier than January 2017 so the test planning would likely begin in October 2016.

Kim Isaacs - Electric Lightwave said in regard to the XO question about connectivity, customers will need to keep both connections up and will need to figure out what CenturyLink system to send orders to.

Mark Coyne – CenturyLink said that was true and it would be to everyone’s benefit to get through the remaining consolidation phases quickly. He asked if there were any other questions. There were none.

7/20/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said CenturyLink had issued a notification on July 7, 2016 to relay the issuance of Draft Interface Technical Specifications will be August 12, 2016 instead of July 18, 2016. Mark said a notification had been sent on July 11, 2016 requesting that any customers that are interested in participating in testing for this project should send a self nomination to cmpcomm@centurylink.com. The email should be sent by August 1, 2016 and should include the person who will be the point of contact for that company. Mark said that, so far, there have been five companies that have requested to test with CenturyLink for this project: Integra, XO, dishNET, Charter, and Mobius Communications. Mark said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan should be forthcoming. CenturyLink was working on the remainder of the Milestone dates for the LSR Project Timeline, testing dates, etc. The document should be available no later than the August CMP meeting. Mark relayed that CenturyLink had implemented a new Local Service Consolidation Web page as of July 1, 2016 that will be similar in content as the Access Systems Consolidation Project. Mark asked if there were any questions. There were none.

6/15/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan should be available by the end of the month including an updated LSR Project Timeline. CenturyLink will be establishing a new Local Service Consolidation web page that is similar to the Access Consolidation web page that will house documentation and information about the Local Service system consolidation. The Statement of Work for the Third Party Facilitator is still underway. Mark said we will likely be sending a notification prior to the July CMP meeting asking for customers to self nominate for Customer testing for the Local Access project. The next Milestone Date for the project is the issuance of the Draft Interface Technical Specifications on July 18, 2016. Mark asked if there were any questions. There were none.

5/18/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said that on April 14, 2016, CenturyLink issued a notification to relay the new delivery date of July 18, 2016 to provide the Draft Technical Specifications for EASE and Ensemble. The notice also indicated that the Release to Production date for the Eastern Region will be no earlier than April 10, 2017. CenturyLink is still working on the other Milestone dates in between and should provide them soon along with an updated Local Service Ordering and Billing System Consolidation Plan. Mark then relayed that in regard to the Third Party Facilitator, CenturyLink had shared the decision to go with Wicresoft but that the finalized dates for testing were being determined so the dates could be included in the Statement of Work. Mark asked if there were any questions. There were none.

4/20/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink advised that on March 14, 2016, CenturyLink issued a notification to delay the delivery of the Draft Technical Specifications for EASE and Ensemble. On April 14, 2016, CenturyLink issued a notification to advise the new delivery date for Draft Technical Specifications will be July 18, 2016. Mark said that associated with the new Draft Tech Spec date, the new Project Release to Production date for the Eastern Region will be no earlier than April 10, 2017. Mark asked if there were any questions. There were none.

Mark Coyne – CenturyLink then provided an update on the Third Party Facilitator and said as discussed in the March meeting, the RFP was sent to suppliers to secure a Third Party Facilitator. Only the vendor Wicresoft responded. Following an interview with Wicresoft and based on the criteria of cost, knowledge, availability and our experience so far with them on the Access Consolidation project, CenturyLink recommended that Wicresoft be selected as the Third Party Facilitator for the project. Mark said CenturyLink had asked for customers to provide any feedback or concerns to the CMP mailbox by March 31, 2016. No feedback was received. CenturyLink is proceeding with Wicresoft but is still reviewing the Project timeline to determine the Wicresoft start date. CenturyLink will be providing Version 3 of the Local Service Ordering and Billing System Consolidation Plan to communicate the new timeline and any additional information to Wholesale customers. Mark asked if there were any questions. There were none.

3/16/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said a notification was distributed on Monday, March 14, 2016 to relay that the Draft Technical Specifications for the Local Service Ordering System Consolidation Project are being delayed. Mark relayed that as stated in the notification, the delay is a result of CenturyLink's consideration of customer requests and our ongoing internal reviews to ensure the delivery of a high quality systems product to customers. On April 14, 2016, CenturyLink will provide an update on the status of the delivery date of the Draft Technical Specifications and will send the appropriate notifications to communicate any required revisions to the Local Service Ordering and Billing System Consolidation timeline. Mark said a revised version of the OSS Interface Calendar is included in the Package but we have also since posted a revised version to today’s meeting. Armando Fimbres - Oregon Public Utility Commission asked if the official schedule has been updated and asked if the Oregon docket would be updated. Mark Coyne – CenturyLink said we know the LSR Production effective date for Eastern will change but that new date has not yet been determined. We will provide a status on April 14, 2016 and once the revised schedule is determined, the appropriate updates would be made with the states. Mark then provided a status on the Request for Proposal (RFP) that had been sent to suppliers to secure a Third Party Facilitator for the project. He said only one vendor responded which was Wicresoft. CenturyLink did conduct an interview with Wicresoft and based on the criteria of cost, knowledge, availability and our experience so far with them on the Access Consolidation project, CenturyLink is recommending that Wicresoft be selected as the Third Party Facilitator for the project. Mark asked if there were any concerns. He said customers could provide feedback on this recommendation on the call or via the CMPCOMM mailbox but unless there is feedback, CenturyLink will be proceeding with this selection. CenturyLink will likely not engage Wicresoft until the new effective date is determined. Kim Isaacs – Integra said she would like to have time to consider this selection within Integra and asked if anything had yet been formalized with Wicresoft. Mark Coyne – CenturyLink said this is the CenturyLink recommendation based on merger agreements. He said CenturyLink would like to have any CLEC comments sent to the CMPCOMM mailbox by March 31, 2016. If there are any comments, they would be considered in the April CMP meeting. Mark asked if there were any other questions. There were none.

2/17/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink provided an update on the Local Service Consolidation project relaying that the Preliminary Implementation Plan Review meeting was held on January 27, 2016 and those meeting minutes are available. There was a request by the CLEC community to extend the formal Comment cycle. CenturyLink sent a notification to extend the comment cycle through February 11, 2016 thus providing an additional week. Mark said the response to comments and final version of the Local Service Consolidation Plan is due February 25, 2016. In regard to the Request for Proposal (RFP) for a Third Party Facilitator, Mark said the CLEC Notification with the redlined RFP was sent for review on January 28, 2016 with CLEC feedback due February 11, 2016. CenturyLink sent a notification that included the Response to CLEC comments and the Final version of the RFP on February 16, 2016. CenturyLink is distributing the RFP to potential vendors. Mark asked if there were any questions. There were none.

01/27/16 Preliminary Interface Implementation Plan Review Meeting FINAL Local Service Ordering and Billing System Consolidation Plan Meeting minutes

SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs.

Attendees: Troy Peters – Alliance Connect (Iowa Network Services) Donna Barfield – Birch Katherine Merschat – Birch Mary Taylor – Birch Tiffany Kidd – Birch Dennis Molner – Charter Communications Linda McDonald – Charter Communications Tam Doan – Comcast Jason Renander – Comcast Andrea Smith - Comcast Kasha Fauscett – Comcast Lynn Notarianni – Colorado PUC Susan Travis – Colorado PUC Shannon Bishop – Consolidated fka Inventive Christy Kennedy – CTC Communications Rob Garth - DishNET George Devargis - DishNET Graham Northcutt- DishNET Joel Mitchell- DishNET Melat Lewis- DishNET Shawn Stickle- DishNET Josh Santos – Douglas FastNet JoAnn Norton – Gervais Telephone Co. Brendan Hamel – Granite Adam DeFeo – Granite Judy O’Day – Granite Budd Shearing – Granite Nancy Hansen – Granite Lisa Lynn – Granite Edie Wallace – Granite Kim Isaacs - Integra Laurie Roberson – Integra Nancy Taylor – Integra Julie Pickar – Integra Jamie Shay - Integra Carmen Painter – LS Networks Valerie Starr - LS Networks Emily Davis – Midcontinent Karen Viste - Midcontinent Mary Lohnes - Midcontinent Bonnie Johnson - Minnesota Department of Commerce Lan Nguyen - Neustar Armando Fimbres – Oregon PUC Pam Popp – Popp Communications LoriAnn Kuhn – Quantum Communications Jeff Hocker - – Quantum Communications Kurt Boucher - Southwest Cyberport Rick Heck - Spectrotel Jeanne Kulesa – Synchronoss John Zhan – Synchronoss Manjunath Gowda – Synchronoss Jackie Diebold - TDS Telecom Marnie Silvernail - TDS Telecom Victor Gaither - Time Warner Cable Ed Keefer – Value Telecommunications Tim Zawislak – Washington Commission (Staff) Lynn Denton – Windstream Don Lemke – Windstream Mary Conquest – XO Communications Mark Coyne - CenturyLink John Hansen - CenturyLink Denise Martinez - CenturyLink Sandy Nelson - CenturyLink Mike Laughman - CenturyLink Shawn Simpson - CenturyLink Sue Kriebel - CenturyLink Lee Gomez - CenturyLink Renee Albersheim - CenturyLink Marty Wilson - CenturyLink Rusty Burdette - CenturyLink Rick Breitenbach - CenturyLink Mike Norton - CenturyLink Susan Lorence - CenturyLink

Mark Coyne - CenturyLink defined the purpose of the call which is to review the CenturyLink Local Service Ordering and Billing System Consolidation Plan which combines the requirement of the Detail Plan as specified by Merger requirements and the Preliminary Interface Implementation Plan as required by CMP. The plan is to cover at a high level each section of the Consolidation Plan. Mark said Ordering and Billing SMEs are on the call to answer any customer questions. For any questions that cannot be answered on the call, CenturyLink will take an action item for follow-up. The CenturyLink response will be covered either in the meeting minutes or will be covered in a subsequent CMP meeting. Any technical questions will be addressed as part of the Draft Technical Specifications planned for April 8, 2016. Mark asked if that process would work for those on the call. There were no objections. Mark began the review of Consolidation Plan. The following questions were asked as the high points of each section were covered.

Section 1.0 Executive Summary Kim Isaacs - Integra said it was too early to use the term Benefits for customers. At best, any OSS transition can be difficult; it is important for discussion to occur early. Kim said there is a lot of work that has to be done in EASE for it to be equivalent to IMA and that execution will determine the benefits.

Mark Coyne - CenturyLink said the updates to EASE are addressed later in the document.

Section 1.2 - Assumptions Joel Mitchell - DishNET asked about availability of completed orders for 24 months and whether that history would be kept in IMA.

Mike Norton - CenturyLink said the Completed orders would remain available in a view only mode in IMA and that following conversion, the same archive requirements as exist today would remain in the new system.

Kim Isaacs - Integra said her assumption is that not only would CMP be followed for the consolidation itself but that CMP would be followed to address future system updates.

Mark Coyne - CenturyLink said that was correct as it pertains to the products/services governed by CMP today.

Rob Garth - DishNET asked if BillMate would be retained as one of the existing output choices for billing media.

Sue Kriebel - CenturyLink said that CenturyLink is still analyzing the best option and it was only the ASCII BillMate format that was undecided.

Joel Mitchell - DishNET asked whether the billing account number structure in EASE would be used or whether the structure in IMA would be retained.

Mike Norton - CenturyLink said an account hierarchy will be set up in EASE based on RSID/ZCID. He said CenturyLink plans to hold a Customer Brown Bag on account hierarchy options and then have Service Managers work with customers to determine how their accounts should be set up. In regard to account numbers in Ensemble, they are set up based on Product ID which is typically the telephone number.

Joel Mitchell - DishNET asked if the WTN structure (NPA NXX and Cus Code) would be used.

Sue Kriebel - CenturyLink said the invoice in Ensemble will not be in NPA NXX Cus Code format but will be a nine digit number.

Mike Norton - CenturyLink said BAN mapping changes will be communicated well in advance of the conversion.

Kim Isaacs - Integra asked if the BANs for unbundled loops will change formats and no longer use the NPA NXX format. Kim asked if circuit ids will change.

Sean Simpson – CenturyLink said CenturyLink will try not to change those account number in Ensemble unless there is already a product id in existence with that same number. CenturyLink will analyze each account number from CRIS to determine whether it can be reused. Sean said circuit ids themselves will not change.

Joel Mitchell - DishNET asked if the consolidation was only for ordering or if there were support system changes also, e.g., NEAC vs. CSIE or modem activation.

Mark Coyne - CenturyLink each area will be looked at individually.

Kim Isaacs - Integra said that in regard to any support system changes, the merger conditions require adequately trained staff.

Mike Norton - CenturyLink said the back end dispatch, design and provisioning processes are not changing with this project. There have already been some consolidations where legacy CenturyLink has consolidated into Legacy Qwest systems.

Section 2.1 Current State System View Lynn Notarianni – Colorado PUC said there are inconsistencies on how the terms LSR orders, Local Service Requests, orders, etc., are used in the Consolidation Plan and thought they may have different meanings. Lynn suggested it would be helpful to figure out the right term to use.

Mark Coyne - CenturyLink said we will take that action item back to the document owner to review and be more consistent.

Section 2.2 End State System View Kim Isaacs - Integra asked whether CenturyLink retail was going to use EASE as the ordering platform for residential services.

Mike Norton - CenturyLink said CenturyLink Retail only uses EASE for the one process of Loss notification otherwise Retail works directly in Ensemble and other platforms.

Kim Isaacs - Integra said then Retail ordering cannot see what Wholesale is doing.

Mike Norton - CenturyLink said that is correct that Retail cannot see what is in EASE for Wholesale and that for Ensemble, he is working with CenturyLink Regulatory to assess if any enhancements are required for CPNI for Legacy Qwest.

Kim Isaacs - Integra asked if there will be the capability that a CLEC can view the CSR of another resale account like what occurs in IMA today?

Mike Norton - CenturyLink said that will be the same.

Kim Isaacs - Integra said Integra has had a problem with another company that uses a Synchronoss application and asked if CenturyLink was going to lock down Wholesale BANs so Retail cannot add to them.

Mike Norton - CenturyLink said those details are still being worked out with Regulatory.

Section 2.3.1 Service Ordering Comparison – IMA to EASE Rob Garth – DishNetwork asked whether there would be improvement in the process to “Manage Users” and whether a certificate was required. Rob asked if the process would utilize a GUI or an API.

Mike Norton - CenturyLink said EASE does not generally require a certificate but said there may be a requirements for one if there is electronic bonding. Mike said there are different user administration requirements. A technical call will be conducted with IT personnel on both sides to review the certificate requirements, XML tech specs, testing, etc.

Adam DeFeo – Granite asked how to get on the distribution list for the technical calls.

Mark Coyne - CenturyLink said systems notifications will be sent for the technical reviews so customers should be sure they are signed up to receive notifications or they can send an email to cmpcomm@centurylink.com for assistance.

Rob Garth - DishNET asked if there would be a GUI or API to assist with user management.

Mike Norton - CenturyLink said there is a GUI based user management capability for customers. Mike said he did not think APIs are available in EASE nor are they available today in IMA.

Mark Coyne - CenturyLink referenced the matrices in Section 2.3.1 and said the asterisk indicates there will be development required in EASE to provide those functions.

Joel Mitchell - DishNET asked if the functions that are to be added to EASE will be placed in production prior to conversion.

Mike Norton - CenturyLink said the EASE enhancements may go in for Legacy CenturyLink and Embarq customers prior to the LSR account consolidation which will help test the system updates and will introduce the new capability to the current EASE customers. He said appropriate system notification would be sent.

Josh Santos – Douglas FastNet asked if both IMA and EASE will be active in tandem while customers get used to the new system.

Mike Norton - CenturyLink said no, IMA and EASE will not be available in tandem for the same states. He said the system implementation will be phased by region so once Eastern is converted, IMA will only be available to review the 2 year old order history. For Western and Central, IMA and CRIS will be business as usual

Joel Mitchell - DishNET asked if the “Manage Users” functionality in EASE will allow more control of user access and gave the example of whether some order functions could be limited for one person vs. another.

Mike Norton - CenturyLink said if that capability exists today in IMA, then the capability would have to be looked at for EASE.

Joel Mitchell - DishNET asked about recapping from Pre-order to order. Joel said they have a lot more questions about how functions will be provided but would hold off until the draft tech specs are available.

Mike Norton - CenturyLink said discussion is underway as to how to provide information that will aid customers in the transition, likely it will be some combination of tech specs, PCATs, developer worksheets, etc. He said the PCATs are probably the most descriptive of the changes.

Kim Isaacs - Integra said under the matrix for Ordering Functionality, there are lot of functions not listed and wanted to insure those are being addressed.

Mike Norton - CenturyLink said the SME team is currently going through user stories and that there are high level functions as well as specific functions that they are capturing. He said the matrix would be very extensive to add them to this document but said he thought they would be delineated in the Tech Specs.

Lynn Notarianni – Colorado PUC asked if part of the concern is that this Consolidation Plan is preliminary and asked if a statement should be added that the document is not intended to represent the full capability that will be provided.

Mark Coyne - CenturyLink said this document is preliminary and pointed to the Scope. He said it is not intended to go into great detail.

Kim Isaacs - Integra said she knows this is a high level but like the ASR project, there were some differences in how customers and CenturyLink define functionality. Kim said she is concerned that there is no asterisk by the EASE functions since she knows there are some specific capabilities, requested thru CMP by both CLECs and Qwest, that need to be added to EASE.

Mark Coyne - CenturyLink said that though this Consolidation Plan is not intended to be very detailed, there will likely be updates made to it as more is known. The SME team now knows more than they did when the document was released in early January.

Joel Mitchell - DishNET asked if the Consolidation Plan would be updated monthly.

Mark Coyne - CenturyLink said not necessarily monthly but it will definitely be updated when CenturyLink responds to CLEC comments on February 25, 2016.

Joel Mitchell - DishNET asked if it was possible to extend the February 4, 2016 comment cycle due date since this session had been pushed out a week.

Mark Coyne - CenturyLink said he would look at whether the date could be pushed a week and would include that in the meeting minutes. [NOTE: On February 2, 2016, CenturyLink sent out notifications to extend the formal comment period by one week. The original comment cycle was to end on February 4, 2016 but was extended through February 11, 2016. See notice numbers SYST.OTHR.02.02.16.F.14265.LSRSysCnsldtnCmtsExtnded and GENL.ANNC.02.02.16.F.14266.LSRSysCnsldtnCmtCycExtnd.]

Mike Norton - CenturyLink said the SME team will add a lot more asterisks on the various matrices after continued requirement meetings over the last month. Lynn Notarianni – Colorado PUC said because of the complexity of the LSR transition and potential for Commission complaints, she thinks it would be appropriate to add a disclaimer that this is a preliminary document and is not intended to represent the final project functionality. Lynn said that will help insure that all understand the intent of this document.

Joel Mitchell - DishNET asked if there would be a distinction between Legacy Qwest and Legacy CenturyLink/Embarq territory. He said there will be a need to know which support group to call depending on the region and then gave the example of CEMR-MTG and asked if it applied to Legacy Qwest and Legacy CenturyLink/Embarq territory.

Mike Norton - CenturyLink said the goal is to minimize functional or product differences across CenturyLink. He said because there are some backend systems that are region specific, there will be a requirement to provide some indication of differences should they occur. Mike said there are two primary systems in the CenturyLink suite that are not common – Address Management and the Copper inventory for assignment. Other than that, the main functional applications are the same.

Lynn Notarianni – Colorado PUC asked if the Consolidation Plan identifies what is to be done with the various PID/PAP measures. Lynn said she assumes since the applications are changing the measures will need to be updated.

Mike Norton - CenturyLink said we will add a paragraph in the document for that and there is a SME team already working on that.

Section 2.4 Billing System Differences between CRIS to Ensemble Tam Dohn – Comcast asked about the BAN changes and said they use a third party to set up new accounts which can take some time. She asked if a report can be received in advance.

Sue Kriebel – CenturyLink said yes we will provide that cross reference a couple months in advance and that for those customers that are testing with us, it would be provided sooner. Sue said we are working thru that process now on the ASR side.

Kim Isaacs - Integra said as Integra went through a system transition with another company, the BAN change was a big issue. She said if there any deviations to the plan, they will need to be communicated ASAP. If a customer cannot audit the bill, that stops payment and said CenturyLink may need to consider stopping LPCs for a period of time.

Section 3 Consolidation Plan Implementation Troy Peters - Alliance Connect asked how customer support will work when this is occurring by region.

Mark Coyne - CenturyLink said the CenturyLink customer support will be scheduled to support all customers regardless of their location.

Kim Isaacs - Integra said Integra has already expressed concern that this is an aggressive schedule. Kim said there is an LNP administrator change that overlaps with this schedule and asked how it will impact the EASE implementation. She said there is no implementation date yet but thought it could impact resources for companies.

Mike Norton - CenturyLink said EASE does not interact with NPAC but said the SOAs would be impacted with that NPAC change.

Mark Coyne - CenturyLink said any scheduling concerns will likely be part of the formal comments that the SME team will then address.

Section 3.2 3rd Party Facilitator Lynn Notarianni – Colorado PUC asked about the 3rd Party Facilitator and how that process will work.

Mark Coyne - CenturyLink relayed that there will be a notification sent on January 28, 2016 about the 3rd Party Facilitator selection process that will also provide the proposed RFP updates and planned schedule. Mark said the 3rd Party Facilitator may not come on board until the 2nd quarter timeframe. NOTE: For details of this timeline and process, refer to notification CMPR.CMPP.01.28.16.F.14250.RFPThrdPrtyFacilitatrLSR.

Section 3.3.2 Training and Process Plan Kim Isaacs - Integra asked what the training will encompass and whether it will cover the business rules. Kim said it is the understanding of the business rules that is most important.

Mark Coyne - CenturyLink said he thought training would cover screen navigation but would relay that information back to the Training team.

Mike Norton - CenturyLink said IMA is on LSOG 6 and EASE is on LSOG 10, CenturyLink will be moving to a current version of the LSOG.

Kim Isaacs - Integra said Qwest made the business decision as to what LSOG that IMA is based on. Going from LSOG 6 to 10 and the related update to so many business rules is a big concern and will need to be made clear to those writing the order.

Mike Norton - CenturyLink said he thinks EASE will be moving to LSOG 14.2 (numbering is now year and quarter) with customization. The tech specs and PCATs would be updated accordingly. Mike said that upgrade will occur in EASE first so it will not be part of the actual conversion.

Rob Garth - DishNET asked the timeframe for the LSOG version upgrade to EASE.

Mike Norton - CenturyLink said it will likely be about 90 days before the planned conversion. By doing this, the current EASE customers will have time to implement the changes. The benefit is that it allows the focus at conversion to be on that vs. an additional system change. Mike said that will increase the quality of the initial implementation.

Kim Isaacs - Integra said another big problem that Integra experienced during a recent system consolidation with another company was that flowthrough was significantly impacted and caused an impact to center staff that had to process the orders manually. Kim said CenturyLink should plan on an increase in manual orders and that training on the CenturyLink side needs to prepare for that.

Jackie Diebold - TDS Telecom asked if the training would be instructor led or web based.

Mark Coyne - CenturyLink said he does not think that has been determined yet but that it will follow CMP requirements which provides for instructor led, web based or a combination. Mark said training is scheduled to begin July 15, 2016.

Lynn Notarianni – Colorado PUC asked if CenturyLink is planning for an interim process for escalations during the conversion.

Mark Coyne - CenturyLink said there will be an interim process for escalations during the conversion.

Section 3.3.3 Customer Testing Rob Garth - DishNET asked if there are plans to enhance the current EASE testing, for example, availability, test cases, etc.

Mike Norton - CenturyLink said there will be a dedicated environment for CLEC testing which will interface with downstream systems, such as address validation, inventory systems, CFA queries. Mike said there will be a “full suite” of applications to support testing.

Rob Garth - DishNET asked how defect classification, reporting and resolution would be addressed - including SLAs for resolution. Rob said he wants to work with CenturyLink to determine this prior to production and asked if there will be a severity rating for defects and asked if CLECs will have a voice in that.

Mike Norton - CenturyLink said that UAT will be where this process is developed. Mike said the 3rd party facilitator will play a key part to developing the defect process also. He said it is difficult to have an SLA tied to problem resolution since there are so many variables that could impact that. Mike asked if it was reasonable to wait until the 3rd party facilitator is available.

Rob Garth - DishNET said he thought it was reasonable but did not want to get too much farther before it is determined.

Mike Norton - CenturyLink said it will be resolved well ahead of UAT beginning. There is already protection in the Testing process with the Go/No Go decision that is part of the merger agreement. He said the 3rd party facilitator should be involved in the negotiation which benefits both sides.

Mark Coyne - CenturyLink said he thought defining those processes will be part of the Test Planning in preparation for UAT.

Section 3.3.4 Load and Performance Testing Rob Garth - DishNET asked if CenturyLink will include customers in Load and Performance testing to test capacity.

Mike Norton - CenturyLink said CenturyLink will share the Load and Performance volumes and results.

Rob Garth - DishNET said Dish has had to temper some large volume queries in IMA in the past and would like to test using some real world data. Rob asked if CenturyLink is still tied to the same back end systems which have certain volume limitations.

Mike Norton - CenturyLink said EASE is tied to the same back end systems and said any performance changes to those systems are out of scope for this project. He used the example of the Loop Qual volumes in TIRKs.

Rob Garth - DishNET asked if there will be a simplified process for Loop Qual.

Mike Norton - CenturyLink said CenturyLink will provide the same information that IMA provides but it may be presented differently.

Rob Garth - DishNET asked if system availability will be the same as today or would there be an increase in hours.

Mike Norton - CenturyLink said there are “guaranteed hours” of availability in EASE however the system is not taken down if no system maintenance is required; this may result in an increase in availability but it is not guaranteed. At a minimum, CenturyLink will meet the available hours that exist in IMA today.

Rob Garth - DishNET asked if supporting infrastructure systems will remain as today by territory, e.g., SAGA or FAM.

Mike Norton - CenturyLink said that consolidating infrastructure is not part of this project but gave the example that address validation may eventually go to a data warehouse solution.

Mark Coyne - CenturyLink said the call was nearing the planned timeline and reminded customers their comments can be sent to cmpcomm@centurylink.com. He said the comment cycle will be extended through February 11. Depending on the extent of the questions, another call might be scheduled to allow more discussion. Mark asked if there were any final questions.

Rob Garth - DishNET asked when the minutes from the call would be available.

Mark Coyne - CenturyLink said the draft meeting minutes will be available in a week on the wholesale calendar.

Susan Lorence - CenturyLink said the draft minutes will also be distributed to participants on the call but we may need to use a point of contact per company if an email address is not available.

Mark Coyne - CenturyLink thanked everyone for participating on the call today and said he appreciated the discussion.

The meeting was adjourned at 11:00 AM Mountain Time.

01/20/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink provided an update on the LSR Consolidation project relaying that the CMP Initial Release Notification and the Initial Retirement Notifications were distributed on January 4, 2016 with an extended formal Comment cycle. As of that date, the Preliminary Interface Implementation Plan was available for review. The Preliminary Interface Implementation Plan Review Meeting is now scheduled for January 27, 2016 from 9:00 -11:00 AM MT. Mark said CenturyLink is working on updating the RFP for the 3rd Party Facilitator for this project. The Release Milestones are now included in the OSS Calendar. Mark asked if there were any questions. There were none.

12/16/15 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said these four CRs associated with the LSR Consolidation Project were presented by Tracy Strombotne – CenturyLink in the November 2015 monthly meeting. Mark said an Ad hoc meeting was held with the customer community on December 1, 2015. The Powerpoint presentation that was reviewed on that call is posted to the Wholesale calendar along with the final version of the meeting minutes from that call. Mark said the CMP notice and Preliminary Interface Implementation Plan will be available in early January 2016 and the notice will include a 30 day customer review cycle. An ad hoc call will be established for mid January for CenturyLink to review the plan with customers. Mark said work is beginning around developing the RFP for the 3rd Party Facilitator. He said a notice will be sent in early January to ask for customers to identify themselves if they would like to be involved in developing the RFP for the LSR project. It is likely that we will be able to use some of the work that occurred for the ASR Project. Mark asked if there were any questions. There were none.

LSR Consolidation Project Ad hoc meeting minutes FINAL December 1, 2015 SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs.

Attendees: Tywanda Bloodworth - Access Point Deborah Pasquale - Access Point Patrick Hall - Access Point Katherine Merschat - Birch Chris Garrison - Central Scott Telephone Renee Albersheim - CenturyLink Susan Lorence - CenturyLink John Hansen - CenturyLink Lee Gomez - CenturyLink Mark Coyne - CenturyLink Tracy Strombotne - CenturyLink Mike Norton - CenturyLink Paul Dunphy - Charter Linda Birchem - Comcast Randee Ryan - Comcast Andrea Smith - Comcast Kasha Fauscett - Comcast Roger Delgrosso - Custom Call Jay Bobacaci - Custom Call Kim Isaacs - Integra Laurie Roberson - Integra Becky Chandler – Integra Rhonda Otto – Integra Steve Schmidt - Iowa Network Services Mary Lohnes - Midcontinent Bonnie Johnson - Minnesota Department of Commerce Lan Nguyen - Neustar Amber Taylor - Nex-Tech Missy McMullan - Nex-Tech Jackie Diebold - TDS Telecom Mark Andersen - TDS Telecom Denise Boe - Tekstar Victor Gaither - Time Warner Cable Jamie Wright – Valley Telecom

Mark Coyne – CenturyLink defined the purpose of the call which is to share information about the LSR system integration work associated with four CenturyLink Change Requests that were presented in the November 2015 Monthly CMP meeting. Mark said the call would be reviewing the “CenturyLink LSR System Ordering and Billing Consolidation” document that is posted on the Wholesale calendar and that attendees could ask questions at any time during the call. If the question could not be readily answered, CenturyLink would take an Action item to follow up after the call. Mark said there would be more meetings on this topic through the life of the project. Renee Albersheim – CenturyLink then reviewed the Agenda located on page 3 of the PowerPoint presentation. Renee then presented history regarding the Merger Commitments and steps that lead up to this conversion project. She then covered the systems that will be addressed during the LSR system consolidation project: IMA to EASE for Ordering and CRIS to Ensemble for Billing. The benefits of the LSR system consolidation project were then presented. Renee asked if there were any questions.

Kim Isaacs - Integra asked what the impacts to CenturyLink residential customer will be.

Renee Albersheim - CenturyLink explained that the CenturyLink Residential group did not use the systems in the same manner as the CLEC, but that systems are used for CenturyLink Residential accounts.

Kim Isaacs - Integra said she had experience with previous conversions to Synchronoss products and asked about the significant volume increase [12/11/15 Updates received from Integra in CAPS] ASSOCIATED WITH CENTURYLINK RESIDENTIAL ACCOUNTS and the POSSIBLE impact to system stability and system response times. Mike Norton - CenturyLink responded that the internal CenturyLink systems interface directly with call center sub-applications that interface with Ensemble and there are volume implications that will be accounted for. The only CenturyLink retail use of EASE is invoked during the port-out process, otherwise, internal CenturyLink users do not use EASE.

Renee Albersheim - CenturyLink continued by describing the benefits of both EASE and Ensemble as per slide 6 of the presentation.

Kim Isaacs - Integra asked when it would be appropriate to present concerns.

Mark Coyne - CenturyLink replied if there were concern with a specific slide, they could be addressed at that time otherwise, they can be addressed at the end.

Kim Isaacs - Integra stated that for LSR GUI users, the documentation, especially regarding the Business Rules, a more user friendly document would be needed more like the IMA LSOR rules than just the technical specifications. [12/11/15 Updates received from Integra in CAPS] THIS IS AN EARLY REQUEST FOR THE LSR CONSOLIDATION PROJECT BECAUSE THE DOCUMENTATION FOR THE ASR CONSOLIDATION PROJECT WAS NOT USER FRIENDLY FOR A GUI USER.

Renee Albersheim - CenturyLink continued by explaining that with the new LSR system, there would only need to be one order for both provisioning and billing, whereas with IMA, it required two orders that CenturyLink had to synch up. She then turned the presentation over to Mike Norton – CenturyLink.

Becky Chandler – Integra asked if the back-up Billmate files would be required after the conversion and if the Ensemble bill was in CABS format.

Kim Isaacs – Integra said if the Billmate file goes away, the information that was on the Billmate file would still need to be available on the Ensemble bill.

Mike Norton - CenturyLink clarified that there are several bill media formats within Ensemble, but the BOS format was not one of them. CenturyLink is researching a BOS standard output for appropriate Design services when USOCs and FIDs are normally provided. Mike said the bulk of the services are non-design and will not have a BOS standard format. He confirmed the Billmate files are going away but the information would be on the Ensemble bills. Mike continued with slide 7 of the presentation that provided some history around the company that developed Ensemble and a description of the application.

Kim Isaacs - Integra asked about the PID/PAP performance metrics and if that would remain intact.

Mike Norton - CenturyLink confirmed that was true that equivalent data measurement points were currently being determined and fed into the reporting system.

Kim Isaacs – Integra said that was very good and asked if reports would remain available

Mike Norton - CenturyLink confirmed that they would be available.

Kim Isaacs - Integra asked if there would be testing available for the performance metrics.

Mike Norton - CenturyLink confirmed that there would be and mentioned a past conversion between Embarq and CenturyTel and that we would be utilizing lessons learned during that conversion to make this conversion better. He continued with the description of EASE as defined on slide 8.

Kim Isaacs - Integra said since CenturyLink is required by CMP to provide the release capacity for the following year, Kim asked if CenturyLink had negotiated an annual release capacity with Synchronoss.

Mike Norton - CenturyLink said that 95% of the EASE [12/11/15 Updates received from Integra in CAPS] [delete UPGRADES WERE IMPLEMENTED] DEVELOPMENT CAN BE MADE without Synchronoss support. The tool is an off-the-shelf tool but is very configurable. Most of the business rules are controlled by CenturyLink IT. From the GUI perspective, CenturyLink tries to remain complaint with the Synchronoss tool while utilizing the internal development function as needed. He added that during the conversion, CenturyLink would work closely with Synchronoss because there would be substantial development necessary in the initial stages.

Kim Isaacs - Integra asked Mark Coyne - CenturyLink if he thought there would be a similar level of hours available for EASE that currently exists for IMA.

Mark Coyne - CenturyLink responded that the CenturyLink IT folks are aware that CenturyLink is required to provide a certain annual capacity as required by CMP. He said we will have to wait and see how things progress. Mark said development has been tapering off with respect to IMA changes in recent years.

Mike Norton - CenturyLink discussed customer impacts as indicated on slide 9. He then described some of the key differences as listed on slide 10. CenturyLink has a team of system and business analysts that are working to determine differences between the functionalities of IMA and EASE and to determine if there are gaps that need to be closed.

Becky Chandler – Integra asked if the differences in the existing three Qwest billing systems was being addressed.

Mike Norton - CenturyLink stated that there are two SME/analyst teams that are performing detailed reviews of ordering and billing.

Kim Isaacs - Integra asked what “equivalent functionality” means to CenturyLink and stated that she did not believe that it meant the same to CenturyLink as it does to CLECs.

Mark Coyne - CenturyLink asked if Kim was looking for a definition.

Kim Isaacs - Integra offered the email status notification as an example and described her concerns comparing the functionality differences in the ASR conversion. She also mentioned IMA availability to pull CFA information in a range of 100 at a time and asked if EASE did the same. Kim said though CenturyLink identifies that both systems provide some capability does not necessarily mean they have equivalent functionality.

Mark Coyne – CenturyLink said he did not think anyone on the call could provide a solid definition. He said that CenturyLink was taking each capability and reviewing it in detail to determine if the functions would be considered equivalent between the two systems - which was being done on the ASR project.

Mike Norton - CenturyLink stated in general, when the systems are compared, the data and appearance may be different. He mentioned that Loop Qual as in IMA is not yet available in EASE and that would be defined as a gap and CenturyLink will need to build one. He also gave a few more examples of potential gaps that CenturyLink was addressing the equivalent functionality.

Kim Isaacs - Integra said that she had a concern and had asked the question during the initial ASR conversion walkthrough about ASR email status. Kim said she was still waiting for a response. She stated that equivalent functionality needed to be defined and that the differences between the systems needed to be addressed.

Tracy Strombotne – CenturyLink stated that we were looking into specifics on the ASR email status and should have a response from IT shortly.

Mark Coyne – CenturyLink said he thought the CenturyLink response to the ASR email status concern is part of the Delayed response to CLEC comments due December 9. If the CenturyLink response did not answer all of the questions, more discussion could occur.

Kim Isaacs - Integra reiterated that this is a big concern about equivalency that she has brought up multiple times on the ASR project. She said for the LSR project, Loop qualification and Raw Loop data will be a big focus to review equivalent functionality since today EASE is not where it will need to be. Kim said if there is not equivalent functionality it would be a No Go for the project vote.

Tracy Strombotne – CenturyLink said that CenturyLink could not possibly know how Integra uses all of the available functions of IMA and that she appreciates hearing the various examples that are important to CLECs.

Kim Isaacs - Integra stated that she wanted to be up front with the fact that these issues could affect CenturyLink’s ability to meet its timeline on the conversion.

Mark Coyne – CenturyLink said he appreciated Kim bringing it up early and that it is a lessons learned from the ASR project.

Renee Albersheim - CenturyLink added that CenturyLink recognized that Integra had done a lot of integration between its system and IMA which is why CenturyLink is trying to set up a visit so that we can see first-hand how the two systems work together.

Mark Coyne - CenturyLink added that this walkthrough is high level and that there are SME teams in both provisioning and billing that continue to work on these issues so that the final consolidation plan can be developed.

Mike Norton - CenturyLink continued the overview with slide 10 – Key Differences and said CenturyLink is working extensively to develop requirements to bridge each of the various gaps. Mike asked if there were any questions about this high level review of the key differences.

Kim Isaacs - Integra asked when the greater level of detail will be available to the CLECs.

Mike Norton - CenturyLink responded that the draft Tech Specs should be in April 2016. There will also be more information available with detailed implementation plan in early January 2016.

Kim Isaacs - Integra said that CenturyLink has identified that there has been quite a bit of work done to date and asked if those specific differences could be shared now.

Mike Norton - CenturyLink said he would work with the IT and CMP regarding that request and get back with her.

Mark Coyne - CenturyLink said most of that information would be included in the detailed consolidation plan and that CenturyLink will set up time to discuss the plan and differences.

Kim Isaacs - Integra asked when that would be done.

Mark Coyne - CenturyLink replied that it would be early January 2016 and that the timeline would be covered as part of the presentation.

Mike Norton - CenturyLink continued with his review of information in slide 11 – Conversion Strategy.

Mark Coyne - CenturyLink acknowledged that the call had gone over the scheduled hour and that if anyone needed to drop, CenturyLink would provide a summary of this call on the Wholesale Calendar. Mark then reviewed the Timelines on slides 12-14. He said the information above the timeline represents Merger related activities while the information below the timeline relates to CMP activities. Mark said the original approach as reflected on the slides was to issue the Implementation plan for the project in early December but that has been pushed out to early January. He said this information will be addressed in more detail in that Implementation Plan. Mark said if anyone had questions on the presentation after the call, those questions could be submitted through the CMP mailbox at cmpcomm@centurylink.com and we will respond. He next reviewed slide 15 – Next steps. Mark said the key purpose of the call is for customers to begin to understand the project so they can also begin to prepare for this significant project that will bring challenges to both CenturyLink and customers. CenturyLink wants the project to be a success for all parties. Mark asked if there were any questions. There were none.

The meeting was adjourned at approximately 10:45 AM Mountain Time

11/18/15 Monthly Systems CMP Meeting Tracy Strombotne – CenturyLink presented this new CenturyLink CR as listed in the CR Description. Tracy said the EASE implementation dates are the same as those for the Ensemble CR so the implementations occur at the same time. Tracy asked if there were any questions.

Liz Tierney – Global Capacity asked if both UOM and XML were moving.

Tracy Strombotne – CenturyLink said both UOM and XML will be moving to EASE.

CenturyLink Response

Open System CR SCR110415-3 Detail

 
Title: Retire CRIS for Wholesale billing
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR110415-3 Deferred
2/15/2017
-   11/ Billing Centrex, Private Line, Resale , UDIT, Unbundled Loop, UNE - All types, Directory Listings
Originator: Strombotne, Tracy
Originator Company Name: CenturyLink
Owner: Coyne, Mark
Director:
CR PM: Lorence, Susan

Description Of Change

Retire the existing Customer Records Information System (CRIS) application which is being replaced by Ensemble.

With the retirement of CRIS, references to the application will be removed from the CenturyLink external documentation and various Operations Support System (OSS) pages and documentation.

Existing services being billed in CRIS will be converted and all bills from that point forward will be generated from Ensemble.

CenturyLink will implement Ensemble which is the replacement for CRIS in a phased process beginning with the CenturyLink QC Eastern region which has a planned effective date in December 2016. The Western region of CenturyLink QC will follow with a planned effective date midyear 2017. The Central region of CenturyLink QC will be last with a planned effective date in late 2017.

Expected Deliverables/Proposed Implementation Date: Retirement of CRIS is expected in December 2017 for all regions.

Status History

Date Action Description
11/4/2015 CR Submitted CR Submitted. 
11/6/2015 CR Acknowledged CR Acknowledged. 
11/18/2015 Status Changed Status changed to Presented. 
11/18/2015 Action Item Created Discussed in the November Systems CMP Meeting - See Attachment C in the Distribution Package. 
11/23/2015 Communicator Issued See Notification number CMPR.MEET.11.23.15.F.14096.AdHocMtgLSR_CnsolidatnCRs. 
12/1/2015 General Meeting Held Ad hoc meeting to discuss four new system consolidation CenturyLink Change Requests. 
12/16/2015 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment I in the Distribution Package. 
1/4/2016 Communicator Issued See notification number SYST.OTHR.01.04.16.F.14176.Init_Retirement_IMA_CRIS. Initial Retirement notice sent. Preliminary Interface Implementation Plan provided with Review meeting scheduled for January 18, 2016. 
1/12/2016 Communicator Issued See notification number SYST.OTHR.01.12.16.F.14205.LSR_ConsldtnCALL_RESCHED. Preliminary Interface Plan Review meeting rescheduled to January 19, 2016. 
1/14/2016 Communicator Issued See notification number SYST.OTHR.01.14.16.F.14209.LSR_CnsldtnCALL2ndRESCHED. Preliminary Interface Plan Review meeting now scheduled for January 27, 2016. 
1/20/2016 Discussed at Monthly CMP Meeting Discussed in the January Systems CMP Meeting - See Attachment H in the Distribution Package. 
1/27/2016 General Meeting Held Preliminary Interface Implementation Plan Review Meeting conducted. Meeting minutes available 2-3-16. 
1/28/2016 Communicator Issued See notice number CMPR.CMPP.01.28.16.F.14250.RFP_ThrdPrtyFacilitatrLSR. 
2/2/2016 Communicator Issued Customer Comment cycle extended. See Notice number SYST.OTHR.02.02.16.F.14265.LSR_SysCnsldtnCmtsExtnded. 
2/16/2016 Communicator Issued See Notification number CMPR.CMPP.02.16.16.F.14317.RFP_ThrdPrtyFcilitatr_FNL. 
2/17/2016 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment I in the Distribution Package. 
2/23/2016 Communicator Issued See Notification number SYST.OTHR.02.23.16.F.14333.LSR_ConsolPln_DelayedResp. 
3/7/2016 Communicator Issued See Notification number SYST.OTHR.03.07.16.F.14376.FNL_Retirement_IMA_CRIS for FINAL RETIREMENT NOTICE for IMA and CRIS. 
3/14/2016 Communicator Issued See notification number SYST.OTHR.03.14.16.F.14401.LocalServPrjTechSpecDELAY. 
3/16/2016 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment I in the Distribution Package. 
4/14/2016 Communicator Issued See notification number SYST.OTHR.04.14.16.F.14479.LocalServProj_NewEffDate. New Release to Production effective date for Eastern established as no earlier than April 10, 2017. 
4/20/2016 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment I in the Distribution Package. 
5/18/2016 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/15/2016 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/30/2016 Communicator Issued See notification number WEBS.ANNC.06.30.16.F.14752.OSS_Consolidation_Pages. 
7/11/2016 Communicator Issued See notification number CMPR.CMPP.07.11.16.F.14775.LSR_ProjctCustomerTesting. 
7/20/2016 Discussed at Monthly CMP Meeting Discussed in the July System CMP Meeting - See Attachment I in the Distribution Package. 
8/17/2016 Discussed at Monthly CMP Meeting Discussed in the August System CMP Meeting - See Attachment I in the Distribution Package. 
8/22/2016 Communicator Issued See notification number SYST.OTHR.08.22.16.F.14883.LoclSerCnsldtnDrftTestPln. 
9/21/2016 Discussed at Monthly CMP Meeting Discussed in the September System CMP Meeting - See Attachment I in the Distribution Package. 
10/6/2016 Communicator Issued See notification number SYST.OTHR.10.06.16.F.14986.LSRCnsldtnPROJ_DELAY. 
10/19/2016 Discussed at Monthly CMP Meeting Discussed in the October Systems CMP Meeting - See Attachment I in the Distribution Package. 
11/16/2016 Discussed at Monthly CMP Meeting Discussed in the November Systems CMP Meeting - See Attachment I in the Distribution Package. 
12/14/2016 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment I in the Distribution Package. 
1/18/2017 Discussed at Monthly CMP Meeting Discussed in the January Systems CMP Meeting - See Attachment I in the Distribution Package. 
2/13/2017 Communicator Issued See notification number GENL.ANNC.02.13.17.F.15335.LSR_Consol_ProjSTATUS_UPD. 
2/15/2017 Status Changed Status changed to Deferred. 
2/15/2017 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment I in the Distribution Package. 
3/15/2017 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment J in the Distribution Package. 
9/20/2017 Discussed at Monthly CMP Meeting Discussed in the September Systems CMP Meeting - See Attachment I in the Distribution Package. 
10/18/2017 Discussed at Monthly CMP Meeting Discussed in the October Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/20/2018 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment J in the Distribution Package. 

Project Meetings

6/20/18 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink advised the above CRs (SCR110415 1-4) remain in Deferred status. CenturyLink will soon be updating the Consolidation Plan to include the most recently known dates for the project which is NO EARLIER THAN FIRST QUARTER 2020 and adding some wording about the Retail Trial.

10/18/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink said these four CMP CRs are in a Deferred status and we plan to keep them in that status for now. Mark said that last month he had relayed that the first planned migration would likely be 4th quarter 2019. The date in the package is now showing 1st quarter 2020. He said the Project team is still working toward some portion of the migration to begin late 2019. When Version 3 of the Consolidation Plan is provided later this year, the best estimate of planned migration dates will be provided at that time. The updated document will also include some information about the interim phase that will be occurring with retail customers that is associated with the IMA CR SCR101217-1. Mark then turned the call over to Mike Norton – CenturyLink to provide an update on planned system enhancements being made to Legacy CenturyLink (L-C) EASE for LSR processing.

Mike Norton – CenturyLink said there is considerable development in EASE LSR that is occurring in preparation for the Local Service Consolidation project. Mike talked about the development occurring in the L-C systems to meet the functional requirements that already exist in IMA. He said the intent is to reduce overall risk and to prove in some of the equivalent functionality before the first L-Q migrations begin in early 2020. Mike said the first major release for L-C systems will be in February 2018. One of the biggest changes is to upgrade EASE LSR to LSOG 14Q2 which is the last version of the Ordering and Billing Forum (OBF) LSOG standards that was released 2nd quarter 2014. L-C customers have already been notified of these Technical Specification changes. Mike said some customization is occurring with the L-C release to match some of the customization that occurs in IMA today but these fields will not likely be utilized until the first migration. The following EASE enhancements are being made associated with Pre-Order functionality: Address validation, Customer Service Information, Loop Qualification, Raw Loop Data, TN Reservation. Mike said these functions are not all of the enhancements that will be made to Pre-Order; more will be added at a later date. Other functions to be added in February are associated with the Exchange Carrier Version (EC VER) and some gap closure on some of the auto-population of some fields. With these enhancements, CenturyLink will be able to get some customer feedback on these functions prior to the first migration. Mike asked if there were any questions. There were none.

9/20/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink provided some information about the four CMP CRs that were moved to a Deferred status in February 2017. Mark relayed the Local Service Consolidation Project Web page has a statement that indicates more information will be provided late 2017. The website currently has Version 2 of the Consolidation Plan which includes out-dated planned effective dates. The LSR Consolidation team plans to post a Version 3 by end of year that relays the first planned migration date is likely to be 4th Quarter 2019. The team also plans a Version 4 of the Consolidation Plan that will provide more information about dates and migration approach; the document will likely be issued mid 2018. Mark said there are enhancements being made to the Legacy C EASE LSR system that will add additional functionality to process Legacy Qwest accounts. The Legacy C Release is planned for 1st Quarter 2018. Mike Norton – CenturyLink will likely attend CMP in the coming months to review the planned Legacy C EASE LSR enhancements. Mark asked if there were any questions. There were none.

3/15/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink reminded those on the call that on last month’s call, the above fours CRs have been moved into a Deferred status.

2/15/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink reminded those on the call that the LSR Consolidation Project had been delayed and that there will be no testing or conversion activity in 2017 while the SME team continues to re-evaluate the timing and conversion approach. Mark said a General notification had been sent on February 13, 2017 to relay this status to all Wholesale Customers and said the notice was posted to the Wholesale calendar. He then reviewed some of the key points in the notice:

- CenturyLink will be working on enhancements to EASE and Ensemble to incorporate changes that will be required for processing of Legacy Qwest accounts. - CenturyLink will be placing the CRs in a DEFERRED status likely until the end of 2017. - By the end of 2017, CenturyLink will update the Local Service Ordering and Billing Systems Consolidation Plan with more information about the conversion strategy and timeline. - The LSR Consolidation web site will be updated with a NOTE at the top of the page to relay there will be more information provided late 2017 around the migration approach, testing and planned system consolidation dates. Armando Fimbres – Oregon PUC asked about the first paragraph in the General notice and what the phrase “during the eventual consolidation” meant. NOTE: The full sentence from the notice is “During the eventual Local Service Systems Consolidation, CenturyLink will move all Local Service Request ordering to Electronic Administration & Service Order Exchange (EASE) from Interconnect Mediated Access (IMA). “

Mark Coyne – CenturyLink said that customer accounts will be moved once the consolidation begins on the conversion weekend. He asked if there were any other questions. There were none.

1/18/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink said these are the Local Service System Consolidation CRs where CenturyLink has previously communicated a project delay while the timing and conversion approach are being re-evaluated. On December 13, 2016, CenturyLink distributed notifications associated with updates to the EASE and Ensemble Final Technical Specifications which also included updates to the CenturyLink responses to customer comments. There are several customer comments that show CenturyLink responses are still being determined. Mark said because of the project delay, CenturyLink is considering whether to move these CRs into a Deferred status for a period of time. Mark asked if there were any questions.

Frank Behnke – AT&T asked with this information about the project delay, could he tell his management that there will be no action until 2018. He said they have a lot of work to do and need to plan work for the year.

Mark Coyne – CenturyLink said that statement was safe; there will be no testing or conversion activity in 2017. Mark said in the coming months, CenturyLink will hopefully have more info high level information to share.

Lisa Lynn – Granite asked if that was why CenturyLink was implementing an IMA Release 40.0.

Mark Coyne – CenturyLink said yes. As discussed in December as part of 2017 OSS capacity planning, there would be a Release 40.0 for IMA.

12/14/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink reminded those on the call that this Project has been delayed while the SME team is re-evaluating timing and conversion approach. No testing or conversion activity is planned for 2017. Two system notifications were distributed on December 13, 2016 to provide updated Final Technical Specifications for EASE and updated CenturyLink responses to customer comments for both EASE and Ensemble. Mark asked if there were any questions. There were none.

11/16/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink reminded those on the call that this project has been delayed. The CenturyLink SME team is currently re-evaluating the timing and conversion approach and, as discussed last month, there will be no testing or conversion activity planned in 2017. Mark then referred to the System notification SYST.OTHR.10.31.16.F.15087.LoclServR1.0ResptoCommUPD sent on October 31, 2016 (included in the package) to relay the updated CenturyLink response to customer’s comments was still pending for some questions still under investigation. He said the CenturyLink SME team planned to send the updated response to comments and final technical specifications on November 18, 2016. The Local Service Ordering and Billing System Consolidation Plan (Version 3) updates are also still pending.

NOTE: The EASE and Ensemble final technical specification notices were not sent as planned on November 18, 2016 due to some .xsd files still pending.

10/19/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink provided an update on the status of these Local Service System Consolidation CRs. He said the Final Technical Specifications and CenturyLink Response to Comments for EASE and Ensemble were sent September 30, 2016. The SME teams are working on providing an updated CenturyLink Response to Comments by the end of October for the remaining customer questions that are listed as “still under investigation” on the CenturyLink Response to Comments. Mark said a System Notification SYST.OTHR.10.06.16.F.14986.LSRCnsldtnPROJDELAY was distributed on October 6, 2016 to relay a Project delay. In conjunction with the project delay, CenturyLink cancelled the Joint Test Planning/Testing Walkthrough that had been scheduled for October 18, 2016. Mark said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan and the updates to the remainder of the Milestone dates for the Project Timeline are PENDING. Mark said it is well known that this system project is large and complex. The CenturyLink project team is reviewing the approach and timelines and is considering some other phased implementation alternatives. He said it has become fairly clear that there will be no Wholesale customer impacts that will occur in 2017. Mark said the project team will be making some further decisions over the coming months and will communicate the information when available.

Mike Norton – CenturyLink said he wanted to clarify that there will be no customer testing in 2017.

Rob Garth – DishNET asked if that meant there was no environment for customer testing.

Mike Norton – CenturyLink said that the customer testing that was to begin in 1st quarter as required by CMP and merger agreements would not occur in 2017. It would begin beyond that date. Mike said no conversion within wholesale would be occurring either.

Rob Garth – DishNET asked what the biggest factor was in the project delay.

Mike Norton – CenturyLink said it was the project complexity and feedback from internal and external customers. The Project team is looking at the approach to determine if it can be simplified.

Rob Garth – DishNET asked if this meant CenturyLink was back to the drawing board. Rob asked if the project technical specifications that had been made available to customers are still valid?

Mike Norton – CenturyLink said the technical specifications were not 100% locked down but that he did not think a change in the approach would significantly impact them. He said the LSOG is based on Issue 2Q14 and those requirements to IT are not changing. CenturyLink would continue to refine the tech specs as testing occurs and as feedback is received from customers similar to the feedback provided during the formal comment cycle. Mike said the major issue now is the timing.

Mark Coyne – CenturyLink said it sounds like it is safe to say the requirements and tech specs are still valid and will continue to be used going forward.

Mike Norton – CenturyLink said absolutely. Mike said the system development will impact Legacy CenturyLink customers as well as Legacy Qwest customers as the current system is upgraded with Legacy Qwest requirements. Mike said CenturyLink is also anxious to firm up the revised approach and dates. The plans are still to do an automated migration by region.

9/21/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said the EASE and Ensemble Draft Technical Specification walkthroughs had been held August 25, 2016 and an additional Walkthough-Q/A was scheduled and held on September 7, 2016. Mark said the meeting minutes and draft responses to Customer comments are available on Wholesale calendar. The formal comment cycle on Draft Technical Specifications for EASE and Ensemble was extended through September 16, 2016. The Final Technical Specifications and CenturyLink Response to Comments are now scheduled for September 30, 2016. (The various notices are included in the system distribution package.) Mark said we have received a significant amount of additional comments so we may send a first set of responses on September 30, 2016 and follow-up with the remainder of CenturyLink responses a couple weeks later. CenturyLink has a Testing Walkthrough scheduled for October 18, 2016; related documents are on the Wholesale calendar. Mark relayed an additional Self Nomination was received for Customer Testing; the Testing companies now include Electric Light Wave/Integra, XO, Mobius, Charter/Accenture, dishNET, TDS Metro. Mark asked if there were any questions. There were none.

8/17/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said the biggest update here is the change to the Release to Production for Eastern Region to be no earlier than June 2017. On August 12, 2016, CenturyLink issued two notifications associated with posting the Draft Technical Specifications for EASE and Ensemble and Mark referred to the notices in the System package. He relayed that the Walkthroughs are scheduled for August 25, 2016 and are available on Wholesale calendar: EASE August 25, 2016 9:30 AM MT - 11:30 AM MT Ensemble August 25, 2016 1:30 PM MT - 3:00 PM MT

Kim Isaacs - Electric Lightwave said she wanted to provide some early questions to allow CenturyLink to prepare. There are whole product groups that CenturyLink still offers that are not available in the Draft Tech Specs, e.g., UNE-P, DSS, Trunking, etc. Kim said some of the CenturyLink specific fields are also not addressed, e.g., manual reject override. Kim said it would be valuable to have SMEs relay which fields would be used in those instances.

Mark Coyne – CenturyLink said we would provide those questions to the SME team to allow them to prepare.

Susan Lorence - CenturyLink said if customers can submit any additional questions to CMPCOMM prior to the walkthrough that would be helpful.

Armando Fimbres – Oregon PUC asked if the change to the Eastern Release to Production date would impact the other regions effective dates.

Mark Coyne – CenturyLink said he could not answer that question at this time. He thought the SME team would be sharing the Project timeline as it becomes available.

Mark Coyne – CenturyLink said the Self Nominations for Customer Testing had been requested by August 1, 2016 and there were five companies that self nominated: Electric Lightwave, XO Communications, dishNET Wireline, Charter, and Mobius. Mark said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan and the remainder of Milestone dates for the Local Service Consolidaton Project Timeline were being updated for the change in date for Eastern and would likely be available before the September CMP meeting.

Michelle Ewton – XO Communications said they currently do not have connectivity with the Legacy CenturyLink systems and asked how far in advance that effort will need to begin.

Mike Norton – CenturyLink said if it is a brand new connection, the timeline is approximately 90 days.

Michelle Ewton – XO Communications said they would be getting with CenturyLink in the 4th quarter of this year to begin the process.

Mark Coyne – CenturyLink said the current timeline shows that customer testing would begin no earlier than January 2017 so the test planning would likely begin in October 2016.

Kim Isaacs - Electric Lightwave said in regard to the XO question about connectivity, customers will need to keep both connections up and will need to figure out what CenturyLink system to send orders to.

Mark Coyne – CenturyLink said that was true and it would be to everyone’s benefit to get through the remaining consolidation phases quickly. He asked if there were any other questions. There were none.

7/20/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said CenturyLink had issued a notification on July 7, 2016 to relay the issuance of Draft Interface Technical Specifications will be August 12, 2016 instead of July 18, 2016. Mark said a notification had been sent on July 11, 2016 requesting that any customers that are interested in participating in testing for this project should send a self nomination to cmpcomm@centurylink.com. The email should be sent by August 1, 2016 and should include the person who will be the point of contact for that company. Mark said that, so far, there have been five companies that have requested to test with CenturyLink for this project: Integra, XO, dishNET, Charter, and Mobius Communications. Mark said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan should be forthcoming. CenturyLink was working on the remainder of the Milestone dates for the LSR Project Timeline, testing dates, etc. The document should be available no later than the August CMP meeting. Mark relayed that CenturyLink had implemented a new Local Service Consolidation Web page as of July 1, 2016 that will be similar in content as the Access Systems Consolidation Project. Mark asked if there were any questions. There were none.

6/15/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan should be available by the end of the month including an updated LSR Project Timeline. CenturyLink will be establishing a new Local Service Consolidation web page that is similar to the Access Consolidation web page that will house documentation and information about the Local Service system consolidation. The Statement of Work for the Third Party Facilitator is still underway. Mark said we will likely be sending a notification prior to the July CMP meeting asking for customers to self nominate for Customer testing for the Local Access project. The next Milestone Date for the project is the issuance of the Draft Interface Technical Specifications on July 18, 2016. Mark asked if there were any questions. There were none.

5/18/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said that on April 14, 2016, CenturyLink issued a notification to relay the new delivery date of July 18, 2016 to provide the Draft Technical Specifications for EASE and Ensemble. The notice also indicated that the Release to Production date for the Eastern Region will be no earlier than April 10, 2017. CenturyLink is still working on the other Milestone dates in between and should provide them soon along with an updated Local Service Ordering and Billing System Consolidation Plan. Mark then relayed that in regard to the Third Party Facilitator, CenturyLink had shared the decision to go with Wicresoft but that the finalized dates for testing were being determined so the dates could be included in the Statement of Work. Mark asked if there were any questions. There were none.

4/20/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink advised that on March 14, 2016, CenturyLink issued a notification to delay the delivery of the Draft Technical Specifications for EASE and Ensemble. On April 14, 2016, CenturyLink issued a notification to advise the new delivery date for Draft Technical Specifications will be July 18, 2016. Mark said that associated with the new Draft Tech Spec date, the new Project Release to Production date for the Eastern Region will be no earlier than April 10, 2017. Mark asked if there were any questions. There were none.

Mark Coyne – CenturyLink then provided an update on the Third Party Facilitator and said as discussed in the March meeting, the RFP was sent to suppliers to secure a Third Party Facilitator. Only the vendor Wicresoft responded. Following an interview with Wicresoft and based on the criteria of cost, knowledge, availability and our experience so far with them on the Access Consolidation project, CenturyLink recommended that Wicresoft be selected as the Third Party Facilitator for the project. Mark said CenturyLink had asked for customers to provide any feedback or concerns to the CMP mailbox by March 31, 2016. No feedback was received. CenturyLink is proceeding with Wicresoft but is still reviewing the Project timeline to determine the Wicresoft start date. CenturyLink will be providing Version 3 of the Local Service Ordering and Billing System Consolidation Plan to communicate the new timeline and any additional information to Wholesale customers. Mark asked if there were any questions. There were none.

3/16/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said a notification was distributed on Monday, March 14, 2016 to relay that the Draft Technical Specifications for the Local Service Ordering System Consolidation Project are being delayed. Mark relayed that as stated in the notification, the delay is a result of CenturyLink's consideration of customer requests and our ongoing internal reviews to ensure the delivery of a high quality systems product to customers. On April 14, 2016, CenturyLink will provide an update on the status of the delivery date of the Draft Technical Specifications and will send the appropriate notifications to communicate any required revisions to the Local Service Ordering and Billing System Consolidation timeline. Mark said a revised version of the OSS Interface Calendar is included in the Package but we have also since posted a revised version to today’s meeting. Armando Fimbres - Oregon Public Utility Commission asked if the official schedule has been updated and asked if the Oregon docket would be updated. Mark Coyne – CenturyLink said we know the LSR Production effective date for Eastern will change but that new date has not yet been determined. We will provide a status on April 14, 2016 and once the revised schedule is determined, the appropriate updates would be made with the states. Mark then provided a status on the Request for Proposal (RFP) that had been sent to suppliers to secure a Third Party Facilitator for the project. He said only one vendor responded which was Wicresoft. CenturyLink did conduct an interview with Wicresoft and based on the criteria of cost, knowledge, availability and our experience so far with them on the Access Consolidation project, CenturyLink is recommending that Wicresoft be selected as the Third Party Facilitator for the project. Mark asked if there were any concerns. He said customers could provide feedback on this recommendation on the call or via the CMPCOMM mailbox but unless there is feedback, CenturyLink will be proceeding with this selection. CenturyLink will likely not engage Wicresoft until the new effective date is determined. Kim Isaacs – Integra said she would like to have time to consider this selection within Integra and asked if anything had yet been formalized with Wicresoft. Mark Coyne – CenturyLink said this is the CenturyLink recommendation based on merger agreements. He said CenturyLink would like to have any CLEC comments sent to the CMPCOMM mailbox by March 31, 2016. If there are any comments, they would be considered in the April CMP meeting. Mark asked if there were any other questions. There were none.

2/17/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink provided an update on the Local Service Consolidation project relaying that the Preliminary Implementation Plan Review meeting was held on January 27, 2016 and those meeting minutes are available. There was a request by the CLEC community to extend the formal Comment cycle. CenturyLink sent a notification to extend the comment cycle through February 11, 2016 thus providing an additional week. Mark said the response to comments and final version of the Local Service Consolidation Plan is due February 25, 2016. In regard to the Request for Proposal (RFP) for a Third Party Facilitator, Mark said the CLEC Notification with the redlined RFP was sent for review on January 28, 2016 with CLEC feedback due February 11, 2016. CenturyLink sent a notification that included the Response to CLEC comments and the Final version of the RFP on February 16, 2016. CenturyLink is distributing the RFP to potential vendors. Mark asked if there were any questions. There were none.

01/27/16 Preliminary Interface Implementation Plan Review Meeting FINAL Local Service Ordering and Billing System Consolidation Plan Meeting minutes

SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs.

Attendees: Troy Peters – Alliance Connect (Iowa Network Services) Donna Barfield – Birch Katherine Merschat – Birch Mary Taylor – Birch Tiffany Kidd – Birch Dennis Molner – Charter Communications Linda McDonald – Charter Communications Tam Doan – Comcast Jason Renander – Comcast Andrea Smith - Comcast Kasha Fauscett – Comcast Lynn Notarianni – Colorado PUC Susan Travis – Colorado PUC Shannon Bishop – Consolidated fka Inventive Christy Kennedy – CTC Communications Rob Garth - DishNET George Devargis - DishNET Graham Northcutt- DishNET Joel Mitchell- DishNET Melat Lewis- DishNET Shawn Stickle- DishNET Josh Santos – Douglas FastNet JoAnn Norton – Gervais Telephone Co. Brendan Hamel – Granite Adam DeFeo – Granite Judy O’Day – Granite Budd Shearing – Granite Nancy Hansen – Granite Lisa Lynn – Granite Edie Wallace – Granite Kim Isaacs - Integra Laurie Roberson – Integra Nancy Taylor – Integra Julie Pickar – Integra Jamie Shay - Integra Carmen Painter – LS Networks Valerie Starr - LS Networks Emily Davis – Midcontinent Karen Viste - Midcontinent Mary Lohnes - Midcontinent Bonnie Johnson - Minnesota Department of Commerce Lan Nguyen - Neustar Armando Fimbres – Oregon PUC Pam Popp – Popp Communications LoriAnn Kuhn – Quantum Communications Jeff Hocker - – Quantum Communications Kurt Boucher - Southwest Cyberport Rick Heck - Spectrotel Jeanne Kulesa – Synchronoss John Zhan – Synchronoss Manjunath Gowda – Synchronoss Jackie Diebold - TDS Telecom Marnie Silvernail - TDS Telecom Victor Gaither - Time Warner Cable Ed Keefer – Value Telecommunications Tim Zawislak – Washington Commission (Staff) Lynn Denton – Windstream Don Lemke – Windstream Mary Conquest – XO Communications Mark Coyne - CenturyLink John Hansen - CenturyLink Denise Martinez - CenturyLink Sandy Nelson - CenturyLink Mike Laughman - CenturyLink Shawn Simpson - CenturyLink Sue Kriebel - CenturyLink Lee Gomez - CenturyLink Renee Albersheim - CenturyLink Marty Wilson - CenturyLink Rusty Burdette - CenturyLink Rick Breitenbach - CenturyLink Mike Norton - CenturyLink Susan Lorence - CenturyLink

Mark Coyne - CenturyLink defined the purpose of the call which is to review the CenturyLink Local Service Ordering and Billing System Consolidation Plan which combines the requirement of the Detail Plan as specified by Merger requirements and the Preliminary Interface Implementation Plan as required by CMP. The plan is to cover at a high level each section of the Consolidation Plan. Mark said Ordering and Billing SMEs are on the call to answer any customer questions. For any questions that cannot be answered on the call, CenturyLink will take an action item for follow-up. The CenturyLink response will be covered either in the meeting minutes or will be covered in a subsequent CMP meeting. Any technical questions will be addressed as part of the Draft Technical Specifications planned for April 8, 2016. Mark asked if that process would work for those on the call. There were no objections. Mark began the review of Consolidation Plan. The following questions were asked as the high points of each section were covered.

Section 1.0 Executive Summary Kim Isaacs - Integra said it was too early to use the term Benefits for customers. At best, any OSS transition can be difficult; it is important for discussion to occur early. Kim said there is a lot of work that has to be done in EASE for it to be equivalent to IMA and that execution will determine the benefits. Mark Coyne - CenturyLink said the updates to EASE are addressed later in the document.

Section 1.2 - Assumptions Joel Mitchell - DishNET asked about availability of completed orders for 24 months and whether that history would be kept in IMA.

Mike Norton - CenturyLink said the Completed orders would remain available in a view only mode in IMA and that following conversion, the same archive requirements as exist today would remain in the new system.

Kim Isaacs - Integra said her assumption is that not only would CMP be followed for the consolidation itself but that CMP would be followed to address future system updates.

Mark Coyne - CenturyLink said that was correct as it pertains to the products/services governed by CMP today.

Rob Garth - DishNET asked if BillMate would be retained as one of the existing output choices for billing media.

Sue Kriebel - CenturyLink said that CenturyLink is still analyzing the best option and it was only the ASCII BillMate format that was undecided.

Joel Mitchell - DishNET asked whether the billing account number structure in EASE would be used or whether the structure in IMA would be retained. Mike Norton - CenturyLink said an account hierarchy will be set up in EASE based on RSID/ZCID. He said CenturyLink plans to hold a Customer Brown Bag on account hierarchy options and then have Service Managers work with customers to determine how their accounts should be set up. In regard to account numbers in Ensemble, they are set up based on Product ID which is typically the telephone number.

Joel Mitchell - DishNET asked if the WTN structure (NPA NXX and Cus Code) would be used.

Sue Kriebel - CenturyLink said the invoice in Ensemble will not be in NPA NXX Cus Code format but will be a nine digit number.

Mike Norton - CenturyLink said BAN mapping changes will be communicated well in advance of the conversion.

Kim Isaacs - Integra asked if the BANs for unbundled loops will change formats and no longer use the NPA NXX format. Kim asked if circuit ids will change.

Sean Simpson – CenturyLink said CenturyLink will try not to change those account number in Ensemble unless there is already a product id in existence with that same number. CenturyLink will analyze each account number from CRIS to determine whether it can be reused. Sean said circuit ids themselves will not change.

Joel Mitchell - DishNET asked if the consolidation was only for ordering or if there were support system changes also, e.g., NEAC vs. CSIE or modem activation.

Mark Coyne - CenturyLink each area will be looked at individually.

Kim Isaacs - Integra said that in regard to any support system changes, the merger conditions require adequately trained staff.

Mike Norton - CenturyLink said the back end dispatch, design and provisioning processes are not changing with this project. There have already been some consolidations where legacy CenturyLink has consolidated into Legacy Qwest systems. Section 2.1 Current State System View Lynn Notarianni – Colorado PUC said there are inconsistencies on how the terms LSR orders, Local Service Requests, orders, etc., are used in the Consolidation Plan and thought they may have different meanings. Lynn suggested it would be helpful to figure out the right term to use.

Mark Coyne - CenturyLink said we will take that action item back to the document owner to review and be more consistent.

Section 2.2 End State System View Kim Isaacs - Integra asked whether CenturyLink retail was going to use EASE as the ordering platform for residential services.

Mike Norton - CenturyLink said CenturyLink Retail only uses EASE for the one process of Loss notification otherwise Retail works directly in Ensemble and other platforms.

Kim Isaacs - Integra said then Retail ordering cannot see what Wholesale is doing.

Mike Norton - CenturyLink said that is correct that Retail cannot see what is in EASE for Wholesale and that for Ensemble, he is working with CenturyLink Regulatory to assess if any enhancements are required for CPNI for Legacy Qwest.

Kim Isaacs - Integra asked if there will be the capability that a CLEC can view the CSR of another resale account like what occurs in IMA today?

Mike Norton - CenturyLink said that will be the same.

Kim Isaacs - Integra said Integra has had a problem with another company that uses a Synchronoss application and asked if CenturyLink was going to lock down Wholesale BANs so Retail cannot add to them.

Mike Norton - CenturyLink said those details are still being worked out with Regulatory.

Section 2.3.1 Service Ordering Comparison – IMA to EASE Rob Garth – DishNetwork asked whether there would be improvement in the process to “Manage Users” and whether a certificate was required. Rob asked if the process would utilize a GUI or an API.

Mike Norton - CenturyLink said EASE does not generally require a certificate but said there may be a requirements for one if there is electronic bonding. Mike said there are different user administration requirements. A technical call will be conducted with IT personnel on both sides to review the certificate requirements, XML tech specs, testing, etc.

Adam DeFeo – Granite asked how to get on the distribution list for the technical calls.

Mark Coyne - CenturyLink said systems notifications will be sent for the technical reviews so customers should be sure they are signed up to receive notifications or they can send an email to cmpcomm@centurylink.com for assistance.

Rob Garth - DishNET asked if there would be a GUI or API to assist with user management.

Mike Norton - CenturyLink said there is a GUI based user management capability for customers. Mike said he did not think APIs are available in EASE nor are they available today in IMA.

Mark Coyne - CenturyLink referenced the matrices in Section 2.3.1 and said the asterisk indicates there will be development required in EASE to provide those functions.

Joel Mitchell - DishNET asked if the functions that are to be added to EASE will be placed in production prior to conversion.

Mike Norton - CenturyLink said the EASE enhancements may go in for Legacy CenturyLink and Embarq customers prior to the LSR account consolidation which will help test the system updates and will introduce the new capability to the current EASE customers. He said appropriate system notification would be sent.

Josh Santos – Douglas FastNet asked if both IMA and EASE will be active in tandem while customers get used to the new system.

Mike Norton - CenturyLink said no, IMA and EASE will not be available in tandem for the same states. He said the system implementation will be phased by region so once Eastern is converted, IMA will only be available to review the 2 year old order history. For Western and Central, IMA and CRIS will be business as usual

Joel Mitchell - DishNET asked if the “Manage Users” functionality in EASE will allow more control of user access and gave the example of whether some order functions could be limited for one person vs. another.

Mike Norton - CenturyLink said if that capability exists today in IMA, then the capability would have to be looked at for EASE.

Joel Mitchell - DishNET asked about recapping from Pre-order to order. Joel said they have a lot more questions about how functions will be provided but would hold off until the draft tech specs are available.

Mike Norton - CenturyLink said discussion is underway as to how to provide information that will aid customers in the transition, likely it will be some combination of tech specs, PCATs, developer worksheets, etc. He said the PCATs are probably the most descriptive of the changes.

Kim Isaacs - Integra said under the matrix for Ordering Functionality, there are lot of functions not listed and wanted to insure those are being addressed.

Mike Norton - CenturyLink said the SME team is currently going through user stories and that there are high level functions as well as specific functions that they are capturing. He said the matrix would be very extensive to add them to this document but said he thought they would be delineated in the Tech Specs.

Lynn Notarianni – Colorado PUC asked if part of the concern is that this Consolidation Plan is preliminary and asked if a statement should be added that the document is not intended to represent the full capability that will be provided.

Mark Coyne - CenturyLink said this document is preliminary and pointed to the Scope. He said it is not intended to go into great detail.

Kim Isaacs - Integra said she knows this is a high level but like the ASR project, there were some differences in how customers and CenturyLink define functionality. Kim said she is concerned that there is no asterisk by the EASE functions since she knows there are some specific capabilities, requested thru CMP by both CLECs and Qwest, that need to be added to EASE.

Mark Coyne - CenturyLink said that though this Consolidation Plan is not intended to be very detailed, there will likely be updates made to it as more is known. The SME team now knows more than they did when the document was released in early January.

Joel Mitchell - DishNET asked if the Consolidation Plan would be updated monthly.

Mark Coyne - CenturyLink said not necessarily monthly but it will definitely be updated when CenturyLink responds to CLEC comments on February 25, 2016.

Joel Mitchell - DishNET asked if it was possible to extend the February 4, 2016 comment cycle due date since this session had been pushed out a week.

Mark Coyne - CenturyLink said he would look at whether the date could be pushed a week and would include that in the meeting minutes. [NOTE: On February 2, 2016, CenturyLink sent out notifications to extend the formal comment period by one week. The original comment cycle was to end on February 4, 2016 but was extended through February 11, 2016. See notice numbers SYST.OTHR.02.02.16.F.14265.LSRSysCnsldtnCmtsExtnded and GENL.ANNC.02.02.16.F.14266.LSRSysCnsldtnCmtCycExtnd.]

Mike Norton - CenturyLink said the SME team will add a lot more asterisks on the various matrices after continued requirement meetings over the last month. Lynn Notarianni – Colorado PUC said because of the complexity of the LSR transition and potential for Commission complaints, she thinks it would be appropriate to add a disclaimer that this is a preliminary document and is not intended to represent the final project functionality. Lynn said that will help insure that all understand the intent of this document.

Joel Mitchell - DishNET asked if there would be a distinction between Legacy Qwest and Legacy CenturyLink/Embarq territory. He said there will be a need to know which support group to call depending on the region and then gave the example of CEMR-MTG and asked if it applied to Legacy Qwest and Legacy CenturyLink/Embarq territory.

Mike Norton - CenturyLink said the goal is to minimize functional or product differences across CenturyLink. He said because there are some backend systems that are region specific, there will be a requirement to provide some indication of differences should they occur. Mike said there are two primary systems in the CenturyLink suite that are not common – Address Management and the Copper inventory for assignment. Other than that, the main functional applications are the same.

Lynn Notarianni – Colorado PUC asked if the Consolidation Plan identifies what is to be done with the various PID/PAP measures. Lynn said she assumes since the applications are changing the measures will need to be updated.

Mike Norton - CenturyLink said we will add a paragraph in the document for that and there is a SME team already working on that.

Section 2.4 Billing System Differences between CRIS to Ensemble Tam Dohn – Comcast asked about the BAN changes and said they use a third party to set up new accounts which can take some time. She asked if a report can be received in advance.

Sue Kriebel – CenturyLink said yes we will provide that cross reference a couple months in advance and that for those customers that are testing with us, it would be provided sooner. Sue said we are working thru that process now on the ASR side.

Kim Isaacs - Integra said as Integra went through a system transition with another company, the BAN change was a big issue. She said if there any deviations to the plan, they will need to be communicated ASAP. If a customer cannot audit the bill, that stops payment and said CenturyLink may need to consider stopping LPCs for a period of time.

Section 3 Consolidation Plan Implementation Troy Peters - Alliance Connect asked how customer support will work when this is occurring by region.

Mark Coyne - CenturyLink said the CenturyLink customer support will be scheduled to support all customers regardless of their location.

Kim Isaacs - Integra said Integra has already expressed concern that this is an aggressive schedule. Kim said there is an LNP administrator change that overlaps with this schedule and asked how it will impact the EASE implementation. She said there is no implementation date yet but thought it could impact resources for companies.

Mike Norton - CenturyLink said EASE does not interact with NPAC but said the SOAs would be impacted with that NPAC change.

Mark Coyne - CenturyLink said any scheduling concerns will likely be part of the formal comments that the SME team will then address.

Section 3.2 3rd Party Facilitator Lynn Notarianni – Colorado PUC asked about the 3rd Party Facilitator and how that process will work.

Mark Coyne - CenturyLink relayed that there will be a notification sent on January 28, 2016 about the 3rd Party Facilitator selection process that will also provide the proposed RFP updates and planned schedule. Mark said the 3rd Party Facilitator may not come on board until the 2nd quarter timeframe. NOTE: For details of this timeline and process, refer to notification CMPR.CMPP.01.28.16.F.14250.RFPThrdPrtyFacilitatrLSR.

Section 3.3.2 Training and Process Plan Kim Isaacs - Integra asked what the training will encompass and whether it will cover the business rules. Kim said it is the understanding of the business rules that is most important.

Mark Coyne - CenturyLink said he thought training would cover screen navigation but would relay that information back to the Training team.

Mike Norton - CenturyLink said IMA is on LSOG 6 and EASE is on LSOG 10, CenturyLink will be moving to a current version of the LSOG.

Kim Isaacs - Integra said Qwest made the business decision as to what LSOG that IMA is based on. Going from LSOG 6 to 10 and the related update to so many business rules is a big concern and will need to be made clear to those writing the order.

Mike Norton - CenturyLink said he thinks EASE will be moving to LSOG 14.2 (numbering is now year and quarter) with customization. The tech specs and PCATs would be updated accordingly. Mike said that upgrade will occur in EASE first so it will not be part of the actual conversion.

Rob Garth - DishNET asked the timeframe for the LSOG version upgrade to EASE.

Mike Norton - CenturyLink said it will likely be about 90 days before the planned conversion. By doing this, the current EASE customers will have time to implement the changes. The benefit is that it allows the focus at conversion to be on that vs. an additional system change. Mike said that will increase the quality of the initial implementation.

Kim Isaacs - Integra said another big problem that Integra experienced during a recent system consolidation with another company was that flowthrough was significantly impacted and caused an impact to center staff that had to process the orders manually. Kim said CenturyLink should plan on an increase in manual orders and that training on the CenturyLink side needs to prepare for that.

Jackie Diebold - TDS Telecom asked if the training would be instructor led or web based.

Mark Coyne - CenturyLink said he does not think that has been determined yet but that it will follow CMP requirements which provides for instructor led, web based or a combination. Mark said training is scheduled to begin July 15, 2016.

Lynn Notarianni – Colorado PUC asked if CenturyLink is planning for an interim process for escalations during the conversion.

Mark Coyne - CenturyLink said there will be an interim process for escalations during the conversion.

Section 3.3.3 Customer Testing Rob Garth - DishNET asked if there are plans to enhance the current EASE testing, for example, availability, test cases, etc.

Mike Norton - CenturyLink said there will be a dedicated environment for CLEC testing which will interface with downstream systems, such as address validation, inventory systems, CFA queries. Mike said there will be a “full suite” of applications to support testing.

Rob Garth - DishNET asked how defect classification, reporting and resolution would be addressed - including SLAs for resolution. Rob said he wants to work with CenturyLink to determine this prior to production and asked if there will be a severity rating for defects and asked if CLECs will have a voice in that.

Mike Norton - CenturyLink said that UAT will be where this process is developed. Mike said the 3rd party facilitator will play a key part to developing the defect process also. He said it is difficult to have an SLA tied to problem resolution since there are so many variables that could impact that. Mike asked if it was reasonable to wait until the 3rd party facilitator is available.

Rob Garth - DishNET said he thought it was reasonable but did not want to get too much farther before it is determined.

Mike Norton - CenturyLink said it will be resolved well ahead of UAT beginning. There is already protection in the Testing process with the Go/No Go decision that is part of the merger agreement. He said the 3rd party facilitator should be involved in the negotiation which benefits both sides.

Mark Coyne - CenturyLink said he thought defining those processes will be part of the Test Planning in preparation for UAT.

Section 3.3.4 Load and Performance Testing Rob Garth - DishNET asked if CenturyLink will include customers in Load and Performance testing to test capacity.

Mike Norton - CenturyLink said CenturyLink will share the Load and Performance volumes and results.

Rob Garth - DishNET said Dish has had to temper some large volume queries in IMA in the past and would like to test using some real world data. Rob asked if CenturyLink is still tied to the same back end systems which have certain volume limitations.

Mike Norton - CenturyLink said EASE is tied to the same back end systems and said any performance changes to those systems are out of scope for this project. He used the example of the Loop Qual volumes in TIRKs.

Rob Garth - DishNET asked if there will be a simplified process for Loop Qual.

Mike Norton - CenturyLink said CenturyLink will provide the same information that IMA provides but it may be presented differently.

Rob Garth - DishNET asked if system availability will be the same as today or would there be an increase in hours.

Mike Norton - CenturyLink said there are “guaranteed hours” of availability in EASE however the system is not taken down if no system maintenance is required; this may result in an increase in availability but it is not guaranteed. At a minimum, CenturyLink will meet the available hours that exist in IMA today.

Rob Garth - DishNET asked if supporting infrastructure systems will remain as today by territory, e.g., SAGA or FAM.

Mike Norton - CenturyLink said that consolidating infrastructure is not part of this project but gave the example that address validation may eventually go to a data warehouse solution.

Mark Coyne - CenturyLink said the call was nearing the planned timeline and reminded customers their comments can be sent to cmpcomm@centurylink.com. He said the comment cycle will be extended through February 11. Depending on the extent of the questions, another call might be scheduled to allow more discussion. Mark asked if there were any final questions.

Rob Garth - DishNET asked when the minutes from the call would be available.

Mark Coyne - CenturyLink said the draft meeting minutes will be available in a week on the wholesale calendar.

Susan Lorence - CenturyLink said the draft minutes will also be distributed to participants on the call but we may need to use a point of contact per company if an email address is not available.

Mark Coyne - CenturyLink thanked everyone for participating on the call today and said he appreciated the discussion.

The meeting was adjourned at 11:00 AM Mountain Time.

01/20/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink provided an update on the LSR Consolidation project relaying that the CMP Initial Release Notification and the Initial Retirement Notifications were distributed on January 4, 2016 with an extended formal Comment cycle. As of that date, the Preliminary Interface Implementation Plan was available for review. The Preliminary Interface Implementation Plan Review Meeting is now scheduled for January 27, 2016 from 9:00 -11:00 AM MT. Mark said CenturyLink is working on updating the RFP for the 3rd Party Facilitator for this project. The Release Milestones are now included in the OSS Calendar. Mark asked if there were any questions. There were none.

12/16/15 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said these four CRs associated with the LSR Consolidation Project were presented by Tracy Strombotne – CenturyLink in the November 2015 monthly meeting. Mark said an Ad hoc meeting was held with the customer community on December 1, 2015. The Powerpoint presentation that was reviewed on that call is posted to the Wholesale calendar along with the final version of the meeting minutes from that call. Mark said the CMP notice and Preliminary Interface Implementation Plan will be available in early January 2016 and the notice will include a 30 day customer review cycle. An ad hoc call will be established for mid January for CenturyLink to review the plan with customers. Mark said work is beginning around developing the RFP for the 3rd Party Facilitator. He said a notice will be sent in early January to ask for customers to identify themselves if they would like to be involved in developing the RFP for the LSR project. It is likely that we will be able to use some of the work that occurred for the ASR Project. Mark asked if there were any questions. There were none.

LSR Consolidation Project Ad hoc meeting minutes FINAL December 1, 2015 SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs.

Attendees: Tywanda Bloodworth - Access Point Deborah Pasquale - Access Point Patrick Hall - Access Point Katherine Merschat - Birch Chris Garrison - Central Scott Telephone Renee Albersheim - CenturyLink Susan Lorence - CenturyLink John Hansen - CenturyLink Lee Gomez - CenturyLink Mark Coyne - CenturyLink Tracy Strombotne - CenturyLink Mike Norton - CenturyLink Paul Dunphy - Charter Linda Birchem - Comcast Randee Ryan - Comcast Andrea Smith - Comcast Kasha Fauscett - Comcast Roger Delgrosso - Custom Call Jay Bobacaci - Custom Call Kim Isaacs - Integra Laurie Roberson - Integra Becky Chandler – Integra Rhonda Otto – Integra Steve Schmidt - Iowa Network Services Mary Lohnes - Midcontinent Bonnie Johnson - Minnesota Department of Commerce Lan Nguyen - Neustar Amber Taylor - Nex-Tech Missy McMullan - Nex-Tech Jackie Diebold - TDS Telecom Mark Andersen - TDS Telecom Denise Boe - Tekstar Victor Gaither - Time Warner Cable Jamie Wright – Valley Telecom

Mark Coyne – CenturyLink defined the purpose of the call which is to share information about the LSR system integration work associated with four CenturyLink Change Requests that were presented in the November 2015 Monthly CMP meeting. Mark said the call would be reviewing the “CenturyLink LSR System Ordering and Billing Consolidation” document that is posted on the Wholesale calendar and that attendees could ask questions at any time during the call. If the question could not be readily answered, CenturyLink would take an Action item to follow up after the call. Mark said there would be more meetings on this topic through the life of the project.

Renee Albersheim – CenturyLink then reviewed the Agenda located on page 3 of the PowerPoint presentation. Renee then presented history regarding the Merger Commitments and steps that lead up to this conversion project. She then covered the systems that will be addressed during the LSR system consolidation project: IMA to EASE for Ordering and CRIS to Ensemble for Billing. The benefits of the LSR system consolidation project were then presented. Renee asked if there were any questions.

Kim Isaacs - Integra asked what the impacts to CenturyLink residential customer will be.

Renee Albersheim - CenturyLink explained that the CenturyLink Residential group did not use the systems in the same manner as the CLEC, but that systems are used for CenturyLink Residential accounts.

Kim Isaacs - Integra said she had experience with previous conversions to Synchronoss products and asked about the significant volume increase [12/11/15 Updates received from Integra in CAPS] ASSOCIATED WITH CENTURYLINK RESIDENTIAL ACCOUNTS and the POSSIBLE impact to system stability and system response times. Mike Norton - CenturyLink responded that the internal CenturyLink systems interface directly with call center sub-applications that interface with Ensemble and there are volume implications that will be accounted for. The only CenturyLink retail use of EASE is invoked during the port-out process, otherwise, internal CenturyLink users do not use EASE.

Renee Albersheim - CenturyLink continued by describing the benefits of both EASE and Ensemble as per slide 6 of the presentation.

Kim Isaacs - Integra asked when it would be appropriate to present concerns.

Mark Coyne - CenturyLink replied if there were concern with a specific slide, they could be addressed at that time otherwise, they can be addressed at the end.

Kim Isaacs - Integra stated that for LSR GUI users, the documentation, especially regarding the Business Rules, a more user friendly document would be needed more like the IMA LSOR rules than just the technical specifications. [12/11/15 Updates received from Integra in CAPS] THIS IS AN EARLY REQUEST FOR THE LSR CONSOLIDATION PROJECT BECAUSE THE DOCUMENTATION FOR THE ASR CONSOLIDATION PROJECT WAS NOT USER FRIENDLY FOR A GUI USER.

Renee Albersheim - CenturyLink continued by explaining that with the new LSR system, there would only need to be one order for both provisioning and billing, whereas with IMA, it required two orders that CenturyLink had to synch up. She then turned the presentation over to Mike Norton – CenturyLink.

Becky Chandler – Integra asked if the back-up Billmate files would be required after the conversion and if the Ensemble bill was in CABS format.

Kim Isaacs – Integra said if the Billmate file goes away, the information that was on the Billmate file would still need to be available on the Ensemble bill.

Mike Norton - CenturyLink clarified that there are several bill media formats within Ensemble, but the BOS format was not one of them. CenturyLink is researching a BOS standard output for appropriate Design services when USOCs and FIDs are normally provided. Mike said the bulk of the services are non-design and will not have a BOS standard format. He confirmed the Billmate files are going away but the information would be on the Ensemble bills. Mike continued with slide 7 of the presentation that provided some history around the company that developed Ensemble and a description of the application.

Kim Isaacs - Integra asked about the PID/PAP performance metrics and if that would remain intact.

Mike Norton - CenturyLink confirmed that was true that equivalent data measurement points were currently being determined and fed into the reporting system.

Kim Isaacs – Integra said that was very good and asked if reports would remain available

Mike Norton - CenturyLink confirmed that they would be available.

Kim Isaacs - Integra asked if there would be testing available for the performance metrics.

Mike Norton - CenturyLink confirmed that there would be and mentioned a past conversion between Embarq and CenturyTel and that we would be utilizing lessons learned during that conversion to make this conversion better. He continued with the description of EASE as defined on slide 8.

Kim Isaacs - Integra said since CenturyLink is required by CMP to provide the release capacity for the following year, Kim asked if CenturyLink had negotiated an annual release capacity with Synchronoss.

Mike Norton - CenturyLink said that 95% of the EASE [12/11/15 Updates received from Integra in CAPS] [delete UPGRADES WERE IMPLEMENTED] DEVELOPMENT CAN BE MADE without Synchronoss support. The tool is an off-the-shelf tool but is very configurable. Most of the business rules are controlled by CenturyLink IT. From the GUI perspective, CenturyLink tries to remain complaint with the Synchronoss tool while utilizing the internal development function as needed. He added that during the conversion, CenturyLink would work closely with Synchronoss because there would be substantial development necessary in the initial stages.

Kim Isaacs - Integra asked Mark Coyne - CenturyLink if he thought there would be a similar level of hours available for EASE that currently exists for IMA.

Mark Coyne - CenturyLink responded that the CenturyLink IT folks are aware that CenturyLink is required to provide a certain annual capacity as required by CMP. He said we will have to wait and see how things progress. Mark said development has been tapering off with respect to IMA changes in recent years.

Mike Norton - CenturyLink discussed customer impacts as indicated on slide 9. He then described some of the key differences as listed on slide 10. CenturyLink has a team of system and business analysts that are working to determine differences between the functionalities of IMA and EASE and to determine if there are gaps that need to be closed.

Becky Chandler – Integra asked if the differences in the existing three Qwest billing systems was being addressed.

Mike Norton - CenturyLink stated that there are two SME/analyst teams that are performing detailed reviews of ordering and billing.

Kim Isaacs - Integra asked what “equivalent functionality” means to CenturyLink and stated that she did not believe that it meant the same to CenturyLink as it does to CLECs.

Mark Coyne - CenturyLink asked if Kim was looking for a definition.

Kim Isaacs - Integra offered the email status notification as an example and described her concerns comparing the functionality differences in the ASR conversion. She also mentioned IMA availability to pull CFA information in a range of 100 at a time and asked if EASE did the same. Kim said though CenturyLink identifies that both systems provide some capability does not necessarily mean they have equivalent functionality.

Mark Coyne – CenturyLink said he did not think anyone on the call could provide a solid definition. He said that CenturyLink was taking each capability and reviewing it in detail to determine if the functions would be considered equivalent between the two systems - which was being done on the ASR project.

Mike Norton - CenturyLink stated in general, when the systems are compared, the data and appearance may be different. He mentioned that Loop Qual as in IMA is not yet available in EASE and that would be defined as a gap and CenturyLink will need to build one. He also gave a few more examples of potential gaps that CenturyLink was addressing the equivalent functionality.

Kim Isaacs - Integra said that she had a concern and had asked the question during the initial ASR conversion walkthrough about ASR email status. Kim said she was still waiting for a response. She stated that equivalent functionality needed to be defined and that the differences between the systems needed to be addressed.

Tracy Strombotne – CenturyLink stated that we were looking into specifics on the ASR email status and should have a response from IT shortly.

Mark Coyne – CenturyLink said he thought the CenturyLink response to the ASR email status concern is part of the Delayed response to CLEC comments due December 9. If the CenturyLink response did not answer all of the questions, more discussion could occur.

Kim Isaacs - Integra reiterated that this is a big concern about equivalency that she has brought up multiple times on the ASR project. She said for the LSR project, Loop qualification and Raw Loop data will be a big focus to review equivalent functionality since today EASE is not where it will need to be. Kim said if there is not equivalent functionality it would be a No Go for the project vote.

Tracy Strombotne – CenturyLink said that CenturyLink could not possibly know how Integra uses all of the available functions of IMA and that she appreciates hearing the various examples that are important to CLECs.

Kim Isaacs - Integra stated that she wanted to be up front with the fact that these issues could affect CenturyLink’s ability to meet its timeline on the conversion.

Mark Coyne – CenturyLink said he appreciated Kim bringing it up early and that it is a lessons learned from the ASR project.

Renee Albersheim - CenturyLink added that CenturyLink recognized that Integra had done a lot of integration between its system and IMA which is why CenturyLink is trying to set up a visit so that we can see first-hand how the two systems work together.

Mark Coyne - CenturyLink added that this walkthrough is high level and that there are SME teams in both provisioning and billing that continue to work on these issues so that the final consolidation plan can be developed.

Mike Norton - CenturyLink continued the overview with slide 10 – Key Differences and said CenturyLink is working extensively to develop requirements to bridge each of the various gaps. Mike asked if there were any questions about this high level review of the key differences.

Kim Isaacs - Integra asked when the greater level of detail will be available to the CLECs.

Mike Norton - CenturyLink responded that the draft Tech Specs should be in April 2016. There will also be more information available with detailed implementation plan in early January 2016.

Kim Isaacs - Integra said that CenturyLink has identified that there has been quite a bit of work done to date and asked if those specific differences could be shared now.

Mike Norton - CenturyLink said he would work with the IT and CMP regarding that request and get back with her.

Mark Coyne - CenturyLink said most of that information would be included in the detailed consolidation plan and that CenturyLink will set up time to discuss the plan and differences.

Kim Isaacs - Integra asked when that would be done.

Mark Coyne - CenturyLink replied that it would be early January 2016 and that the timeline would be covered as part of the presentation.

Mike Norton - CenturyLink continued with his review of information in slide 11 – Conversion Strategy.

Mark Coyne - CenturyLink acknowledged that the call had gone over the scheduled hour and that if anyone needed to drop, CenturyLink would provide a summary of this call on the Wholesale Calendar. Mark then reviewed the Timelines on slides 12-14. He said the information above the timeline represents Merger related activities while the information below the timeline relates to CMP activities. Mark said the original approach as reflected on the slides was to issue the Implementation plan for the project in early December but that has been pushed out to early January. He said this information will be addressed in more detail in that Implementation Plan. Mark said if anyone had questions on the presentation after the call, those questions could be submitted through the CMP mailbox at cmpcomm@centurylink.com and we will respond. He next reviewed slide 15 – Next steps. Mark said the key purpose of the call is for customers to begin to understand the project so they can also begin to prepare for this significant project that will bring challenges to both CenturyLink and customers. CenturyLink wants the project to be a success for all parties. Mark asked if there were any questions. There were none.

The meeting was adjourned at approximately 10:45 AM Mountain Time

11/18/15 Monthly Systems CMP Meeting Tracy Strombotne – CenturyLink presented this new CenturyLink CR as listed in the CR Description. Tracy relayed the timeline as listed in the CR for each region and said the retirement of CRIS is planned for December 2017 for all regions. Tracy asked if there were any questions. There were none.

CenturyLink Response

Open System CR SCR110415-4 Detail

 
Title: Retire the IMA GUI and XML application for processing LSRs.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR110415-4 Deferred
2/15/2017
-   3/ Pre-ordering and Ordering Centrex, Private Line, Resale , UDIT, Unbundled Loop, UNE - All types, Directory Listings
Originator: Strombotne, Tracy
Originator Company Name: CenturyLink
Owner: Coyne, Mark
Director:
CR PM: Lorence, Susan

Description Of Change

Retire the existing Interconnect Mediated Access (IMA) application which is being replaced by Electronic Administration & Service Order Exchange (EASE).

With the retirement of IMA, references to the application will be removed from the CenturyLink external documentation, the various Operations Support System (OSS) pages and documentation, and the CMP Change Request form.

The EASE application will provide a single, centralized platform for all LSR processing.

CenturyLink will implement EASE which is the replacement for IMA in a phased process beginning with the CenturyLink QC Eastern region which has a planned effective date in December 2016. The Western region of CenturyLink QC will follow with a planned effective date midyear 2017. The Central region of CenturyLink QC will be last with a planned effective date in late 2017.

Expected Deliverables/Proposed Implementation Date: Retirement is expected to be December 2017 for all regions.

Status History

Date Action Description
11/4/2015 CR Submitted CR Submitted. 
11/6/2015 CR Acknowledged CR Acknowledged. 
11/18/2015 Status Changed Status changed to Presented. 
11/18/2015 Discussed at Monthly CMP Meeting Discussed in the November Systems CMP Meeting - See Attachment C in the Distribution Package. 
11/23/2015 Communicator Issued See Notification number CMPR.MEET.11.23.15.F.14096.AdHocMtgLSR_CnsolidatnCRs. 
12/1/2015 General Meeting Held Ad hoc meeting to discuss four new system consolidation CenturyLink Change Requests. 
12/16/2015 Status Changed Status changed to Development. 
12/16/2015 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment I in the Distribution Package. 
1/4/2016 Communicator Issued See notification number SYST.OTHR.01.04.16.F.14176.Init_Retirement_IMA_CRIS. Initial Retirement notice sent. Preliminary Interface Implementation Plan provided with Review meeting scheduled for January 18, 2016. 
1/12/2016 Communicator Issued See notification number SYST.OTHR.01.12.16.F.14205.LSR_ConsldtnCALL_RESCHED. Preliminary Interface Plan Review meeting rescheduled to January 19, 2016. 
1/14/2016 Communicator Issued See notification number SYST.OTHR.01.14.16.F.14209.LSR_CnsldtnCALL2ndRESCHED. Preliminary Interface Plan Review meeting now scheduled for January 27, 2016. 
1/20/2016 Discussed at Monthly CMP Meeting Discussed in the January Systems CMP Meeting - See Attachment H in the Distribution Package. 
1/27/2016 General Meeting Held Preliminary Interface Implementation Plan Review Meeting conducted. Meeting minutes available 2-3-16. 
1/28/2016 Communicator Issued See notice number CMPR.CMPP.01.28.16.F.14250.RFP_ThrdPrtyFacilitatrLSR. 
2/2/2016 Communicator Issued Customer Comment cycle extended. See Notice number SYST.OTHR.02.02.16.F.14265.LSR_SysCnsldtnCmtsExtnded. 
2/16/2016 Communicator Issued See Notification number CMPR.CMPP.02.16.16.F.14317.RFP_ThrdPrtyFcilitatr_FNL. 
2/17/2016 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment I in the Distribution Package. 
2/23/2016 Communicator Issued See Notification number SYST.OTHR.02.23.16.F.14333.LSR_ConsolPln_DelayedResp. 
3/7/2016 Communicator Issued See Notification number SYST.OTHR.03.07.16.F.14376.FNL_Retirement_IMA_CRIS for FINAL RETIREMENT NOTICE for IMA and CRIS. 
3/14/2016 Communicator Issued See notification number SYST.OTHR.03.14.16.F.14401.LocalServPrjTechSpecDELAY. 
3/16/2016 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment I in the Distribution Package. 
4/14/2016 Communicator Issued See notification number SYST.OTHR.04.14.16.F.14479.LocalServProj_NewEffDate. New Release to Production effective date for Eastern established as no earlier than April 10, 2017. 
4/20/2016 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment I in the Distribution Package. 
5/18/2016 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/15/2016 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/30/2016 Communicator Issued See notification number WEBS.ANNC.06.30.16.F.14752.OSS_Consolidation_Pages. 
7/11/2016 Communicator Issued See notification number CMPR.CMPP.07.11.16.F.14775.LSR_ProjctCustomerTesting. 
7/20/2016 Discussed at Monthly CMP Meeting Discussed in the July System CMP Meeting - See Attachment I in the Distribution Package. 
8/17/2016 Discussed at Monthly CMP Meeting Discussed in the August System CMP Meeting - See Attachment I in the Distribution Package. 
8/22/2016 Communicator Issued See notification number SYST.OTHR.08.22.16.F.14883.LoclSerCnsldtnDrftTestPln. 
9/21/2016 Discussed at Monthly CMP Meeting Discussed in the September System CMP Meeting - See Attachment I in the Distribution Package. 
10/6/2016 Communicator Issued See notification number SYST.OTHR.10.06.16.F.14986.LSRCnsldtnPROJ_DELAY. 
10/19/2016 Discussed at Monthly CMP Meeting Discussed in the October Systems CMP Meeting - See Attachment I in the Distribution Package. 
11/16/2016 Discussed at Monthly CMP Meeting Discussed in the November Systems CMP Meeting - See Attachment I in the Distribution Package. 
12/14/2016 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment I in the Distribution Package. 
1/18/2017 Discussed at Monthly CMP Meeting Discussed in the January Systems CMP Meeting - See Attachment I in the Distribution Package. 
2/13/2017 Communicator Issued See notification number GENL.ANNC.02.13.17.F.15335.LSR_Consol_ProjSTATUS_UPD. 
2/15/2017 Status Changed Status changed to Deferred. 
2/15/2017 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment I in the Distribution Package. 
3/15/2017 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment J in the Distribution Package. 
9/20/2017 Discussed at Monthly CMP Meeting Discussed in the September Systems CMP Meeting - See Attachment I in the Distribution Package. 
10/18/2017 Discussed at Monthly CMP Meeting Discussed in the October Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/20/2018 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment J in the Distribution Package. 

Project Meetings

6/20/18 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink advised the above CRs (SCR110415 1-4) remain in Deferred status. CenturyLink will soon be updating the Consolidation Plan to include the most recently known dates for the project which is NO EARLIER THAN FIRST QUARTER 2020 and adding some wording about the Retail Trial.

10/18/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink said these four CMP CRs are in a Deferred status and we plan to keep them in that status for now. Mark said that last month he had relayed that the first planned migration would likely be 4th quarter 2019. The date in the package is now showing 1st quarter 2020. He said the Project team is still working toward some portion of the migration to begin late 2019. When Version 3 of the Consolidation Plan is provided later this year, the best estimate of planned migration dates will be provided at that time. The updated document will also include some information about the interim phase that will be occurring with retail customers that is associated with the IMA CR SCR101217-1. Mark then turned the call over to Mike Norton – CenturyLink to provide an update on planned system enhancements being made to Legacy CenturyLink (L-C) EASE for LSR processing.

Mike Norton – CenturyLink said there is considerable development in EASE LSR that is occurring in preparation for the Local Service Consolidation project. Mike talked about the development occurring in the L-C systems to meet the functional requirements that already exist in IMA. He said the intent is to reduce overall risk and to prove in some of the equivalent functionality before the first L-Q migrations begin in early 2020. Mike said the first major release for L-C systems will be in February 2018. One of the biggest changes is to upgrade EASE LSR to LSOG 14Q2 which is the last version of the Ordering and Billing Forum (OBF) LSOG standards that was released 2nd quarter 2014. L-C customers have already been notified of these Technical Specification changes. Mike said some customization is occurring with the L-C release to match some of the customization that occurs in IMA today but these fields will not likely be utilized until the first migration. The following EASE enhancements are being made associated with Pre-Order functionality: Address validation, Customer Service Information, Loop Qualification, Raw Loop Data, TN Reservation. Mike said these functions are not all of the enhancements that will be made to Pre-Order; more will be added at a later date. Other functions to be added in February are associated with the Exchange Carrier Version (EC VER) and some gap closure on some of the auto-population of some fields. With these enhancements, CenturyLink will be able to get some customer feedback on these functions prior to the first migration. Mike asked if there were any questions. There were none.

9/20/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink provided some information about the four CMP CRs that were moved to a Deferred status in February 2017. Mark relayed the Local Service Consolidation Project Web page has a statement that indicates more information will be provided late 2017. The website currently has Version 2 of the Consolidation Plan which includes out-dated planned effective dates. The LSR Consolidation team plans to post a Version 3 by end of year that relays the first planned migration date is likely to be 4th Quarter 2019. The team also plans a Version 4 of the Consolidation Plan that will provide more information about dates and migration approach; the document will likely be issued mid 2018. Mark said there are enhancements being made to the Legacy C EASE LSR system that will add additional functionality to process Legacy Qwest accounts. The Legacy C Release is planned for 1st Quarter 2018. Mike Norton – CenturyLink will likely attend CMP in the coming months to review the planned Legacy C EASE LSR enhancements. Mark asked if there were any questions. There were none.

3/15/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink reminded those on the call that on last month’s call, the above fours CRs have been moved into a Deferred status.

2/15/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink reminded those on the call that the LSR Consolidation Project had been delayed and that there will be no testing or conversion activity in 2017 while the SME team continues to re-evaluate the timing and conversion approach. Mark said a General notification had been sent on February 13, 2017 to relay this status to all Wholesale Customers and said the notice was posted to the Wholesale calendar. He then reviewed some of the key points in the notice:

- CenturyLink will be working on enhancements to EASE and Ensemble to incorporate changes that will be required for processing of Legacy Qwest accounts. - CenturyLink will be placing the CRs in a DEFERRED status likely until the end of 2017. - By the end of 2017, CenturyLink will update the Local Service Ordering and Billing Systems Consolidation Plan with more information about the conversion strategy and timeline. - The LSR Consolidation web site will be updated with a NOTE at the top of the page to relay there will be more information provided late 2017 around the migration approach, testing and planned system consolidation dates. Armando Fimbres – Oregon PUC asked about the first paragraph in the General notice and what the phrase “during the eventual consolidation” meant. NOTE: The full sentence from the notice is “During the eventual Local Service Systems Consolidation, CenturyLink will move all Local Service Request ordering to Electronic Administration & Service Order Exchange (EASE) from Interconnect Mediated Access (IMA). “

Mark Coyne – CenturyLink said that customer accounts will be moved once the consolidation begins on the conversion weekend. He asked if there were any other questions. There were none.

1/18/17 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs Mark Coyne – CenturyLink said these are the Local Service System Consolidation CRs where CenturyLink has previously communicated a project delay while the timing and conversion approach are being re-evaluated. On December 13, 2016, CenturyLink distributed notifications associated with updates to the EASE and Ensemble Final Technical Specifications which also included updates to the CenturyLink responses to customer comments. There are several customer comments that show CenturyLink responses are still being determined. Mark said because of the project delay, CenturyLink is considering whether to move these CRs into a Deferred status for a period of time. Mark asked if there were any questions.

Frank Behnke – AT&T asked with this information about the project delay, could he tell his management that there will be no action until 2018. He said they have a lot of work to do and need to plan work for the year.

Mark Coyne – CenturyLink said that statement was safe; there will be no testing or conversion activity in 2017. Mark said in the coming months, CenturyLink will hopefully have more info high level information to share.

Lisa Lynn – Granite asked if that was why CenturyLink was implementing an IMA Release 40.0.

Mark Coyne – CenturyLink said yes. As discussed in December as part of 2017 OSS capacity planning, there would be a Release 40.0 for IMA.

12/14/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink reminded those on the call that this Project has been delayed while the SME team is re-evaluating timing and conversion approach. No testing or conversion activity is planned for 2017. Two system notifications were distributed on December 13, 2016 to provide updated Final Technical Specifications for EASE and updated CenturyLink responses to customer comments for both EASE and Ensemble. Mark asked if there were any questions. There were none.

11/16/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink reminded those on the call that this project has been delayed. The CenturyLink SME team is currently re-evaluating the timing and conversion approach and, as discussed last month, there will be no testing or conversion activity planned in 2017. Mark then referred to the System notification SYST.OTHR.10.31.16.F.15087.LoclServR1.0ResptoCommUPD sent on October 31, 2016 (included in the package) to relay the updated CenturyLink response to customer’s comments was still pending for some questions still under investigation. He said the CenturyLink SME team planned to send the updated response to comments and final technical specifications on November 18, 2016. The Local Service Ordering and Billing System Consolidation Plan (Version 3) updates are also still pending.

NOTE: The EASE and Ensemble final technical specification notices were not sent as planned on November 18, 2016 due to some .xsd files still pending.

10/19/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink provided an update on the status of these Local Service System Consolidation CRs. He said the Final Technical Specifications and CenturyLink Response to Comments for EASE and Ensemble were sent September 30, 2016. The SME teams are working on providing an updated CenturyLink Response to Comments by the end of October for the remaining customer questions that are listed as “still under investigation” on the CenturyLink Response to Comments. Mark said a System Notification SYST.OTHR.10.06.16.F.14986.LSRCnsldtnPROJDELAY was distributed on October 6, 2016 to relay a Project delay. In conjunction with the project delay, CenturyLink cancelled the Joint Test Planning/Testing Walkthrough that had been scheduled for October 18, 2016. Mark said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan and the updates to the remainder of the Milestone dates for the Project Timeline are PENDING. Mark said it is well known that this system project is large and complex. The CenturyLink project team is reviewing the approach and timelines and is considering some other phased implementation alternatives. He said it has become fairly clear that there will be no Wholesale customer impacts that will occur in 2017. Mark said the project team will be making some further decisions over the coming months and will communicate the information when available.

Mike Norton – CenturyLink said he wanted to clarify that there will be no customer testing in 2017.

Rob Garth – DishNET asked if that meant there was no environment for customer testing.

Mike Norton – CenturyLink said that the customer testing that was to begin in 1st quarter as required by CMP and merger agreements would not occur in 2017. It would begin beyond that date. Mike said no conversion within wholesale would be occurring either.

Rob Garth – DishNET asked what the biggest factor was in the project delay.

Mike Norton – CenturyLink said it was the project complexity and feedback from internal and external customers. The Project team is looking at the approach to determine if it can be simplified.

Rob Garth – DishNET asked if this meant CenturyLink was back to the drawing board. Rob asked if the project technical specifications that had been made available to customers are still valid?

Mike Norton – CenturyLink said the technical specifications were not 100% locked down but that he did not think a change in the approach would significantly impact them. He said the LSOG is based on Issue 2Q14 and those requirements to IT are not changing. CenturyLink would continue to refine the tech specs as testing occurs and as feedback is received from customers similar to the feedback provided during the formal comment cycle. Mike said the major issue now is the timing.

Mark Coyne – CenturyLink said it sounds like it is safe to say the requirements and tech specs are still valid and will continue to be used going forward.

Mike Norton – CenturyLink said absolutely. Mike said the system development will impact Legacy CenturyLink customers as well as Legacy Qwest customers as the current system is upgraded with Legacy Qwest requirements. Mike said CenturyLink is also anxious to firm up the revised approach and dates. The plans are still to do an automated migration by region.

9/21/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said the EASE and Ensemble Draft Technical Specification walkthroughs had been held August 25, 2016 and an additional Walkthough-Q/A was scheduled and held on September 7, 2016. Mark said the meeting minutes and draft responses to Customer comments are available on Wholesale calendar. The formal comment cycle on Draft Technical Specifications for EASE and Ensemble was extended through September 16, 2016. The Final Technical Specifications and CenturyLink Response to Comments are now scheduled for September 30, 2016. (The various notices are included in the system distribution package.) Mark said we have received a significant amount of additional comments so we may send a first set of responses on September 30, 2016 and follow-up with the remainder of CenturyLink responses a couple weeks later. CenturyLink has a Testing Walkthrough scheduled for October 18, 2016; related documents are on the Wholesale calendar. Mark relayed an additional Self Nomination was received for Customer Testing; the Testing companies now include Electric Light Wave/Integra, XO, Mobius, Charter/Accenture, dishNET, TDS Metro. Mark asked if there were any questions. There were none.

8/17/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said the biggest update here is the change to the Release to Production for Eastern Region to be no earlier than June 2017. On August 12, 2016, CenturyLink issued two notifications associated with posting the Draft Technical Specifications for EASE and Ensemble and Mark referred to the notices in the System package. He relayed that the Walkthroughs are scheduled for August 25, 2016 and are available on Wholesale calendar: EASE August 25, 2016 9:30 AM MT - 11:30 AM MT Ensemble August 25, 2016 1:30 PM MT - 3:00 PM MT

Kim Isaacs - Electric Lightwave said she wanted to provide some early questions to allow CenturyLink to prepare. There are whole product groups that CenturyLink still offers that are not available in the Draft Tech Specs, e.g., UNE-P, DSS, Trunking, etc. Kim said some of the CenturyLink specific fields are also not addressed, e.g., manual reject override. Kim said it would be valuable to have SMEs relay which fields would be used in those instances.

Mark Coyne – CenturyLink said we would provide those questions to the SME team to allow them to prepare.

Susan Lorence - CenturyLink said if customers can submit any additional questions to CMPCOMM prior to the walkthrough that would be helpful.

Armando Fimbres – Oregon PUC asked if the change to the Eastern Release to Production date would impact the other regions effective dates.

Mark Coyne – CenturyLink said he could not answer that question at this time. He thought the SME team would be sharing the Project timeline as it becomes available.

Mark Coyne – CenturyLink said the Self Nominations for Customer Testing had been requested by August 1, 2016 and there were five companies that self nominated: Electric Lightwave, XO Communications, dishNET Wireline, Charter, and Mobius. Mark said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan and the remainder of Milestone dates for the Local Service Consolidaton Project Timeline were being updated for the change in date for Eastern and would likely be available before the September CMP meeting.

Michelle Ewton – XO Communications said they currently do not have connectivity with the Legacy CenturyLink systems and asked how far in advance that effort will need to begin.

Mike Norton – CenturyLink said if it is a brand new connection, the timeline is approximately 90 days.

Michelle Ewton – XO Communications said they would be getting with CenturyLink in the 4th quarter of this year to begin the process.

Mark Coyne – CenturyLink said the current timeline shows that customer testing would begin no earlier than January 2017 so the test planning would likely begin in October 2016.

Kim Isaacs - Electric Lightwave said in regard to the XO question about connectivity, customers will need to keep both connections up and will need to figure out what CenturyLink system to send orders to.

Mark Coyne – CenturyLink said that was true and it would be to everyone’s benefit to get through the remaining consolidation phases quickly. He asked if there were any other questions. There were none.

7/20/16 System CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said CenturyLink had issued a notification on July 7, 2016 to relay the issuance of Draft Interface Technical Specifications will be August 12, 2016 instead of July 18, 2016. Mark said a notification had been sent on July 11, 2016 requesting that any customers that are interested in participating in testing for this project should send a self nomination to cmpcomm@centurylink.com. The email should be sent by August 1, 2016 and should include the person who will be the point of contact for that company. Mark said that, so far, there have been five companies that have requested to test with CenturyLink for this project: Integra, XO, dishNET, Charter, and Mobius Communications. Mark said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan should be forthcoming. CenturyLink was working on the remainder of the Milestone dates for the LSR Project Timeline, testing dates, etc. The document should be available no later than the August CMP meeting. Mark relayed that CenturyLink had implemented a new Local Service Consolidation Web page as of July 1, 2016 that will be similar in content as the Access Systems Consolidation Project. Mark asked if there were any questions. There were none.

6/15/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said that Version 3 of the Local Service Ordering and Billing System Consolidation Plan should be available by the end of the month including an updated LSR Project Timeline. CenturyLink will be establishing a new Local Service Consolidation web page that is similar to the Access Consolidation web page that will house documentation and information about the Local Service system consolidation. The Statement of Work for the Third Party Facilitator is still underway. Mark said we will likely be sending a notification prior to the July CMP meeting asking for customers to self nominate for Customer testing for the Local Access project. The next Milestone Date for the project is the issuance of the Draft Interface Technical Specifications on July 18, 2016. Mark asked if there were any questions. There were none.

5/18/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said that on April 14, 2016, CenturyLink issued a notification to relay the new delivery date of July 18, 2016 to provide the Draft Technical Specifications for EASE and Ensemble. The notice also indicated that the Release to Production date for the Eastern Region will be no earlier than April 10, 2017. CenturyLink is still working on the other Milestone dates in between and should provide them soon along with an updated Local Service Ordering and Billing System Consolidation Plan. Mark then relayed that in regard to the Third Party Facilitator, CenturyLink had shared the decision to go with Wicresoft but that the finalized dates for testing were being determined so the dates could be included in the Statement of Work. Mark asked if there were any questions. There were none.

4/20/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink advised that on March 14, 2016, CenturyLink issued a notification to delay the delivery of the Draft Technical Specifications for EASE and Ensemble. On April 14, 2016, CenturyLink issued a notification to advise the new delivery date for Draft Technical Specifications will be July 18, 2016. Mark said that associated with the new Draft Tech Spec date, the new Project Release to Production date for the Eastern Region will be no earlier than April 10, 2017. Mark asked if there were any questions. There were none.

Mark Coyne – CenturyLink then provided an update on the Third Party Facilitator and said as discussed in the March meeting, the RFP was sent to suppliers to secure a Third Party Facilitator. Only the vendor Wicresoft responded. Following an interview with Wicresoft and based on the criteria of cost, knowledge, availability and our experience so far with them on the Access Consolidation project, CenturyLink recommended that Wicresoft be selected as the Third Party Facilitator for the project. Mark said CenturyLink had asked for customers to provide any feedback or concerns to the CMP mailbox by March 31, 2016. No feedback was received. CenturyLink is proceeding with Wicresoft but is still reviewing the Project timeline to determine the Wicresoft start date. CenturyLink will be providing Version 3 of the Local Service Ordering and Billing System Consolidation Plan to communicate the new timeline and any additional information to Wholesale customers. Mark asked if there were any questions. There were none.

3/16/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said a notification was distributed on Monday, March 14, 2016 to relay that the Draft Technical Specifications for the Local Service Ordering System Consolidation Project are being delayed. Mark relayed that as stated in the notification, the delay is a result of CenturyLink's consideration of customer requests and our ongoing internal reviews to ensure the delivery of a high quality systems product to customers. On April 14, 2016, CenturyLink will provide an update on the status of the delivery date of the Draft Technical Specifications and will send the appropriate notifications to communicate any required revisions to the Local Service Ordering and Billing System Consolidation timeline. Mark said a revised version of the OSS Interface Calendar is included in the Package but we have also since posted a revised version to today’s meeting. Armando Fimbres - Oregon Public Utility Commission asked if the official schedule has been updated and asked if the Oregon docket would be updated. Mark Coyne – CenturyLink said we know the LSR Production effective date for Eastern will change but that new date has not yet been determined. We will provide a status on April 14, 2016 and once the revised schedule is determined, the appropriate updates would be made with the states. Mark then provided a status on the Request for Proposal (RFP) that had been sent to suppliers to secure a Third Party Facilitator for the project. He said only one vendor responded which was Wicresoft. CenturyLink did conduct an interview with Wicresoft and based on the criteria of cost, knowledge, availability and our experience so far with them on the Access Consolidation project, CenturyLink is recommending that Wicresoft be selected as the Third Party Facilitator for the project. Mark asked if there were any concerns. He said customers could provide feedback on this recommendation on the call or via the CMPCOMM mailbox but unless there is feedback, CenturyLink will be proceeding with this selection. CenturyLink will likely not engage Wicresoft until the new effective date is determined. Kim Isaacs – Integra said she would like to have time to consider this selection within Integra and asked if anything had yet been formalized with Wicresoft. Mark Coyne – CenturyLink said this is the CenturyLink recommendation based on merger agreements. He said CenturyLink would like to have any CLEC comments sent to the CMPCOMM mailbox by March 31, 2016. If there are any comments, they would be considered in the April CMP meeting. Mark asked if there were any other questions. There were none.

2/17/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink provided an update on the Local Service Consolidation project relaying that the Preliminary Implementation Plan Review meeting was held on January 27, 2016 and those meeting minutes are available. There was a request by the CLEC community to extend the formal Comment cycle. CenturyLink sent a notification to extend the comment cycle through February 11, 2016 thus providing an additional week. Mark said the response to comments and final version of the Local Service Consolidation Plan is due February 25, 2016. In regard to the Request for Proposal (RFP) for a Third Party Facilitator, Mark said the CLEC Notification with the redlined RFP was sent for review on January 28, 2016 with CLEC feedback due February 11, 2016. CenturyLink sent a notification that included the Response to CLEC comments and the Final version of the RFP on February 16, 2016. CenturyLink is distributing the RFP to potential vendors. Mark asked if there were any questions. There were none.

01/27/16 Preliminary Interface Implementation Plan Review Meeting FINAL Local Service Ordering and Billing System Consolidation Plan Meeting minutes

SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs.

Attendees: Troy Peters – Alliance Connect (Iowa Network Services) Donna Barfield – Birch Katherine Merschat – Birch Mary Taylor – Birch Tiffany Kidd – Birch Dennis Molner – Charter Communications Linda McDonald – Charter Communications Tam Doan – Comcast Jason Renander – Comcast Andrea Smith - Comcast Kasha Fauscett – Comcast Lynn Notarianni – Colorado PUC Susan Travis – Colorado PUC Shannon Bishop – Consolidated fka Inventive Christy Kennedy – CTC Communications Rob Garth - DishNET George Devargis - DishNET Graham Northcutt- DishNET Joel Mitchell- DishNET Melat Lewis- DishNET Shawn Stickle- DishNET Josh Santos – Douglas FastNet JoAnn Norton – Gervais Telephone Co. Brendan Hamel – Granite Adam DeFeo – Granite Judy O’Day – Granite Budd Shearing – Granite Nancy Hansen – Granite Lisa Lynn – Granite Edie Wallace – Granite Kim Isaacs - Integra Laurie Roberson – Integra Nancy Taylor – Integra Julie Pickar – Integra Jamie Shay - Integra Carmen Painter – LS Networks Valerie Starr - LS Networks Emily Davis – Midcontinent Karen Viste - Midcontinent Mary Lohnes - Midcontinent Bonnie Johnson - Minnesota Department of Commerce Lan Nguyen - Neustar Armando Fimbres – Oregon PUC Pam Popp – Popp Communications LoriAnn Kuhn – Quantum Communications Jeff Hocker - – Quantum Communications Kurt Boucher - Southwest Cyberport Rick Heck - Spectrotel Jeanne Kulesa – Synchronoss John Zhan – Synchronoss Manjunath Gowda – Synchronoss Jackie Diebold - TDS Telecom Marnie Silvernail - TDS Telecom Victor Gaither - Time Warner Cable Ed Keefer – Value Telecommunications Tim Zawislak – Washington Commission (Staff) Lynn Denton – Windstream Don Lemke – Windstream Mary Conquest – XO Communications Mark Coyne - CenturyLink John Hansen - CenturyLink Denise Martinez - CenturyLink Sandy Nelson - CenturyLink Mike Laughman - CenturyLink Shawn Simpson - CenturyLink Sue Kriebel - CenturyLink Lee Gomez - CenturyLink Renee Albersheim - CenturyLink Marty Wilson - CenturyLink Rusty Burdette - CenturyLink Rick Breitenbach - CenturyLink Mike Norton - CenturyLink Susan Lorence - CenturyLink

Mark Coyne - CenturyLink defined the purpose of the call which is to review the CenturyLink Local Service Ordering and Billing System Consolidation Plan which combines the requirement of the Detail Plan as specified by Merger requirements and the Preliminary Interface Implementation Plan as required by CMP. The plan is to cover at a high level each section of the Consolidation Plan. Mark said Ordering and Billing SMEs are on the call to answer any customer questions. For any questions that cannot be answered on the call, CenturyLink will take an action item for follow-up. The CenturyLink response will be covered either in the meeting minutes or will be covered in a subsequent CMP meeting. Any technical questions will be addressed as part of the Draft Technical Specifications planned for April 8, 2016. Mark asked if that process would work for those on the call. There were no objections. Mark began the review of Consolidation Plan. The following questions were asked as the high points of each section were covered.

Section 1.0 Executive Summary Kim Isaacs - Integra said it was too early to use the term Benefits for customers. At best, any OSS transition can be difficult; it is important for discussion to occur early. Kim said there is a lot of work that has to be done in EASE for it to be equivalent to IMA and that execution will determine the benefits. Mark Coyne - CenturyLink said the updates to EASE are addressed later in the document.

Section 1.2 - Assumptions Joel Mitchell - DishNET asked about availability of completed orders for 24 months and whether that history would be kept in IMA.

Mike Norton - CenturyLink said the Completed orders would remain available in a view only mode in IMA and that following conversion, the same archive requirements as exist today would remain in the new system.

Kim Isaacs - Integra said her assumption is that not only would CMP be followed for the consolidation itself but that CMP would be followed to address future system updates.

Mark Coyne - CenturyLink said that was correct as it pertains to the products/services governed by CMP today.

Rob Garth - DishNET asked if BillMate would be retained as one of the existing output choices for billing media.

Sue Kriebel - CenturyLink said that CenturyLink is still analyzing the best option and it was only the ASCII BillMate format that was undecided.

Joel Mitchell - DishNET asked whether the billing account number structure in EASE would be used or whether the structure in IMA would be retained. Mike Norton - CenturyLink said an account hierarchy will be set up in EASE based on RSID/ZCID. He said CenturyLink plans to hold a Customer Brown Bag on account hierarchy options and then have Service Managers work with customers to determine how their accounts should be set up. In regard to account numbers in Ensemble, they are set up based on Product ID which is typically the telephone number.

Joel Mitchell - DishNET asked if the WTN structure (NPA NXX and Cus Code) would be used.

Sue Kriebel - CenturyLink said the invoice in Ensemble will not be in NPA NXX Cus Code format but will be a nine digit number.

Mike Norton - CenturyLink said BAN mapping changes will be communicated well in advance of the conversion.

Kim Isaacs - Integra asked if the BANs for unbundled loops will change formats and no longer use the NPA NXX format. Kim asked if circuit ids will change.

Sean Simpson – CenturyLink said CenturyLink will try not to change those account number in Ensemble unless there is already a product id in existence with that same number. CenturyLink will analyze each account number from CRIS to determine whether it can be reused. Sean said circuit ids themselves will not change.

Joel Mitchell - DishNET asked if the consolidation was only for ordering or if there were support system changes also, e.g., NEAC vs. CSIE or modem activation.

Mark Coyne - CenturyLink each area will be looked at individually.

Kim Isaacs - Integra said that in regard to any support system changes, the merger conditions require adequately trained staff.

Mike Norton - CenturyLink said the back end dispatch, design and provisioning processes are not changing with this project. There have already been some consolidations where legacy CenturyLink has consolidated into Legacy Qwest systems. Section 2.1 Current State System View Lynn Notarianni – Colorado PUC said there are inconsistencies on how the terms LSR orders, Local Service Requests, orders, etc., are used in the Consolidation Plan and thought they may have different meanings. Lynn suggested it would be helpful to figure out the right term to use.

Mark Coyne - CenturyLink said we will take that action item back to the document owner to review and be more consistent.

Section 2.2 End State System View Kim Isaacs - Integra asked whether CenturyLink retail was going to use EASE as the ordering platform for residential services.

Mike Norton - CenturyLink said CenturyLink Retail only uses EASE for the one process of Loss notification otherwise Retail works directly in Ensemble and other platforms.

Kim Isaacs - Integra said then Retail ordering cannot see what Wholesale is doing.

Mike Norton - CenturyLink said that is correct that Retail cannot see what is in EASE for Wholesale and that for Ensemble, he is working with CenturyLink Regulatory to assess if any enhancements are required for CPNI for Legacy Qwest.

Kim Isaacs - Integra asked if there will be the capability that a CLEC can view the CSR of another resale account like what occurs in IMA today?

Mike Norton - CenturyLink said that will be the same.

Kim Isaacs - Integra said Integra has had a problem with another company that uses a Synchronoss application and asked if CenturyLink was going to lock down Wholesale BANs so Retail cannot add to them.

Mike Norton - CenturyLink said those details are still being worked out with Regulatory.

Section 2.3.1 Service Ordering Comparison – IMA to EASE Rob Garth – DishNetwork asked whether there would be improvement in the process to “Manage Users” and whether a certificate was required. Rob asked if the process would utilize a GUI or an API.

Mike Norton - CenturyLink said EASE does not generally require a certificate but said there may be a requirements for one if there is electronic bonding. Mike said there are different user administration requirements. A technical call will be conducted with IT personnel on both sides to review the certificate requirements, XML tech specs, testing, etc.

Adam DeFeo – Granite asked how to get on the distribution list for the technical calls.

Mark Coyne - CenturyLink said systems notifications will be sent for the technical reviews so customers should be sure they are signed up to receive notifications or they can send an email to cmpcomm@centurylink.com for assistance.

Rob Garth - DishNET asked if there would be a GUI or API to assist with user management.

Mike Norton - CenturyLink said there is a GUI based user management capability for customers. Mike said he did not think APIs are available in EASE nor are they available today in IMA.

Mark Coyne - CenturyLink referenced the matrices in Section 2.3.1 and said the asterisk indicates there will be development required in EASE to provide those functions.

Joel Mitchell - DishNET asked if the functions that are to be added to EASE will be placed in production prior to conversion.

Mike Norton - CenturyLink said the EASE enhancements may go in for Legacy CenturyLink and Embarq customers prior to the LSR account consolidation which will help test the system updates and will introduce the new capability to the current EASE customers. He said appropriate system notification would be sent.

Josh Santos – Douglas FastNet asked if both IMA and EASE will be active in tandem while customers get used to the new system.

Mike Norton - CenturyLink said no, IMA and EASE will not be available in tandem for the same states. He said the system implementation will be phased by region so once Eastern is converted, IMA will only be available to review the 2 year old order history. For Western and Central, IMA and CRIS will be business as usual

Joel Mitchell - DishNET asked if the “Manage Users” functionality in EASE will allow more control of user access and gave the example of whether some order functions could be limited for one person vs. another.

Mike Norton - CenturyLink said if that capability exists today in IMA, then the capability would have to be looked at for EASE.

Joel Mitchell - DishNET asked about recapping from Pre-order to order. Joel said they have a lot more questions about how functions will be provided but would hold off until the draft tech specs are available.

Mike Norton - CenturyLink said discussion is underway as to how to provide information that will aid customers in the transition, likely it will be some combination of tech specs, PCATs, developer worksheets, etc. He said the PCATs are probably the most descriptive of the changes.

Kim Isaacs - Integra said under the matrix for Ordering Functionality, there are lot of functions not listed and wanted to insure those are being addressed.

Mike Norton - CenturyLink said the SME team is currently going through user stories and that there are high level functions as well as specific functions that they are capturing. He said the matrix would be very extensive to add them to this document but said he thought they would be delineated in the Tech Specs.

Lynn Notarianni – Colorado PUC asked if part of the concern is that this Consolidation Plan is preliminary and asked if a statement should be added that the document is not intended to represent the full capability that will be provided.

Mark Coyne - CenturyLink said this document is preliminary and pointed to the Scope. He said it is not intended to go into great detail.

Kim Isaacs - Integra said she knows this is a high level but like the ASR project, there were some differences in how customers and CenturyLink define functionality. Kim said she is concerned that there is no asterisk by the EASE functions since she knows there are some specific capabilities, requested thru CMP by both CLECs and Qwest, that need to be added to EASE.

Mark Coyne - CenturyLink said that though this Consolidation Plan is not intended to be very detailed, there will likely be updates made to it as more is known. The SME team now knows more than they did when the document was released in early January.

Joel Mitchell - DishNET asked if the Consolidation Plan would be updated monthly.

Mark Coyne - CenturyLink said not necessarily monthly but it will definitely be updated when CenturyLink responds to CLEC comments on February 25, 2016.

Joel Mitchell - DishNET asked if it was possible to extend the February 4, 2016 comment cycle due date since this session had been pushed out a week.

Mark Coyne - CenturyLink said he would look at whether the date could be pushed a week and would include that in the meeting minutes. [NOTE: On February 2, 2016, CenturyLink sent out notifications to extend the formal comment period by one week. The original comment cycle was to end on February 4, 2016 but was extended through February 11, 2016. See notice numbers SYST.OTHR.02.02.16.F.14265.LSRSysCnsldtnCmtsExtnded and GENL.ANNC.02.02.16.F.14266.LSRSysCnsldtnCmtCycExtnd.]

Mike Norton - CenturyLink said the SME team will add a lot more asterisks on the various matrices after continued requirement meetings over the last month. Lynn Notarianni – Colorado PUC said because of the complexity of the LSR transition and potential for Commission complaints, she thinks it would be appropriate to add a disclaimer that this is a preliminary document and is not intended to represent the final project functionality. Lynn said that will help insure that all understand the intent of this document.

Joel Mitchell - DishNET asked if there would be a distinction between Legacy Qwest and Legacy CenturyLink/Embarq territory. He said there will be a need to know which support group to call depending on the region and then gave the example of CEMR-MTG and asked if it applied to Legacy Qwest and Legacy CenturyLink/Embarq territory.

Mike Norton - CenturyLink said the goal is to minimize functional or product differences across CenturyLink. He said because there are some backend systems that are region specific, there will be a requirement to provide some indication of differences should they occur. Mike said there are two primary systems in the CenturyLink suite that are not common – Address Management and the Copper inventory for assignment. Other than that, the main functional applications are the same.

Lynn Notarianni – Colorado PUC asked if the Consolidation Plan identifies what is to be done with the various PID/PAP measures. Lynn said she assumes since the applications are changing the measures will need to be updated.

Mike Norton - CenturyLink said we will add a paragraph in the document for that and there is a SME team already working on that.

Section 2.4 Billing System Differences between CRIS to Ensemble Tam Dohn – Comcast asked about the BAN changes and said they use a third party to set up new accounts which can take some time. She asked if a report can be received in advance.

Sue Kriebel – CenturyLink said yes we will provide that cross reference a couple months in advance and that for those customers that are testing with us, it would be provided sooner. Sue said we are working thru that process now on the ASR side.

Kim Isaacs - Integra said as Integra went through a system transition with another company, the BAN change was a big issue. She said if there any deviations to the plan, they will need to be communicated ASAP. If a customer cannot audit the bill, that stops payment and said CenturyLink may need to consider stopping LPCs for a period of time.

Section 3 Consolidation Plan Implementation Troy Peters - Alliance Connect asked how customer support will work when this is occurring by region.

Mark Coyne - CenturyLink said the CenturyLink customer support will be scheduled to support all customers regardless of their location.

Kim Isaacs - Integra said Integra has already expressed concern that this is an aggressive schedule. Kim said there is an LNP administrator change that overlaps with this schedule and asked how it will impact the EASE implementation. She said there is no implementation date yet but thought it could impact resources for companies.

Mike Norton - CenturyLink said EASE does not interact with NPAC but said the SOAs would be impacted with that NPAC change.

Mark Coyne - CenturyLink said any scheduling concerns will likely be part of the formal comments that the SME team will then address.

Section 3.2 3rd Party Facilitator Lynn Notarianni – Colorado PUC asked about the 3rd Party Facilitator and how that process will work.

Mark Coyne - CenturyLink relayed that there will be a notification sent on January 28, 2016 about the 3rd Party Facilitator selection process that will also provide the proposed RFP updates and planned schedule. Mark said the 3rd Party Facilitator may not come on board until the 2nd quarter timeframe. NOTE: For details of this timeline and process, refer to notification CMPR.CMPP.01.28.16.F.14250.RFPThrdPrtyFacilitatrLSR.

Section 3.3.2 Training and Process Plan Kim Isaacs - Integra asked what the training will encompass and whether it will cover the business rules. Kim said it is the understanding of the business rules that is most important.

Mark Coyne - CenturyLink said he thought training would cover screen navigation but would relay that information back to the Training team.

Mike Norton - CenturyLink said IMA is on LSOG 6 and EASE is on LSOG 10, CenturyLink will be moving to a current version of the LSOG.

Kim Isaacs - Integra said Qwest made the business decision as to what LSOG that IMA is based on. Going from LSOG 6 to 10 and the related update to so many business rules is a big concern and will need to be made clear to those writing the order.

Mike Norton - CenturyLink said he thinks EASE will be moving to LSOG 14.2 (numbering is now year and quarter) with customization. The tech specs and PCATs would be updated accordingly. Mike said that upgrade will occur in EASE first so it will not be part of the actual conversion.

Rob Garth - DishNET asked the timeframe for the LSOG version upgrade to EASE.

Mike Norton - CenturyLink said it will likely be about 90 days before the planned conversion. By doing this, the current EASE customers will have time to implement the changes. The benefit is that it allows the focus at conversion to be on that vs. an additional system change. Mike said that will increase the quality of the initial implementation.

Kim Isaacs - Integra said another big problem that Integra experienced during a recent system consolidation with another company was that flowthrough was significantly impacted and caused an impact to center staff that had to process the orders manually. Kim said CenturyLink should plan on an increase in manual orders and that training on the CenturyLink side needs to prepare for that.

Jackie Diebold - TDS Telecom asked if the training would be instructor led or web based.

Mark Coyne - CenturyLink said he does not think that has been determined yet but that it will follow CMP requirements which provides for instructor led, web based or a combination. Mark said training is scheduled to begin July 15, 2016.

Lynn Notarianni – Colorado PUC asked if CenturyLink is planning for an interim process for escalations during the conversion.

Mark Coyne - CenturyLink said there will be an interim process for escalations during the conversion.

Section 3.3.3 Customer Testing Rob Garth - DishNET asked if there are plans to enhance the current EASE testing, for example, availability, test cases, etc.

Mike Norton - CenturyLink said there will be a dedicated environment for CLEC testing which will interface with downstream systems, such as address validation, inventory systems, CFA queries. Mike said there will be a “full suite” of applications to support testing.

Rob Garth - DishNET asked how defect classification, reporting and resolution would be addressed - including SLAs for resolution. Rob said he wants to work with CenturyLink to determine this prior to production and asked if there will be a severity rating for defects and asked if CLECs will have a voice in that.

Mike Norton - CenturyLink said that UAT will be where this process is developed. Mike said the 3rd party facilitator will play a key part to developing the defect process also. He said it is difficult to have an SLA tied to problem resolution since there are so many variables that could impact that. Mike asked if it was reasonable to wait until the 3rd party facilitator is available.

Rob Garth - DishNET said he thought it was reasonable but did not want to get too much farther before it is determined.

Mike Norton - CenturyLink said it will be resolved well ahead of UAT beginning. There is already protection in the Testing process with the Go/No Go decision that is part of the merger agreement. He said the 3rd party facilitator should be involved in the negotiation which benefits both sides.

Mark Coyne - CenturyLink said he thought defining those processes will be part of the Test Planning in preparation for UAT.

Section 3.3.4 Load and Performance Testing Rob Garth - DishNET asked if CenturyLink will include customers in Load and Performance testing to test capacity.

Mike Norton - CenturyLink said CenturyLink will share the Load and Performance volumes and results.

Rob Garth - DishNET said Dish has had to temper some large volume queries in IMA in the past and would like to test using some real world data. Rob asked if CenturyLink is still tied to the same back end systems which have certain volume limitations.

Mike Norton - CenturyLink said EASE is tied to the same back end systems and said any performance changes to those systems are out of scope for this project. He used the example of the Loop Qual volumes in TIRKs.

Rob Garth - DishNET asked if there will be a simplified process for Loop Qual.

Mike Norton - CenturyLink said CenturyLink will provide the same information that IMA provides but it may be presented differently.

Rob Garth - DishNET asked if system availability will be the same as today or would there be an increase in hours.

Mike Norton - CenturyLink said there are “guaranteed hours” of availability in EASE however the system is not taken down if no system maintenance is required; this may result in an increase in availability but it is not guaranteed. At a minimum, CenturyLink will meet the available hours that exist in IMA today.

Rob Garth - DishNET asked if supporting infrastructure systems will remain as today by territory, e.g., SAGA or FAM.

Mike Norton - CenturyLink said that consolidating infrastructure is not part of this project but gave the example that address validation may eventually go to a data warehouse solution.

Mark Coyne - CenturyLink said the call was nearing the planned timeline and reminded customers their comments can be sent to cmpcomm@centurylink.com. He said the comment cycle will be extended through February 11. Depending on the extent of the questions, another call might be scheduled to allow more discussion. Mark asked if there were any final questions.

Rob Garth - DishNET asked when the minutes from the call would be available.

Mark Coyne - CenturyLink said the draft meeting minutes will be available in a week on the wholesale calendar.

Susan Lorence - CenturyLink said the draft minutes will also be distributed to participants on the call but we may need to use a point of contact per company if an email address is not available.

Mark Coyne - CenturyLink thanked everyone for participating on the call today and said he appreciated the discussion.

The meeting was adjourned at 11:00 AM Mountain Time.

01/20/16 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink provided an update on the LSR Consolidation project relaying that the CMP Initial Release Notification and the Initial Retirement Notifications were distributed on January 4, 2016 with an extended formal Comment cycle. As of that date, the Preliminary Interface Implementation Plan was available for review. The Preliminary Interface Implementation Plan Review Meeting is now scheduled for January 27, 2016 from 9:00 -11:00 AM MT. Mark said CenturyLink is working on updating the RFP for the 3rd Party Facilitator for this project. The Release Milestones are now included in the OSS Calendar. Mark asked if there were any questions. There were none.

12/16/15 Monthly Systems CMP Meeting SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs. Mark Coyne – CenturyLink said these four CRs associated with the LSR Consolidation Project were presented by Tracy Strombotne – CenturyLink in the November 2015 monthly meeting. Mark said an Ad hoc meeting was held with the customer community on December 1, 2015. The Powerpoint presentation that was reviewed on that call is posted to the Wholesale calendar along with the final version of the meeting minutes from that call. Mark said the CMP notice and Preliminary Interface Implementation Plan will be available in early January 2016 and the notice will include a 30 day customer review cycle. An ad hoc call will be established for mid January for CenturyLink to review the plan with customers. Mark said work is beginning around developing the RFP for the 3rd Party Facilitator. He said a notice will be sent in early January to ask for customers to identify themselves if they would like to be involved in developing the RFP for the LSR project. It is likely that we will be able to use some of the work that occurred for the ASR Project. Mark asked if there were any questions. There were none.

LSR Consolidation Project Ad hoc meeting minutes FINAL December 1, 2015 SCR110415-1 Implement Ensemble to provide a single application to bill Wholesale Customers for their Local Service Requests (LSR) SCR110415-2 Implement EASE to provide a centralized platform for LSR processing SCR110415-3 Retire CRIS for Wholesale billing SCR110415-4 Retire the IMA GUI and XML application for processing LSRs.

Attendees: Tywanda Bloodworth - Access Point Deborah Pasquale - Access Point Patrick Hall - Access Point Katherine Merschat - Birch Chris Garrison - Central Scott Telephone Renee Albersheim - CenturyLink Susan Lorence - CenturyLink John Hansen - CenturyLink Lee Gomez - CenturyLink Mark Coyne - CenturyLink Tracy Strombotne - CenturyLink Mike Norton - CenturyLink Paul Dunphy - Charter Linda Birchem - Comcast Randee Ryan - Comcast Andrea Smith - Comcast Kasha Fauscett - Comcast Roger Delgrosso - Custom Call Jay Bobacaci - Custom Call Kim Isaacs - Integra Laurie Roberson - Integra Becky Chandler – Integra Rhonda Otto – Integra Steve Schmidt - Iowa Network Services Mary Lohnes - Midcontinent Bonnie Johnson - Minnesota Department of Commerce Lan Nguyen - Neustar Amber Taylor - Nex-Tech Missy McMullan - Nex-Tech Jackie Diebold - TDS Telecom Mark Andersen - TDS Telecom Denise Boe - Tekstar Victor Gaither - Time Warner Cable Jamie Wright – Valley Telecom

Mark Coyne – CenturyLink defined the purpose of the call which is to share information about the LSR system integration work associated with four CenturyLink Change Requests that were presented in the November 2015 Monthly CMP meeting. Mark said the call would be reviewing the “CenturyLink LSR System Ordering and Billing Consolidation” document that is posted on the Wholesale calendar and that attendees could ask questions at any time during the call. If the question could not be readily answered, CenturyLink would take an Action item to follow up after the call. Mark said there would be more meetings on this topic through the life of the project.

Renee Albersheim – CenturyLink then reviewed the Agenda located on page 3 of the PowerPoint presentation. Renee then presented history regarding the Merger Commitments and steps that lead up to this conversion project. She then covered the systems that will be addressed during the LSR system consolidation project: IMA to EASE for Ordering and CRIS to Ensemble for Billing. The benefits of the LSR system consolidation project were then presented. Renee asked if there were any questions.

Kim Isaacs - Integra asked what the impacts to CenturyLink residential customer will be.

Renee Albersheim - CenturyLink explained that the CenturyLink Residential group did not use the systems in the same manner as the CLEC, but that systems are used for CenturyLink Residential accounts.

Kim Isaacs - Integra said she had experience with previous conversions to Synchronoss products and asked about the significant volume increase [12/11/15 Updates received from Integra in CAPS] ASSOCIATED WITH CENTURYLINK RESIDENTIAL ACCOUNTS and the POSSIBLE impact to system stability and system response times. Mike Norton - CenturyLink responded that the internal CenturyLink systems interface directly with call center sub-applications that interface with Ensemble and there are volume implications that will be accounted for. The only CenturyLink retail use of EASE is invoked during the port-out process, otherwise, internal CenturyLink users do not use EASE.

Renee Albersheim - CenturyLink continued by describing the benefits of both EASE and Ensemble as per slide 6 of the presentation.

Kim Isaacs - Integra asked when it would be appropriate to present concerns.

Mark Coyne - CenturyLink replied if there were concern with a specific slide, they could be addressed at that time otherwise, they can be addressed at the end.

Kim Isaacs - Integra stated that for LSR GUI users, the documentation, especially regarding the Business Rules, a more user friendly document would be needed more like the IMA LSOR rules than just the technical specifications. [12/11/15 Updates received from Integra in CAPS] THIS IS AN EARLY REQUEST FOR THE LSR CONSOLIDATION PROJECT BECAUSE THE DOCUMENTATION FOR THE ASR CONSOLIDATION PROJECT WAS NOT USER FRIENDLY FOR A GUI USER.

Renee Albersheim - CenturyLink continued by explaining that with the new LSR system, there would only need to be one order for both provisioning and billing, whereas with IMA, it required two orders that CenturyLink had to synch up. She then turned the presentation over to Mike Norton – CenturyLink.

Becky Chandler – Integra asked if the back-up Billmate files would be required after the conversion and if the Ensemble bill was in CABS format.

Kim Isaacs – Integra said if the Billmate file goes away, the information that was on the Billmate file would still need to be available on the Ensemble bill.

Mike Norton - CenturyLink clarified that there are several bill media formats within Ensemble, but the BOS format was not one of them. CenturyLink is researching a BOS standard output for appropriate Design services when USOCs and FIDs are normally provided. Mike said the bulk of the services are non-design and will not have a BOS standard format. He confirmed the Billmate files are going away but the information would be on the Ensemble bills. Mike continued with slide 7 of the presentation that provided some history around the company that developed Ensemble and a description of the application.

Kim Isaacs - Integra asked about the PID/PAP performance metrics and if that would remain intact.

Mike Norton - CenturyLink confirmed that was true that equivalent data measurement points were currently being determined and fed into the reporting system.

Kim Isaacs – Integra said that was very good and asked if reports would remain available

Mike Norton - CenturyLink confirmed that they would be available.

Kim Isaacs - Integra asked if there would be testing available for the performance metrics.

Mike Norton - CenturyLink confirmed that there would be and mentioned a past conversion between Embarq and CenturyTel and that we would be utilizing lessons learned during that conversion to make this conversion better. He continued with the description of EASE as defined on slide 8.

Kim Isaacs - Integra said since CenturyLink is required by CMP to provide the release capacity for the following year, Kim asked if CenturyLink had negotiated an annual release capacity with Synchronoss.

Mike Norton - CenturyLink said that 95% of the EASE [12/11/15 Updates received from Integra in CAPS] [delete UPGRADES WERE IMPLEMENTED] DEVELOPMENT CAN BE MADE without Synchronoss support. The tool is an off-the-shelf tool but is very configurable. Most of the business rules are controlled by CenturyLink IT. From the GUI perspective, CenturyLink tries to remain complaint with the Synchronoss tool while utilizing the internal development function as needed. He added that during the conversion, CenturyLink would work closely with Synchronoss because there would be substantial development necessary in the initial stages.

Kim Isaacs - Integra asked Mark Coyne - CenturyLink if he thought there would be a similar level of hours available for EASE that currently exists for IMA.

Mark Coyne - CenturyLink responded that the CenturyLink IT folks are aware that CenturyLink is required to provide a certain annual capacity as required by CMP. He said we will have to wait and see how things progress. Mark said development has been tapering off with respect to IMA changes in recent years.

Mike Norton - CenturyLink discussed customer impacts as indicated on slide 9. He then described some of the key differences as listed on slide 10. CenturyLink has a team of system and business analysts that are working to determine differences between the functionalities of IMA and EASE and to determine if there are gaps that need to be closed.

Becky Chandler – Integra asked if the differences in the existing three Qwest billing systems was being addressed.

Mike Norton - CenturyLink stated that there are two SME/analyst teams that are performing detailed reviews of ordering and billing.

Kim Isaacs - Integra asked what “equivalent functionality” means to CenturyLink and stated that she did not believe that it meant the same to CenturyLink as it does to CLECs.

Mark Coyne - CenturyLink asked if Kim was looking for a definition.

Kim Isaacs - Integra offered the email status notification as an example and described her concerns comparing the functionality differences in the ASR conversion. She also mentioned IMA availability to pull CFA information in a range of 100 at a time and asked if EASE did the same. Kim said though CenturyLink identifies that both systems provide some capability does not necessarily mean they have equivalent functionality.

Mark Coyne – CenturyLink said he did not think anyone on the call could provide a solid definition. He said that CenturyLink was taking each capability and reviewing it in detail to determine if the functions would be considered equivalent between the two systems - which was being done on the ASR project.

Mike Norton - CenturyLink stated in general, when the systems are compared, the data and appearance may be different. He mentioned that Loop Qual as in IMA is not yet available in EASE and that would be defined as a gap and CenturyLink will need to build one. He also gave a few more examples of potential gaps that CenturyLink was addressing the equivalent functionality.

Kim Isaacs - Integra said that she had a concern and had asked the question during the initial ASR conversion walkthrough about ASR email status. Kim said she was still waiting for a response. She stated that equivalent functionality needed to be defined and that the differences between the systems needed to be addressed.

Tracy Strombotne – CenturyLink stated that we were looking into specifics on the ASR email status and should have a response from IT shortly.

Mark Coyne – CenturyLink said he thought the CenturyLink response to the ASR email status concern is part of the Delayed response to CLEC comments due December 9. If the CenturyLink response did not answer all of the questions, more discussion could occur.

Kim Isaacs - Integra reiterated that this is a big concern about equivalency that she has brought up multiple times on the ASR project. She said for the LSR project, Loop qualification and Raw Loop data will be a big focus to review equivalent functionality since today EASE is not where it will need to be. Kim said if there is not equivalent functionality it would be a No Go for the project vote.

Tracy Strombotne – CenturyLink said that CenturyLink could not possibly know how Integra uses all of the available functions of IMA and that she appreciates hearing the various examples that are important to CLECs.

Kim Isaacs - Integra stated that she wanted to be up front with the fact that these issues could affect CenturyLink’s ability to meet its timeline on the conversion.

Mark Coyne – CenturyLink said he appreciated Kim bringing it up early and that it is a lessons learned from the ASR project.

Renee Albersheim - CenturyLink added that CenturyLink recognized that Integra had done a lot of integration between its system and IMA which is why CenturyLink is trying to set up a visit so that we can see first-hand how the two systems work together.

Mark Coyne - CenturyLink added that this walkthrough is high level and that there are SME teams in both provisioning and billing that continue to work on these issues so that the final consolidation plan can be developed.

Mike Norton - CenturyLink continued the overview with slide 10 – Key Differences and said CenturyLink is working extensively to develop requirements to bridge each of the various gaps. Mike asked if there were any questions about this high level review of the key differences.

Kim Isaacs - Integra asked when the greater level of detail will be available to the CLECs.

Mike Norton - CenturyLink responded that the draft Tech Specs should be in April 2016. There will also be more information available with detailed implementation plan in early January 2016.

Kim Isaacs - Integra said that CenturyLink has identified that there has been quite a bit of work done to date and asked if those specific differences could be shared now.

Mike Norton - CenturyLink said he would work with the IT and CMP regarding that request and get back with her.

Mark Coyne - CenturyLink said most of that information would be included in the detailed consolidation plan and that CenturyLink will set up time to discuss the plan and differences.

Kim Isaacs - Integra asked when that would be done.

Mark Coyne - CenturyLink replied that it would be early January 2016 and that the timeline would be covered as part of the presentation.

Mike Norton - CenturyLink continued with his review of information in slide 11 – Conversion Strategy.

Mark Coyne - CenturyLink acknowledged that the call had gone over the scheduled hour and that if anyone needed to drop, CenturyLink would provide a summary of this call on the Wholesale Calendar. Mark then reviewed the Timelines on slides 12-14. He said the information above the timeline represents Merger related activities while the information below the timeline relates to CMP activities. Mark said the original approach as reflected on the slides was to issue the Implementation plan for the project in early December but that has been pushed out to early January. He said this information will be addressed in more detail in that Implementation Plan. Mark said if anyone had questions on the presentation after the call, those questions could be submitted through the CMP mailbox at cmpcomm@centurylink.com and we will respond. He next reviewed slide 15 – Next steps. Mark said the key purpose of the call is for customers to begin to understand the project so they can also begin to prepare for this significant project that will bring challenges to both CenturyLink and customers. CenturyLink wants the project to be a success for all parties. Mark asked if there were any questions. There were none.

The meeting was adjourned at approximately 10:45 AM Mountain Time

11/18/15 Monthly Systems CMP Meeting Tracy Strombotne – CenturyLink presented this new CenturyLink CR as listed in the CR Description. Tracy said the retirement of IMA will be the phased approach beginning with the Eastern region and said the retirement of IMA for all regions is planned for December 2017. Tracy asked if there were any questions. There were none.

Mark Coyne – CenturyLink said CenturyLink understands the challenges presented with this project – not only for CenturyLink but our customers - and we want the project to be a success for all impacted. Mark said any customer feedback will be provided to the Project team. A high level presentation had recently been provided to some customers and state commissions. CenturyLink will be sending out a meeting notice to conduct a review with all customers; the review is tentatively planned for December 1, 2015. CenturyLink is also planning on sending the Preliminary Interface Implementation Plan/Consolidation Plan on December 4, 2015. Similar to what occurred for the ASR project, the Consolidation Plan will provide more detail, including a more detailed Project timeline, and there will be an extended comment cycle with an Implementation Plan Review meeting to occur during the initial comment cycle. Mark asked if there were any questions.

Armando Fimbres – Oregon PUC asked whether the Consolidation Plan would be filed in each state and asked who would receive it in Oregon.

Renee Albersheim - CenturyLink said the Consolidation Plan will be filed under the Merger document in each state.

Kim Isaacs – Integra said [12/1/15 Updates received from Integra in CAPS] IN AN EFFORT TO IDENTIFY ISSUES EARLY IN THE PROCESS, IT APPEARS THERE IS A DIFFERENCE IN THE INTERPRETATION OF [delete HER CONCERN IS AROUND THE DEFINITION OF] “like functionality”. There may be a difference between CenturyLink and customers on what that definition means. Kim WAS [delete IS] concerned about THE SYSTEM DIFFERENCES LIST PROVIDED FOR THE ASR CONVERSION AND the timing if the system differences are provided as part of the detailed plan. [delete AND GAVE THE ] FOR example, JUST BECAUSE BOTH SYSTEMS CREATE FOCS DOES NOT MEAN THERE IS “LIKE FUNCTIONALITY”. IMA AND CORA CURRENTLY SEND EMAIL NOTIFICATION WHEN THE STATUS OF A REQUEST CHANGES. INTEGRA HAS BUILT INTERNAL [delete OF THE] automation of the emails that are received today from IMA.

Mark Coyne – CenturyLink said CenturyLink understands that customers have automation on their side that will need to be addressed. The Consolidation Plan will provide a matrix of comparison functionality between the EASE and IMA. Mark said during the review of that matrix is the time to discuss comparable functions and raise any concerns.

Kim Isaacs – Integra gave the example of the ASR plan where both systems do Preorder; it was identified in the ASR Project Plan as having like functionality. But if you look at address validation, it seems like there are differences between the systems that [12/1/15 Updates received from Integra in CAPS] COULD EQUATE [delete EQUATES] to a loss of functionality. Kim said she had raised this type of concern on the ASR side at THE FIRST MEETING REGARDING THE ASR CONSOLIDATION and is still waiting to hear on her specific question: Will EASE send an email to their provisioners if the status of the ASR changes.

Tracy Strombotne – CenturyLink said we will get an answer and include it in the meeting minutes if possible. [12/1/15 Updates received from Integra in CAPS] INTEGRA NOTE: AS OF DEC. 1, 2015 AND 7 DAYS AFTER THE FINAL TECHNICAL SPECIFICATIONS WERE DUE (CENTURYLINK’S RESPONSE AND FINAL TECHNICAL SPECIFICATIONS HAVE BEEN DELAYED), INTEGRA STILL DOES NOT KNOW IF EASE WILL HAVE THE CORA FUNCTIONALITY OF SENDING AN EMAIL NOTIFICATION WHEN THE STATUS OF AN ASR CHANGES.

Kim Isaacs – Integra requested that CenturyLink drill down to the next level when the LSR Consolidation Plan is provided. She said Raw Loop Data is an important function and [12/1/15 Updates received from Integra in CAPS] [delete SHE THOUGHT] EASE needs a lot of enhancement to provide that capability. Kim said CenturyLink needs to provide a greater level of detail in the LSR Consolidation plan to specify the differences between how IMA qualifies a Loop and how EASE does. She believes it is a big difference to address before migrating to EASE.

Tracy Strombotne – CenturyLink said there are CenturyLink SMEs on the LSR Project currently working on requirements and to address the differences.

Mark Coyne – CenturyLink said there is a difference between the Project Plan level of detail and the Technical Specification level of detail but it will be good to get the concern expressed.

Kim Isaacs – Integra said she is concerned that CenturyLink is making plans without understanding the level of comparable functionality required. If that information is available early, it will be less of an impact on the Project timeline.

Tracy Strombotne – CenturyLink said we appreciate Kim providing her expectations early since as Kim has indicated, it will be less impacting than if they are expressed later.

Kim Isaacs – Integra said she wants very much for the LSR project to be a success on both sides. It is important for CenturyLink to be aware that each CLEC may have built different automation on their [12/1/15 Updates received from Integra in CAPS] [delete CUSTOMER] side.

Mark Coyne – CenturyLink asked if other CLECs had similar concerns that they wanted to express.

Bonnie Johnson – Minnesota Department of Commerce said she will review the testimony in the Merger proceedings around the Loop Qualification function and the differences between IMA and EASE. Bonnie said she believes CenturyLink assured the Minnesota Commission that they would address any differences. She said CenturyLink cannot consider it like functionality if there is an automated Loop Qual response in IMA that takes seconds with a manual Loop Qual process in EASE that takes a several days.

Mark Coyne – CenturyLink said as previously stated, CenturyLink intends to meet our commitments in regard to the Merger agreement. To do that, it is important to understand the differences.

Liz Tierney – Global Capacity said she agreed that it is very important for them to understand the system differences and the early documentation will help prior to receiving the detailed technical specifications.

Mark Coyne – CenturyLink said CenturyLink understands IMA is an important customer application as customers helped build it 15 years ago. CenturyLink wants to make it to be a success for all.

Kasha Fauscett - Comcast asked about the ebonding method with EASE.

Tracy Strombotne – CenturyLink said EASE will provide ebonding for the GUI and XML. If more detail is required, it will need to be taken offline.

Linda Birchem – Comcast said she joined late and asked what the CR number is for the project.

Mark Coyne – CenturyLink said there are four CRs under Attachment C of the System package. He asked if there were any other questions. There were none.

CenturyLink Response

Open System CR SCR020718-1 Detail

 
Title: Retire the CenturyLink file transfer protocol CenturyLink Protected Internet Delivery (CPID) previously known as Qwest Protected Internet Delivery (QPID).
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR020718-1 Development
3/1/2018
-   15/ File Transfer Protocol
Originator: Bunnell, Mark
Originator Company Name: CenturyLink
Owner: Bunnell, Mark
Director:
CR PM: Lorence, Susan

Description Of Change

CenturyLink is working to retire the existing file transfer interface CPID/QPID no later than by end of year 2018. Instead of customers using this CenturyLink developed protocol, CenturyLink will be working with impacted customers to create a transition plan to an existing gateway that follows industry file transfer standard/protocols. The industry standard tools for file transfers have significantly increased functionality and enhanced security capability.

The CMP requirement for retiring an interface is 270 days.

With the retirement of CPID/QPID, references to this protocol will be removed from the CenturyLink wholesale web documentation following the appropriate CMP notification process.

NOTE: CenturyLink will be introducing a related CR to enhance the current gateway to provide additional standard options for file transfer. An existing tool allows the File Transfer Protocol over SSL/TLS, e.g., FTPS.

02-28-18 NOTE: The System retirement notice identified the following areas of impact:

• PIC/LPIC

• Billing information – CRIS and Additional Outputs SMDR, Completion Report, Loss Report

• FAM-SAGA

• RSS

• DLIS

• Performance Assurance Plan Information

This CR is related to SCR020718-2 to Introduce additional industry standard file transfer protocols.

Status History

Date Action Description
2/7/2018 CR Submitted CR Submitted. 
2/9/2018 CR Acknowledged CR Acknowledged. 
2/21/2018 Status Changed Status changed to Presented. 
2/21/2018 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment C in the Distribution Package. 
2/23/2018 Communicator Issued See notification number SYST.OTHR.02.23.18.F.16396.Init_Retirement_CPID_QPID. 
2/28/2018 Record Update The Description section of the CR was updated with the areas of system impacts. 
3/1/2018 Status Changed Status changed to Development. 
3/21/2018 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment I in the Distribution Package. 
4/6/2018 Communicator Issued See notification number SYST.OTHR.04.06.18.F.16528.FINALRetirementCPID_QPID. 
4/18/2018 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment I in the Distribution Package. 
5/7/2018 Communicator Issued See Notification number GENL.ANNC.05.07.18.F.16550.CPID_QPID_Decomm. 
5/16/2018 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment I in the Distribution Package. 
8/15/2018 Discussed at Monthly CMP Meeting Discussed in the August Systems CMP Meeting - See Attachment J in the Distribution Package. 
9/14/2018 Additional Information CR was updated by Mark Bunnell, CR Originator, to now reflect an April 1, 2019 planned retirement effective date. 
9/19/2018 Discussed at Monthly CMP Meeting Discussed in the September Systems CMP Meeting - See Attachment I in the Distribution Package. 
9/28/2018 Communicator Issued See notification number SYST.OTHR.09.28.18.F.16950.REV_FINAL_RetireCPID_QPID. Notice to extend effective date. 
10/2/2018 Communicator Issued See notification number SYST.OTHR.10.02.18.F.16963.REV_FNL_RetireCPID_QPID. 
2/14/2019 Additional Information CR was updated by Mark Bunnell, CR Originator, to now reflect a planned retirement effective date of December 31, 2019. 
2/20/2019 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment I in the Distribution Package. 
2/27/2019 Communicator Issued See Notification number SYST.OTHR.02.27.19.F.17127.REV_FINAL_RetireCPID_QPID to extend effective date until December 31, 2019. 

Project Meetings

2/20/19 System CMP Meeting Mark Coyne – CenturyLink said the CR originator has requested a change to the planned effective date to move it from April 1, 2019 to now be December 31, 2019. Mark said that a revised Final system notice that provides the new planned effective date will be sent by month end. It will also request customers that have not yet been contacted by the IT SME team to start discussions about the protocol change over from CPID to send an email to QPID.Decomm@centurylink.com or CMPCOMM@centurylink.com.

9/19/18 System CMP Meeting Mark Coyne – CenturyLink stated the planned effective date for this retirement was November 20, 2018. After talking over the current status with the SME team, the CR was revised to now reflect an April 1, 2019 date. A revised Final System notice will be distributed shortly. 8/15/18 System CMP Meeting Mark Coyne – CenturyLink said the SME team is continuing to work with those customers where they have received POC information which remains about 50% of customers. The effective date for this planned retirement is November 20, 2018 however CenturyLink is reevaluating that date based on the amount of work left to do.

5/16/18 System CMP Meeting Mark Coyne – CenturyLink said a General notification GENL.ANNC.05.07.18.F.16550.CPIDQPIDDecomm was distributed to remind customers to submit POCs to the CenturyLink mailbox QPID.Decomm@centurylink.com. Mark said the IT SME team has received POCs for approximately 50% of customers so far. The team is working with each customer to aid in the transition to other available protocols. CenturyLink plans to issue an Event notice early June to see about getting additional POCs. Mark asked if there were any questions. There were none.

4/18/18 System CMP Meeting Mark Coyne – CenturyLink said the Final System notification and CenturyLink response to comments for this CR was sent on April 6, 2018. He reminded those on the call to submit their POC to the CenturyLink mailbox QPID.Decomm@centurylink.com. CenturyLink will also send a General or Process notice mid May to ask customers to send in their POC information so our IT team can assist impacted customers with the transition to a different file transfer protocol.

3/21/18 System CMP Meeting Mark Coyne – CenturyLink said the system notification was sent February 23, 2018 to announce CPID/QPID retirement. The notice is included in the package. The Comment cycle ended March 9, 2018. During the CLEC comment cycle, two comments were received. The Final notice and response to CLEC comments are due April 6, 2018. Mark said our CenturyLink IT team recently relayed that only a handful of customers have submitted their POCs to the CenturyLink mailbox QPID.Decomm@centurylink.com as requested on the notice. He reminded customers to submit their POCs to the mailbox and said CenturyLink will also send a Process notice to remind customers to submit those POC names so IT can begin to work with them on the transition plan to move to a different file transfer protocol.

2/21/18 System CMP Meeting Mark Bunnell – CenturyLink presented this new CR to retire CPID/QPID for file delivery which is old and not as secure. Mark said CenturyLink will be introducing a protocol to take its place that is industry standard and has increased functionality.

Kim Isaacs – Allstream said this CR is a good idea and was happy to hear that the new tool that will be introduced will not require a digital certificate.

Mark Coyne – CenturyLink then relayed that though this is not a system application, CenturyLink plans to send a 270 day system retirement notification on February 23, 2018 with a planned CPID/QPID Production Retirement Date of November 20, 2018. CenturyLink will be asking each customer to send a Point of Contact for their company to a new CenturyLink mailbox that will only be used for customers on CPID/QPID. Our SME team will then work with each impacted customer to develop a transition plan to move from CPID/QPID to a different file transfer protocol.

CenturyLink Response

Open System CR SCR020718-2 Detail

 
Title: Introduce additional industry standard file transfer protocols for more flexible options and improved security as CPID/QPID is retired.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR020718-2 Development
3/1/2018
-   15/ File Transfer Protocol
Originator: Bunnell, Mark
Originator Company Name: CenturyLink
Owner: Bunnell, Mark
Director:
CR PM: Lorence, Susan

Description Of Change

CenturyLink is introducing an enhanced suite of industry standard file transfer protocols to replace CPID/QPID. These industry standard tools for file transfers have significantly increased functionality and increased security. CenturyLink has an existing tool which allows the File Transfer Protocol over SSL/TLS, e.g., FTPS. Some examples of increased capability include:

o FTP-SSH: Auto flow or Manual Push/Pull

o FTPS-SSL: Auto flow

o HTTPS (Web Browser)

o AS2

CenturyLink will be working with each impacted customer to develop a transition plan to move from CPID/QPID to this enhanced set of tools for file transfers.

CenturyLink wholesale web documentation will be updated following the appropriate CMP notification process to provide information about the enhanced file transfer protocols.

NOTE: This CR is associated with the CPID/QPID retirement CR, SCR020718-1.

Status History

Date Action Description
2/7/2018 CR Submitted CR submitted. 
2/9/2018 CR Acknowledged CR Acknowledged. 
2/21/2018 Status Changed Status changed to Presented. 
2/21/2018 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment C in the Distribution Package. 
3/1/2018 Status Changed Status changed to Development. 
3/21/2018 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment I in the Distribution Package. 
4/18/2018 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment J in the Distribution Package. 
4/27/2018 Communicator Issued See notification number PROS.MISC.04.27.18.F.16551.Addl_FileTransProtclAvail. 
5/11/2018 Communicator Issued See notification number PROS.LIST.05.11.18.F.16602.DLPBP_V72. 
5/16/2018 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment I in the Distribution Package. 
8/15/2018 Discussed at Monthly CMP Meeting Discussed in the August Systems CMP Meeting - See Attachment J in the Distribution Package. 
9/14/2018 Additional Information CR was updated by Mark Bunnell, CR Originator, to now reflect a February 1, 2019 planned retirement effective date. 
9/19/2018 Discussed at Monthly CMP Meeting Discussed in the September Systems CMP Meeting - See Attachment I in the Distribution Package. 
2/14/2019 Additional Information CR was updated by Mark Bunnell, CR Originator, to now reflect a planned retirement effective date of December 31, 2019. 
2/20/2019 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment I in the Distribution Package. 

Project Meetings

2/20/19 System CMP Meeting Mark Coyne – CenturyLink said this CR is associated with the one just discussed. Mark said the new replacement protocols associated with this CR that were introduced last May 2018 need to be added to the CenturyLink CCDB Questionnaire. The SME team is working to schedule these questionnaire updates which should be completed prior to the newly revised effective date of December 31, 2019. Mark asked if there were any questions on either CR. There were none.

9/19/18 System CMP Meeting Mark Coyne – CenturyLink stated the planned effective date for this update was also November 20, 2018. The effective date for this CR was revised to now reflect a February 1, 2019 date. This is due to the changes to the Customer Questionnaire that are still pending. The new file transfer protocol options associated with this CR have been available since April 30, 2018 when the level 1 notice was distributed. Mark asked if there were any comments or questions about either of these CR’s. There were none.

8/15/18 System CMP Meeting Mark Coyne – CenturyLink said that CenturyLink sent notifications on the new industry standard file transfer protocols in April and May but that changes are still pending for the Customer Questionnaire.

5/16/18 System CMP Meeting Mark Coyne – CenturyLink said CenturyLink distributed two Process notifications PROS.MISC.04.27.18.F.16551.AddlFileTransProtclAvail and PROS.LIST.05.11.18.F.16602.DLPBPV72 to provide additional industry standard file transfer protocols. Changes to the Customer Questionnaire are pending to add the new protocols. Mark asked if there were any questions. There were none.

4/18/18 System CMP Meeting Mark Coyne – CenturyLink said by the end of April, CenturyLink will be sending a notification associated with documentation updates to provide the additional file transfer protocol options.

3/21/18 System CMP Meeting Mark Coyne – CenturyLink said the SME team is looking at the required documentation updates that will need to occur. The CMP notification to introduce the additional file transfer tools will likely be sent around April 6, 2018.

2/21/18 System CMP Meeting Mark Bunnell – CenturyLink presented this new CR related to the CPID retirement CR to introduce additional options for file transfer protocols. This gateway protocol will provide enhanced capability and security to our wholesale customers with the multiple protocols. Mark reiterated that the SME team has a new mailbox QPID.Decomm@centurylink.com to communicate with Wholesale customers during this CPID/QPID transition period. Kim Isaacs – Allstream asked CenturyLink to provide files that are using CPID/QPID today. She said that would help to insure nothing is missed. She said she was aware of a couple areas including PID/PAP, Listings, and Wire center.

Mark Bunnell – CenturyLink said there are also daily usage files that use CPID. Mark said if a customer has their CPID ids, if they send that into the new mailbox, Mark will confirm the files for a company.

Susan Lorence – CenturyLink said we will update the CR with the specific files and also include the impacted file/applications in the notice that goes out.

02-28-18 NOTE: The System retirement notice identified the following areas of impact: • PIC/LPIC • Billing information – CRIS and Additional Outputs SMDR, Completion Report, Loss Report • FAM-SAGA • RSS • DLIS • Performance Assurance Plan Information

Kim Isaacs – Allstream said she is trying to figure the best way to search within her company to see if Allstream employees have access to CPID today and then will need access to a new protocol once the transition has occurred.

CenturyLink Response

Open System CR SCR090418-1 Detail

 
Title: Grandfather Frame Relay and Asynchronous Transfer Mode Service
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR090418-1 Completed
3/20/2019
-   12/ Ordering
Originator: Pavlovich, Joe
Originator Company Name: CenturyLink
Owner: Pavlovich, Joe
Director:
CR PM: Lorence, Susan

Description Of Change

Qwest Corporation d/b/a CenturyLink QC plans to file and post material to grandfather its Frame Relay and Asynchronous Transfer Mode Service.

UPDATE July 25, 2018 from CR Originator:

As of October 15, 2018, or as soon after that date as authorized by the relevant regulatory commissions, CenturyLink QC Frame Relay service and CenturyLink QC ATM service will no longer be available to new customers or for new orders from existing customers.

Existing customers of these services will be grandfathered as follows:

• Existing contracts for these services will not be renewed.

• Customers with a contract that expires prior to March 1, 2019 may retain their CenturyLink QC Frame Relay and/or QC ATM service covered by that contract on a month-to-month basis per the terms of their contract until March 1, 2019.

• Customers with a contract that expires after March 1, 2019 may retain their CenturyLink QC Frame Relay and/or QC ATM service covered by that contract until the expiration of that contract. At that time, the current service will be considered end-of-life, and will no longer be supported.

Status History

Date Action Description
4/24/2018 CR Submitted CR Submitted. 
4/25/2018 CR Acknowledged CR Acknowledged. 
5/16/2018 Discussed at Monthly CMP Meeting Discussed in the May Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
5/16/2018 Status Changed Status changed to Presented. 
6/1/2018 Status Changed Status changed to Development. 
6/20/2018 Discussed at Monthly CMP Meeting Discussed in the June Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
7/18/2018 Discussed at Monthly CMP Meeting Discussed in the July Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
7/25/2018 Record Update CR Description Update received from originator Lee Brummett. 
8/15/2018 Discussed at Monthly CMP Meeting Discussed in the August Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
8/31/2018 Communicator Issued See notification number PROD.RESL.08.31.18.F.16920.Grandfather_Elim_ATM_FRS. 
9/4/2018 CR Submitted CR Submitted. 
9/7/2018 CR Acknowledged CR Acknowledged. 
9/13/2018 Additional Information CR Description updated by originator to clarify that this CR only impacts EASE ASR UOM customers and does not impact customers that only use the EASE VFO (GUI). 
9/19/2018 Discussed at Monthly CMP Meeting Discussed in the September Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
9/19/2018 Discussed at Monthly CMP Meeting Discussed in the September Systems CMP Meeting - See Attachment C in the Distribution Package. 
9/19/2018 Status Changed Status changed to Presented. 
9/27/2018 Status Changed Status changed to Development. 
9/28/2018 Communicator Issued See notification number PROD.RESL.09.28.18.F.16960.FNL_Grndfthr_Elim_ATM_FRS. 
10/15/2018 Status Changed Status changed to CLEC Test. 
10/17/2018 Discussed at Monthly CMP Meeting Discussed in the October Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
10/17/2018 Discussed at Monthly CMP Meeting Discussed in the October Systems CMP Meeting - See Attachment I in the Distribution Package. 
10/19/2018 Communicator Issued See notification number SYST.EASE.10.19.18.F.16982.New_API_DraftTechSpecs. 
10/30/2018 General Meeting Held System Release walkthrough was held. Bridge was opened however no customers called into the call. 
11/14/2018 Discussed at Monthly CMP Meeting Discussed in the November Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
11/14/2018 Discussed at Monthly CMP Meeting Discussed in the November Systems CMP Meeting - See Attachment I in the Distribution Package. 
11/16/2018 Communicator Issued See notification number SYST.EASE.11.16.18.F.17009.New_API_FINALTechSpecs. 
12/12/2018 Discussed at Monthly CMP Meeting Discussed in the December Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
12/12/2018 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment I in the Distribution Package. 
12/31/2018 Status Changed Status changed to CLEC Test. 
1/16/2019 Discussed at Monthly CMP Meeting Discussed in the January Systems CMP Meeting - See Attachment G in the Distribution Package. 
1/16/2019 Discussed at Monthly CMP Meeting Discussed in the January Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
2/20/2019 CR Submitted CR Submitted. 
2/20/2019 Discussed at Monthly CMP Meeting Discussed in the February Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
2/22/2019 CR Acknowledged CR Acknowledged. 
3/20/2019 Status Changed CR Status changed to COMPLETED. 
3/20/2019 Discussed at Monthly CMP Meeting Discussed in the March Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
3/20/2019 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment C in the Distribution Package. 
3/20/2019 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment G in the Distribution Package. 
3/20/2019 Status Changed Status changed to Presented. 
3/22/2019 Communicator Issued Ad hoc meeting scheduled. See notification number CMPR.MEET.03.22.19.F.17155.AdHocMtgSystemCR_EASE_Doc 
3/27/2019 Status Changed Status changed to Development. 
4/1/2019 General Meeting Held Ad hoc meeting conducted. 
4/4/2019 Communicator Issued Planned system documentation changes sent for review. See notification number SYST.EASE.04.04.19.F.17333.EASE_SystemDoc_Streamline. 
4/17/2019 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment G in the Distribution Package. 
4/17/2019 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment K in the Distribution Package. 
5/3/2019 Status Changed Status changed to CLEC Test. 
5/15/2019 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment G in the Distribution Package. 
5/15/2019 Status Changed Status changed to Completed. 
5/15/2019 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment G in the Distribution Package. 
6/19/2019 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment G in the Distribution Package. 

Project Meetings

03/20/19 Product Process CMP Meeting Mark Coyne – CenturyLink said that this CR has been in CLEC Test since October 15, 2018. March 1, 2019 is the date that this product was eliminated. We would like to move this CR to a Completed status. Mark asked if there were any objections. There were none.

02/20/19 Product Process CMP Meeting Mark Coyne – CenturyLink said that this CR has been in CLEC Test since October 15, 2018. The effective date of the grandfathering of these products is March 1, 2019. We will consider moving the CR to a Completed status in the March CMP meeting.

01/16/19 Product Process CMP Meeting Mark Coyne – CenturyLink said that this CR is now in CLEC Test and will remain there until the effective date of March 1, 2019 when the product will be eliminated.

12/12/18 Product Process CMP Meeting Mark Coyne – CenturyLink said that this CR is now in CLEC TEST. The CR will remain in CLEC Test until the effective date of March 1, 2019 when the product will be eliminated.

11/14/18 Product Process CMP Meeting Mark Coyne – CenturyLink said that this CR was moved to CLEC Test on October 15, 2018 and will remain in CLEC Test until the product elimination date of March 1, 2019. Mark reminded customers of information shared in the July 2018 Monthly CMP meeting: "Customers with a contract that expires after March 1, 2019 may retain their CenturyLink QC Frame Relay and/or QC ATM service covered by that contract until the expiration of that contract. At that time, the current service will be considered end-of-life and will no longer be supported. " Mark asked if there were any other questions or comments. There were none.

10/17/18 Product Process CMP Meeting Mark Coyne – CenturyLink stated the Level 4 final notice, to grandfather these services, was sent on September 28, 2018 with an effective date of October 15, 2018. The CR is now in CLEC TEST. The product elimination date is March 1, 2019. Mark asked if there were any other questions or comments. There were none.

9/19/18 Product Process CMP Meeting Mark Coyne – CenturyLink stated the Level 4 initial notice to grandfather these services was sent on 8-31-18 and the comment cycle ended on 9-15-18. No comments were received. The final notice is due on 9-28-18 with an effective date of 10-15-18. The product elimination date is 3-1-19. Mark asked if there were any other questions or comments. There were none.

8/15/18 Product Process CMP Meeting Mark Coyne – CenturyLink said this CenturyLink CR was presented in the May CMP meeting by Lee Brummett - CenturyLink. At that time, no planned effective date was identified. In the July meeting, Lee relayed that the date to grandfather these services was going to be October 15, 2018 and that CenturyLink also had identified a date to eliminate the product which is scheduled for March 1, 2019. During the July meeting, there was a request for clarification of how the product elimination would work. Mark then relayed the specific information as included in the July meeting minutes. He said in July there was also a question about how grandfathering would impact hosting based on ATM service.

Jamal Boudhaouia – CenturyLink explained that if a CLEC has DSL Hosting Services that uses the CenturyLink ATM switch as the aggregator, it will not be affected by the grandfathering of this product at this time.

Kim Isaacs – Allstream asked when they can expect to receive the list of circuits that are impacted.

Mark Coyne – CenturyLink stated that list should be received in the next week or so and said the level 4 notice will be sent at the end of August.

7/18/18 Product Process CMP Meeting Mark Coyne – CenturyLink said this CR was presented in May. The CR originator, Lee Brummett, relayed that at that point in time, the planned effective date to grandfather these services was still being determined.

Lee Brummett – CenturyLink relayed that the Grandfather date is planned for October 15, 2018. The date for product elimination is March 1, 2019.

Kim Isaacs – Allstream asked if a product elimination date was relayed when the CR was presented in May.

Lee Brummett – CenturyLink said he did not think so but there is now a date for product elimination.

Kim Isaacs – Allstream said she thought the CenturyLink resale broadband network is based on ATM service and asked how it will work to eliminate that. She said that Allstream was not going to be growing their ATM network so when the product was going to be grandfathered, that was not a problem. The March 2019 elimination date will be an issue.

Lee Brummett – CenturyLink stated he will check with the Product Manager.

Susan Lorence – CenturyLink said if Lee can get the information soon, we can include it in the meeting minutes.

07-25-18 INFO RECEIVED FROM LEE BRUMMETT As of October 15, 2018, or as soon after that date as authorized by the relevant regulatory commissions, CenturyLink QC Frame Relay service and CenturyLink QC ATM service will no longer be available to new customers or for new orders from existing customers.

Existing customers of these services will be grandfathered as follows: • Existing contracts for these services will not be renewed.

• Customers with a contract that expires prior to March 1, 2019 may retain their CenturyLink QC Frame Relay and/or QC ATM service covered by that contract on a month-to-month basis per the terms of their contract until March 1, 2019.

• Customers with a contract that expires after March 1, 2019 may retain their CenturyLink QC Frame Relay and/or QC ATM service covered by that contract until the expiration of that contract. At that time, the current service will be considered end-of-life and will no longer be supported.

Kim Isaacs - Allstream asked if CenturyLink was going to be filing with the FCC and states.

Lee Brummett - CenturyLink confirmed yes.

Mark Coyne – CenturyLink asked Lee to insure we get the CR updated with this new information. He said based on the mid October grandfathering date, CenturyLink will send out a Level 4 notice in late August.

Kim Isaacs - Allstream stated CenturyLink will have to contact customers directly for some states for the elimination piece. March 2019 will only provide 5 months and that is not enough time to move ATM/Frame Relay. Kim said she thought CenturyLink retail/government accounts will also have a problem.

6/20/18 Product Process CMP Meeting Mark Coyne – CenturyLink stated this CR was presented in the May meeting to advise customers of CenturyLink’s plan to grandfather Frame Relay and Asynchronous Mode Service. There was no planned effective when the CR was presented.

Lee Brummett – CenturyLink advised that the effective date is still pending.

Mark Coyne – CenturyLink said when the effective date is confirmed, a Level 4 notice will be sent.

05/16/18 Product Process CMP Meeting Mark Coyne – CenturyLink stated that this was a new CR and asked Lee Brummett to present.

Lee Brummett – CenturyLink stated that the purpose of this CR was to advise customers of CenturyLink’s intention to file and post material to grandfather Frame Relay and Asynchronous Mode Service. There is no effective date at this time.

Kim Isaacs – Allstream asked for confirmation that grandfathering meant that the existing service remained available though no changes would be allowed.

Lee Brummett – CenturyLink concurred. He stated that CenturyLink was in the process of identifying customers subscribing to the products.

Kim Isaacs – Allstream stated that some of the ATM circuits supported the CenturyLink Broadband for Resale product and wanted to be sure they were not going to have a problem with those circuits.

Lee Brummett – CenturyLink said the circuits would be grandfathered.

Mark Coyne – CenturyLink asked if there were any other questions. There were none.

CenturyLink Response

Open System CR SCR090418-1 Detail

 
Title: Introduce a new Application Programming Interface (API) for EASE ASR.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR090418-1 CLEC Test
12/31/2018
-   28/ Ordering
Originator: Pavlovich, Joe
Originator Company Name: CenturyLink
Owner: Pavlovich, Joe
Director:
CR PM: Lorence, Susan

Description Of Change

CenturyLink will be introducing a new Application Programming Interface for EASE – ASR. There are no application to application functions that will be changing. This change is only impacting connectivity. The amount of customer impact is dependent on the type of customer connectivity that exists today.

UPDATE AS OF 09-13-18:

CenturyLink is introducing a change in the EASE UOM gateway that will impact customers utilizing the UOM interface for EASE ASR processing. Customers who ONLY utilize the CenturyLink EASE VFO (GUI) application WILL NOT be impacted by this change. Although we expect minimal impact, CenturyLink will be reaching out directly to the impacted customers to discuss the change needed and set up a timeframe to complete the changes.

***********

CenturyLink will be working with each impacted customer to develop a transition plan and timeline.

Testing could begin as early as 1Q19 with a full implementation in production by November 2019.

Status History

Date Action Description
4/24/2018 CR Submitted CR Submitted. 
4/25/2018 CR Acknowledged CR Acknowledged. 
5/16/2018 Discussed at Monthly CMP Meeting Discussed in the May Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
5/16/2018 Status Changed Status changed to Presented. 
6/1/2018 Status Changed Status changed to Development. 
6/20/2018 Discussed at Monthly CMP Meeting Discussed in the June Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
7/18/2018 Discussed at Monthly CMP Meeting Discussed in the July Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
7/25/2018 Record Update CR Description Update received from originator Lee Brummett. 
8/15/2018 Discussed at Monthly CMP Meeting Discussed in the August Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
8/31/2018 Communicator Issued See notification number PROD.RESL.08.31.18.F.16920.Grandfather_Elim_ATM_FRS. 
9/4/2018 CR Submitted CR Submitted. 
9/7/2018 CR Acknowledged CR Acknowledged. 
9/13/2018 Additional Information CR Description updated by originator to clarify that this CR only impacts EASE ASR UOM customers and does not impact customers that only use the EASE VFO (GUI). 
9/19/2018 Discussed at Monthly CMP Meeting Discussed in the September Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
9/19/2018 Discussed at Monthly CMP Meeting Discussed in the September Systems CMP Meeting - See Attachment C in the Distribution Package. 
9/19/2018 Status Changed Status changed to Presented. 
9/27/2018 Status Changed Status changed to Development. 
9/28/2018 Communicator Issued See notification number PROD.RESL.09.28.18.F.16960.FNL_Grndfthr_Elim_ATM_FRS. 
10/15/2018 Status Changed Status changed to CLEC Test. 
10/17/2018 Discussed at Monthly CMP Meeting Discussed in the October Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
10/17/2018 Discussed at Monthly CMP Meeting Discussed in the October Systems CMP Meeting - See Attachment I in the Distribution Package. 
10/19/2018 Communicator Issued See notification number SYST.EASE.10.19.18.F.16982.New_API_DraftTechSpecs. 
10/30/2018 General Meeting Held System Release walkthrough was held. Bridge was opened however no customers called into the call. 
11/14/2018 Discussed at Monthly CMP Meeting Discussed in the November Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
11/14/2018 Discussed at Monthly CMP Meeting Discussed in the November Systems CMP Meeting - See Attachment I in the Distribution Package. 
11/16/2018 Communicator Issued See notification number SYST.EASE.11.16.18.F.17009.New_API_FINALTechSpecs. 
12/12/2018 Discussed at Monthly CMP Meeting Discussed in the December Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
12/12/2018 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment I in the Distribution Package. 
12/31/2018 Status Changed Status changed to CLEC Test. 
1/16/2019 Discussed at Monthly CMP Meeting Discussed in the January Systems CMP Meeting - See Attachment G in the Distribution Package. 
1/16/2019 Discussed at Monthly CMP Meeting Discussed in the January Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
2/20/2019 CR Submitted CR Submitted. 
2/20/2019 Discussed at Monthly CMP Meeting Discussed in the February Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
2/22/2019 CR Acknowledged CR Acknowledged. 
3/20/2019 Status Changed CR Status changed to COMPLETED. 
3/20/2019 Discussed at Monthly CMP Meeting Discussed in the March Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
3/20/2019 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment C in the Distribution Package. 
3/20/2019 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment G in the Distribution Package. 
3/20/2019 Status Changed Status changed to Presented. 
3/22/2019 Communicator Issued Ad hoc meeting scheduled. See notification number CMPR.MEET.03.22.19.F.17155.AdHocMtgSystemCR_EASE_Doc 
3/27/2019 Status Changed Status changed to Development. 
4/1/2019 General Meeting Held Ad hoc meeting conducted. 
4/4/2019 Communicator Issued Planned system documentation changes sent for review. See notification number SYST.EASE.04.04.19.F.17333.EASE_SystemDoc_Streamline. 
4/17/2019 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment G in the Distribution Package. 
4/17/2019 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment K in the Distribution Package. 
5/3/2019 Status Changed Status changed to CLEC Test. 
5/15/2019 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment G in the Distribution Package. 
5/15/2019 Status Changed Status changed to Completed. 
5/15/2019 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment G in the Distribution Package. 
6/19/2019 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment G in the Distribution Package. 

Project Meetings

6/19/19 System CMP Meeting Mark Coyne – CenturyLink said there is nothing new to share for this CR. The planned Production effective date remains November 2019. This CR is associated with the change in the EASE UOM gateway that ONLY impacts customers utilizing the UOM interface for EASE ASR processing. CenturyLink will continue to monitor this CR to determine when all customers have been migrated so we can move this to a Completed status.

5/15/19 System CMP Meeting Mark Coyne – CenturyLink said there is nothing new to share for this CR. The planned Production effective date remains November 2019. Mark said we will continue to monitor this CR to determine when all customers have been migrated so we can move it to a Completed status.

4/17/19 System CMP Meeting Mark Coyne – CenturyLink said this CR remains in CLEC Test. CenturyLink is continuing to work directly with the impacted customers to establish a timeframe to complete the change to the new API. The planned Production effective date remains November 2019. Mark said we will continue to monitor this CR to determine when all customers have been migrated so we can move it to a Completed status.

3/20/19 System CMP Meeting Mark Coyne – CenturyLink said this CR is associated with the change in the EASE UOM gateway that only impacts customers utilizing the UOM interface for EASE ASR processing. CenturyLink is working directly with the impacted customers to establish a timeline to change to the new API. Mark said the Production effective date is November 2019. We will monitor the CR and keep it in CLEC Test until all customers have been migrated.

01/16/19 System CMP Meeting Mark Coyne – CenturyLink said this CR is now in CLEC test. It will remain in CLEC Test until the full implementation which is planned for November 2019. As a reminder, only EASE UOM customers are impacted by this new API. Mark said CenturyLink SMEs are working with impacted customers to begin testing.

12/12/18 System CMP Meeting Mark Coyne – CenturyLink said the Final Technical Specification System Notice was issued on November 16, 2018. This CR for a new API only impacts EASE UOM customers; it does not impact EASE GUI VFO customers. Testing with impacted customers will begin first quarter 2019 with full implementation in production planned for November 2019. CenturyLink personnel are contacting impacted customers to review the interfaces that will be changing to this new API.

11/14/18 System CMP Meeting Mark Coyne – CenturyLink said the Draft Technical Specification System Notice was issued on October 19, 2018. This new API change only impacts EASE UOM customers; it does not impact EASE GUI VFO customers. Mark said a walkthrough was held on October 30, 2018; no customers called into the call. Testing with impacted customers will begin first quarter 2019 with full implementation in production scheduled for November 2019.

10/17/18 System CMP Meeting Mark Coyne – CenturyLink stated this CR was presented last month associated with the new API that only impacts customers that use the EASE UOM gateway for ASR processing. There are no impacts to customers who only utilize the CenturyLink EASE VFO (GUI) application. The Draft Technical Specification System Notice will be issued on October 19, 2018. The dates in System Notification Timeline are associated with testing with impacted customers. The walkthrough is tentatively scheduled for October 30, 2018. Testing could begin as early as 1Q19 with full implementation in Production planned for November 2019.

NOTE: Attachment I in the System package included a REMINDER that mistakenly referenced IMA customers being impacted by this new API. It is only EASE UOM customers that are impacted.

9/19/18 System CMP Meeting Letty Walker - CenturyLink presented this new CR. She advised that CenturyLink is introducing an upgrade to the EASE UOM gateway API that will only impact customers utilizing the UOM interface for EASE ASR processing. CenturyLink will be reaching out directly to the impacted customers to discuss the change needed and set up a timeframe to complete the changes with each customer. Letty said we could begin testing as early as 1st Quarter 2019 with a full implementation in production by November 2019. It is not a short turnaround. The intent is to provide as much lead time as possible.

Mark Coyne – CenturyLink said we will send a 73 day System notice to relay the app to app changes likely by the end of September. He asked if there were any comments or questions. There were none.

CenturyLink Response

Open System CR SCR101918-1 Detail

 
Title: Modification of EASE ASR External Apps Menu GUI for Order Status
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR101918-1 Completed
3/18/2019
-   28/ Ordering
Originator: Woods, Tonya
Originator Company Name: CenturyLink
Owner: Woods, Tonya
Director:
CR PM: Lorence, Susan

Description Of Change

Provide additional status for EASE ASRs through the order life cycle for GUI display only.

Status History

Date Action Description

Project Meetings

7/17/19 System CMP Meeting Mark Coyne (CenturyLink) No additional issues have been reported and there were no objections to closing this out. Mark also asked if anyone had a chance to use the new functionality. Kim Isaacs (Allstream) stated she will talk with her order writers and project managers to verify.

6/16/19 System CMP Meeting Mark Coyne – CenturyLink stated this CR was implemented in March with the ASOG 58 EASE Major release, however the GUI tool was subsequently taken offline due to some issues. An updated Event notice was distributed. The May EASE ASR Point Release notice for 6.1 included the deployment of this CR. An issue was identified, and the fix went in over this past weekend. We have issued the EN closure. We will review for CR closure in the July meeting. Mark asked if there were any questions. There were none.

5/15/19 System CMP Meeting Mark Coyne – CenturyLink said the plan for this CR was to implement it on March 18, 2019 in conjunction with the EASE ASOG 58 release. However, the GUI tool associated with this CR was taken offline due to some issues. Mark said that CenturyLink issued an updated Event notice to relay the status. The May EASE ASR Point Release 6.1 includes the deployment of this CR. That release will be installed over the weekend and will be effective on May 20, 2019. Mark said we will review this CR in June to move to a Completed status.

Susan Lorence – CenturyLink said there had been a SME team meeting the day before to make sure Order status tool was a GO and that the IT team relayed there was a minor screen change.

Letty Walker – CenturyLink shared that the new ASR EASE User Guide had a minor update to the heading detail on the screen print associated with this change and that she would like to keep the production guide up to date. Letty said there is no change to the functionality or steps.

Susan Lorence – CenturyLink suggested that once the release is implemented that we send a System notice effective immediately to post the screen shot update to the User Guide. Susan said the approach is not typical but CenturyLink would like to post the current version of the document. She asked if there were any concerns. Kim Isaacs – Allstream said if it is just correcting the screen shot, this approach would be OK.

4/17/19 System CMP Meeting Mark Coyne – CenturyLink said this CR was implemented March 18, 2019 in conjunction with the EASE ASOG 58 release. The GUI tool associated with this CR was then taken offline due to some issues. An updated Event notice was distributed. The CenturyLink SME team is continuing to review the functionality and test results to determine when it can be implemented – likely with the May EASE ASR Point release.

NOTE 04-24-19: The CR was included in the EASE ASR Release 6.1 notification that was distributed on April 19, 2019. See notification number SYST.EASE.04.19.19.F.17356.EASER6.1CustomBusRules.

3/20/19 System CMP Meeting Mark Coyne – CenturyLink said this CR was implemented March 18, 2019 in conjunction with the EASE ASOG 58 release but the GUI tool associated with this CR has been taken offline due to some issues. An updated Event notice was distributed on Tuesday, March 19, 2019. We will continue to monitor the status of this.

2/20/19 System CMP Meeting Mark Coyne – CenturyLink said this CR was originally scheduled for the EASE Point Release 5.2 scheduled for implementation January 21, 2019. The CR includes enhancements to the EASE ASR VFO GUI to provide functionality to check on Order status for EASE ASRs throughout their life cycle. Prior to the Point release implementation, the SME team determined additional testing was required and issued an event notification on January 15, 2019 to relay the implementation for this CR would be delayed. The CR is now planned for implementation with the EASE Release 6.0. Information about the CR was included in the EASE GUI Release 6.0 notice that was distributed on February 18, 2019. A Training notice associated with the GUI change will be distributed on Monday, February 25, 2019.

01/16/19 System CMP Meeting Mark Coyne – CenturyLink said this CR is associated with enhancements to the EASE ASR VFO GUI to provide a new tool to check on Order status for ASRs throughout their life cycle. CenturyLink had requested that we include this change in the EASE Release 5.2 that is scheduled for implementation January 21, 2019. That combined initial system release notice was distributed on December 21, 2018. The Final system notice was sent on January 4, 2019. Because CenturyLink is performing some additional testing on the changes associated with this CR, this functionality will not be included in the release that will be effective on January 21, 2019. Mark said on January 15, 2019, an event notification was distributed to relay the delay in implementation.

Susan Lorence – CenturyLink said that Kim Isaacs – Allstream had submitted a question into the CMPCOMM mailbox about that Event notification. Kim had asked if the rest of the EASE ASR Release 5.2 would be delayed. Susan said a response had been sent to relay that the remainder of the release that included the planned Custom Business Rules would go into effect as of January 21, 2019. 12/12/18 System CMP Meeting Mark Coyne – CenturyLink said this new CR was presented last month. The CR is associated with enhancements to the EASE ASR VFO GUI to provide a new tool to check on Order status for EASE ASRs throughout their life cycle. Mark said we discussed last month that we would like to include this GUI update in the EASE Point Release scheduled for implementation for January 21, 2019. We proposed combining the GUI notice and the Custom Business Rules notice for the release into a single notice and comment cycle. There was no disagreement to combine the two notices. The EASE Release 5.2 notice is scheduled for distribution on December 21, 2018.

11/14/18 Systems CMP Meeting Letty Walker – Centurylink presented this new CR to update the EASE ASR VFO GUI. She said there is an option called “External Apps” in EASE today. CenturyLink is adding a new option to that section for Order Status. A customer can use this new tool to check on additional status for EASE ASRs through the ASR life cycle from the time it is accepted to the time it is completed. Letty gave some examples of status that will be available: Status of Build, Ticket number, Project manager assigned, Site survey scheduled date, etc. Letty said CenturyLink would like to include this CR in the EASE ASR Point Release 5.2 which is a Custom Business Rule release. She asked if there were any questions.

Kim Isaacs – Allstream asked if this new option would assist customers in knowing when a site survey is completed vs. having to call CenturyLink.

Letty Walker – Centurylink said yes. She said the tool will allow customers to check for themselves when the survey is scheduled, when it is completed, etc.

Mark Coyne – CenturyLink said we are currently planning to include the CR in the EASE ASR Point Release 5.2 which will become effective on January 21, 2019. He said the CR is intended to provide more information to customers vs. it being a change in process for customers. The Point Release notification has a 30 day lead time with a customer comment cycle. The GUI notification cycle has a 28 day notification lead time also with a comment cycle. Mark said we would like to just send one notice and asked if there were any objections to that approach or if customers preferred two notifications. There were no comments or objections. Mark said there may be some Training information that needs to be updated which will be sent with a 21 day lead time. We will discuss the effective date again in the December CMP monthly meeting.

CenturyLink Response

Open System CR SCR090418-1 Detail

 
Title: Rewrite of EASE ASR system documentation
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR090418-1 Completed
5/15/2019
-   28/ System Documentation
Originator: Pavlovich, Joe
Originator Company Name: CenturyLink
Owner: Pavlovich, Joe
Director:
CR PM: Lorence, Susan

Description Of Change

This modification will combine the EASE Pre-Order Guide 4.0, the EASE ASR Overview Guide, the EASE Student Guide and the EASE ASR Infor Guide into a EASE ASR USER GUIDE. The EASE ASR ADMIN guide will also be revamped. The intent is to condense and update the information into a more readable format for users. In addition, versioning of changes will match versioning of the system information that is represented. This will make it easier for users to correlate the system changes that result in documentation changes.

Status History

Date Action Description
4/24/2018 CR Submitted CR Submitted. 
4/25/2018 CR Acknowledged CR Acknowledged. 
5/16/2018 Discussed at Monthly CMP Meeting Discussed in the May Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
5/16/2018 Status Changed Status changed to Presented. 
6/1/2018 Status Changed Status changed to Development. 
6/20/2018 Discussed at Monthly CMP Meeting Discussed in the June Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
7/18/2018 Discussed at Monthly CMP Meeting Discussed in the July Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
7/25/2018 Record Update CR Description Update received from originator Lee Brummett. 
8/15/2018 Discussed at Monthly CMP Meeting Discussed in the August Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
8/31/2018 Communicator Issued See notification number PROD.RESL.08.31.18.F.16920.Grandfather_Elim_ATM_FRS. 
9/4/2018 CR Submitted CR Submitted. 
9/7/2018 CR Acknowledged CR Acknowledged. 
9/13/2018 Additional Information CR Description updated by originator to clarify that this CR only impacts EASE ASR UOM customers and does not impact customers that only use the EASE VFO (GUI). 
9/19/2018 Discussed at Monthly CMP Meeting Discussed in the September Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
9/19/2018 Discussed at Monthly CMP Meeting Discussed in the September Systems CMP Meeting - See Attachment C in the Distribution Package. 
9/19/2018 Status Changed Status changed to Presented. 
9/27/2018 Status Changed Status changed to Development. 
9/28/2018 Communicator Issued See notification number PROD.RESL.09.28.18.F.16960.FNL_Grndfthr_Elim_ATM_FRS. 
10/15/2018 Status Changed Status changed to CLEC Test. 
10/17/2018 Discussed at Monthly CMP Meeting Discussed in the October Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
10/17/2018 Discussed at Monthly CMP Meeting Discussed in the October Systems CMP Meeting - See Attachment I in the Distribution Package. 
10/19/2018 Communicator Issued See notification number SYST.EASE.10.19.18.F.16982.New_API_DraftTechSpecs. 
10/30/2018 General Meeting Held System Release walkthrough was held. Bridge was opened however no customers called into the call. 
11/14/2018 Discussed at Monthly CMP Meeting Discussed in the November Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
11/14/2018 Discussed at Monthly CMP Meeting Discussed in the November Systems CMP Meeting - See Attachment I in the Distribution Package. 
11/16/2018 Communicator Issued See notification number SYST.EASE.11.16.18.F.17009.New_API_FINALTechSpecs. 
12/12/2018 Discussed at Monthly CMP Meeting Discussed in the December Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
12/12/2018 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment I in the Distribution Package. 
12/31/2018 Status Changed Status changed to CLEC Test. 
1/16/2019 Discussed at Monthly CMP Meeting Discussed in the January Systems CMP Meeting - See Attachment G in the Distribution Package. 
1/16/2019 Discussed at Monthly CMP Meeting Discussed in the January Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
2/20/2019 CR Submitted CR Submitted. 
2/20/2019 Discussed at Monthly CMP Meeting Discussed in the February Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
2/22/2019 CR Acknowledged CR Acknowledged. 
3/20/2019 Status Changed CR Status changed to COMPLETED. 
3/20/2019 Discussed at Monthly CMP Meeting Discussed in the March Product/Process CMP Meeting - See Attachment D in the Distribution Package. 
3/20/2019 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment C in the Distribution Package. 
3/20/2019 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment G in the Distribution Package. 
3/20/2019 Status Changed Status changed to Presented. 
3/22/2019 Communicator Issued Ad hoc meeting scheduled. See notification number CMPR.MEET.03.22.19.F.17155.AdHocMtgSystemCR_EASE_Doc 
3/27/2019 Status Changed Status changed to Development. 
4/1/2019 General Meeting Held Ad hoc meeting conducted. 
4/4/2019 Communicator Issued Planned system documentation changes sent for review. See notification number SYST.EASE.04.04.19.F.17333.EASE_SystemDoc_Streamline. 
4/17/2019 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment G in the Distribution Package. 
4/17/2019 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment K in the Distribution Package. 
5/3/2019 Status Changed Status changed to CLEC Test. 
5/15/2019 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment G in the Distribution Package. 
5/15/2019 Status Changed Status changed to Completed. 
5/15/2019 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment G in the Distribution Package. 
6/19/2019 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment G in the Distribution Package. 

Project Meetings

7/17/19 System CMP Meeting Mark Coyne (CenturyLink) We will continue to monitor this CR to determine when all customers have been migrated so we can move this to a completed status. We are still targeting for November.

5/15/19 System CMP Meeting Mark Coyne – CenturyLink said this CR was presented in the March meeting related to streamlining the EASE ASR documentation. An Ad hoc call was conducted on April 1, 2019. CenturyLink proposed and it was agreed upon that we implement this change with a 30 day system courtesy notice. The notice was issued on April 4, 2019. There were no CLEC comments so no final notification was required. The CR was moved to CLEC Test on the planned effective date of May 3, 2019. The old system documents have been removed. The rewritten, customer friendly EASE ASR User Guide and EASE ASR Administration Guide are now posted to the EASE web site. Mark asked if there were any objections to moving this CR to Completed. There were none.

4/17/19 System CMP Meeting Mark Coyne – CenturyLink said this CR was presented last month by Letty Walker. The CR is associated with streamlining the EASE ASR documentation. An Ad hoc call was conducted on April 1, 2019 with members of the CLEC community. A system notification was issued on April 4, 2019 to relay the changes to the full customer community. Mark said the formal CLEC comment cycle will end on April 18, 2019 with a planned effective date of May 3, 2019. At that time the EASE ASR system page will be updated to include only the EASE ASR User Guide and EASE ASR Administration Guide. Mark asked if there were any questions. There were none.

FINAL Ad hoc meeting minutes April 1, 2019

SCR022019-1 Rewrite of EASE ASR system documentation

Attendees: Larry Couch – Action Communications Lori Deal – Interstate Telecom Consulting Nancy Taylor – Allstream Kim Isaacs – Allstream Rod Cox – TDS Metrocom Letty Walker – CenturyLink Mark Coyne – CenturyLink Susan Lorence – CenturyLink

Susan Lorence – CenturyLink relayed the purpose for the Ad Hoc call which was to review the proposed changes to the EASE ASR system documentation associated with CenturyLink Change Request SCR022019-1. The CR was presented in the March CMP monthly meeting by Letty Walker – CenturyLink. Susan said we announced in the meeting that we would be having an Ad hoc call and a meeting notice was sent. The Ad hoc call is associated with planned changes to streamline the current production EASE ASR system documents into two documents: the EASE ASR User Guide and the EASE ASR Admin Guide. The intent is to condense the information into a more useable format. Susan said the agenda will be to review the planned change, answer any questions and confirm the associated deliverables.

Letty Walker – CenturyLink said when we went through the ASR system consolidation, there were a number of system guides that were developed for the consolidation, e.g., EASE ASR Info guide, EASE Implementation Guide, EASR ASR Pre-order guide, etc. Letty said that she thought what would be most beneficial to customers is just two documents: a User Guide and an Admin Guide. She said the Online Training would remain available as it is stand alone.

EASE ASR User Guide Letty Walker – CenturyLink said she is putting the ASOG version in the guide. She said that should help identify what is included in the document. Letty then walked through some of the various sections of the EASE ASR User Guide. Some key points included:

• The Table of Contents is interactive so if you click on it, it will take you to that section. • Document Overview - The link to ATIS may change in the future as they are changing their download process. • Sections/Headings – Under a specific Section, the heading will be on the left-hand side with the detailed information provided on the right. • The Guide has been redesigned to fit the EASE screen layout and is sequenced to match the three main tabs in EASE: Order, Preorder and Template. • Each tab provides the examples of screen shots to match this section. • It is more of an intuitive guide that is step driven. • There is more information than has been available in the past.

Letty asked if it made sense how the guide is now laid out.

Kim Isaacs – Allstream said yes it does.

Letty Walker – CenturyLink said she hoped customers will look through the Guide to determine if they have any questions.

EASE ASR Admin Guide Letty Walker – CenturyLink then referred those on the call to the other document available for review and discussion, the EASE ASR Admin Guide. Letty said each company that utilizes EASE has the capability to add, update, remove users through their Admin person. This guide has been redone and is also step-driven to provide more unique information for each company’s EASE Admin person. Letty asked if there were any questions about this guide. There were none.

Susan Lorence – CenturyLink asked those on the call to go to the current EASE System page at https://www.centurylink.com/wholesale/systems/asr.html. She said she wants to review the documents that will be eliminated and replaced with the two documents Letty just reviewed. Under the heading, ASR Guides & Training, the current documents to be removed are:

• EASE ASR Info Guide • EASE Implementation Guidelines • EASE ASR VFO Admin Guide • EASE ASR VFO User Guide • EASE ASR Pre-Order Guide • EASE ASR Training • EASE GUI Overview • EASE Student Guide

Letty Walker – CenturyLink said these documents have all been merged into the EASE ASR User Guide. The two new documents will be available under the ASR Guides & Training.

Kim Isaacs – Allstream asked if the Technical Specifications under the heading ASR Ordering Technical Specifications would be impacted.

Letty Walker – CenturyLink said no, these documents will not be changed.

Kim Isaacs – Allstream asked if CenturyLink would be eliminating the EASE CORA ASR Order Differences that is listed under the FAQ section.

Letty Walker – CenturyLink said yes that will be removed also.

Susan Lorence – CenturyLink then proposed that CenturyLink send a 30 day system courtesy notice that has a timeline that is used for Point release. The notice has a 10 day customer comment review cycle followed 5 days later by a CenturyLink final notice and response to comments if required. Susan asked if that would work for this.

Kim Isaacs – Allstream and Rod Cox – TDS Metrocom both said that would be fine.

Larry Couch – Action Communications said it was fine with them also. They have not been using ASR as frequently.

Susan Lorence – CenturyLink said we will send the system notice out by the end of the week. The meeting minutes will also be distributed as required by CMP. The minutes will be brief covering the main discussion points on the call.

Letty Walker – CenturyLink said she wanted to make sure everyone was aware that in EASE itself, customers can always clink on these guides while they are in the EASE system. The same docs will be available there.

Susan Lorence – CenturyLink asked about the point of when these documents would be updated. Will the expectation be with every release?

Letty Walker – CenturyLink said her view is that these documents will ONLY be changed when there has been a change due to a release or other driver. Otherwise the documents will not be updated with a version number.

Kim Isaacs – Allstream said she tends to agree. Only if there are screen shots or if there is a change associated with the ASOG, then the assumption will be the documents will be updated.

Larry Couch – Action Communications said it was better to keep it simple.

Susan Lorence – CenturyLink said with this in mind, when it is time for an EASE release, if no documentation updates are required, CenturyLink will send a notice identifying that and then will not offer a comment cycle.

Letty Walker – CenturyLink agreed and said she will still create a CMP CR and relay the changes that are included in the release but would not expect a comment cycle if there are no documentation updates.

Susan Lorence – CenturyLink asked if those on the call were all OK with that approach also and if they had any questions.

All those on the call responded with a “yes”. No other questions were identified.

Susan Lorence – CenturyLink said she thought that covered everything and thanked those on the call for attending. The Ad hoc meeting was adjourned at 10:30 AM MT.

3/20/19 System CMP Meeting Letty Walker – CenturyLink presented this new CR associated with streamlining the EASE ASR system documentation. She said there were a lot of documents that were somewhat of a carryover from the ASR system consolidation, including UOM Guide, Pre-Order, General Guide, Training guide. Letty said there was no document that is step driven that is in the sequence of EASE processes that she would consider a full User Guide. She said that she has also revamped the Admin Guide to streamline it. Rather than four or five guides, she is planning for two – a User guide and an Admin guide.

Susan Lorence – CenturyLink said we have an Ad hoc meeting tentatively scheduled for Monday, April 1, 2019, from 10 -11 AM MT to review these planned changes. Susan said once we confirm on today’s call that no one has any problems with the April 1 date, the Ad hoc meeting notice will be sent. The preliminary documents will be posted to the Web site for customers to be able to review ahead of time.

Kim Isaacs – Allstream asked if these documentation updates will address the content of the custom business rules to become more readable.

Letty Walker – CenturyLink said no, this CR does not address the custom business rules. She said this will make EASE system information easier to find, less redundant and more useable.

Susan Lorence – CenturyLink said we wanted to separate these system documentation updates from the Release system changes so the updates would be clear.

Kim Isaacs – Allstream asked if EASE Web based training was impacted.

Letty Walker – CenturyLink said the Web based training is not impacted. It stands on its own.

CenturyLink Response

Open System CR SCR050819-I Detail

 
Title: EASE System modification for User Reset capabilities for security upgrade
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR050819-I Completed
6/3/2019
-   28/ Security
Originator: Walker, Letty
Originator Company Name: CenturyLink
Owner: Walker, Letty
Director:
CR PM: Lorence, Susan

Description Of Change

EASE will be implementing a modification to the user reset capabilities. This will require all users to provide a valid email in addition to establishing a unique security question/answer reset key when they log into the system for the first time after implementing.

Status History

Date Action Description
10/19/2018 CR Submitted CR Submitted 
10/22/2018 CR Acknowledged CR Acknowledged 
11/14/2018 Status Changed Status changed to Presented. 
11/14/2018 Discussed at Monthly CMP Meeting Discussed in the November Systems CMP Meeting - See Attachment C in the Distribution Package. 
11/30/2018 Status Changed Status changed to Development. 
12/12/2018 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment I in the Distribution Package. 
12/21/2018 Communicator Issued See notification number SYST.EASE.12.21.18.F.17035.EASE_R5.2_CustomBusRules. 
1/4/2019 Communicator Issued See notification number SYST.EASE.01.04.19.F.17047.FNL_EASE_R5.2CustBusRules. 
1/15/2019 Record Update Event notification 10675588 issued to relay delay to CR implementation. 
1/16/2019 Discussed at Monthly CMP Meeting Discussed in the January Systems CMP Meeting - See Attachment K in the Distribution Package. 
2/15/2019 Record Update Planned effective date tentatively changed to March 18, 2019 associated with EASE Release 6.0. 
2/18/2019 Communicator Issued See Notification number SYST.EASE.02.18.19.F.17117.EASE_GUI_R6.0DrftRelNote. 
2/20/2019 Discussed at Monthly CMP Meeting Discussed in the February Systems CMP Meeting - See Attachment K in the Distribution Package. 
2/25/2019 Communicator Issued See notification number SYST.EASE.02.25.19.F.17120.EASE_GUI_R6.0FnlRelNotes. 
2/25/2019 Communicator Issued See Notification number TRNG.ANNC.02.25.19.F.17119.EASE_ASR_VFO_WBT_Availble. 
3/18/2019 Status Changed Status changed to CLEC Test. 
3/19/2019 Record Update Event notification 10675588 updated to relay delay to CR implementation. 
3/20/2019 Discussed at Monthly CMP Meeting Discussed in the March Systems CMP Meeting - See Attachment G in the Distribution Package. 
4/17/2019 Discussed at Monthly CMP Meeting Discussed in the April Systems CMP Meeting - See Attachment G in the Distribution Package. 
5/8/2019 CR Submitted CR Submitted. 
5/8/2019 CR Submitted CR Submitted. 
5/10/2019 CR Acknowledged CR Acknowledged. 
5/10/2019 CR Acknowledged CR Acknowledged. 
5/15/2019 Status Changed Status changed to Presented. 
5/15/2019 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment F in the Distribution Package.  
5/15/2019 Status Changed Status changed to Presented. 
5/15/2019 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment F in the Distribution Package. 
5/15/2019 Discussed at Monthly CMP Meeting Discussed in the May Systems CMP Meeting - See Attachment G in the Distribution Package. 
5/21/2019 Communicator Issued See notification number .SYST.EASE.05.21.19.F.17404.EASE_R6.1_Doc_Update. 
6/3/2019 Status Changed Status changed to Development. 
6/5/2019 Status Changed Status to Development. 
6/19/2019 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment G in the Distribution Package. 
6/19/2019 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment I in the Distribution Package. 
6/19/2019 Discussed at Monthly CMP Meeting Discussed in the June Systems CMP Meeting - See Attachment I in the Distribution Package. 

Project Meetings

7/17/19 System CMP Meeting Mark Coyne (CenturyLink) The notice for ASOG 59 went out on 7/12/19. Letty Walker (CenturyLink) completed the walk thru of the changes right after the CMP call. Comments are due July 30th and testing will begin August 24th with implementation September 23rd, 2019. There were no questions or comments.

6/19/19 System CMP Meeting Mark Coyne – CenturyLink stated this CR was presented last month by Letty Walker. Everyone agreed this CR will be included in the July 22 EASE Point Release 6.2. A notification went out Friday 6/21 and included updates to the EASE ASR admin guide along with custom business rules.

5/15/19 System CMP Meeting Letty Walker – CenturyLink said CenturyLink is always looking for ways to improve our systems for users. This CR is to allow users to reset their EASE ASR password without having to go through an administrator. Letty said after this change is implemented, it will require each user to provide an email address the first time they log in to EASE and then they will be required to set up a series of security questions. Letty said this same change is being implemented for CenturyLink users.

Mark Coyne – CenturyLink said this CR will be included in the July 22, 2019 EASE Point Release 6.2.

Letty Walker – CenturyLink said this is more of a process change for users and that CenturyLink will update the EASE ASR Admin Guide.

Kim Isaacs – Allstream said what will happen for existing users.

Letty Walker – CenturyLink said after this is implemented, everyone will have to enter in their email address the very first time they use the system.

Kim Isaacs – Allstream said she likes this change.

Susan Lorence – CenturyLink said she wanted to confirm that this change will be included in the System EASE ASR Release 6.2. On the system notice that will go out on June 21, 2019, CenturyLink will include an update to the EASE ASR Admin Guide along with the Custom Business Rules updates. Susan said there will be a ten day comment cycle and that the update will be implemented on July 22, 2019.

CenturyLink Response

Open System CR SCR050819-2IG Detail

 
Title: ASOG 59 changes for the EASE ordering system
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR050819-2IG Completed
6/5/2019
-   28/7 ATIS-OBF
Originator: Walker, Letty
Originator Company Name: CenturyLink
Owner: Walker, Letty
Director:
CR PM: Lorence, Susan

Description Of Change

CenturyLink will implement the ATIS /OBF modifications associated with ASOG 59 effective September 21, 2019. Included in that release are the following issues:

Issue 3619 – Modify SALI (015) practice to update existing fields (LAT/LONG) to clarify existing assumptions

Issue 3620 – Update CNR (010) practice to modify the existing usage for the field CNT to clarify existing assumptions

Issue 3623 – Modification of LREF field for ‘R’ activity

Issue 3624 – Modify Transport (005) practice to clarify existing LATENCY field

Issue 3626 – Expand use of FDT field on the ASR Form

CenturyLink will begin the implementation of these modifications on Friday September 20, 2019. All systems will resume availability on Monday, September 23, 2019.

Status History

Date Action Description

Project Meetings

7/17/19 System CMP Meeting Mark Coyne (CenturyLink) Notice went out on 6/21/19 and no comments were received. This will go into effect on 7/22/19 and we will look to close in August. Reminder: the 1st time you sign in, after the 22nd, you will need to put in your reset information. Andrea Smith Comcast) likes the additional security.

6/19/19 System CMP Meeting Mark Coyne – CenturyLink stated this CR was presented last month by Letty Walker. The CR is scheduled for an effective date of sept 23rd . There is a scheduling attachment under calendar that speaks to ASOG 59. Tech specs will go out July 12th and we will set up a walk through and the notice will go out around July 30th. This CR is scheduled for EASE Release 7.0 with dates according to OSS calendar in attachment M.

5/15/19 System CMP Meeting Letty Walker – CenturyLink presented this new CR associated with the ASOG 59 release from ATIS. Letty reviewed the five ASOG Issues that are included in the EASE release as listed in the CR Description. This will be EASE ASR Release 7.0 that will be effective Monday, September 23, 2019. CenturyLink will begin the implementation of these modifications on Friday, September 20, 2019. Letty said she did not think there would be an update to the User Guides since the work is background work in the system. Letty asked if there were any questions. There were none.

CenturyLink Response

Open System CR SCR100119-1 Detail

 
Title: CEMR Form update
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR100119-1 Presented
10/1/2019
-   0/ Maintenance and Repair
Originator: Welch, Todd
Originator Company Name: CenturyLink
Owner: Welch, Todd
Director:
CR PM: Coyne, Mark

Description Of Change

CTL would like to lengthen the explanation field in the Description/Remark area of the form to 150 characters to allow for more detail.

Status History

Date Action Description

Project Meetings

CenturyLink Response

Open System CR SCR100219-1IG Detail

 
Title: Implementation of ASOG 60 for ASR ordering
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR100219-1IG Presented
10/2/2019
-   28/ pre-order/order
Originator: Walker, Letty
Originator Company Name: CenturyLink
Owner: Walker, Letty
Director:
CR PM: Coyne, Mark

Description Of Change

CenturyLink will be implementing the OBF ASOG60 release in the EASE-ASR ordering environment. This change will incorporate the following issues:

ISSUE NUMBER DESCRIPTION

3629 ASOG: Modify the MSL Form (Practice 006)to update Note 1 on GBTN to remove the value “X”

3630 ASOG: Modify AFG field to generic field of Gov (Government)

3633 ASOG: Modify the usage rules for the UREF field on the EVC form

3634 ASOG: PNUM addition to Confirmation (Practice 11)

3635 ASOG: Change Name and Expand Use of TLE / TLR field to the ASR Form

3636 ASOG: Amend documentation for Dark Fiber

3637 ASOG: Modify Usage note 1 for DIVPON to allow ACT C

3638 ASOG: Modification to DIVCKT field on ACI form

Status History

Date Action Description

Project Meetings

CenturyLink Response

Open System CR SCR120219-1 Detail

 
Title: Conversion of Qwest LSR customers from IMA system to the EASE ordering platform
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR120219-1 Development
12/2/2019
-   1/ CMP Document Update All local services
Originator: Walker, Letty
Originator Company Name: CenturyLink
Owner: Walker, Letty
Director:
CR PM: Coyne, Mark

Description Of Change

Conversion of Qwest LSR customers from IMA system to the EASE ordering platform. This will provide a go-forward single interface to customers in the CenturyLink local region for order processing. The sustainable Test Environment in IMA will be decommissioned, and customers will be redirected to the EASE Test Environment for testing. No modifications will be made to designated billing systems for CenturyLink regions/services.

Status History

Date Action Description
2/14/2020 Action Item Created 01/22/20 - The CR was reviewed and the IMA to EASE System Consolidation Plan walked through during an Adhoc meeting. 
4/9/2020 Record Update 03/31/20 – Adhoc meeting was held and draft technical specifications documentation was reviewed. Customer comments due back on 4/30/20 
4/17/2020 Discussed at Monthly CMP Meeting Reviewed timeline for pending CR and upcoming objective dates. Changed status to Development. 

Project Meetings

CenturyLink Response

Open System CR SCR060420-1 Detail

 
Title: Implementation of ASOG 61 for ASR ordering
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR060420-1 Submitted
6/1/2020
-   28/ CMP Document Update Multiple products supported by the ASOG and ASR process
Originator: Walker, Letty
Originator Company Name: CenturyLink
Owner: Walker, Letty
Director:
CR PM: Bratetic, Alan

Description Of Change

CenturyLink will be implementing the OBF ASOG60 and ASOG61 release in the EASE-ASR ordering environment.

Status History

Date Action Description

Project Meetings

CenturyLink Response

Information Current as of 1/15/2021